Green City Colony
MOHAMMED KHALEEL AND OTHER · Mahabubnagar · RERA P01400011257
GREEN CITY COLONY is a residential plotted development in Bureddipalle, Jadcherla Mandal, Mahabubnagar District. The registered promoter is MOHAMMED KHALEEL AND OTHER. The site extent is 5040.17 sq m, and the layout has 16 residential plots; no tower or floor configuration is stated. The plots are for detached single-family dwelling houses, with software-measured sizes of 135.85–263.78 sq m. The project is registered under TG-RERA registration P01400011257, with a proposed completion date of 12/05/2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | GREEN CITY COLONY RERA record |
| Project type | Plotted development / residential plotted layout RERA record RERA filing |
| Phase or registered portion | Phase not disclosed; TG-RERA registration is for the project as recorded |
| TG-RERA registration | P01400011257 RERA record |
| Registration validity | Stated as 12/05/2022 to 12/05/2024 (2 years); the supplied certificate states no extension |
| Registered promoter | MOHAMMED KHALEEL AND OTHER RERA record RERA filing |
| Entity type | RERA filing describes the organization type as “Others” and its description as “Partners”; formal legal-entity type is not otherwise established in the supplied record RERA filing |
| RERA project status | “On-Going Project” in the RERA filing RERA filing |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | Jadcherla / Bureddipalle RERA record |
| Revenue village | Bureddipalle (also rendered in source documents as Bureddypally / Bureddy Pally) RERA record |
| Mandal | Jadcherla RERA record |
| District | Mahabubnagar RERA record |
| PIN | 509001 RERA record |
| Project survey number(s) | 56/2/2; the filed draft layout drawing also lists 56 RERA filing |
| Survey reference in completion document | 56/P |
| Registered site extent | 5040.17 sq m in the RERA land details RERA filing |
| Layout drawing area statement | Total Layout Area 5039.90; Net Layout Area 4947.66; “Total net layout” 4947.70 100.00 |
| Boundaries (RERA filing) | East: LAND OF CDF AND IN SY NO 56; West: MALLEBOINPALLY SIVAR AND SY NO 35; North: LAND IN SY NO 56; South: EXISTING 15M WIDE ROAD RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | BADEPALLY (JADCHERLA) Municipality/Municipal Corporation; the completion certificate is attributed to Jadcherla Municipality |
| Principal layout approval | Tentative layout approval 0003/LO/3068/2022, dated 12 May, 2022 |
| Other layout/inward identifier | TS/018461/2022 appears on the draft technical layout pattern |
| Approved built-up area | Not disclosed in the supplied plotted-layout approval record; the RERA filing lists 3026.78 sq m as “Approved Built up Area” RERA filing |
| Plot count | 16 in the layout drawing and tentative layout approval |
| Buildings and floors | Not applicable as a building configuration is not supplied for this plotted layout; the approval states only detached dwelling houses designed for single-family occupation may be built on a site |
| Parking | The draft drawing states “PROPOSED NUMBER OF PARKINGS 0” and “Common Parking Area 0.00”; no separate parking provision or plot-level allocation is established in the supplied record |
Offering and status
| Field | Project record |
|---|---|
| Offering | Residential plots; the approved layout record identifies 16 plots |
| Plot sizes | Software-measured from the layout drawing: 135.85–263.78 sq m (smallest to largest); 16 plots are listed and plot areas sum to the drawing’s plotted-area statement Layout record |
| Booked / available plots | Not disclosed in the supplied RERA information |
| RERA completion date | 12/05/2024, both original and revised proposed completion dates in the filing RERA filing |
| Promoter completion undertaking | Form B states completion by 12th May, 2024 |
| Development-work completion evidence | A “WORK COMPLETED CERTIFICATE” dated 01/04/2024 reports completion of layout development works |
| Completion / occupancy certificate status | No occupancy certificate is supplied. The completion-work certificate is not identified as an occupancy certificate |
The project story
GREEN CITY COLONY is recorded with TG-RERA as a residential plotted development in Bureddipalle Revenue Village, Jadcherla Mandal, Mahabubnagar District. The project filing identifies Survey No. 56/2/2, and its land schedule gives a site extent of 5040.17 sq m. The layout drawing shows a 16-plot arrangement with internal roads, park/open-space land, social-infrastructure land and utility land. RERA record RERA filing
The tentative layout approval is dated 12 May 2022. The promoter’s RERA-filed completion undertaking gives 12 May 2024 as the completion date. Separately, a municipal “WORK COMPLETED CERTIFICATE,” dated 1 April 2024, reports completion of layout development works, including roads, drainage, open-space fencing, lighting, electricity, sewerage and protected water supply. That document records development-work completion; the supplied material does not establish an occupancy certificate or the current status of individual plot sales.
