Sri Venkateshwara Infra Developers
SRI VENKATESHWARA INFRA DEVELOPERS · Hanamkonda · RERA P00300004596
SRI VENKATESHWARA INFRA DEVELOPERS is a plotted residential development in Madikonda Revenue Village, Khazipet, Warangal Urban. The registered promoter developing it is SRI VENKATESHWARA INFRA DEVELOPERS. The RERA-filed land area is 23304.5418 sq mts, and the tentative residential layout approval states 72 plots; no building or floor configuration is stated. The project is registered with TG-RERA as P00300004596, with a proposed completion date of 12/04/2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | SRI VENKATESHWARA INFRA DEVELOPERS RERA record |
| Project type | Plotted development; the RERA-filed tentative layout approval describes a residential layout. RERA record |
| Phase / registered portion | No separate phase designation is supplied. The RERA certificate and layout record identify the project at Madikonda. |
| TG-RERA registration | P00300004596 |
| Registration validity | 13/06/2022 to 12/04/2025; the certificate says “2 years.” This is the registration period, not a statement of current registration status or a completion certificate. No extension is recorded on the certificate. |
| Registered promoter | SRI VENKATESHWARA INFRA DEVELOPERS |
| RERA status in supplied record | Registration certificate issued; its stated validity ended on 12/04/2025. Current extension or renewal status is not established by the supplied certificate. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Madikonda; the layout document identifies Madikonda Revenue Village. RERA record |
| Mandal | Khazipet in the RERA certificate; the layout approval says GWMC Mandal. |
| District | Warangal Urban in the RERA certificate; the layout approval says Warangal (Urban) District. |
| PIN | 506142 RERA record |
| Project survey numbers | 686/A/2, 686/A1/2, 686/A1/3, 687/B2/1, 687/B2/2, 687/B2/3, 687/B1/4, 688/B2/1, 688/B2/2, 688/B2/3 RERA record |
| Additional survey number in layout approval | 686/A1/1 is also listed in the tentative layout approval’s survey-number list. |
| RERA-filed land area | Total area 23304.5418 sq mts; net area 23304.54 sq mts. RERA record RERA filing |
| Layout approval’s stated extent | 5 Acer 30.34 Gts 27872 Sq. Yds. |
| Boundaries | East: 60 FEET WIDE ROAD; West: 25 FEET ROAD; North and South: AGRICULTURE LAND OF OTHERS. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | GWMC Municipality/Municipal Corporation, as named in the tentative layout approval. |
| Principal approval | 0053/LO/3006/2022, “APPROVAL FOR TENTATIVE LAYOUT PLAN”; application 001307/LO/DTCP/3006/0051/2022. Application date: 12 April, 2022. |
| Approved development | Tentative residential layout for 72 plots. |
| Land-use split stated in layout approval | Plotted area: 3 Acer 35.22 Gts 18782 Sq. Yds (68.14%); road area: 1 Acer 3.52 Gts 5267 Sq. Yds (19.11%); open-space park: 0 Acer 20.77 Gts 2513 Sq. Yds (9.12%); social infrastructure: 0 Acer 5.96 Gts 721 Sq. Yds (2.62%); utilities: 0 Acer 2.32 Gts 281 Sq. Yds (1.02%). The approval also identifies a mortgage area of 0 Acer 26.26 Gts 3177 Sq. Yds (16.88% of plotted area). |
| Buildings / floors / approved built-up area | Not applicable to the supplied plotted-layout description; no building count, floor configuration or approved built-up area is stated in the supplied project records. RERA filing |
Offering and status
| Field | Record |
|---|---|
| Offered product | Plots in a residential layout; the tentative layout approval states 72 No’s. Individual plot sizes and plot-wise inventory are not supplied here. |
| Booked / available plots | Not disclosed in the supplied records. |
| Development stage | The RERA-filed amenities record reports different completion percentages for infrastructure items; these are reported figures, not independent site verification. See section 6. RERA amenities |
| Promoter-declared completion undertaking | 12/03/2025 in Form B. |
| Completion date shown in RERA project information | 12/04/2025. RERA filing |
| Occupancy / completion certificate | Not supplied; no occupancy or completion certificate status is established in the provided documents. A plotted layout does not itself establish plot-level completion or handover. Document index |
2. The project story
This is a plotted residential development registered with TG-RERA as SRI VENKATESHWARA INFRA DEVELOPERS, located in Madikonda Revenue Village, Khazipet, Warangal Urban. The RERA-filed tentative layout approval describes 72 plots, with land allocated among plotted area, roads, a park/open space, social infrastructure and utilities. RERA record
The approval describes a tentative layout and makes the developer responsible for carrying out its infrastructure and amenity works. The RERA-filed amenities record gives reported completion percentages for several works, but these are not an independent inspection or confirmation of completed delivery. The supplied records do not establish plot-wise booking or availability, final layout release, or an occupancy/completion certificate. RERA amenities
3. Master plan, architecture & building design
The supplied development record is for a plotted layout, not an apartment or multi-building scheme. Its tentative layout approval states an extent of 5 Acer 30.34 Gts 27872 Sq. Yds and allocates land to plots, roads, open space, social infrastructure and utilities as listed above. The approval identifies 72 plots and a mortgage area of 0 Acer 26.26 Gts 3177 Sq. Yds, comprising Plot No. 2,1,30,29,28,27,26,25,24 in favour of the Municipality/Municipal Corporation under Mortgage Deed No. 8292/2022.
