JPR RESIDENCY is a residential apartment project in Peddur, Sircilla mandal, Rajanna Sircilla district. It is being developed by the registered promoter J V R DEVELOPERS on a site of 704.28 m², with one residential building comprising 1 Stilt + 5 upper floors and 20 2BHK homes. The project is registered under TG-RERA registration number P03000010598, and its proposed and revised completion date is 11/12/2026.

01What we found

Period endedTG-RERA registration ran to 11 Aug 2026 - check its extension on TG-RERA
29documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Peddur, Sircilla, Rajanna Sircilla · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered nameJPR RESIDENCY RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionA single registered project is identified; no separate phase designation is disclosed. RERA record
TG-RERA registrationP03000010598, granted under section 5; certificate states validity from 11/08/2023 to 11/08/2026. RERA record
Registered promoterJ V R DEVELOPERS. RERA record
RERA statusThe project is recorded as On-Going Project. The registration certificate states the validity dates above; this report does not establish a later extension. RERA record

Land and geographic identity

ItemProject record
Locality / revenue villagePeddur; the registration certificate also identifies the locality as Peddur. RERA record
Mandal / district / PINSircilla / Rajanna Sircilla / 505301. RERA record
All project survey numbers and subdivisions130/1/1, 130/1/2, 130/1/3, 130/1/4, 130/2/1, 130/2/2, 130/2/3, 130/2/4, 144/2/1/1, 144/2/1/2, 144/2/1/4, 144/2/1/3, 144/3/2, 144/3/3, 144/3/4 and 144/3/5. RERA record
Registered site extent704.28 m²; RERA land details record total area and net area as 704.28 sq. m, with affected area as 0. RERA filing
BoundariesNorth: 40 FEET WIDE ROAD; South: 40 FEET WIDE ROAD; East: OPEN PLACE OF OTHERS; West: PLOT NO 27 AND 32. RERA filing

Development identity

ItemProject record
Sanctioning authoritySircilla Municipality/Municipal Corporation; the RERA project record identifies DTCP as the authority. Approvals record
Principal approval0011/BP/3016/2023, approved 11 August, 2023. The approval document also lists file no. 005281/BP/DTCP/3016/0013/2023.
Approved area figuresBuilding permit records 1,775.50 m² upper-floor residential area and 346.33 m² stilt/parking-floor area; these are distinct recorded components.
Building count and configurationOne residential building, described in the permit as 1 Stilt + 5 upper floors, height 14.25 m. The permit records 0.00 m² ground residential area and 0.00 m² cellar area. RERA filing
Parking provision in planStilt is approved for parking; the permit’s extracted parameters give 346.33 m² for the stilt parking floor. A count of parking spaces is not disclosed in the supplied record.
Unit countsThe RERA filing records 20 total units in the offered configuration. The building approval’s extracted material does not state a separate approved unit count. RERA unit table RERA unit details

Offering and status

ItemProject record
Configuration2BHK; RERA-filed saleable area 95.04 sqm. RERA unit table RERA unit details
Booked / available0 booked / 20 available, as last read from the TG-RERA portal; the portal record supplied here has no as-of date, so counts are indicative. RERA unit table
Construction stageNo independently verified site-progress assessment is supplied. RERA’s amenity progress fields include recorded percentages for selected items; these are reported progress values, not independent site verification. RERA amenities
Completion dateThe RERA project record gives proposed and revised completion as 11/12/2026. A promoter Form-B declaration also states completion by 11th August, 2026. RERA record
Registration validityCertificate validity is stated as 11/08/2023–11/08/2026; this is separate from the recorded completion date.
Occupancy certificate (OC)No OC is included in the supplied project documents. The building permit states that an OC is compulsory before occupation.

2. The project story

JPR RESIDENCY is a RERA-registered residential apartment development in Peddur, Sircilla mandal, Rajanna Sircilla district. Its registered land description covers plots 28, 29, 30 and 31 and the 16 survey subdivisions listed above, with a recorded site extent of 704.28 sq. m. RERA filing

The building permit describes one residential building with a stilt and five upper floors, with the stilt designated for parking. The offered configuration is 2BHK, with 20 units recorded in the RERA unit data. RERA unit details The RERA portal’s unit counts show 0 booked and 20 available, but provide no as-of date in the supplied extract. RERA unit table

The RERA record lists 11/12/2026 as the proposed and revised completion date. No site inspection or independently verified construction-progress report is supplied here; the percentages in the RERA amenity record should therefore be read as recorded progress, not as independent confirmation of completed works. No occupancy certificate is supplied. RERA record RERA amenities

3. Master plan, architecture & building design

The building approval identifies a 704.28 m² site and one residential building, 1 Stilt + 5 upper floors, with a stated height of 14.25 m. It records 1,775.50 m² of upper-floor residential area, 346.33 m² of stilt parking-floor area, and 0.00 m² for both ground-floor residential area and cellar. These are the extracted approval figures; no separate FSI-counted area or building-footprint figure is supplied.

