Shubha Pradham
SRI SWARNAYUG INFRA PROJECTS LLP · Medchal-Malkajgiri · RERA P02200011111
Shubha Pradham is a residential apartment project in Kompally, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District, developed by registered promoter SRI SWARNAYUG INFRA PROJECTS LLP. It comprises one residential building on a site of 6,091.9 sq.m, configured as 2 Cellars + Ground Floor + 5 Floors, with 97 homes: 35 2BHK and 62 3BHK. The project is registered under TG-RERA P02200011111, and its proposed completion date is 21/05/2029.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | Shubha Pradham RERA record |
| Project type / status | Residential apartment project; recorded as a new project RERA record RERA filing |
| Registered portion / phase | One residential building/project is identified; no separate phase name is disclosed RERA record |
| TG-RERA registration | P02200011111 RERA record |
| Registration validity | 17/03/2026–21/01/2029, unless extended by the Authority |
| Registered promoter | SRI SWARNAYUG INFRA PROJECTS LLP RERA record Corporate record |
| RERA status | Registration certificate recorded; captured on 2026-09-10 15:33:31 Approvals record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Kompally / Kompally Village; the approved-plan extraction also uses “Kompalle” RERA record RERA filing |
| Mandal | Dundigal Gandimaisamma RERA record |
| District | Medchal-Malkajgiri RERA record |
| PIN | 500100 RERA record |
| Survey number(s) / subdivision(s) | Survey No. 94D (also written 94/D in title records); no further subdivision is identified Land records |
| Site extent | Total/gross area 6,091.9 sq.m; road-affected area 912.27 sq.m; net plot area 5,179.63 sq.m RERA filing |
| Boundaries filed | East: Neighbours Land; West: Neighbours Land; North: Neighbours Land; South: 24 M WIDE MAIN ROAD RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | HMDA technical approval; building-permission records are also issued through GHMC Approvals record |
| Principal building approval | 1486/HMDA/SWBP/2026, approved 17/03/2026; associated file/application number 003155/HMDA/00904/SWBP/MDL1/2025 Approvals record |
| Sanctioned configuration | 2 Cellars + Ground Floor + 5 Floors; one residential building |
| Approved area figures | Permit records Total Proposed BUA including Parking 21,777.96 sq.m and Total Proposed BUA excluding Parking 14,590.3 sq.m. A separate sanctioned-parameter entry records gross BUA 22,997.66 sq.m and total net BUA 14,590.30 sq.m; these labels are retained as recorded and are not treated as interchangeable |
| Building height | 17.99 m in the permit parameters |
| Parking | Sanctioned-plan parameters record 178 car parking spaces and 0 two-wheeler spaces; permit records total parking area 6,672.85 sq.m |
| Unit counts | TG-RERA filing: 97 homes—35 2BHK and 62 3BHK. The approved-plan extraction records “29 units shown as UNIT BUA 1–29”; the environmental clearance records 97 Units RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configurations | 2BHK and 3BHK RERA unit table |
| RERA-filed saleable area | 2BHK: 118.34 sq.m; 3BHK: 166.3 sq.m RERA unit table |
| Booked / available | Portal-derived counts: 2BHK 0 booked / 35 available; 3BHK 0 booked / 62 available. These counts have no as-of date in the supplied record and are indicative RERA unit table RERA unit details |
| Construction stage | The record identifies a proposed/registered development; no independently verified site-progress measurement is supplied RERA record Approvals record |
| Completion date | Form B undertaking states completion by 21st JANUARY, 2029; the project header separately lists proposed completion 21/05/2029 RERA record |
| Occupancy / completion certificate | No completion certificate or occupancy certificate is recorded; permit records require completion notice and an occupancy certificate before occupation |
2. The project story
Shubha Pradham is registered as a residential apartment project at Kompally, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District, on Survey No. 94D. The project record describes one building with two cellar levels, a ground floor and five floors above ground. The permit also identifies a ground-floor commercial area, while the project is registered as residential; the supplied evidence does not identify a separately registered commercial phase or commercial unit offering. RERA record Land records
The TG-RERA filing lists 97 homes: 35 two-bedroom and 62 three-bedroom units. The permit and project records describe the development as proposed, with completion targeted in 2029. No independently verified construction-progress report or occupancy certificate is included in the supplied evidence. The building-permission records state that an occupancy certificate is required before occupation. RERA unit table
3. Master plan, architecture & building design
The project site is recorded as 6,091.9 sq.m gross, including 912.27 sq.m affected for road widening, leaving a 5,179.63 sq.m net plot area. The approved-plan extraction records proposed coverage of 2,602.68 sq.m (50%) and vacant plot area of 2,560.91 sq.m. These are drawing/permit figures, not measurements of completed works.
