JBs PRISTINE CITY PHASE-1
WASIF HASAN LATEEF · Vikarabad · RERA P02100009708
JBs PRISTINE CITY PHASE-1 is a plotted residential layout in DHANARAM, Vikarabad Mandal, Vikarabad District. The registered promoter is WASIF HASAN LATEEF, recorded as a proprietorship. The project covers 17,977.57 sq. m and the approved tentative layout identifies 54 residential plots; building or floor counts are not stated. Its TG-RERA registration is P02100009708, and the promoter’s Form B undertaking gives a proposed completion date of 28-01-2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | JBs PRISTINE CITY PHASE-1 RERA record |
| Project type | Plotted development / residential layout RERA record RERA filing |
| Registered phase/portion | Phase-1; the registration and filed layout relate to the identified project and its 54-plot layout RERA record |
| TG-RERA registration | P02100009708 |
| Registration validity | 28/01/2023 to 28/01/2026; certificate records a three-year term and no extension in the supplied record |
| Registered promoter | WASIF HASAN LATEEF, recorded as a proprietorship Corporate record RERA filing |
| RERA status | Registered; the certificate states the validity dates above. The registration deadline and the project completion undertaking are separate matters. |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality | DHANARAM RERA record RERA filing |
| Revenue village | Dannaram; the filed approval also describes the site as Dhannaram Revenue Village RERA record RERA filing |
| Mandal | Vikarabad RERA record RERA filing |
| District | Vikarabad RERA record RERA filing |
| PIN | 501101 RERA record RERA filing |
| Survey numbers / subdivisions | 229, 229/A; the approval identifies Sy. Nos. 229 and 229/A. Subdivision detail is not specified in the project identity record. RERA record RERA filing |
| Registered site extent | 17,977.57 sq. m; the RERA filing records the same amount as total and net area, with 0 sq. m affected by road widening/FTL/nala widening. RERA filing |
| Approval-drawing extent | “4 Acer 17.69 Gts 21501 Sq. Yds” |
| Boundaries | Not stated in the supplied project land record (shown as NA). Land records |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | VIKARABAD Municipality/Municipal Corporation, as named on the filed tentative layout approval |
| Principal approval | Tentative layout plan approval 0024/LO/3042/2023, dated 28 January, 2023 |
| Application / plan number | 003814/LO/DTCP/3042/0017/2022 RERA record Approvals record |
| Approved development type and count | 54-plot residential layout |
| Approved built-up area | The RERA filing records 9521 sq. m as approved built-up area; the supplied material does not explain how this field applies to the plotted layout. RERA filing |
| Buildings, floors and parking levels | Not disclosed in the supplied evidence. This is a plotted layout, not a disclosed apartment/tower scheme. |
| Layout area allocation | Approval drawing records plotted area 59.5%, roads 27.62%, open space/park 9.01%, social infrastructure 2.86%, utilities 1.01%; it also records mortgage area 15.42%. |
Offering and status
| Item | Project record |
|---|---|
| Unit type | Residential plots |
| Plot count | 54 plots, according to the approved tentative layout drawing |
| Plot sizes | The layout drawing’s software-read schedule covers 54 plots; smallest 139.5 sq. m (166.8 sq. yd), median 170.26 sq. m (203.6 sq. yd), largest 309.6 sq. m (370.3 sq. yd). These are drawing-derived measurements, not RERA-filed saleable-area figures. Layout record |
| Booked / available counts | Not supplied. RERA unit table |
| Construction / development stage | RERA amenity entries show 0% progress where percentages are recorded; this is a filed progress figure, not independent site verification. RERA amenities |
| Completion date | Promoter’s Form B undertaking gives 28-01-2026 as the project completion date. |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied documents. Document index |
2. The project story
JBs PRISTINE CITY PHASE-1 is registered as a plotted residential layout in Dannaram/Dhannaram village, Vikarabad Mandal and District, on Survey Nos. 229 and 229/A. Its filed tentative layout approval describes 54 plots and places roads, park/open space, utilities and social infrastructure within the layout plan. RERA record
The promoter’s Form B states a completion undertaking of 28-01-2026. The RERA amenity schedule records 0% progress for the listed facilities where progress is shown; no independently verified site-progress evidence or completion certificate is supplied. The available record therefore supports describing the project as registered with a proposed completion date, but does not establish that development is complete or occupancy-certified. RERA amenities Document index
3. Master plan, architecture & building design
The filed approval is for a tentative plotted layout, not a supplied apartment-building design. The drawing-derived schedule identifies 54 plots. Its land-use table records 9,520.93 sq. m of plots (59.50%), 4,419.61 sq. m of roads (27.62%), 1,441.19 sq. m of parks/open space (9.01%), 457.71 sq. m of social infrastructure (2.86%) and 161.62 sq. m of utilities (1.01%), using the drawing’s stated area basis. These are software-read figures from the approved layout drawing and should be checked against the original drawing. Layout record
The approval extraction separately records land-use figures and a mortgage area of 15.42%, described as Plots 44–48 and 51–54, under mortgage deed 5059/2022. The approval says the mortgage secures completion of layout-development conditions; it also states that release of the final layout is conditional on completion of development works and release of the mortgaged land.
