AJR GRAND CITY is a plotted development / residential layout in Kalwakurthy Revenue Village, Kalwakurthy Mandal, Nagarkurnool District, developed by registered promoter ALUGONDA JANGA REDDY. The RERA-filed total site area is 36,339.10 sq.m, and the approved layout has 126 residential plots; no building or floor configuration is disclosed. The plot sizes range from 81.34 sq.m to 335.65 sq.m, with a median of 125.36 sq.m. The project is registered under TG-RERA registration P01600009677, with a declared completion date of 23/05/2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | AJR GRAND CITY RERA record |
| Project type | Plotted development / residential layout RERA record |
| Phase / registered portion | No phase designation is disclosed; the RERA certificate identifies the project as a whole |
| TG-RERA registration | P01600009677 RERA record |
| Registration validity | 23/05/2022 to 23/05/2024; the supplied certificate records no extension |
| Registered promoter | ALUGONDA JANGA REDDY |
| RERA status | The project data describes it as “On-Going Project”; the supplied registration certificate specifies the validity period above RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | KALWAKURTHY / Kalwakurthy Revenue Village RERA record RERA filing |
| Mandal | Kalwakurthy RERA record RERA filing |
| District | Nagarkurnool RERA record RERA filing |
| PIN | 509324 RERA record |
| Project survey numbers | Sy. Nos. 100A/2 and 101 RERA record |
| RERA-filed total site area | 36,339.10 sq.m; the filing separately records 4,334.48 sq.m as affected by road widening/FTL of tanks/nala widening and 32,004.62 sq.m net area RERA filing |
| Approval-document layout extent | “8 Acer 39.19 Gts 43463 Sq. Yds” |
| Boundaries in RERA filing | East: NEIGHBOURS OPEN LAND; West: NEIGHBOURS OPEN PLOTS; North: OWNER OPEN PLACE; South: ROAD RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Kalwakurthy Municipality / Municipal Corporation, as named in the tentative layout approval |
| Principal approval | Tentative Layout Plan No. 0009/LO/3061/2022, dated 23 May 2022 Approvals record |
| Application number | 004324/LO/DTCP/3061/0018/2022 |
| Approved plotted area | 18,186.57 sq.m in the drawing-derived layout record Layout record |
| Buildings / floors | Not applicable to the plotted layout; no apartment or building configuration is disclosed |
| Approved plot count | 126 plots Layout record |
| Mortgage area | The RERA filing states 2,768.41 sq.m; the layout approval records a mortgage area of “0 Acer 27.36 Gts 3311 Sq. Yds” RERA filing |
Offering and status
| Field | Record |
|---|---|
| Unit type | Residential plots RERA record |
| Plot sizes | Software-read layout schedule: 126 plots; smallest 81.34 sq.m, median 125.36 sq.m, largest 335.65 sq.m Layout record |
| Booked / available plots | Not supplied RERA unit table |
| Declared completion date | 23/05/2024 in the RERA project information and promoter’s Form B declaration RERA filing |
| Development-work completion record | A municipal Work Completion Certificate dated 23.05.2022 states that specified layout development works were completed; it is not identified as an occupancy certificate |
| Occupancy certificate | Not applicable to the plotted layout in the supplied record; no occupancy certificate is supplied Document index |
2. The project story
AJR GRAND CITY is a proposed residential plotted layout in Kalwakurthy Revenue Village, Kalwakurthy Mandal, Nagarkurnool District. The RERA filing identifies Sy. Nos. 100A/2 and 101, and the project is registered as P01600009677. The tentative layout approval describes 126 residential plots and reserves land for roads, open space, utilities and social infrastructure. RERA record RERA filing
The promoter declared a completion date of 23 May 2024. Separately, the municipal Work Completion Certificate records completion of listed layout works within seven months after approval and is dated 23 May 2022. The supplied documents do not establish the current on-site condition or confirm that all layout obligations have been completed and formally released. No phase-wise build-out or plot inventory status is provided.