The building permission describes a single building with 2 Cellars + Ground Floor + 5 Floors, with a stated height of 17.99 m. The sanctioned area schedule records residential ground-floor area of 1,900.0 sq.m, residential upper-floor area of 12,189.43 sq.m, and commercial ground-floor area of 500.87 sq.m. The permit extraction separately records proposed BUA including parking of 21,777.96 sq.m and excluding parking of 14,590.3 sq.m; the available record also lists gross BUA 22,997.66 sq.m. These figures are reproduced with their supplied labels; no FSI, carpet area or saleable-area calculation is inferred.
The drawing extraction identifies a 31.34m long 5.8m Wide Vehicular Ramp, 4.5m Wide Drive Way, and 4.51m Wide Drive Way. The permit records front setback 7.5 m and rear and side setbacks 3.5 m each. The sanctioned record also lists a tot lot of 519.49 sq.m, rainwater-harvesting pits, trees and a transformer space. Detailed tower arrangement, flats per floor, lift count, stair configuration and landscape plan dimensions are not established in the supplied extracts.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 35 | 0 | 35 | 118.34 sq.m | Not measured in supplied drawing review | Not supplied |
| 3BHK | 62 | 0 | 62 | 166.3 sq.m | Not measured in supplied drawing review | Not supplied |
RERA unit table RERA unit details Floor plans
The RERA filing supplies unit counts and saleable areas. Saleable area is not carpet area: it includes the home’s share of common areas, whereas carpet area is a distinct unit measurement. The supplied floor-plan review reports that no flats were measurable in the available drawing set, so there are no software-measured carpet areas or room dimensions to report. The booked and available figures are portal-derived and carry no as-of date in the supplied record. RERA unit details Floor plans RERA unit table
5. Parking & vehicle circulation
The sanctioned-plan parameters record 178 car parking spaces, 0 two-wheeler spaces, and 6,672.85 sq.m total parking area. The approved building configuration includes two cellar levels, and the permit requires cellar and stilt areas designated for parking to be used exclusively for parking. The supplied record does not establish visitor-space allocation, accessible spaces, EV-charging locations or the parking space legally allocated to any particular apartment. A drawn or sanctioned parking provision does not by itself establish exclusive ownership or allotment.
The plan extraction records a 31.34m long 5.8m Wide Vehicular Ramp and driveways of 4.5m and 4.51m. No separate pedestrian-circulation or vehicle-entry/exit arrangement is described in the supplied extracts.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot lot | 519.49 sq.m | Permit | Sanctioned provision; completion not verified |
| Green strip / peripheral greenery | Listed in the plan amenity extraction; no area specified | Sanctioned/plan-listed; completion not verified | |
| Gym | Listed in plan amenity extraction; no size specified | Plan-listed; completion not verified | |
| Indoor games | Listed in plan amenity extraction; no size specified | Plan-listed; completion not verified | |
| Multipurpose hall | Listed in plan amenity extraction; no size specified | Plan-listed; completion not verified | |
| Yoga/aerobics | Listed in plan amenity extraction; no size specified | Plan-listed; completion not verified | |
| Society office | Listed in plan amenity extraction; no size specified | Plan-listed; completion not verified | |
| Creche | Listed in plan amenity extraction; no size specified | Plan-listed; completion not verified | |
| Super market / grocery store | Both listed in plan amenity extraction; no size specified | Plan-listed; completion not verified | |
| Gentlemen’s room | Listed in plan amenity extraction; no size specified | Plan-listed; completion not verified |
The amenity list is drawn from the supplied plan extraction; it does not establish construction or delivery. The approved-plan conditions also require the tot lot to be fenced and maintained as greenery before issue of the occupancy certificate. No independently verified completed amenity is identified.