The certificate’s completion statement concerns development works for the approved layout, rather than the construction of individual houses. The approval says plots are for detached single-family dwelling houses; no house construction, house designs or house-by-house progress figures are provided.
Master plan, architecture & building design
This is a plotted layout, not a supplied apartment or multi-building plan. The draft technical layout pattern identifies 16 plots and gives a total layout area of 5039.90 and net layout area of 4947.66; its land-use table lists 3026.71 for plots, 1281.83 for roads, 447.29 for organized open space/park, 141.67 for social infrastructure, and 50.20 for utilities. The drawing’s figures and areas are reproduced as shown; no unit is stated alongside these table figures.
| Layout element | Drawing figure | Evidence |
|---|---|---|
| Total Layout Area | 5039.90 | |
| Net Layout Area | 4947.66 | |
| Plotted Area | 3026.71; 61.17% | |
| Road Area | 1281.83; 25.91% | |
| Organized open space/park Area | 447.29; 9.04% | |
| Social Infrastructure Area | 141.67; 2.86% | |
| Utility Area | 50.20; 1.01% | |
| Internal road shown | 10.0M internal road | |
| Proposed parking / common parking | 0 / 0.00 |
The layout drawing also labels 15.00 MT wide existing, 18.00 MT wide proposed, 18.0m wide and 60.0m wide National Highway No. 44 roads. The supplied evidence does not establish the detailed alignment or relationship of each labelled road to the project entrance.
The tentative approval requires the layout developer to carry out infrastructure and amenities, keep roads open for access to neighbouring sites, and hand over specified open-space, utility and road areas to the municipality by registered gift deed before release of the tentative layout. It also records mortgage of Plot Nos. 13, 14 and 15 to the municipality, covering 0 Acer 4.58 Gts 555 Sq. Yds.
No building count, building footprint, floor configuration, basement/stilt/podium arrangement, or apartment configuration is supplied for the project. The approval states that only detached single-family dwelling houses may be built on a site.
Homes, configurations & floor plans
The project offering evidenced in the supplied record is plots, not apartment configurations. The layout schedule identifies 16 plots. Software measurement of the drawing gives plot sizes from 135.85 sq m to 263.78 sq m, with a median of 161.0 sq m; the measured bands are shown below. These are drawing-derived measurements, not RERA-filed saleable-area disclosures. Layout record
| Plot-size band (software-measured) | Number of plots |
|---|---|
| 150–200 sq yd (125–167 sq m) | 9 |
| 250–300 sq yd (209–251 sq m) | 6 |
| 300–400 sq yd (251–334 sq m) | 1 |
No RERA-filed plot-by-plot saleable-area schedule, booked/available inventory count, or allotment list is supplied. The floor-plan review reports one drawing overall, identified as a layout sheet, with no flat-level measurements available. Floor plans
Parking & vehicle circulation
The draft technical layout pattern lists PROPOSED NUMBER OF PARKINGS 0 and Common Parking Area 0.00. No resident, visitor or accessible parking count, plot-specific parking allocation, or parking ownership arrangement is evidenced in the supplied records.
The drawing identifies a 10.0M internal road and also labels other road widths, including a 15.00 MT existing road and an 18.00 MT proposed road. The tentative approval says roads are to remain open for access to neighbouring sites. The material does not specify vehicle entrances/exits, pedestrian separation, turning arrangements or EV charging.