3. Master plan, architecture & building design
This is a plotted layout, not a multi-storey building project. The tentative layout approval identifies 126 plots across the approved layout and records roads, park/open space, social infrastructure, utilities and a mortgage area. The approval records 17 specified plots mortgaged to Kalwakurthy Municipality as security for completion of layout works and related conditions. The approval states that municipal building permission is not to be issued in the mortgaged area until development works are completed and the mortgaged land is released. Building footprints, floor configurations and apartment areas are not applicable or disclosed.
The drawing-derived area statement records a base area of 32,003.96 sq.m: plots 18,186.57 sq.m (56.82%); roads 6,740.77 sq.m (21.06%); parks/open space 5,741.80 sq.m (17.94%); utilities 367.02 sq.m (1.15%); social infrastructure 967.80 sq.m (3.02%); and amenities 0 sq.m (0.00%). These figures are software-read from the approved layout drawing and its area statement. Layout record
4. Homes, configurations & floor plans
The offering shown in the supplied layout record is plotted residential land. The plot schedule is software-read from the drawing; it should be checked against the drawing itself. Layout record
| Plot-size band | Number of plots |
|---|---|
| 0–100 sq. yd (0–84 sq.m) | 2 |
| 100–150 sq. yd (84–125 sq.m) | 87 |
| 150–200 sq. yd (125–167 sq.m) | 18 |
| 200–250 sq. yd (167–209 sq.m) | 4 |
| 250–300 sq. yd (209–251 sq.m) | 3 |
| 300–400 sq. yd (251–334 sq.m) | 10 |
| 400–500 sq. yd (334–418 sq.m) | 2 |
The measured plot-size range is 81.34–335.65 sq.m, with a median of 125.36 sq.m. The layout record says the sum of plot areas matches the plotted area in the drawing’s area statement. Layout record The supplied floor-plan input contains no flat plans or measured carpet areas; RERA-filed plot-wise saleable areas, bookings and availability are not supplied. Floor plans RERA unit table
5. Parking & vehicle circulation
The supplied project records do not state parking-space counts, visitor parking, accessible parking, parking allocation to individual plots or a parking layout. The approval requires roads to be opened for access to neighbouring sites and says the developer must not construct a compound wall/fencing around the site. The internal road area is recorded as 6,740.77 sq.m in the drawing-derived land-use schedule. Layout record No spaces-per-plot ratio can be established from the supplied evidence.
6. Amenities, recreation & open spaces
The layout approval and completion certificate describe layout-level infrastructure and open-space works. The RERA amenity checklist records the following statuses; percentages are reported as supplied and are not independent site verification. RERA amenities
| Description / size | Internal road area: 6,740.77 sq.m in drawing-derived area statement Layout record |
|---|---|
| Evidence source | RERA amenity checklist; layout drawing |
| Declared progress / verified status | Checklist: 100%; municipal certificate records roads RERA amenities |
| Description / size | Park/open space: 5,741.80 sq.m; approval states 17.94% Layout record |
|---|---|
| Evidence source | RERA checklist; tentative layout approval; Work Completion Certificate |
| Declared progress / verified status | Checklist: 100%; certificate describes greenery, avenue plantation and fencing RERA amenities |
| Description / size | 967.80 sq.m in drawing-derived area statement Layout record |
|---|---|
| Evidence source | Tentative layout approval and layout record |
| Declared progress / verified status | Area reserved; no specific facility or delivery status supplied Layout record |
| Description / size | No area or facility description supplied |
|---|---|
| Evidence source | RERA amenity checklist |
| Declared progress / verified status | Checklist: 0% RERA amenities |
| Description / size | Area shown as park/open space above |
|---|---|
| Evidence source | RERA amenity checklist; layout drawing |
| Declared progress / verified status | Checklist: 100% RERA amenities |
7. Utilities, building services & safety
The tentative layout approval lists a water reservoir, septic tank, sewage treatment plant, electric transformer and solid-waste management among the layout’s proposed infrastructure and amenities. Its development-work conditions also refer to underground drainage lines and a common septic tank/STP, internal water-supply pipelines, an overhead tank, an assured water-supply source, electrical lines and streetlights, park development and rainwater-harvesting pits.