The approval document lists a layout permit reference T.L.P NO.122/2020/W dated 10/06/2020. A standalone stamped layout drawing is not included in the supplied evidence. Document index

The permit’s stated site boundaries include roads on the north and south, open place of others on the east, and plots 27 and 32 on the west. The supplied evidence does not establish the building’s internal floor-by-floor arrangement, flats per floor, lift count, stair configuration, or measured open-space area. RERA filing

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK2002095.04 sqmSoftware-measured range: 59.9–71.6 sqm; median 61.5 sqm35%

RERA records the 2BHK saleable area as 95.04 sqm and the unit data as 20 total, 0 booked and 20 available. Booking counts are portal figures with no as-of date in the supplied extract. RERA unit details RERA unit table

The carpet-area figures are software measurements from approved floor-plan drawing geometry, not RERA-filed carpet-area disclosures, and the source notes that the measurements need review. Eight flat designs were measured; six are marked as needing review. Floor plans The measured example plan labels two bedrooms, a kitchen, a hall, two toilets and balconies; the drawing identifies one balcony as 1.30 M. WIDE BALC. RERA unit details

Carpet area, balcony area, common-area share and saleable area are different measures. The supplied record states that the RERA saleable area includes the home’s share of common areas; it does not provide a separate balcony-area total or a separately verified common-area loading calculation. Floor plans RERA unit details

5. Parking & vehicle circulation

The building permit identifies the stilt as a parking floor and records its area as 346.33 m²; it also states that approved cellar and stilt parking must be used exclusively for vehicle parking without partition walls or rolling shutters. The extracted permit records 0.00 m² of cellar area.

The RERA/vendor records mention covered parking, but the supplied evidence does not establish the number of car or two-wheeler spaces, visitor or accessible-space provision, parking allocation to individual units, a ramp or internal driveway arrangement, or EV charging installation status. The permit requires parking places in buildings to have Electric Vehicle Charging Infrastructure; this is an approval condition, not evidence that charging equipment has been installed. Promoter website

6. Amenities, recreation & open spaces

Covered parking
Description / sizeCovered parking is listed; permit identifies the stilt as parking, with 346.33 m² recorded for the stilt parking floor.
Evidence sourcePromoter website
Declared progress / verified statusNo completed-space count or independent verification supplied.
Water supply
Description / sizeRERA amenity record marks availability “YES.”
Evidence sourceRERA amenities
Declared progress / verified status85% recorded progress; not independently verified.
Sewerage
Description / sizeRERA amenity label refers to chambers, lines, septic tank and STP; availability marked “YES.”
Evidence sourceRERA amenities
Declared progress / verified status100% recorded progress; not independently verified.
Green strip / tot-lot / park
Description / sizeRERA amenity record marks availability “YES”; permit requires a fenced tot-lot maintained as greenery and a peripheral greenery strip.
Evidence sourceRERA amenities
Declared progress / verified status90% recorded progress; not independently verified.
Rainwater harvesting
Description / sizePermit requires a rainwater-harvesting percolation pit; RERA marks water conservation/rainwater harvesting “YES.”
Evidence sourceRERA amenities
Declared progress / verified status100% recorded progress; not independently verified.
Energy management
Description / sizeListed in the RERA amenity record.
Evidence sourceRERA amenities
Declared progress / verified status100% recorded progress; the specific equipment or system is not detailed.
Electrical meter room / substation / receiving station
Description / sizeListed in the RERA amenity record; the permit requires space for a transformer.
Evidence sourceRERA amenities
Declared progress / verified status90% recorded progress; not independently verified.
Other listed works
Description / sizeInternal roads and footpaths, storm-water drains, street lighting, community buildings, sewage/sullage treatment and disposal, solid-waste management, fire protection, and aggregate recreational open space appear in the RERA amenity schedule.
Evidence sourceRERA amenities
Declared progress / verified statusEach is recorded at 0%; this is the supplied progress entry, not an independent site assessment.