Amenities, recreation & open spaces
The layout approval and drawing identify open-space, social-infrastructure and utility land. The municipality’s approval requires the applicant to provide and hand over specified areas; this does not itself establish that every listed facility has been delivered or independently inspected. The separate work-completed certificate reports several layout works as completed.
| Facility / provision | Organized open space / park |
|---|---|
| Description / size | 447.29; 9.04% in layout drawing |
| Declared progress / verified status | Area shown in drawing; completion certificate reports open-space fencing, but does not give an independent inspection finding |
| Facility / provision | Social infrastructure land |
|---|---|
| Description / size | 141.67; 2.86% in layout drawing |
| Declared progress / verified status | Land allocation shown; no specific community building or facility is identified |
| Facility / provision | Utility land |
|---|---|
| Description / size | 50.20; 1.01% in layout drawing |
| Declared progress / verified status | Land allocation shown; intended utility items are listed in the approval conditions |
| Facility / provision | Other sports or recreation facilities |
|---|---|
| Description / size | Not disclosed |
| Evidence source | RERA amenities |
| Declared progress / verified status | No specific facility evidenced |
The RERA amenity record marks internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/park and water conservation/rainwater harvesting as available at 100%. Street lighting, community buildings, sewage/sullage treatment and disposal, solid-waste management, energy management, fire safety and aggregate recreational open-space entries are recorded at 0%. These are filing-derived amenity status entries, not independent verification of current operation. RERA amenities
Utilities, building services & safety
The tentative layout approval lists water reservoir, overhead tank, internal water-supply pipelines, septic tank/common septic tank or STP, underground drainage lines, street lights, avenue plantation, rainwater-harvesting pits, electric transformer and solid-waste management among the proposed infrastructure/utility items. The approval requires the applicant to carry out the infrastructure and amenities.
The work-completed certificate reports street lighting, electricity facilities, sewerage disposal system, protected water-supply system and rainwater-harvesting pits as completed. It does not provide capacities, test results, service-provider details or operational performance.
No further particulars are supplied for water-source yield or storage capacity, treatment-plant capacity, sewerage reuse, electrical substation capacity, backup power, waste-segregation arrangements, security systems, accessibility features, or fire/life-safety systems. The supplied plotted-layout record does not provide building-level fire or lift specifications. RERA amenities
Location, access & connectivity
The registered project location is Bureddipalle Revenue Village, Jadcherla Mandal, Mahabubnagar District, PIN 509001. The RERA land schedule describes the southern boundary as an EXISTING 15M WIDE ROAD; the layout drawing also labels internal and proposed roads. RERA record RERA filing
The supplied location data gives the nearest sampled Outer Ring Road interchange as approximately 60.9 km away. No travel time, public-transport information or additional verified landmark distances are provided. Location record
Developer & development status
The registered promoter is MOHAMMED KHALEEL AND OTHER. The RERA filing describes the organization as “Others” and gives “Partners” as the description; the supplied record does not establish a more specific legal-entity type or provide an official website or contact details. RERA record RERA filing
Form B, signed by Mohammed Khaleel as promoter, identifies GREEN CITY COLONY, declares a title basis and states that the land is free from encumbrances, and undertakes completion by 12th May, 2024. These are promoter declarations in the RERA-filed document. The registration certificate states a validity period from 12/05/2022 to 12/05/2024; no extension is recorded in the supplied certificate.
The municipal work-completed certificate dated 01/04/2024 reports completion of layout development works. It is not presented in the supplied material as an occupancy certificate for individual homes, and no plot-wise construction progress or current inventory is provided.
Approvals, official records & documents
| Identifier / date | P01400011257; stated validity 12/05/2022–12/05/2024 |
|---|---|
| What it evidences | Registration of GREEN CITY COLONY under section 5; certificate records a two-year validity period |
| Identifier / date | 0003/LO/3068/2022; 12 May, 2022 |
|---|---|
| What it evidences | Tentative residential plotted layout approval for 16 plots, with conditions including infrastructure works, municipal handover areas and mortgage plots |
| Identifier / date | TS/018461/2022 |
|---|---|
| What it evidences | Drawing with 16 plots, road labels and land-use statement |
| Identifier / date | 0003/LO/3068/2022; dated 01/04/2024 |
|---|---|
| What it evidences | Reports completion of development works for the layout |
| Identifier / date | Dated 18 October, 2025 |
|---|---|
| What it evidences | Promoter’s stated title basis, encumbrance declaration and completion undertaking |
The supplied approval and completion records describe the layout and its development works. No occupancy certificate, plot-wise sale inventory, or current sales-status schedule is included in the materials reviewed.