7. Utilities, building services & safety
The project’s environmental-clearance record describes a proposed STP – 85 KLD and lists total water requirement 84 KLD, comprising 55 KLD fresh water and 29 KLD recycled water, with wastewater generation of 70 KLD. It also records a requirement to obtain water and sewerage connections from HMWS&SB or the local municipality. These are project-document figures and conditions, not evidence that the services are installed or operating.
The building-permission records list 12 rainwater-harvesting pits, transformer space and a garbage house. The approved plan also lists a sump, generator, overhead water tank, lift, STP, garbage pit and distribution transformer. No capacities for the sump, generator, lifts or overhead tank are supplied. The permit requires fire-fighting installations and an occupancy Fire NOC before issue of the occupancy certificate; the supplied evidence does not establish that those systems or clearances have been completed.
The environmental-clearance conditions include sewage treatment and reuse, rainwater harvesting, waste management and construction-phase environmental controls. These conditions describe required or proposed measures; they are not independent verification of implementation.
8. Location, access & connectivity
The registered location is OPEN PLACE D No 1-115, Kompally, Dundigal Gandimaisamma, Medchal-Malkajgiri, 500100, on Survey No. 94D. The project boundary entry identifies a 24 M WIDE MAIN ROAD on the south. The plan extraction records an existing road width of 24.0 m and a proposed road width of 60.0 m; the permit records surrender of the 912.27 sq.m road-affected portion to the local body. RERA filing
The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 7.3 km. No public-transport routes or independently verified distances to other landmarks are supplied. Location record
9. Developer & development status
The registered promoter is SRI SWARNAYUG INFRA PROJECTS LLP, an LLP, with GSTIN 36AFOFS3306L1ZL. The RERA filing gives its address as Shed No B4, Phase I, IDA Jeedimetla, Kompally, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana, PIN 500100. No official website or contact number is supplied in the reviewed evidence. Corporate record Parties record
The RERA record identifies PRATAP HEALTH AND FOODS INDIA PVT LTD as the landowner and records an area-share arrangement. The building-plan documents identify Sri Swarnayug Infra Projects LLP as DAGPA holder/developer. The promoter’s Form B declaration, signed by authorized signatory ANIL RAJ GOUD ARKALA in March 2026, states a completion undertaking of three years from permission, i.e. by 21st JANUARY, 2029. Parties record
No independently verified construction-progress assessment is included. The permit records that construction was to commence before 20/07/2026 and be completed before 21/01/2029; the supplied record does not establish whether construction commenced. No occupancy or completion certificate is recorded.
10. Approvals, official records & documents
| Identifier / date | P02200011111; valid 17/03/2026–21/01/2029 |
|---|---|
| What it evidences | Registration of Shubha Pradham and registered promoter |
| Identifier / date | 1486/HMDA/SWBP/2026; 17/03/2026 |
|---|---|
| What it evidences | Building-permission record for the development on Survey No. 94D |
| Identifier / date | 003155/HMDA/00904/SWBP/MDL1/2025 |
|---|---|
| What it evidences | File/application identifier shown on the plan and permit records |
| Identifier / date | Document 653102, pages 1–2 |
|---|---|
| What it evidences | Plan extraction for the proposed building and site-area schedule |
| Identifier / date | EC25C3801TG5955984N; proposal SIA/TG/INFRA2/547548/2025; 04/09/2025 |
|---|---|
| What it evidences | Project-specific EC identifies Survey No. 94D, Kompally Village, and 97 units, subject to conditions |
| Identifier / date | March 2026 |
|---|---|
| What it evidences | Promoter’s title, encumbrance, completion and separate-account declarations |
| Identifier / date | Registration No. 4897/2025; 23-04-2025 |
|---|---|
| What it evidences | Development rights over the stated project extent; not a conveyance of land title |
| Identifier / date | Document 718357 |
|---|---|
| What it evidences | Revised landowner/developer allocation for the project |
| Identifier / date | 14969/2025; 03/12/2025 |
|---|---|
| What it evidences | Permit records mortgage of 1,465.89 sq.m of built-up area, ground and first floors, in favour of the Metropolitan Commissioner, HMDA |
The supplied records do not include a completion certificate or occupancy certificate. The building-permission conditions require a completion notice and occupancy certificate before occupation.