The RERA filing lists approved built-up area as 9521 sq. m, but the supplied record does not provide a building schedule, building count, floor configuration, building footprint or explanation of that figure for this plotted project. No apartment floor plans or building-level design measurements are supplied. RERA filing Document index Floor plans
4. Homes, configurations & floor plans
This is a plotted layout rather than an apartment configuration schedule. The approval drawing identifies 54 plots. Software measurement of the drawing’s plot schedule gives a range of 139.5–309.6 sq. m (166.8–370.3 sq. yd), with a median of 170.26 sq. m (203.6 sq. yd). These drawing-based measurements are not RERA-filed saleable-area figures. Layout record
| Plot-size band (drawing-derived) | Plot count |
|---|---|
| 150–200 sq. yd (125–167 sq. m) | 26 |
| 200–250 sq. yd (167–209 sq. m) | 21 |
| 250–300 sq. yd (209–251 sq. m) | 4 |
| 300–400 sq. yd (251–334 sq. m) | 3 |
The supplied record does not establish booked or available plot counts, individual plot allocations to buyers, or a RERA-filed plot-size schedule. The floor-plan record contains two layout sheets and no measured apartment floor plans. RERA unit table Floor plans
5. Parking & vehicle circulation
The supplied project records do not state a parking-space count, visitor or accessible parking provision, parking allocation by plot, or parking level. The approval drawing identifies roads as 27.62% of its stated area basis and requires roads to be opened for access to neighbouring sites. It also says the layout owner/developer is not to construct a compound wall or fencing around the site. No vehicle-entry, ramp, driveway-width or pedestrian-separation details are available in the supplied material. Layout record
6. Amenities, recreation & open spaces
The layout approval specifies infrastructure and amenity works to be carried out by the applicant. The RERA amenity schedule marks several facilities “YES” but records 0% progress where progress is given; these are filed entries, not independently verified completed facilities. The approval’s amenity and development conditions include roads, drainage, water infrastructure, lighting, planting and park development. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park/open space | 9.01%; approval extraction states “0 Acer 14.25 Gts 1724 Sq. Yds” | RERA schedule lists Green Strip/TOT LOT/Park as YES, 0%; not independently verified. RERA amenities | |
| Social infrastructure | 2.86%; “0 Acer 4.52 Gts 547 Sq. Yds” | No progress percentage or completion evidence supplied. RERA amenities | |
| Internal roads and footpaths | Roads: 27.62%; approval condition specifies road formation with black top. | RERA schedule lists Internal Roads & Footpaths as YES, 0%; not independently verified. RERA amenities | |
| Avenue plantation | Included in the approval’s layout-development works | No completion evidence supplied. | |
| Community buildings | Listed in the RERA amenity schedule; no size or specification supplied | RERA amenities | Progress recorded as 0%; not independently verified. |
| Utilities land | 1.01%; “0 Acer 1.6 Gts 193 Sq. Yds” | See utilities section; no completion evidence supplied. |
7. Utilities, building services & safety
The tentative layout approval specifies development works including a water reservoir, overhead tank, internal water-supply pipelines and an assured water-supply source; storm-water drains; underground drainage lines and a common septic tank/STP; electrical supply lines, street lights and a transformer; solid-waste management; avenue plantation; park development; and rainwater-harvesting pits. The approval also directs construction of a sump/overhead tank and sufficient harvesting pits. These are required or described works in the approval record, not evidence that they have been completed.