Project at a glance
Project identity
Registered project name: GREEN CITY COLONY
Project type: Plotted development / residential plotted layout
Phase or registered portion: Phase not disclosed; TG-RERA registration is for the project as recorded
TG-RERA registration: P01400011257
Registration validity: Stated as 12/05/2022 to 12/05/2024 (2 years); the supplied certificate states no extension
Registered promoter: MOHAMMED KHALEEL AND OTHER
Entity type: RERA filing describes the organization type as “Others” and its description as “Partners”; formal legal-entity type is not otherwise established in the supplied record
RERA project status: “On-Going Project” in the RERA filing
Land and geographic identity
Locality: Jadcherla / Bureddipalle
Revenue village: Bureddipalle (also rendered in source documents as Bureddypally / Bureddy Pally)
Mandal: Jadcherla
District: Mahabubnagar
PIN: 509001
Project survey number(s): 56/2/2; the filed draft layout drawing also lists 56
Survey reference in completion document: 56/P
Registered site extent: 5040.17 sq m in the RERA land details
Layout drawing area statement: Total Layout Area 5039.90; Net Layout Area 4947.66; “Total net layout” 4947.70 100.00
Boundaries (RERA filing): East: LAND OF CDF AND IN SY NO 56; West: MALLEBOINPALLY SIVAR AND SY NO 35; North: LAND IN SY NO 56; South: EXISTING 15M WIDE ROAD
Development identity
Sanctioning authority: BADEPALLY (JADCHERLA) Municipality/Municipal Corporation; the completion certificate is attributed to Jadcherla Municipality
Principal layout approval: Tentative layout approval 0003/LO/3068/2022, dated 12 May, 2022
Other layout/inward identifier: TS/018461/2022 appears on the draft technical layout pattern
Approved built-up area: Not disclosed in the supplied plotted-layout approval record; the RERA filing lists 3026.78 sq m as “Approved Built up Area”
Plot count: 16 in the layout drawing and tentative layout approval
Buildings and floors: Not applicable as a building configuration is not supplied for this plotted layout; the approval states only detached dwelling houses designed for single-family occupation may be built on a site
Parking: The draft drawing states “PROPOSED NUMBER OF PARKINGS 0” and “Common Parking Area 0.00”; no separate parking provision or plot-level allocation is established in the supplied record
Offering and status
Offering: Residential plots; the approved layout record identifies 16 plots
Plot sizes: Software-measured from the layout drawing: 135.85–263.78 sq m (smallest to largest); 16 plots are listed and plot areas sum to the drawing’s plotted-area statement
Booked / available plots: Not disclosed in the supplied RERA information
RERA completion date: 12/05/2024, both original and revised proposed completion dates in the filing
Promoter completion undertaking: Form B states completion by 12th May, 2024
Development-work completion evidence: A “WORK COMPLETED CERTIFICATE” dated 01/04/2024 reports completion of layout development works
Completion / occupancy certificate status: No occupancy certificate is supplied. The completion-work certificate is not identified as an occupancy certificate
The project story
GREEN CITY COLONY is recorded with TG-RERA as a residential plotted development in Bureddipalle Revenue Village, Jadcherla Mandal, Mahabubnagar District. The project filing identifies Survey No. 56/2/2, and its land schedule gives a site extent of 5040.17 sq m. The layout drawing shows a 16-plot arrangement with internal roads, park/open-space land, social-infrastructure land and utility land.
The tentative layout approval is dated 12 May 2022. The promoter’s RERA-filed completion undertaking gives 12 May 2024 as the completion date. Separately, a municipal “WORK COMPLETED CERTIFICATE,” dated 1 April 2024, reports completion of layout development works, including roads, drainage, open-space fencing, lighting, electricity, sewerage and protected water supply. That document records development-work completion; the supplied material does not establish an occupancy certificate or the current status of individual plot sales.