1. Project at a glance
Project identity
Registered project name: Shubha Pradham
Project type / status: Residential apartment project; recorded as a new project
Registered portion / phase: One residential building/project is identified; no separate phase name is disclosed
TG-RERA registration: P02200011111
Registration validity: 17/03/2026–21/01/2029, unless extended by the Authority
Registered promoter: SRI SWARNAYUG INFRA PROJECTS LLP
RERA status: Registration certificate recorded; captured on 2026-09-10 15:33:31
Land and geographic identity
Locality / revenue village: Kompally / Kompally Village; the approved-plan extraction also uses “Kompalle”
Mandal: Dundigal Gandimaisamma
District: Medchal-Malkajgiri
PIN: 500100
Survey number(s) / subdivision(s): Survey No. 94D (also written 94/D in title records); no further subdivision is identified
Site extent: Total/gross area 6,091.9 sq.m; road-affected area 912.27 sq.m; net plot area 5,179.63 sq.m
Boundaries filed: East: Neighbours Land; West: Neighbours Land; North: Neighbours Land; South: 24 M WIDE MAIN ROAD
Development identity
Sanctioning authority: HMDA technical approval; building-permission records are also issued through GHMC
Principal building approval: 1486/HMDA/SWBP/2026, approved 17/03/2026; associated file/application number 003155/HMDA/00904/SWBP/MDL1/2025
Sanctioned configuration: 2 Cellars + Ground Floor + 5 Floors; one residential building
Approved area figures: Permit records Total Proposed BUA including Parking 21,777.96 sq.m and Total Proposed BUA excluding Parking 14,590.3 sq.m. A separate sanctioned-parameter entry records gross BUA 22,997.66 sq.m and total net BUA 14,590.30 sq.m; these labels are retained as recorded and are not treated as interchangeable
Building height: 17.99 m in the permit parameters
Parking: Sanctioned-plan parameters record 178 car parking spaces and 0 two-wheeler spaces; permit records total parking area 6,672.85 sq.m
Unit counts: TG-RERA filing: 97 homes—35 2BHK and 62 3BHK. The approved-plan extraction records “29 units shown as UNIT BUA 1–29”; the environmental clearance records 97 Units
Offering and status
RERA-filed configurations: 2BHK and 3BHK
RERA-filed saleable area: 2BHK: 118.34 sq.m; 3BHK: 166.3 sq.m
Booked / available: Portal-derived counts: 2BHK 0 booked / 35 available; 3BHK 0 booked / 62 available. These counts have no as-of date in the supplied record and are indicative
Construction stage: The record identifies a proposed/registered development; no independently verified site-progress measurement is supplied
Completion date: Form B undertaking states completion by 21st JANUARY, 2029; the project header separately lists proposed completion 21/05/2029
Occupancy / completion certificate: No completion certificate or occupancy certificate is recorded; permit records require completion notice and an occupancy certificate before occupation
2. The project story
Shubha Pradham is registered as a residential apartment project at Kompally, Dundigal Gandimaisamma Mandal, Medchal-Malkajgiri District, on Survey No. 94D. The project record describes one building with two cellar levels, a ground floor and five floors above ground. The permit also identifies a ground-floor commercial area, while the project is registered as residential; the supplied evidence does not identify a separately registered commercial phase or commercial unit offering.
The TG-RERA filing lists 97 homes: 35 two-bedroom and 62 three-bedroom units. The permit and project records describe the development as proposed, with completion targeted in 2029. No independently verified construction-progress report or occupancy certificate is included in the supplied evidence. The building-permission records state that an occupancy certificate is required before occupation.
3. Master plan, architecture & building design
The project site is recorded as 6,091.9 sq.m gross, including 912.27 sq.m affected for road widening, leaving a 5,179.63 sq.m net plot area. The approved-plan extraction records proposed coverage of 2,602.68 sq.m (50%) and vacant plot area of 2,560.91 sq.m. These are drawing/permit figures, not measurements of completed works.
