THE PALM RETREAT is a plotted development at Ennepally, VIKARABAD MANDAL, Vikarabad, Vikarabad. The registered promoter is DINNEPATI SIDDHARTHA AND D SILPA. The RERA-filed site extent is 14,696.61 sq. m, and the tentative layout plan records 41 plots, with drawing-based plot sizes of 133.39–197.66 sq. m (159.5–236.4 sq. yd). It is registered under TG-RERA P02100009582, and the proposed completion date is 19/09/2025.

01What we found

RegisteredTG-RERA
26documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Ennepally, Vikarabad, Vikarabad · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered projectTHE PALM RETREAT RERA record
Project typePlotted development RERA record
Phase / registered portionNew Project; no separate phase name or phase-wise scope is disclosed RERA record
TG-RERA registrationP02100009582, granted under section 5; certificate issued 13/05/2025
Registration validityCertificate states validity from 20/09/2023 to 19/09/2025; extension is not recorded in the supplied certificate
Registered promoterDINNEPATI SIDDHARTHA AND D SILPA RERA record
RERA statusThe registration certificate records the project as registered. The supplied record lists 19/09/2025 as the proposed completion date; current registration status is not independently established by the supplied evidence RERA filing

Land and geographic identity

ItemRecord
Revenue villageEnnepally; the filed layout plan names YENNEPALLY Revenue Village RERA record
Locality / mandal / district / PINVIKARABAD MANDAL / Vikarabad / Vikarabad / 501101 RERA record
Survey numbers and subdivisions341AA, 341/4E, 341EE, 341/4/EE, 341/4AA, 341E, 341/4U, 341/4A, 341/2, 341/3, 341/4A/1
RERA-filed site extent14,696.61 sq. m; net area 14,696.61 sq. m; area affected in road widening/FTL/Nala widening recorded as 0 sq. m RERA filing
Layout-plan extent3 Acer 25.26 Gts, stated also as 17,577 Sq. Yds
BoundariesEast, north and south: open land of others; west: 10 MT wide main road RERA filing

Development identity

ItemRecord
RERA-filed plan approval number005817/LO/DTCP/3042/0027/2023 RERA record
Principal layout approval recorded in the filed documentTentative layout approval 0019/LO/3042/2023, issued by VIKARABAD Municipality/Municipal Corporation and dated 20 September 2023
Approved built-up area7,610.94 sq. m recorded in the RERA filing RERA filing
Plot count41 plots in the tentative layout plan
Buildings / floors / parking levelsNot disclosed for this plotted development in the supplied RERA records. Building-specific configurations and parking counts are not established here Document index RERA filing

Offering and status

ItemRecord
OfferingPlots; the tentative layout plan records 41 plots RERA record
Plot sizes41 drawing-scheduled plot areas are software-read from the approved layout drawing: 133.39–197.66 sq. m (159.5–236.4 sq. yd); median 193.24 sq. m (231.1 sq. yd) Layout record
Booked / available countsNot disclosed in the supplied project evidence Document index
Promoter-declared completion date19/09/2025
Construction / development stageThe RERA filing records the project as “New Project”; no independently verified current site-progress assessment is supplied RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents; the project is a plotted layout Document index

2. The project story

THE PALM RETREAT is registered as a plotted development at Ennepally, Vikarabad Mandal, Vikarabad District. The RERA-filed identity covers the listed survey numbers and subdivisions and records a site area of 14,696.61 sq. m. The tentative layout plan describes 41 plots and provides for roads, open space, social-infrastructure land and utility land. It also states that the layout applicant is responsible for carrying out the layout infrastructure and development works. RERA record RERA filing

The promoter’s Form B affidavit undertakes to complete the project by 19/09/2025. That is a promoter declaration, not evidence that development was completed by that date. The supplied record includes no verified site inspection or completion certificate, so present physical progress and delivery status cannot be confirmed from these materials. Document index

3. Master plan, architecture & building design

The filed tentative layout plan states a total extent of 3 Acer 25.26 Gts (17,577 Sq. Yds). Its land-use schedule allocates 51.79% to plots, 35.65% to roads, 9.03% to open space (park), 2.52% to social infrastructure and 1% to utilities. It identifies a mortgage area of 0 Acer 12.73 Gts (1,540 Sq. Yds), stated as 16.8% of plotted area. These are layout-plan figures; the supplied evidence does not include building plans, tower arrangements or building-level floor configurations.

