Sign in

Parakala Sathyanarayana Reddy Arcade

PARAKALA SATHYANARAYANA REDDY AND OTHERS · Mahabubabad · RERA P00700010705

PARAKALA SATHYANARAYANA REDDY ARCADE is a plotted development in Edulapusapalle, Mahabubabad Mandal, Mahabubabad District. The registered promoter is PARAKALA SATHYANARAYANA REDDY AND OTHERS. The project covers 21,647.33 sq m and comprises 51 plots; no tower, block or floor configuration is stated. It is registered under TG-RERA number P00700010705, with a proposed completion date of 10/04/2024.

01What we found

RegisteredTG-RERA
14documents on file - each fact links to its page
0court cases on this project's land in the court records searched
5items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

5 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project namePARAKALA SATHYANARAYANA REDDY ARCADE RERA record
Project typePlotted development / plotted layout RERA record
Phase / registered portionPhase not separately identified; registration is for the project on the listed survey numbers RERA record
TG-RERA registrationP00700010705 RERA record
Registration validity11/04/2022 to 10/04/2024; the supplied certificate records no extension
Registered promoterPARAKALA SATHYANARAYANA REDDY AND OTHERS RERA record
RERA project statusOn-Going Project in the registration record; registration validity has a separate end date of 10/04/2024 RERA record

Land and geographic identity

FieldRecord
Locality / revenue villageEdulapusapalle; the filed layout document calls it Eedulapusapally Revenue Village RERA record RERA filing
Mandal / district / PINMahabubabad / Mahabubabad / 506101 RERA record
Survey numbers and subdivisions482, 483/1, 483/2, 484 and 485; no further project subdivision is specified in the registration identity RERA record
Registered site extent21,647.33 sq m total and net, as recorded in the RERA land details RERA filing
Layout drawing area statementNet layout area 21,646.82 sq m Layout record
Boundaries in the RERA land detailsEast: EXISTING 100 WIDE R AND B ROAD; west, north and south: OTHERS LAND RERA filing

Development identity

FieldRecord
Layout sanctioning authorityMAHABUBABAD Municipality/Municipal Corporation
Principal layout approvalTentative Layout Plan approval no. 0003/LO/3003/2022, approved 04/11/2022; application no. 002479/LO/DTCP/3003/0006/2022
RERA-filed plan approval number002479/LO/DTCP/3003/0006/2022 RERA record Approvals record
Approved built-up area / building count / floorsNot disclosed in the supplied records; this is a plotted layout, and no building-floor configuration is established here RERA filing
Layout yield51 plots Layout record
Roads, parks and utilitiesLayout drawing area statement: roads 5,777.82 sq m; parks/open space 1,985.61 sq m; utilities 217.80 sq m; social infrastructure 557.10 sq m Layout record
Authority-mortgaged plotsPlots 32–37 and 39–40 are identified in the filed approval as mortgaged to the Municipality/Municipal Corporation under Mortgage Deed No. 4180/2022

Offering and status

FieldRecord
Unit typePlots; no apartment or villa configurations are disclosed RERA record
Plot count and size evidence51 plots; drawing-derived sizes range from 144.35 sq m to 531.74 sq m, with a median of 212.38 sq m. These are software-read from the approved layout drawing, not RERA-filed saleable areas Layout record
Booked / available plotsNot disclosed in the supplied evidence RERA record
Construction / development progressRERA filing reports 80% completeness; this is a recorded project-progress figure, not independent site verification RERA record
Completion deadlineProposed and revised completion date: 10/04/2024 RERA record; the Form-B declaration also undertakes completion by 10-04-2024
OC / completion-certificate statusNo occupancy or completion certificate is included in the supplied project documents; the project is identified as on-going in the RERA record RERA record

2. The project story

PARAKALA SATHYANARAYANA REDDY ARCADE is registered as a plotted development in Edulapusapalle, Mahabubabad Mandal, Mahabubabad District. The registered land identity covers Sy. Nos. 482, 483/1, 483/2, 484 and 485. The filed tentative layout approval describes 51 plots on approximately 5 Acer 13.96 Gts and includes internal roads, park/open space, utility land and social infrastructure RERA record.