The municipal Work Completion Certificate states that street lighting, electricity, sewerage disposal and protected water supply were provided, and that rainwater-harvesting pits were constructed. It does not give capacities or describe independent testing. The RERA amenity checklist reports water supply, sewerage/septic tank/STP, street lighting and electrical meter room/substation/receiving station at 100%; storm-water drains, sewage/sullage treatment and disposal, solid-waste management, water conservation/rainwater harvesting, energy management and fire safety are listed at 0%. RERA amenities
No detailed fire-safety design, water-treatment capacity, electrical backup, accessibility provision or security-system specification is supplied.
8. Location, access & connectivity
The registered location is Kalwakurthy Revenue Village, Kalwakurthy Mandal, Nagarkurnool District, Telangana, PIN 509324; the project survey numbers are 100A/2 and 101. RERA record The RERA-filed site boundaries describe neighbouring open land to the east, neighbouring open plots to the west, owner open place to the north and a road to the south. RERA filing
The location record gives a cadastral parcel centroid of 16.68238, 78.48664 and reports the nearest sampled Outer Ring Road interchange at approximately 61.2 km. Location record No further approach-road, public-transport or landmark information is supplied.
9. Developer & development status
The registered promoter is ALUGONDA JANGA REDDY; the supplied records do not identify the promoter’s legal-entity type, corporate identifiers, registered office or official contact details. The promoter’s Form B affidavit, dated 12 April 2025, declares a completion date of 23 May 2024 and gives undertakings concerning title, project funds, approvals and accounts. These are promoter declarations.
The project data describes the project as ongoing. The RERA certificate records validity through 23 May 2024 and no extension; the supplied records do not establish a revised completion date or current site progress. RERA record A separate municipal Work Completion Certificate records specified layout development works as completed on 23 May 2022.
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for AJR GRAND CITY, registration P01600009677, promoter ALUGONDA JANGA REDDY; validity 23/05/2022–23/05/2024, with no extension recorded |
| Tentative layout approval | Approval No. 0009/LO/3061/2022, dated 23 May 2022; application No. 004324/LO/DTCP/3061/0018/2022; authority named as Kalwakurthy Municipality/Municipal Corporation |
| Work Completion Certificate | Municipal certificate for listed layout development works in Sy. Nos. 100/A/2 and 101, dated 23.05.2022 |
| Promoter declaration | Form B affidavit by Alugonda Janga Reddy, dated 12 April 2025 |
| Layout drawing record | Two layout sheets; software-read plot schedule and area statement Layout record |
The supplied approval is described as a tentative layout approval. The listed documents do not include a final layout release certificate or an occupancy certificate.
1. Project at a glance
Project identity
Registered project name: AJR GRAND CITY
Project type: Plotted development / residential layout
Phase / registered portion: No phase designation is disclosed; the RERA certificate identifies the project as a whole
TG-RERA registration: P01600009677
Registration validity: 23/05/2022 to 23/05/2024; the supplied certificate records no extension
Registered promoter: ALUGONDA JANGA REDDY
RERA status: The project data describes it as “On-Going Project”; the supplied registration certificate specifies the validity period above
Land and geographic identity
Locality / revenue village: KALWAKURTHY / Kalwakurthy Revenue Village
Mandal: Kalwakurthy
District: Nagarkurnool
PIN: 509324
Project survey numbers: Sy. Nos. 100A/2 and 101
RERA-filed total site area: 36,339.10 sq.m; the filing separately records 4,334.48 sq.m as affected by road widening/FTL of tanks/nala widening and 32,004.62 sq.m net area
Approval-document layout extent: “8 Acer 39.19 Gts 43463 Sq. Yds”
Boundaries in RERA filing: East: NEIGHBOURS OPEN LAND; West: NEIGHBOURS OPEN PLOTS; North: OWNER OPEN PLACE; South: ROAD
Development identity
Sanctioning authority: Kalwakurthy Municipality / Municipal Corporation, as named in the tentative layout approval
Principal approval: Tentative Layout Plan No. 0009/LO/3061/2022, dated 23 May 2022
Application number: 004324/LO/DTCP/3061/0018/2022
Approved plotted area: 18,186.57 sq.m in the drawing-derived layout record
Buildings / floors: Not applicable to the plotted layout; no apartment or building configuration is disclosed
Approved plot count: 126 plots
Mortgage area: The RERA filing states 2,768.41 sq.m; the layout approval records a mortgage area of “0 Acer 27.36 Gts 3311 Sq. Yds”
Offering and status
Unit type: Residential plots
Plot sizes: Software-read layout schedule: 126 plots; smallest 81.34 sq.m, median 125.36 sq.m, largest 335.65 sq.m
Booked / available plots: Not supplied
Declared completion date: 23/05/2024 in the RERA project information and promoter’s Form B declaration
Development-work completion record: A municipal Work Completion Certificate dated 23.05.2022 states that specified layout development works were completed; it is not identified as an occupancy certificate
Occupancy certificate: Not applicable to the plotted layout in the supplied record; no occupancy certificate is supplied
2. The project story
AJR GRAND CITY is a proposed residential plotted layout in Kalwakurthy Revenue Village, Kalwakurthy Mandal, Nagarkurnool District. The RERA filing identifies Sy. Nos. 100A/2 and 101, and the project is registered as P01600009677. The tentative layout approval describes 126 residential plots and reserves land for roads, open space, utilities and social infrastructure.