The layout drawing’s plot schedule was software-read: it records 41 plots, with sizes from 133.39 sq. m to 197.66 sq. m; the median is 193.24 sq. m. The drawing-based count and sizes are not RERA unit-disclosure figures and should be treated as software-measured from the supplied layout record. Layout record

The layout approval lists development works including road formation with black top, storm-water drains, underground drainage, a common septic tank/STP, internal water-supply pipelines, an overhead tank, electrical lines and streetlights, a transformer, avenue planting, park development and rainwater-harvesting pits. The approval requires the applicant to complete the infrastructure and amenities and specifies transfer of reserved open-space, utility and road areas to the municipality by registered gift deed before release of the tentative layout.

4. Homes, configurations & floor plans

This is a plotted project rather than an apartment development. The supplied layout record gives the following drawing-based plot information:

Plot informationRecord
Plots41, as stated in the layout plan; plot schedule is software-read Layout record
Size range133.39–197.66 sq. m (159.5–236.4 sq. yd), software-measured from the layout drawing Layout record
Median size193.24 sq. m (231.1 sq. yd), software-measured from the layout drawing Layout record
Size bands3 plots in 150–200 sq. yd band (125–167 sq. m); 38 plots in 200–250 sq. yd band (167–209 sq. m) Layout record
Booked / available plotsNot disclosed in the supplied evidence Document index

No apartment configurations, RERA-filed saleable-area schedule for individual units, measured carpet areas or unit-specific floor plans are supplied. The two listed drawing sheets are layout sheets, not residential floor plans. Floor plans Document index

5. Parking & vehicle circulation

The supplied project records do not establish a sanctioned parking-space count, visitor or accessible parking provision, parking allocation to individual plots, or a parking layout. The layout approval requires roads to remain open for access to neighbouring sites and does not permit a compound wall or fencing around the site under the stated tentative-layout conditions. The layout plan includes roads as 35.65% of its stated area, but detailed road widths, internal driving routes and pedestrian separation are not established by the supplied extracts.

6. Amenities, recreation & open spaces

The layout approval describes reserved open-space, social-infrastructure and utility areas and lists proposed layout works. Separately, the RERA-filed amenity data records the following availability percentages. These percentages are filing data, not independent verification that a facility has been delivered or is operational. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Open space / park9.03%; layout plan states 0 Acer 13.12 Gts (1,588 Sq. Yds)Reserved in tentative layout; RERA amenity record lists Green Strip/TOT LOT/Park at 90%; completion not independently verified RERA amenities
Social infrastructure2.52%; 0 Acer 3.66 Gts (443 Sq. Yds)Site reserved; no particular building or facility is identified
Community buildingsNo size statedRERA amenitiesRERA amenity record lists 0%; no delivery verification supplied
Internal roads and footpathsNo dimensions statedRERA amenitiesRERA amenity record lists “YES”, 100%
Avenue plantationNo area or quantity statedListed as a layout development work; completion not independently verified
Recreational open-space aggregateNo size stated in amenity recordRERA amenitiesRERA amenity record lists 0%; layout plan separately reserves park/open-space land

The RERA-filed amenity record also lists water supply, sewerage, storm-water drains, street lighting and rainwater harvesting, detailed in the utilities section. RERA amenities

7. Utilities, building services & safety

The tentative layout approval lists a water reservoir, assured water-supply source, internal water-supply pipelines and overhead tank; a common septic tank/STP and underground drainage lines; storm-water drains; rainwater-harvesting pits; streetlights, electrical supply lines and transformer; and solid-waste management. These are approval-document provisions or listed works; the supplied evidence does not verify capacities, construction completion, commissioning or ongoing operation.