The RERA amenity schedule marks water supply, sewerage (including chambers, lines, septic tank and STP), rainwater harvesting, street lighting and electrical meter room/sub-station/receiving station as “YES”; the recorded progress is 0% where stated. The supplied documents do not provide capacities, water-source details, treatment or reuse specifications, electrical backup, fire-system specifications, CCTV/security arrangements, accessibility details, or independent completion verification. RERA amenities
8. Location, access & connectivity
The registered project location is DHANARAM, Dannaram/Dhannaram Revenue Village, Vikarabad Mandal, Vikarabad District, Telangana, PIN 501101. The cadastral parcel centroid supplied for the location is 17.34380445188312, 77.9297166820048. RERA record RERA filing Cadastral map
The approved layout condition requires roads to be opened for accessibility to neighbouring sites. The location record identifies the nearest sampled Outer Ring Road interchange at approximately 40.7 km; it does not provide other measured distances or travel times. Location record
9. Developer & development status
The registered promoter is WASIF HASAN LATEEF, recorded as a proprietorship. The supplied RERA filing gives the promoter address as ROAD NO 12, DHANARAM, DHANARAM, Vikarabad, Vikarabad, 501101. The registration certificate separately lists the promoter office as “Village: Mandal: KHAIRTABAD, District: Hyderabad, Pin: 500034.” Corporate record RERA filing
The promoter’s Form B, dated 09-06-2025, declares that the project will be completed by 28-01-2026 and includes statements concerning title, encumbrances, project funds, audits and pending approvals. These are promoter declarations in the filed form.
The project’s filed progress schedule shows 0% against the listed amenity entries where percentages are recorded; no independently verified construction-progress report or completion certificate is supplied here. RERA amenities Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for JBs PRISTINE CITY PHASE-1, registration P02100009708, valid 28/01/2023–28/01/2026. |
| Tentative layout approval | Approval 0024/LO/3042/2023, dated 28 January, 2023, issued by VIKARABAD Municipality/Municipal Corporation; concerns Sy. Nos. 229 and 229/A, Dhannaram Revenue Village. |
| Application / plan number | 003814/LO/DTCP/3042/0017/2022. |
| Layout drawing | Two layout sheets; drawing-derived plot schedule records 54 plots and the stated land-use allocation. Layout record |
| Form B declaration | Promoter declaration dated 09-06-2025, including the completion undertaking of 28-01-2026. |
| Occupancy/completion certificate | Not identified in the supplied document set. Document index |
The supplied approval is expressly described as a tentative layout plan. The approval record states that the applicant is responsible for development works and that open space, utilities and roads are to be handed over by registered gift deed before release of the tentative layout from the municipality/municipal corporation.
1. Project at a glance
Project identity
Registered project name: JBs PRISTINE CITY PHASE-1
Project type: Plotted development / residential layout
Registered phase/portion: Phase-1; the registration and filed layout relate to the identified project and its 54-plot layout
TG-RERA registration: P02100009708
Registration validity: 28/01/2023 to 28/01/2026; certificate records a three-year term and no extension in the supplied record
Registered promoter: WASIF HASAN LATEEF, recorded as a proprietorship
RERA status: Registered; the certificate states the validity dates above. The registration deadline and the project completion undertaking are separate matters.
Land and geographic identity
Locality: DHANARAM
Revenue village: Dannaram; the filed approval also describes the site as Dhannaram Revenue Village
Mandal: Vikarabad
District: Vikarabad
PIN: 501101
Survey numbers / subdivisions: 229, 229/A; the approval identifies Sy. Nos. 229 and 229/A. Subdivision detail is not specified in the project identity record.
Registered site extent: 17,977.57 sq. m; the RERA filing records the same amount as total and net area, with 0 sq. m affected by road widening/FTL/nala widening.
Approval-drawing extent: “4 Acer 17.69 Gts 21501 Sq. Yds”
Boundaries: Not stated in the supplied project land record (shown as NA).
Development identity
Sanctioning authority: VIKARABAD Municipality/Municipal Corporation, as named on the filed tentative layout approval
Principal approval: Tentative layout plan approval 0024/LO/3042/2023, dated 28 January, 2023
Application / plan number: 003814/LO/DTCP/3042/0017/2022
Approved development type and count: 54-plot residential layout
Approved built-up area: The RERA filing records 9521 sq. m as approved built-up area; the supplied material does not explain how this field applies to the plotted layout.
Buildings, floors and parking levels: Not disclosed in the supplied evidence. This is a plotted layout, not a disclosed apartment/tower scheme.