No plot-by-plot dimensions, plot arrangement drawing details, building footprint, building or floor configuration, or architectural floor-plan measurements are available in the supplied evidence. The layout approval lists infrastructure works including storm-water drains, underground drainage lines, internal water-supply pipelines, overhead tank, electrical supply lines, street lights, avenue plantation and rain-water-harvesting pits. Floor plans
4. Homes, configurations & floor plans
This is a plotted layout. The RERA-filed tentative approval states 72 plots, but the supplied evidence does not provide plot-size bands, individual plot dimensions, or booked and available plot counts.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 72 (layout approval) | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
Three floor-plan drawings are recorded, but all are pending scan review and none has a measured result. The supplied drawing record therefore does not support software-measured plot or home dimensions. Floor plans
5. Parking & vehicle circulation
No parking-space count, parking allocation, or dedicated parking arrangement is disclosed in the supplied records. The tentative layout approval identifies roads and requires roads to be opened for access to neighbouring sites; it does not establish plot-specific parking rights or exclusive parking allocations.
6. Amenities, recreation & open spaces
The tentative layout approval lists proposed infrastructure and reserves land for open space, social infrastructure and utilities. Separately, the RERA-filed amenities record reports completion percentages; those percentages are reported progress, not independently verified delivery. RERA amenities
| Description / size | Park/open space reserved: 0 Acer 20.77 Gts 2513 Sq. Yds (9.12%). |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-filed amenities record: 0%; not independently verified. |
| Description / size | No separate size stated. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-filed amenities record: 0%; not independently verified. |
| Description / size | Site reserved for social infrastructure: 0 Acer 5.96 Gts 721 Sq. Yds (2.62%); no facility specification supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-filed amenities record: 0%; no completion independently verified. |
| Description / size | Layout approval reports road area of 1 Acer 3.52 Gts 5267 Sq. Yds (19.11%). |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-filed amenities record: 90%; not independently verified. |
| Description / size | No quantity or specification supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-filed amenities record: 100%; not independently verified. |
| Description / size | Listed as a layout utility; no system or capacity specified. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA-filed amenities record: 0%; not independently verified. |
The layout approval requires the applicant to provide infrastructure and amenities and describes later transfer by registered gift deed of the reserved open space, utilities and road area to the Municipality/Municipal Corporation.
7. Utilities, building services & safety
The tentative layout approval lists water reservoir, septic tank, sewerage treatment plant (STP), electric transformer, solid waste management, storm-water drains, underground drainage lines, common septic tank/STP, internal water-supply pipelines, overhead tank, electrical supply lines, street lights, avenue plantation and rain-water-harvesting pits. No capacities or technical specifications are supplied.