The promoter declared a completion date of 23 May 2024. Separately, the municipal Work Completion Certificate records completion of listed layout works within seven months after approval and is dated 23 May 2022. The supplied documents do not establish the current on-site condition or confirm that all layout obligations have been completed and formally released. No phase-wise build-out or plot inventory status is provided.
3. Master plan, architecture & building design
This is a plotted layout, not a multi-storey building project. The tentative layout approval identifies 126 plots across the approved layout and records roads, park/open space, social infrastructure, utilities and a mortgage area. The approval records 17 specified plots mortgaged to Kalwakurthy Municipality as security for completion of layout works and related conditions. The approval states that municipal building permission is not to be issued in the mortgaged area until development works are completed and the mortgaged land is released. Building footprints, floor configurations and apartment areas are not applicable or disclosed.
The drawing-derived area statement records a base area of 32,003.96 sq.m: plots 18,186.57 sq.m (56.82%); roads 6,740.77 sq.m (21.06%); parks/open space 5,741.80 sq.m (17.94%); utilities 367.02 sq.m (1.15%); social infrastructure 967.80 sq.m (3.02%); and amenities 0 sq.m (0.00%). These figures are software-read from the approved layout drawing and its area statement.
4. Homes, configurations & floor plans
The offering shown in the supplied layout record is plotted residential land. The plot schedule is software-read from the drawing; it should be checked against the drawing itself.
0–100 sq. yd (0–84 sq.m): 2
100–150 sq. yd (84–125 sq.m): 87
150–200 sq. yd (125–167 sq.m): 18
200–250 sq. yd (167–209 sq.m): 4
250–300 sq. yd (209–251 sq.m): 3
300–400 sq. yd (251–334 sq.m): 10
400–500 sq. yd (334–418 sq.m): 2
The measured plot-size range is 81.34–335.65 sq.m, with a median of 125.36 sq.m. The layout record says the sum of plot areas matches the plotted area in the drawing’s area statement. The supplied floor-plan input contains no flat plans or measured carpet areas; RERA-filed plot-wise saleable areas, bookings and availability are not supplied.
5. Parking & vehicle circulation
The supplied project records do not state parking-space counts, visitor parking, accessible parking, parking allocation to individual plots or a parking layout. The approval requires roads to be opened for access to neighbouring sites and says the developer must not construct a compound wall/fencing around the site. The internal road area is recorded as 6,740.77 sq.m in the drawing-derived land-use schedule. No spaces-per-plot ratio can be established from the supplied evidence.