The building permission describes a single building with 2 Cellars + Ground Floor + 5 Floors, with a stated height of 17.99 m. The sanctioned area schedule records residential ground-floor area of 1,900.0 sq.m, residential upper-floor area of 12,189.43 sq.m, and commercial ground-floor area of 500.87 sq.m. The permit extraction separately records proposed BUA including parking of 21,777.96 sq.m and excluding parking of 14,590.3 sq.m; the available record also lists gross BUA 22,997.66 sq.m. These figures are reproduced with their supplied labels; no FSI, carpet area or saleable-area calculation is inferred.
The drawing extraction identifies a 31.34m long 5.8m Wide Vehicular Ramp, 4.5m Wide Drive Way, and 4.51m Wide Drive Way. The permit records front setback 7.5 m and rear and side setbacks 3.5 m each. The sanctioned record also lists a tot lot of 519.49 sq.m, rainwater-harvesting pits, trees and a transformer space. Detailed tower arrangement, flats per floor, lift count, stair configuration and landscape plan dimensions are not established in the supplied extracts.
4. Homes, configurations & floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 2BHK | 35 | 0 | 35 | 118.34 sq.m | Not measured in supplied drawing review | Not supplied |
| 3BHK | 62 | 0 | 62 | 166.3 sq.m | Not measured in supplied drawing review | Not supplied |
The RERA filing supplies unit counts and saleable areas. Saleable area is not carpet area: it includes the home’s share of common areas, whereas carpet area is a distinct unit measurement. The supplied floor-plan review reports that no flats were measurable in the available drawing set, so there are no software-measured carpet areas or room dimensions to report. The booked and available figures are portal-derived and carry no as-of date in the supplied record.
5. Parking & vehicle circulation
The sanctioned-plan parameters record 178 car parking spaces, 0 two-wheeler spaces, and 6,672.85 sq.m total parking area. The approved building configuration includes two cellar levels, and the permit requires cellar and stilt areas designated for parking to be used exclusively for parking. The supplied record does not establish visitor-space allocation, accessible spaces, EV-charging locations or the parking space legally allocated to any particular apartment. A drawn or sanctioned parking provision does not by itself establish exclusive ownership or allotment.
The plan extraction records a 31.34m long 5.8m Wide Vehicular Ramp and driveways of 4.5m and 4.51m. No separate pedestrian-circulation or vehicle-entry/exit arrangement is described in the supplied extracts.
6. Amenities, recreation & open spaces
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot lot | 519.49 sq.m | Permit | Sanctioned provision; completion not verified |
| Green strip / peripheral greenery | Listed in the plan amenity extraction; no area specified | Sanctioned/plan-listed; completion not verified | |
| Gym | Listed in plan amenity extraction; no size specified | Plan-listed; completion not verified | |
| Indoor games | Listed in plan amenity extraction; no size specified | Plan-listed; completion not verified | |
| Multipurpose hall | Listed in plan amenity extraction; no size specified | Plan-listed; completion not verified | |
| Yoga/aerobics | Listed in plan amenity extraction; no size specified | Plan-listed; completion not verified | |
| Society office | Listed in plan amenity extraction; no size specified | Plan-listed; completion not verified | |
| Creche | Listed in plan amenity extraction; no size specified | Plan-listed; completion not verified | |
| Super market / grocery store | Both listed in plan amenity extraction; no size specified | Plan-listed; completion not verified | |
| Gentlemen’s room | Listed in plan amenity extraction; no size specified | Plan-listed; completion not verified |
The amenity list is drawn from the supplied plan extraction; it does not establish construction or delivery. The approved-plan conditions also require the tot lot to be fenced and maintained as greenery before issue of the occupancy certificate. No independently verified completed amenity is identified.
7. Utilities, building services & safety
The project’s environmental-clearance record describes a proposed STP – 85 KLD and lists total water requirement 84 KLD, comprising 55 KLD fresh water and 29 KLD recycled water, with wastewater generation of 70 KLD. It also records a requirement to obtain water and sewerage connections from HMWS&SB or the local municipality. These are project-document figures and conditions, not evidence that the services are installed or operating.
The building-permission records list 12 rainwater-harvesting pits, transformer space and a garbage house. The approved plan also lists a sump, generator, overhead water tank, lift, STP, garbage pit and distribution transformer. No capacities for the sump, generator, lifts or overhead tank are supplied. The permit requires fire-fighting installations and an occupancy Fire NOC before issue of the occupancy certificate; the supplied evidence does not establish that those systems or clearances have been completed.