The RERA-filed amenities record reports Water Supply 100%, Sewerage (Chamber, Lines, Septic Tank, STP) 100%, Storm Water Drains 100%, Water Conservation, Rain water Harvesting 100%, and Electrical Meter Room, Sub-Station, Receiving Station 80%. These are progress entries in the filing, not independent verification of commissioning or statutory clearance. Fire-safety systems, backup power, security, accessibility features and waste-system operating status are not established in the supplied project evidence. RERA amenities
8. Location, access & connectivity
The registered project location is Madikonda, Khazipet, Warangal Urban, Telangana, PIN 506142. The layout approval describes an east boundary adjoining a 60 FEET WIDE ROAD and a west boundary adjoining a 25 FEET ROAD; it also says roads are to be opened for access to neighbouring sites. RERA record RERA filing
A supplied location record gives a nearest sampled Outer Ring Road interchange distance of 102.2 km. The location record’s geocode identifies Government Ayurvedic Dispensary, Madikonda (Regular), Madikonda, Kazipet, Khaazipet mandal, Hanumakonda, Telangana, 506003; it is a geocoded place label, not a survey-boundary verification. Location record
9. Developer & development status
The registered promoter is SRI VENKATESHWARA INFRA DEVELOPERS, identified in the project evidence as a partnership. Its GSTIN is 36ABQFM7962A1ZY. The supplied RERA certificate lists a promoter office as Village: Mandal: District: Warangal Urban, Pin: 506001; a full registered office address, telephone number and email are not supplied in that certificate. RERA record Corporate record
The promoter’s Form B is a self-declaration by KETHIREDDY VIJAYALAXMI and states a completion undertaking of 12/03/2025. The project-information record separately gives a proposed completion date of 12/04/2025. These are presented here as the respective filed/declaration entries; the supplied records do not establish current completion or independently verified site progress. RERA filing
10. Approvals, official records & documents
| Supplied evidence | Form C certificate, P00300004596, issued 13/06/2022, valid through 12/04/2025. |
|---|---|
| Scope / status shown | Project registration; no extension is recorded on the supplied certificate. |
| Supplied evidence | Approval for Tentative Layout Plan 0053/LO/3006/2022; application 001307/LO/DTCP/3006/0051/2022. |
|---|---|
| Scope / status shown | Tentative layout approval for 72 plots; issued by GWMC Municipality/Municipal Corporation as named in the document. |
| Supplied evidence | Mortgage Deed No. 8292/2022, dated 26 March, 2022. |
|---|---|
| Scope / status shown | Approval document identifies specified plots mortgaged in favour of the Municipality/Municipal Corporation. |
| Supplied evidence | Form B affidavit-cum-declaration by KETHIREDDY VIJAYALAXMI. |
|---|---|
| Scope / status shown | Includes promoter declarations on title, encumbrances, project account obligations and completion undertaking. |
| Supplied evidence | Three drawings recorded; all are pending scan review, with no measured drawings available. Floor plans |
|---|---|
| Scope / status shown | No floor-plan or building-design measurements can be reported. |
| Supplied evidence | Not supplied in the reviewed project records. Document index |
|---|---|
| Scope / status shown | Certificate status is not established by the supplied evidence. |
1. Project at a glance
Project identity
Registered project name: SRI VENKATESHWARA INFRA DEVELOPERS
Project type: Plotted development; the RERA-filed tentative layout approval describes a residential layout.
Phase / registered portion: No separate phase designation is supplied. The RERA certificate and layout record identify the project at Madikonda.
TG-RERA registration: P00300004596
Registration validity: 13/06/2022 to 12/04/2025; the certificate says “2 years.” This is the registration period, not a statement of current registration status or a completion certificate. No extension is recorded on the certificate.
Registered promoter: SRI VENKATESHWARA INFRA DEVELOPERS
RERA status in supplied record: Registration certificate issued; its stated validity ended on 12/04/2025. Current extension or renewal status is not established by the supplied certificate.
Land and geographic identity
Locality / revenue village: Madikonda; the layout document identifies Madikonda Revenue Village.
Mandal: Khazipet in the RERA certificate; the layout approval says GWMC Mandal.
District: Warangal Urban in the RERA certificate; the layout approval says Warangal (Urban) District.
PIN: 506142
Project survey numbers: 686/A/2, 686/A1/2, 686/A1/3, 687/B2/1, 687/B2/2, 687/B2/3, 687/B1/4, 688/B2/1, 688/B2/2, 688/B2/3
Additional survey number in layout approval: 686/A1/1 is also listed in the tentative layout approval’s survey-number list.
RERA-filed land area: Total area 23304.5418 sq mts; net area 23304.54 sq mts.
Layout approval’s stated extent: 5 Acer 30.34 Gts 27872 Sq. Yds.
Boundaries: East: 60 FEET WIDE ROAD; West: 25 FEET ROAD; North and South: AGRICULTURE LAND OF OTHERS.
Development identity
Sanctioning authority: GWMC Municipality/Municipal Corporation, as named in the tentative layout approval.
Principal approval: 0053/LO/3006/2022, “APPROVAL FOR TENTATIVE LAYOUT PLAN”; application 001307/LO/DTCP/3006/0051/2022. Application date: 12 April, 2022.
Approved development: Tentative residential layout for 72 plots.
Land-use split stated in layout approval: Plotted area: 3 Acer 35.22 Gts 18782 Sq. Yds (68.14%); road area: 1 Acer 3.52 Gts 5267 Sq. Yds (19.11%); open-space park: 0 Acer 20.77 Gts 2513 Sq. Yds (9.12%); social infrastructure: 0 Acer 5.96 Gts 721 Sq. Yds (2.62%); utilities: 0 Acer 2.32 Gts 281 Sq. Yds (1.02%). The approval also identifies a mortgage area of 0 Acer 26.26 Gts 3177 Sq. Yds (16.88% of plotted area).