The project offers plots rather than flats or villas. The filing records a proposed/revised completion date of 10/04/2024 and 80% completeness, but the supplied material does not establish that this progress was independently inspected or that a completion/occupancy certificate has been issued RERA record. The layout approval describes development works including road formation, storm-water drains, underground drainage and a common septic tank/STP, internal water pipelines and overhead tank, electrical lines and streetlights, transformer, avenue planting, park development and rainwater-harvesting pits; these are approval-condition descriptions, not confirmation that each item has been completed.

3. Master plan, architecture & building design

The filed tentative layout is a plotted plan, not a building or tower scheme. Its drawing-derived area statement records a net layout area of 21,646.82 sq m, divided as follows: plots 11,722.12 sq m; roads 5,777.82 sq m; parks/open space 1,985.61 sq m; utilities 217.80 sq m; and social infrastructure 557.10 sq m. It lists no amenity area in that statement Layout record. The layout drawing identifies 51 plots, with plot sizes read by software from the drawing; the source cautions that these should be checked against the drawing Layout record.

The filed approval describes a tentative layout extent of 5 Acer 13.96 Gts (25,890 Sq. Yds) and reserves 9.17% for park/open space, 2.57% for social infrastructure, 1.01% for utilities, and 26.69% for roads; the approval also states a plotted area of 54.15%. The approval calls for roads to be opened for access to neighbouring sites and prohibits enclosing the site with a compound wall or fencing. No building footprint, floor count, tower arrangement, apartment plans or building-level approved built-up area is evidenced.

4. Homes, configurations & floor plans

This is a plotted project; no apartment configuration, RERA-filed apartment saleable area, or apartment booked/available inventory is supplied. The registration evidence does not provide plot-wise booking or availability counts RERA record.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Plots51 Layout recordNot disclosedNot disclosedNot disclosedNot applicableNot supplied

The approved-layout drawing’s software-read plot schedule lists 51 plots with sizes from 144.35 sq m (172.6 sq yd) to 531.74 sq m (636.0 sq yd); the median is 212.38 sq m (254.0 sq yd). These are drawing-derived measurements, not RERA-filed saleable areas, and the drawing extraction advises verification against the source drawing Layout record. The supplied floor-plan review records two layout sheets and no flat plans measured Floor plans.

5. Parking & vehicle circulation

No resident, visitor, accessible, or two-wheeler parking-space count, parking-level arrangement, or plot-specific parking allocation is established in the supplied records. The layout approval requires road access and records roads as part of the layout, but does not document vehicle bays, ramps, pedestrian separation, EV charging or individual plot parking rights Layout record. The authority mortgage concerns eight plots reserved pending development conditions; it is not a parking allocation.

6. Amenities, recreation & open spaces

The RERA-filed amenity record marks several layout infrastructure items as available, but the supplied material does not independently verify on-site completion. The layout approval separately specifies works and handover conditions RERA amenities.

Internal roads & footpaths
Description / sizeInternal-road provision; the layout area statement records 5,777.82 sq m of roads
Evidence sourceRERA amenities Layout record
Declared progress / verified statusMarked YES / 100% in the RERA amenity record; not independently verified
Green strip / tot lot / park
Description / sizePark/open-space area 1,985.61 sq m in the drawing-derived area statement
Evidence sourceRERA amenities Layout record
Declared progress / verified statusMarked YES / 100% in the RERA amenity record; not independently verified
Social infrastructure
Description / size557.10 sq m reserved in the drawing-derived area statement
Evidence sourceLayout record
Declared progress / verified statusReserved land shown; a completed facility is not established
Community buildings
Description / sizeNo area or facility detail supplied
Evidence sourceRERA amenities
Declared progress / verified status0% recorded
Water conservation / rainwater harvesting
Description / sizeApproval calls for rainwater-harvesting pits
Evidence sourceRERA amenities
Declared progress / verified statusMarked YES / 100% in the RERA amenity record; completion not independently verified

7. Utilities, building services & safety

The approval’s development-work description includes an assured water-supply source, internal water-supply pipelines, an overhead tank, storm-water drains, underground drainage, a common septic tank/STP, electrical supply lines, street lighting, a transformer, solid-waste management and rainwater-harvesting pits. The filed amenity record marks water supply, sewerage (chambers, lines, septic tank and STP), storm-water drains, street lighting, electrical meter room/sub-station/receiving station, and water conservation/rainwater harvesting as YES / 100%; these are filed status entries, not independent completion verification RERA amenities.