Layout area allocation: Approval drawing records plotted area 59.5%, roads 27.62%, open space/park 9.01%, social infrastructure 2.86%, utilities 1.01%; it also records mortgage area 15.42%.
Offering and status
Unit type: Residential plots
Plot count: 54 plots, according to the approved tentative layout drawing
Plot sizes: The layout drawing’s software-read schedule covers 54 plots; smallest 139.5 sq. m (166.8 sq. yd), median 170.26 sq. m (203.6 sq. yd), largest 309.6 sq. m (370.3 sq. yd). These are drawing-derived measurements, not RERA-filed saleable-area figures.
Booked / available counts: Not supplied.
Construction / development stage: RERA amenity entries show 0% progress where percentages are recorded; this is a filed progress figure, not independent site verification.
Completion date: Promoter’s Form B undertaking gives 28-01-2026 as the project completion date.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied documents.
2. The project story
JBs PRISTINE CITY PHASE-1 is registered as a plotted residential layout in Dannaram/Dhannaram village, Vikarabad Mandal and District, on Survey Nos. 229 and 229/A. Its filed tentative layout approval describes 54 plots and places roads, park/open space, utilities and social infrastructure within the layout plan.
The promoter’s Form B states a completion undertaking of 28-01-2026. The RERA amenity schedule records 0% progress for the listed facilities where progress is shown; no independently verified site-progress evidence or completion certificate is supplied. The available record therefore supports describing the project as registered with a proposed completion date, but does not establish that development is complete or occupancy-certified.
3. Master plan, architecture & building design
The filed approval is for a tentative plotted layout, not a supplied apartment-building design. The drawing-derived schedule identifies 54 plots. Its land-use table records 9,520.93 sq. m of plots (59.50%), 4,419.61 sq. m of roads (27.62%), 1,441.19 sq. m of parks/open space (9.01%), 457.71 sq. m of social infrastructure (2.86%) and 161.62 sq. m of utilities (1.01%), using the drawing’s stated area basis. These are software-read figures from the approved layout drawing and should be checked against the original drawing.
The approval extraction separately records land-use figures and a mortgage area of 15.42%, described as Plots 44–48 and 51–54, under mortgage deed 5059/2022. The approval says the mortgage secures completion of layout-development conditions; it also states that release of the final layout is conditional on completion of development works and release of the mortgaged land.
The RERA filing lists approved built-up area as 9521 sq. m, but the supplied record does not provide a building schedule, building count, floor configuration, building footprint or explanation of that figure for this plotted project. No apartment floor plans or building-level design measurements are supplied.
4. Homes, configurations & floor plans
This is a plotted layout rather than an apartment configuration schedule. The approval drawing identifies 54 plots. Software measurement of the drawing’s plot schedule gives a range of 139.5–309.6 sq. m (166.8–370.3 sq. yd), with a median of 170.26 sq. m (203.6 sq. yd). These drawing-based measurements are not RERA-filed saleable-area figures.
150–200 sq. yd (125–167 sq. m): 26
200–250 sq. yd (167–209 sq. m): 21
250–300 sq. yd (209–251 sq. m): 4
300–400 sq. yd (251–334 sq. m): 3
The supplied record does not establish booked or available plot counts, individual plot allocations to buyers, or a RERA-filed plot-size schedule. The floor-plan record contains two layout sheets and no measured apartment floor plans.
5. Parking & vehicle circulation
The supplied project records do not state a parking-space count, visitor or accessible parking provision, parking allocation by plot, or parking level. The approval drawing identifies roads as 27.62% of its stated area basis and requires roads to be opened for access to neighbouring sites. It also says the layout owner/developer is not to construct a compound wall or fencing around the site. No vehicle-entry, ramp, driveway-width or pedestrian-separation details are available in the supplied material.