No clubhouse, indoor recreation facility, sports facility, or facility size/capacity is established in the supplied evidence. The permit also requires a garbage house within the premises.

7. Utilities, building services & safety

The RERA amenity record reports water supply at 85%, sewerage at 100%, rainwater harvesting at 100%, energy management at 100%, and the electrical meter room/substation/receiving station at 90%. These are recorded progress figures; the supplied evidence does not provide water-source details, storage capacities, treatment capacity, reuse arrangements, electrical-load or backup capacity, or independent verification of completion. RERA amenities

The permit requires a rainwater-harvesting percolation pit, space for a transformer, and a garbage house. It also requires that sanitation, plumbing, fire-safety requirements, lifts and electrical installations be executed under qualified technical personnel. The permit makes structural and fire safety the responsibility of the owner, builder/developer, architect and site engineer; it does not, by itself, establish that the systems are installed or that statutory clearances have been issued.

The vendor specification mentions lifts, staircases, floor lobbies and overhead and underground water tanks, but does not state lift count or capacity, tank capacities, or installation/completion status. Promoter website No detailed fire-system design, escape-stair information, CCTV, access-control, waste-segregation arrangements, or accessibility features are supplied. Document index

8. Location, access & connectivity

The registered location is Peddur, Sircilla mandal, Rajanna Sircilla district, PIN 505301. The project boundary description records a 40 FEET WIDE ROAD on both the north and south sides. RERA record RERA filing The supplied geographic point is identified as the cadastral parcel centroid at 18.37466, 78.77882. Location record Cadastral map

The nearest sampled Outer Ring Road interchange is listed at approximately 88.6 km. No further measured distances, public-transport details, neighborhood facilities, or travel-time information are supplied. Location record

9. Developer & development status

The registered promoter is J V R DEVELOPERS, recorded as a partnership. Its GSTIN is 36AATFJ4160B1ZE. The project evidence lists a promoter address at Kasbekatkur, Ward No 8, Peddur, Sircilla, Rajanna Sircilla, PIN 505301; the RERA registration certificate gives the promoter office as Village: Kasbekatkur, Mandal: Thangallapally, District: Rajanna Sircilla, Pin: 505301. Parties record Corporate record

The project record names JANAGAMA PAPA RAO as the landowner under an area-share arrangement. The registered development arrangement is described in the filed documents; this overview does not treat that arrangement as a title conveyance. Parties record

RERA records the project as on-going and gives proposed and revised completion as 11/12/2026. The promoter’s Form-B declaration states completion by 11th August, 2026. No independently verified construction-stage assessment or OC is supplied. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for JPR RESIDENCY, registration no. P03000010598, under section 5; validity stated as 11/08/2023 to 11/08/2026.
Building approvalApproval for building construction, no. 0011/BP/3016/2023, dated 11 August, 2023, by Sircilla Municipality/Municipal Corporation; file no. 005281/BP/DTCP/3016/0013/2023.
Layout referenceT.L.P NO.122/2020/W, dated 10/06/2020, appears in the building-approval extraction. A standalone approved layout drawing is not supplied. Document index
Promoter declarationForm-B affidavit for JPR RESIDENCY, dated 19th January, 2026, including promoter declarations on title basis, encumbrances, completion and project-fund arrangements.
OC / completion certificateNo occupancy or completion certificate is included in the supplied documents. The building permit requires an OC before occupation. Document index
Other project recordsThe supplied file includes a registered development agreement-cum-GPA and supplemental agreement, and a title-search report. Their full title and encumbrance implications are addressed in the relevant report sections, not determined here.

Frequently asked questions

Is JPR RESIDENCY registered with Telangana RERA?

Yes. JPR RESIDENCY is registered with the Telangana Real Estate Regulatory Authority as P03000010598; the registration status is On-Going Project.

Who is the developer of JPR RESIDENCY?

The promoter named in the RERA registration is J V R DEVELOPERS.

Where is JPR RESIDENCY located?

JPR RESIDENCY is in Peddur, Sircilla, Rajanna Sircilla, Telangana (505301).

When will JPR RESIDENCY be completed?

The promoter's proposed date of completion filed with RERA is 11/12/2026. This is the promoter's declaration, not a guarantee.