The environmental-clearance conditions include sewage treatment and reuse, rainwater harvesting, waste management and construction-phase environmental controls. These conditions describe required or proposed measures; they are not independent verification of implementation.
8. Location, access & connectivity
The registered location is OPEN PLACE D No 1-115, Kompally, Dundigal Gandimaisamma, Medchal-Malkajgiri, 500100, on Survey No. 94D. The project boundary entry identifies a 24 M WIDE MAIN ROAD on the south. The plan extraction records an existing road width of 24.0 m and a proposed road width of 60.0 m; the permit records surrender of the 912.27 sq.m road-affected portion to the local body.
The supplied location record gives the nearest sampled Outer Ring Road interchange at approximately 7.3 km. No public-transport routes or independently verified distances to other landmarks are supplied.
9. Developer & development status
The registered promoter is SRI SWARNAYUG INFRA PROJECTS LLP, an LLP, with GSTIN 36AFOFS3306L1ZL. The RERA filing gives its address as Shed No B4, Phase I, IDA Jeedimetla, Kompally, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana, PIN 500100. No official website or contact number is supplied in the reviewed evidence.
The RERA record identifies PRATAP HEALTH AND FOODS INDIA PVT LTD as the landowner and records an area-share arrangement. The building-plan documents identify Sri Swarnayug Infra Projects LLP as DAGPA holder/developer. The promoter’s Form B declaration, signed by authorized signatory ANIL RAJ GOUD ARKALA in March 2026, states a completion undertaking of three years from permission, i.e. by 21st JANUARY, 2029.
No independently verified construction-progress assessment is included. The permit records that construction was to commence before 20/07/2026 and be completed before 21/01/2029; the supplied record does not establish whether construction commenced. No occupancy or completion certificate is recorded.
10. Approvals, official records & documents
| Identifier / date | P02200011111; valid 17/03/2026–21/01/2029 |
|---|---|
| What it evidences | Registration of Shubha Pradham and registered promoter |
| Identifier / date | 1486/HMDA/SWBP/2026; 17/03/2026 |
|---|---|
| What it evidences | Building-permission record for the development on Survey No. 94D |
| Identifier / date | 003155/HMDA/00904/SWBP/MDL1/2025 |
|---|---|
| What it evidences | File/application identifier shown on the plan and permit records |
| Identifier / date | Document 653102, pages 1–2 |
|---|---|
| What it evidences | Plan extraction for the proposed building and site-area schedule |
| Identifier / date | EC25C3801TG5955984N; proposal SIA/TG/INFRA2/547548/2025; 04/09/2025 |
|---|---|
| What it evidences | Project-specific EC identifies Survey No. 94D, Kompally Village, and 97 units, subject to conditions |
| Identifier / date | March 2026 |
|---|---|
| What it evidences | Promoter’s title, encumbrance, completion and separate-account declarations |
| Identifier / date | Registration No. 4897/2025; 23-04-2025 |
|---|---|
| What it evidences | Development rights over the stated project extent; not a conveyance of land title |
| Identifier / date | Document 718357 |
|---|---|
| What it evidences | Revised landowner/developer allocation for the project |
| Identifier / date | 14969/2025; 03/12/2025 |
|---|---|
| What it evidences | Permit records mortgage of 1,465.89 sq.m of built-up area, ground and first floors, in favour of the Metropolitan Commissioner, HMDA |
The supplied records do not include a completion certificate or occupancy certificate. The building-permission conditions require a completion notice and occupancy certificate before occupation.
Frequently asked questions
Is Shubha Pradham registered with Telangana RERA?
Yes. Shubha Pradham is registered with the Telangana Real Estate Regulatory Authority as P02200011111; the registration status is New Project.
Who is the developer of Shubha Pradham?
The promoter named in the RERA registration is SRI SWARNAYUG INFRA PROJECTS LLP.
Where is Shubha Pradham located?
Shubha Pradham is in Kompally, Dundigal Gandimaisamma, Medchal-Malkajgiri, Telangana (500100).
When will Shubha Pradham be completed?
The promoter's proposed date of completion filed with RERA is 21/05/2029. This is the promoter's declaration, not a guarantee.
More projects in Kompally