6. Amenities, recreation & open spaces
The layout approval specifies infrastructure and amenity works to be carried out by the applicant. The RERA amenity schedule marks several facilities “YES” but records 0% progress where progress is given; these are filed entries, not independently verified completed facilities. The approval’s amenity and development conditions include roads, drainage, water infrastructure, lighting, planting and park development.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park/open space | 9.01%; approval extraction states “0 Acer 14.25 Gts 1724 Sq. Yds” | RERA schedule lists Green Strip/TOT LOT/Park as YES, 0%; not independently verified. | |
| Social infrastructure | 2.86%; “0 Acer 4.52 Gts 547 Sq. Yds” | No progress percentage or completion evidence supplied. | |
| Internal roads and footpaths | Roads: 27.62%; approval condition specifies road formation with black top. | RERA schedule lists Internal Roads & Footpaths as YES, 0%; not independently verified. | |
| Avenue plantation | Included in the approval’s layout-development works | No completion evidence supplied. | |
| Community buildings | Listed in the RERA amenity schedule; no size or specification supplied | Progress recorded as 0%; not independently verified. | |
| Utilities land | 1.01%; “0 Acer 1.6 Gts 193 Sq. Yds” | See utilities section; no completion evidence supplied. |
7. Utilities, building services & safety
The tentative layout approval specifies development works including a water reservoir, overhead tank, internal water-supply pipelines and an assured water-supply source; storm-water drains; underground drainage lines and a common septic tank/STP; electrical supply lines, street lights and a transformer; solid-waste management; avenue plantation; park development; and rainwater-harvesting pits. The approval also directs construction of a sump/overhead tank and sufficient harvesting pits. These are required or described works in the approval record, not evidence that they have been completed.
The RERA amenity schedule marks water supply, sewerage (including chambers, lines, septic tank and STP), rainwater harvesting, street lighting and electrical meter room/sub-station/receiving station as “YES”; the recorded progress is 0% where stated. The supplied documents do not provide capacities, water-source details, treatment or reuse specifications, electrical backup, fire-system specifications, CCTV/security arrangements, accessibility details, or independent completion verification.
8. Location, access & connectivity
The registered project location is DHANARAM, Dannaram/Dhannaram Revenue Village, Vikarabad Mandal, Vikarabad District, Telangana, PIN 501101. The cadastral parcel centroid supplied for the location is 17.34380445188312, 77.9297166820048.
The approved layout condition requires roads to be opened for accessibility to neighbouring sites. The location record identifies the nearest sampled Outer Ring Road interchange at approximately 40.7 km; it does not provide other measured distances or travel times.
9. Developer & development status
The registered promoter is WASIF HASAN LATEEF, recorded as a proprietorship. The supplied RERA filing gives the promoter address as ROAD NO 12, DHANARAM, DHANARAM, Vikarabad, Vikarabad, 501101. The registration certificate separately lists the promoter office as “Village: Mandal: KHAIRTABAD, District: Hyderabad, Pin: 500034.”
The promoter’s Form B, dated 09-06-2025, declares that the project will be completed by 28-01-2026 and includes statements concerning title, encumbrances, project funds, audits and pending approvals. These are promoter declarations in the filed form.
The project’s filed progress schedule shows 0% against the listed amenity entries where percentages are recorded; no independently verified construction-progress report or completion certificate is supplied here.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for JBs PRISTINE CITY PHASE-1, registration P02100009708, valid 28/01/2023–28/01/2026.
Tentative layout approval: Approval 0024/LO/3042/2023, dated 28 January, 2023, issued by VIKARABAD Municipality/Municipal Corporation; concerns Sy. Nos. 229 and 229/A, Dhannaram Revenue Village.
Application / plan number: 003814/LO/DTCP/3042/0017/2022.
Layout drawing: Two layout sheets; drawing-derived plot schedule records 54 plots and the stated land-use allocation.
Form B declaration: Promoter declaration dated 09-06-2025, including the completion undertaking of 28-01-2026.
Occupancy/completion certificate: Not identified in the supplied document set.
The supplied approval is expressly described as a tentative layout plan. The approval record states that the applicant is responsible for development works and that open space, utilities and roads are to be handed over by registered gift deed before release of the tentative layout from the municipality/municipal corporation.
Frequently asked questions
Is JBs PRISTINE CITY PHASE-1 registered with Telangana RERA?
Yes. JBs PRISTINE CITY PHASE-1 is registered with the Telangana Real Estate Regulatory Authority as P02100009708; the registration status is New Project.
Who is the developer of JBs PRISTINE CITY PHASE-1?
The promoter named in the RERA registration is WASIF HASAN LATEEF.
Where is JBs PRISTINE CITY PHASE-1 located?
JBs PRISTINE CITY PHASE-1 is in DHANARAM, Dannaram, Vikarabad, Telangana (501101).
When will JBs PRISTINE CITY PHASE-1 be completed?
The promoter's proposed date of completion filed with RERA is 28/01/2026. This is the promoter's declaration, not a guarantee.
More projects in Dannaram