Buildings / floors / approved built-up area: Not applicable to the supplied plotted-layout description; no building count, floor configuration or approved built-up area is stated in the supplied project records.
Offering and status
Offered product: Plots in a residential layout; the tentative layout approval states 72 No’s. Individual plot sizes and plot-wise inventory are not supplied here.
Booked / available plots: Not disclosed in the supplied records.
Development stage: The RERA-filed amenities record reports different completion percentages for infrastructure items; these are reported figures, not independent site verification. See section 6.
Promoter-declared completion undertaking: 12/03/2025 in Form B.
Completion date shown in RERA project information: 12/04/2025.
Occupancy / completion certificate: Not supplied; no occupancy or completion certificate status is established in the provided documents. A plotted layout does not itself establish plot-level completion or handover.
2. The project story
This is a plotted residential development registered with TG-RERA as SRI VENKATESHWARA INFRA DEVELOPERS, located in Madikonda Revenue Village, Khazipet, Warangal Urban. The RERA-filed tentative layout approval describes 72 plots, with land allocated among plotted area, roads, a park/open space, social infrastructure and utilities.
The approval describes a tentative layout and makes the developer responsible for carrying out its infrastructure and amenity works. The RERA-filed amenities record gives reported completion percentages for several works, but these are not an independent inspection or confirmation of completed delivery. The supplied records do not establish plot-wise booking or availability, final layout release, or an occupancy/completion certificate.
3. Master plan, architecture & building design
The supplied development record is for a plotted layout, not an apartment or multi-building scheme. Its tentative layout approval states an extent of 5 Acer 30.34 Gts 27872 Sq. Yds and allocates land to plots, roads, open space, social infrastructure and utilities as listed above. The approval identifies 72 plots and a mortgage area of 0 Acer 26.26 Gts 3177 Sq. Yds, comprising Plot No. 2,1,30,29,28,27,26,25,24 in favour of the Municipality/Municipal Corporation under Mortgage Deed No. 8292/2022.
No plot-by-plot dimensions, plot arrangement drawing details, building footprint, building or floor configuration, or architectural floor-plan measurements are available in the supplied evidence. The layout approval lists infrastructure works including storm-water drains, underground drainage lines, internal water-supply pipelines, overhead tank, electrical supply lines, street lights, avenue plantation and rain-water-harvesting pits.
4. Homes, configurations & floor plans
This is a plotted layout. The RERA-filed tentative approval states 72 plots, but the supplied evidence does not provide plot-size bands, individual plot dimensions, or booked and available plot counts.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 72 (layout approval) | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
Three floor-plan drawings are recorded, but all are pending scan review and none has a measured result. The supplied drawing record therefore does not support software-measured plot or home dimensions.
5. Parking & vehicle circulation
No parking-space count, parking allocation, or dedicated parking arrangement is disclosed in the supplied records. The tentative layout approval identifies roads and requires roads to be opened for access to neighbouring sites; it does not establish plot-specific parking rights or exclusive parking allocations.
6. Amenities, recreation & open spaces
The tentative layout approval lists proposed infrastructure and reserves land for open space, social infrastructure and utilities. Separately, the RERA-filed amenities record reports completion percentages; those percentages are reported progress, not independently verified delivery.
| Description / size | Park/open space reserved: 0 Acer 20.77 Gts 2513 Sq. Yds (9.12%). |
|---|---|
| Declared progress / verified status | RERA-filed amenities record: 0%; not independently verified. |
| Description / size | No separate size stated. |
|---|---|
| Declared progress / verified status | RERA-filed amenities record: 0%; not independently verified. |
| Description / size | Site reserved for social infrastructure: 0 Acer 5.96 Gts 721 Sq. Yds (2.62%); no facility specification supplied. |
|---|---|
| Declared progress / verified status | RERA-filed amenities record: 0%; no completion independently verified. |
| Description / size | Layout approval reports road area of 1 Acer 3.52 Gts 5267 Sq. Yds (19.11%). |
|---|---|
| Declared progress / verified status | RERA-filed amenities record: 90%; not independently verified. |
| Description / size | No quantity or specification supplied. |
|---|---|
| Declared progress / verified status | RERA-filed amenities record: 100%; not independently verified. |
| Description / size | Listed as a layout utility; no system or capacity specified. |
|---|---|
| Declared progress / verified status | RERA-filed amenities record: 0%; not independently verified. |
The layout approval requires the applicant to provide infrastructure and amenities and describes later transfer by registered gift deed of the reserved open space, utilities and road area to the Municipality/Municipal Corporation.