6. Amenities, recreation & open spaces
The layout approval and completion certificate describe layout-level infrastructure and open-space works. The RERA amenity checklist records the following statuses; percentages are reported as supplied and are not independent site verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | Internal road area: 6,740.77 sq.m in drawing-derived area statement | RERA amenity checklist; layout drawing | Checklist: 100%; municipal certificate records roads |
| Green strip / park | Park/open space: 5,741.80 sq.m; approval states 17.94% | RERA checklist; tentative layout approval; Work Completion Certificate | Checklist: 100%; certificate describes greenery, avenue plantation and fencing |
| Social infrastructure | 967.80 sq.m in drawing-derived area statement | Tentative layout approval and layout record | Area reserved; no specific facility or delivery status supplied |
| Community buildings | No area or facility description supplied | RERA amenity checklist | Checklist: 0% |
| Aggregate recreational open space | Area shown as park/open space above | RERA amenity checklist; layout drawing | Checklist: 100% |
7. Utilities, building services & safety
The tentative layout approval lists a water reservoir, septic tank, sewage treatment plant, electric transformer and solid-waste management among the layout’s proposed infrastructure and amenities. Its development-work conditions also refer to underground drainage lines and a common septic tank/STP, internal water-supply pipelines, an overhead tank, an assured water-supply source, electrical lines and streetlights, park development and rainwater-harvesting pits.
The municipal Work Completion Certificate states that street lighting, electricity, sewerage disposal and protected water supply were provided, and that rainwater-harvesting pits were constructed. It does not give capacities or describe independent testing. The RERA amenity checklist reports water supply, sewerage/septic tank/STP, street lighting and electrical meter room/substation/receiving station at 100%; storm-water drains, sewage/sullage treatment and disposal, solid-waste management, water conservation/rainwater harvesting, energy management and fire safety are listed at 0%.
No detailed fire-safety design, water-treatment capacity, electrical backup, accessibility provision or security-system specification is supplied.
8. Location, access & connectivity
The registered location is Kalwakurthy Revenue Village, Kalwakurthy Mandal, Nagarkurnool District, Telangana, PIN 509324; the project survey numbers are 100A/2 and 101. The RERA-filed site boundaries describe neighbouring open land to the east, neighbouring open plots to the west, owner open place to the north and a road to the south.
The location record gives a cadastral parcel centroid of 16.68238, 78.48664 and reports the nearest sampled Outer Ring Road interchange at approximately 61.2 km. No further approach-road, public-transport or landmark information is supplied.
9. Developer & development status
The registered promoter is ALUGONDA JANGA REDDY; the supplied records do not identify the promoter’s legal-entity type, corporate identifiers, registered office or official contact details. The promoter’s Form B affidavit, dated 12 April 2025, declares a completion date of 23 May 2024 and gives undertakings concerning title, project funds, approvals and accounts. These are promoter declarations.
The project data describes the project as ongoing. The RERA certificate records validity through 23 May 2024 and no extension; the supplied records do not establish a revised completion date or current site progress. A separate municipal Work Completion Certificate records specified layout development works as completed on 23 May 2022.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for AJR GRAND CITY, registration P01600009677, promoter ALUGONDA JANGA REDDY; validity 23/05/2022–23/05/2024, with no extension recorded
Tentative layout approval: Approval No. 0009/LO/3061/2022, dated 23 May 2022; application No. 004324/LO/DTCP/3061/0018/2022; authority named as Kalwakurthy Municipality/Municipal Corporation
Work Completion Certificate: Municipal certificate for listed layout development works in Sy. Nos. 100/A/2 and 101, dated 23.05.2022
Promoter declaration: Form B affidavit by Alugonda Janga Reddy, dated 12 April 2025
Layout drawing record: Two layout sheets; software-read plot schedule and area statement
The supplied approval is described as a tentative layout approval. The listed documents do not include a final layout release certificate or an occupancy certificate.
Frequently asked questions
Is AJR GRAND CITY registered with Telangana RERA?
Yes. AJR GRAND CITY is registered with the Telangana Real Estate Regulatory Authority as P01600009677; the registration status is On-Going Project.
Who is the developer of AJR GRAND CITY?
The promoter named in the RERA registration is ALUGONDA.
Where is AJR GRAND CITY located?
AJR GRAND CITY is in KALWAKURTHY, Nagarkurnool, Telangana (509324).
When will AJR GRAND CITY be completed?
The promoter's proposed date of completion filed with RERA is 23/05/2024. This is the promoter's declaration, not a guarantee.