The RERA-filed amenity record marks water supply, sewerage (chambers, lines, septic tank/STP) and storm-water drains as “YES” at 100%; street lighting at 80%; rainwater harvesting at 70%; and the electrical meter room/sub-station/receiving station at 80%. It lists solid-waste management and disposal at 0%, treatment and disposal of sewage and sullage water at 0%, and fire protection and fire-safety requirements at 0%. These are recorded progress/availability fields, not an independent inspection or a determination of statutory compliance. RERA amenities

The supplied records do not state utility capacities, backup power, EV charging, fire-system specifications, accessible circulation or security systems. Document index RERA amenities

8. Location, access & connectivity

The registered location is Ennepally, Vikarabad Mandal, Vikarabad District, PIN 501101. The filed land boundaries identify a 10 MT wide main road to the west and open land of others on the east, north and south. The parcel-centroid coordinates are 17.336653259373374, 77.91865647062588. RERA record RERA filing Cadastral map

The supplied connectivity record gives the nearest sampled Outer Ring Road interchange at approximately 42.1 km. No public-transport information or additional verified landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is DINNEPATI SIDDHARTHA AND D SILPA, recorded in the RERA filing as a proprietorship. Dinnepati Siddhartha is identified as the authorized signatory; D Silpa is identified as the landowner/promoter participant under an area-share arrangement. The supplied RERA certificate gives the promoter office as “Village: Mandal: Shaikpet, District: Hyderabad, Pin: 500034.” No official contact details or promoter website are supplied. Corporate record Parties record

The Form B affidavit declares a completion undertaking of 19/09/2025 and states that 70% of amounts realized from allottees will be placed in a separate scheduled-bank account for construction and land cost. These are promoter declarations in the filed affidavit. The supplied evidence does not establish current construction progress or completion.

10. Approvals, official records & documents

RecordDetails
TG-RERA registration certificateForm C; registration P02100009582 under section 5; issued 13/05/2025; validity stated as 20/09/2023–19/09/2025
Layout approvalTentative layout approval 0019/LO/3042/2023, VIKARABAD Municipality/Municipal Corporation, dated 20 September 2023; 41 plots stated
RERA-filed plan approval identifier005817/LO/DTCP/3042/0027/2023 RERA record
Land-use conversion ordersNALA order for Sy.No. 341e, extent 0.2000, proceedings 2300249729, dated 06/04/2023; another extracted NALA order identifies Sy. No. 341/4w1, extent 0.0300, proceedings 2300261150, with the date text recorded as “0610412023”
Promoter declarationForm B affidavit by Dinnepati Siddhartha, dated 19 February 2025; includes the completion undertaking and project-fund declarations
Occupancy / completion certificateNo certificate is included in the supplied documents Document index
Other project recordsThe supplied material includes a title report, title instruments, encumbrance statement and tentative layout plan; detailed title and encumbrance analysis belongs in the relevant report sections Document index

Frequently asked questions

Is THE PALM RETREAT registered with Telangana RERA?

Yes. THE PALM RETREAT is registered with the Telangana Real Estate Regulatory Authority as P02100009582; the registration status is New Project.

Who is the developer of THE PALM RETREAT?

The promoter named in the RERA registration is DINNEPATI SIDDHARTHA AND D SILPA.

Where is THE PALM RETREAT located?

THE PALM RETREAT is in VIKARABAD MANDAL, Ennepally, Vikarabad, Telangana (501101).

When will THE PALM RETREAT be completed?

The promoter's proposed date of completion filed with RERA is 19/09/2025. This is the promoter's declaration, not a guarantee.