The approval also identifies a water reservoir, septic tank, STP, electric transformer and solid-waste management among the utilities to be provided, and requires roads, drains and other layout works. No capacities, operating status, utility-provider details, fire-protection system, security/CCTV, accessibility features or completed-service test records are supplied. The RERA amenity record shows 0% for fire protection and fire-safety requirements RERA amenities.

8. Location, access & connectivity

The registered location is Edulapusapalle, Mahabubabad Mandal, Mahabubabad District, PIN 506101 RERA record. The RERA land details give the eastern boundary as “EXISTING 100 WIDE R AND B ROAD”; the other three boundaries are recorded as “OTHERS LAND” RERA filing. A cadastral parcel-centroid coordinate is 17.625294168397353, 80.00119812197775 Cadastral map.

The supplied connectivity record lists the nearest sampled Outer Ring Road interchange at approximately 141.4 km; this is a sampled-distance entry, not a travel-time estimate Location record. No public-transport details or additional verified nearby landmarks are supplied.

9. Developer & development status

The registered promoter is PARAKALA SATHYANARAYANA REDDY AND OTHERS. The RERA record labels the organization type “Others”; its legal-entity form is not established in the supplied evidence. The promoter address is recorded as B, Mahabubabad, Eedulapusapally Revenue Village, Mahabubabad Mandal, Mahabubabad, PIN 506101 RERA record Corporate record.

The Form-B filing is a promoter declaration by PARAKALA SATHYANARAYANA REDDY, including an undertaking to complete the project by 10-04-2024. The RERA record reports 80% completeness and lists 10/04/2024 as both proposed and revised completion date; this is not independent site verification RERA record. The supplied registration certificate records validity ending 10/04/2024 and no extension. No completion/occupancy certificate or independently verified post-deadline construction update is supplied.

10. Approvals, official records & documents

TG-RERA registration
Supplied evidenceForm C, P00700010705
Scope / noteProject registration; validity recorded as 11/04/2022–10/04/2024
Layout approval
Supplied evidenceTentative Layout Plan approval no. 0003/LO/3003/2022, dated 04/11/2022
Scope / noteIssued by MAHABUBABAD Municipality/Municipal Corporation; 51 plots
RERA-filed plan reference
Supplied evidence002479/LO/DTCP/3003/0006/2022 RERA record Approvals record
Scope / noteFiled plan-approval reference
Form-B declaration
Supplied evidencePromoter declaration, including completion and separate-account undertakings
Scope / notePromoter-declared information
Mortgage and gift instruments cited in project material
Supplied evidenceMortgage Deed No. 4180/2022; Gift Deed No. 4179/2022
Scope / noteLayout-related instruments; the filed approval identifies eight plots mortgaged to the Municipality/Municipal Corporation
Completion / occupancy certificate
Supplied evidenceNot present in supplied documents Document index
Scope / noteCertificate status cannot be confirmed from this evidence

The layout approval describes its approval as tentative and states that it is not proof of title; its conditions include completion of the specified development works and release of mortgaged land before final layout release.

Frequently asked questions

Is PARAKALA SATHYANARAYANA REDDY ARCADE registered with Telangana RERA?

Yes. PARAKALA SATHYANARAYANA REDDY ARCADE is registered with the Telangana Real Estate Regulatory Authority as P00700010705; the registration status is On-Going Project.

Who is the developer of PARAKALA SATHYANARAYANA REDDY ARCADE?

The promoter named in the RERA registration is PARAKALA SATHYANARAYANA REDDY AND OTHERS.

Where is PARAKALA SATHYANARAYANA REDDY ARCADE located?

PARAKALA SATHYANARAYANA REDDY ARCADE is in MAHABUBABAD MANDAL, Edulapusapalle, Mahabubabad, Telangana (506101).

When will PARAKALA SATHYANARAYANA REDDY ARCADE be completed?

The promoter's proposed date of completion filed with RERA is 10/04/2024. This is the promoter's declaration, not a guarantee.

More projects in Mahabubabad