The certificate’s completion statement concerns development works for the approved layout, rather than the construction of individual houses. The approval says plots are for detached single-family dwelling houses; no house construction, house designs or house-by-house progress figures are provided.
Master plan, architecture & building design
This is a plotted layout, not a supplied apartment or multi-building plan. The draft technical layout pattern identifies 16 plots and gives a total layout area of 5039.90 and net layout area of 4947.66; its land-use table lists 3026.71 for plots, 1281.83 for roads, 447.29 for organized open space/park, 141.67 for social infrastructure, and 50.20 for utilities. The drawing’s figures and areas are reproduced as shown; no unit is stated alongside these table figures.
| Layout element | Drawing figure | Evidence |
|---|---|---|
| Total Layout Area | 5039.90 | |
| Net Layout Area | 4947.66 | |
| Plotted Area | 3026.71; 61.17% | |
| Road Area | 1281.83; 25.91% | |
| Organized open space/park Area | 447.29; 9.04% | |
| Social Infrastructure Area | 141.67; 2.86% | |
| Utility Area | 50.20; 1.01% | |
| Internal road shown | 10.0M internal road | |
| Proposed parking / common parking | 0 / 0.00 |
The layout drawing also labels 15.00 MT wide existing, 18.00 MT wide proposed, 18.0m wide and 60.0m wide National Highway No. 44 roads. The supplied evidence does not establish the detailed alignment or relationship of each labelled road to the project entrance.
The tentative approval requires the layout developer to carry out infrastructure and amenities, keep roads open for access to neighbouring sites, and hand over specified open-space, utility and road areas to the municipality by registered gift deed before release of the tentative layout. It also records mortgage of Plot Nos. 13, 14 and 15 to the municipality, covering 0 Acer 4.58 Gts 555 Sq. Yds.
No building count, building footprint, floor configuration, basement/stilt/podium arrangement, or apartment configuration is supplied for the project. The approval states that only detached single-family dwelling houses may be built on a site.
Homes, configurations & floor plans
The project offering evidenced in the supplied record is plots, not apartment configurations. The layout schedule identifies 16 plots. Software measurement of the drawing gives plot sizes from 135.85 sq m to 263.78 sq m, with a median of 161.0 sq m; the measured bands are shown below. These are drawing-derived measurements, not RERA-filed saleable-area disclosures.
150–200 sq yd (125–167 sq m): 9
250–300 sq yd (209–251 sq m): 6
300–400 sq yd (251–334 sq m): 1
No RERA-filed plot-by-plot saleable-area schedule, booked/available inventory count, or allotment list is supplied. The floor-plan review reports one drawing overall, identified as a layout sheet, with no flat-level measurements available.
Parking & vehicle circulation
The draft technical layout pattern lists PROPOSED NUMBER OF PARKINGS 0 and Common Parking Area 0.00. No resident, visitor or accessible parking count, plot-specific parking allocation, or parking ownership arrangement is evidenced in the supplied records.
The drawing identifies a 10.0M internal road and also labels other road widths, including a 15.00 MT existing road and an 18.00 MT proposed road. The tentative approval says roads are to remain open for access to neighbouring sites. The material does not specify vehicle entrances/exits, pedestrian separation, turning arrangements or EV charging.
Amenities, recreation & open spaces
The layout approval and drawing identify open-space, social-infrastructure and utility land. The municipality’s approval requires the applicant to provide and hand over specified areas; this does not itself establish that every listed facility has been delivered or independently inspected. The separate work-completed certificate reports several layout works as completed.
| Facility / provision | Organized open space / park |
|---|---|
| Description / size | 447.29; 9.04% in layout drawing |
| Declared progress / verified status | Area shown in drawing; completion certificate reports open-space fencing, but does not give an independent inspection finding |
| Facility / provision | Social infrastructure land |
|---|---|
| Description / size | 141.67; 2.86% in layout drawing |
| Declared progress / verified status | Land allocation shown; no specific community building or facility is identified |
| Facility / provision | Utility land |
|---|---|
| Description / size | 50.20; 1.01% in layout drawing |
| Declared progress / verified status | Land allocation shown; intended utility items are listed in the approval conditions |
| Facility / provision | Other sports or recreation facilities |
|---|---|
| Description / size | Not disclosed |
| Declared progress / verified status | No specific facility evidenced |
The RERA amenity record marks internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/park and water conservation/rainwater harvesting as available at 100%. Street lighting, community buildings, sewage/sullage treatment and disposal, solid-waste management, energy management, fire safety and aggregate recreational open-space entries are recorded at 0%. These are filing-derived amenity status entries, not independent verification of current operation.