7. Utilities, building services & safety
The tentative layout approval lists water reservoir, septic tank, sewerage treatment plant (STP), electric transformer, solid waste management, storm-water drains, underground drainage lines, common septic tank/STP, internal water-supply pipelines, overhead tank, electrical supply lines, street lights, avenue plantation and rain-water-harvesting pits. No capacities or technical specifications are supplied.
The RERA-filed amenities record reports Water Supply 100%, Sewerage (Chamber, Lines, Septic Tank, STP) 100%, Storm Water Drains 100%, Water Conservation, Rain water Harvesting 100%, and Electrical Meter Room, Sub-Station, Receiving Station 80%. These are progress entries in the filing, not independent verification of commissioning or statutory clearance. Fire-safety systems, backup power, security, accessibility features and waste-system operating status are not established in the supplied project evidence.
8. Location, access & connectivity
The registered project location is Madikonda, Khazipet, Warangal Urban, Telangana, PIN 506142. The layout approval describes an east boundary adjoining a 60 FEET WIDE ROAD and a west boundary adjoining a 25 FEET ROAD; it also says roads are to be opened for access to neighbouring sites.
A supplied location record gives a nearest sampled Outer Ring Road interchange distance of 102.2 km. The location record’s geocode identifies Government Ayurvedic Dispensary, Madikonda (Regular), Madikonda, Kazipet, Khaazipet mandal, Hanumakonda, Telangana, 506003; it is a geocoded place label, not a survey-boundary verification.
9. Developer & development status
The registered promoter is SRI VENKATESHWARA INFRA DEVELOPERS, identified in the project evidence as a partnership. Its GSTIN is 36ABQFM7962A1ZY. The supplied RERA certificate lists a promoter office as Village: Mandal: District: Warangal Urban, Pin: 506001; a full registered office address, telephone number and email are not supplied in that certificate.
The promoter’s Form B is a self-declaration by KETHIREDDY VIJAYALAXMI and states a completion undertaking of 12/03/2025. The project-information record separately gives a proposed completion date of 12/04/2025. These are presented here as the respective filed/declaration entries; the supplied records do not establish current completion or independently verified site progress.
10. Approvals, official records & documents
| Supplied evidence | Form C certificate, P00300004596, issued 13/06/2022, valid through 12/04/2025. |
|---|---|
| Scope / status shown | Project registration; no extension is recorded on the supplied certificate. |
| Supplied evidence | Approval for Tentative Layout Plan 0053/LO/3006/2022; application 001307/LO/DTCP/3006/0051/2022. |
|---|---|
| Scope / status shown | Tentative layout approval for 72 plots; issued by GWMC Municipality/Municipal Corporation as named in the document. |
| Supplied evidence | Mortgage Deed No. 8292/2022, dated 26 March, 2022. |
|---|---|
| Scope / status shown | Approval document identifies specified plots mortgaged in favour of the Municipality/Municipal Corporation. |
| Supplied evidence | Form B affidavit-cum-declaration by KETHIREDDY VIJAYALAXMI. |
|---|---|
| Scope / status shown | Includes promoter declarations on title, encumbrances, project account obligations and completion undertaking. |
| Supplied evidence | Three drawings recorded; all are pending scan review, with no measured drawings available. |
|---|---|
| Scope / status shown | No floor-plan or building-design measurements can be reported. |
| Supplied evidence | Not supplied in the reviewed project records. |
|---|---|
| Scope / status shown | Certificate status is not established by the supplied evidence. |
Frequently asked questions
Is SRI VENKATESHWARA INFRA DEVELOPERS registered with Telangana RERA?
Yes. SRI VENKATESHWARA INFRA DEVELOPERS is registered with the Telangana Real Estate Regulatory Authority as P00300004596; the registration status is New Project.
Who is the developer of SRI VENKATESHWARA INFRA DEVELOPERS?
The promoter named in the RERA registration is SRI VENKATESHWARA INFRA DEVELOPERS.
Where is SRI VENKATESHWARA INFRA DEVELOPERS located?
SRI VENKATESHWARA INFRA DEVELOPERS is in MADIKONDA, Khazipet, Hanamkonda, Telangana (506142).
When will SRI VENKATESHWARA INFRA DEVELOPERS be completed?
The promoter's proposed date of completion filed with RERA is 12/04/2025. This is the promoter's declaration, not a guarantee.