Utilities, building services & safety
The tentative layout approval lists water reservoir, overhead tank, internal water-supply pipelines, septic tank/common septic tank or STP, underground drainage lines, street lights, avenue plantation, rainwater-harvesting pits, electric transformer and solid-waste management among the proposed infrastructure/utility items. The approval requires the applicant to carry out the infrastructure and amenities.
The work-completed certificate reports street lighting, electricity facilities, sewerage disposal system, protected water-supply system and rainwater-harvesting pits as completed. It does not provide capacities, test results, service-provider details or operational performance.
No further particulars are supplied for water-source yield or storage capacity, treatment-plant capacity, sewerage reuse, electrical substation capacity, backup power, waste-segregation arrangements, security systems, accessibility features, or fire/life-safety systems. The supplied plotted-layout record does not provide building-level fire or lift specifications.
Location, access & connectivity
The registered project location is Bureddipalle Revenue Village, Jadcherla Mandal, Mahabubnagar District, PIN 509001. The RERA land schedule describes the southern boundary as an EXISTING 15M WIDE ROAD; the layout drawing also labels internal and proposed roads.
The supplied location data gives the nearest sampled Outer Ring Road interchange as approximately 60.9 km away. No travel time, public-transport information or additional verified landmark distances are provided.
Developer & development status
The registered promoter is MOHAMMED KHALEEL AND OTHER. The RERA filing describes the organization as “Others” and gives “Partners” as the description; the supplied record does not establish a more specific legal-entity type or provide an official website or contact details.
Form B, signed by Mohammed Khaleel as promoter, identifies GREEN CITY COLONY, declares a title basis and states that the land is free from encumbrances, and undertakes completion by 12th May, 2024. These are promoter declarations in the RERA-filed document. The registration certificate states a validity period from 12/05/2022 to 12/05/2024; no extension is recorded in the supplied certificate.
The municipal work-completed certificate dated 01/04/2024 reports completion of layout development works. It is not presented in the supplied material as an occupancy certificate for individual homes, and no plot-wise construction progress or current inventory is provided.
Approvals, official records & documents
| Identifier / date | P01400011257; stated validity 12/05/2022–12/05/2024 |
|---|---|
| What it evidences | Registration of GREEN CITY COLONY under section 5; certificate records a two-year validity period |
| Identifier / date | 0003/LO/3068/2022; 12 May, 2022 |
|---|---|
| What it evidences | Tentative residential plotted layout approval for 16 plots, with conditions including infrastructure works, municipal handover areas and mortgage plots |
| Identifier / date | TS/018461/2022 |
|---|---|
| What it evidences | Drawing with 16 plots, road labels and land-use statement |
| Identifier / date | 0003/LO/3068/2022; dated 01/04/2024 |
|---|---|
| What it evidences | Reports completion of development works for the layout |
| Identifier / date | Dated 18 October, 2025 |
|---|---|
| What it evidences | Promoter’s stated title basis, encumbrance declaration and completion undertaking |
The supplied approval and completion records describe the layout and its development works. No occupancy certificate, plot-wise sale inventory, or current sales-status schedule is included in the materials reviewed.
Frequently asked questions
Is GREEN CITY COLONY registered with Telangana RERA?
Yes. GREEN CITY COLONY is registered with the Telangana Real Estate Regulatory Authority as P01400011257; the registration status is On-Going Project.
Who is the developer of GREEN CITY COLONY?
The promoter named in the RERA registration is MOHAMMED KHALEEL AND OTHER.
Where is GREEN CITY COLONY located?
GREEN CITY COLONY is in Jadcherla, Bureddipalle, Mahabubnagar, Telangana (509001).
When will GREEN CITY COLONY be completed?
The promoter's proposed date of completion filed with RERA is 12/05/2024. This is the promoter's declaration, not a guarantee.