Sign in

Balaji Nilayam

M/s S K M INFRA DEVELOPERS · Medchal-Malkajgiri · RERA P02200010701

BALAJI NILAYAM is a residential apartment project in Vasavi Enclave, Pragathi Nagar, Bachupally mandal, Medchal-Malkajgiri district, developed by the registered promoter M/s S K M INFRA DEVELOPERS. The project has a registered site extent of 387.41 sq.m and one residential building with 1 Stilt + 5 Floors. It comprises 10 3BHK apartments, each with a RERA-filed saleable area of 150.22 sq.m. Its TG-RERA registration number is P02200010701, and its proposed completion date is 12/03/2029.

More from S K M Infra Developers · 2 projects →

01What we found

RegisteredTG-RERA - valid till 12 Nov 2028
18documents on file - each fact links to its page
166court cases on this project's land (survey 155, 156, 161, 165, Pragathi Nagar)
7items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from proplocators.comPhoto from proplocators.com
▦ View all 2 photos
Pragathi Nagar, Bachupally, Medchal-Malkajgiri · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameBALAJI NILAYAM RERA record
Project type / phaseResidential apartment project; phase or separately named registered portion is not disclosed RERA record RERA filing
TG-RERA registrationP02200010701; valid 12/11/2025–12/11/2028 RERA record
Registered promoterM/s S K M INFRA DEVELOPERS; partnership RERA record Corporate record
RERA statusNew Project; registration certificate is on file RERA record

Land and geographic identity

ItemRecord
Locality / addressVasavi Enclave, Pragathi Nagar
Revenue villageBachupally
MandalBachupally RERA record
DistrictMedchal-Malkajgiri RERA record
PIN500090 RERA record
Project survey numbers and subdivisions155/PART, 156, 157/PART, 161, 162, 163, 164, 165/PART
Registered site extent387.41 sq.m; approved gross and net plot area are each 387.41 sq.m RERA filing
BoundariesEast: Plots 149 and 150; west: 30 feet wide road; north: 30 feet wide road; south: Plot 163 part, south-side portion RERA filing

Development identity

ItemRecord
Sanctioning authority / principal approvalHMDA; Building Permit Order / file 007725/HMDA/02303/SWBP/MDL1/2025, dated 12/11/2025 Approvals record
Other permit number recorded0997/HMDA/SWBP/2025, attributed in the filed record to Nizampet Municipal Corporation Approvals record
Approved building use and built-up areaResidential apartment use; approved proposed BUA 1155.4 sq.m excluding parking and 1386.48 sq.m including parking
Building count / nameOne residential building, identified in the permit as MEDA SRINIVASA RAO
Sanctioned configuration1 Stilt + 5 Floors; approved floor schedule lists stilt and 1st through 5th floors
Parking provision231.08 sq.m net parking area and 7.00 car parking spaces in the filed sanctioned parameters; stilt is identified for parking
Unit counts10 units in the sanctioned-plan extraction and 10 RERA-filed 3BHK units RERA unit table

Offering and status

ItemRecord
RERA-filed configuration and saleable area3BHK; 150.22 sq.m per unit RERA unit table RERA unit table
Booked / available0 booked / 10 available, as last read from the TG-RERA portal; the record supplies no as-of date, so these counts are indicative RERA unit table
Construction stageRERA record labels the project New Project; no independently verified site-progress measurement is supplied RERA record RERA unit table
Completion datesPromoter Form B declares completion by 12.11.2028; the RERA filing’s proposed completion date is 12/03/2029 RERA filing
Registration validity12/11/2025–12/11/2028; this is the registration period, not a statement that construction is complete
Completion / occupancy certificateNo completion or occupancy certificate is recorded in the supplied documents; the building-permit extraction says completion is not certified

2. The project story

BALAJI NILAYAM is registered as a residential apartment project in Vasavi Enclave, Pragathi Nagar, Bachupally village. Its filed site extent is 387.41 sq.m, and the building permit describes one residential building with 1 stilt level and 5 floors. The RERA unit record lists ten 3BHK apartments, with ten shown as available and none booked; the portal record has no as-of date for those counts. RERA record RERA unit table

The project is registered and has a building-permit order in the supplied file. The permit sets a construction-start deadline of 11/05/2026 and a completion deadline of 12/11/2028. The Form B declaration separately states a completion undertaking of 12.11.2028, while the RERA project-information field gives a proposed completion date of 12/03/2029. No completion or occupancy certificate is supplied, and the documents do not provide independently verified construction-progress measurements. RERA filing

3. Master plan, architecture & building design

The sanctioned-plan extraction records a 387.41 sq.m gross and net plot, proposed coverage of 231.08 sq.m (60%), and vacant plot area of 149.2 sq.m. It lists proposed built-up area as 1155.4 sq.m excluding parking and 1386.48 sq.m including parking. These are approved-plan figures; no separate FSI-counted area, carpet-area total, or project-wide saleable-area total is supplied.

The permit describes one residential building, “MEDA SRINIVASA RAO,” configured as 1 Stilt + 5 Floors. The extracted floor schedule lists the stilt and 1st through 5th floors at 231.08 sq.m each, with a terrace entry of 21.12 sq.m. The 5th floor is identified as TDR in the sanctioned parameters. The supplied material does not establish flats per floor, lift or stair details, internal circulation, or a detailed architectural arrangement.

The permit records front, rear and side setbacks of 3.0 m, 2.0 m, 2.0 m and 2.0 m, respectively. The filed drawing/permit material also identifies road widths of 9.0 m, “9m Wide Main Road” and “9m Wide Sub Road”; the site-boundary record separately identifies 30 feet wide roads to the north and west. RERA filing

The approval conditions call for a percolation-pit rainwater-harvesting structure, transformer space, a garbage house, peripheral greenery and a tot-lot. The permit extraction records 2 rainwater-harvesting pits and 10 trees. These are approval conditions or plan-recorded provisions, not confirmation that the features have been installed.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK (RERA-filed)10010150.22 sq.mNot supplied for the RERA-filed 3BHKNot supplied

RERA unit table RERA unit table

The approved floor-plan drawing measurement records two designs labelled 6BHK, with software-measured carpet areas from 110.0 to 116.5 sq.m (median 113.2 sq.m). This is drawing-based software measurement, flagged as needing review; it is not a RERA-filed configuration or area disclosure and should be checked against the drawing. The available evidence does not match those measured designs to the RERA-filed 3BHK configuration. Floor plans RERA unit details

The RERA-filed saleable area and software-measured carpet area are different measures: the supplied floor-plan note says saleable area also counts the home’s share of common areas. No separate balcony/utility total, loading figure, or RERA-filed carpet area is provided for the 3BHK units. RERA unit table Floor plans

5. Parking & vehicle circulation

The sanctioned parameters record 7.00 car parking spaces, 231.08 sq.m net parking area and a stilt floor of 231.08 sq.m; the permit states that the stilt is to be used exclusively for vehicle parking. The supplied records do not establish resident-versus-visitor allocation, accessible spaces, two-wheeler counts, unit-by-unit parking allotments, or EV charging installation. The permit includes an EV-charging requirement for parking places, but that condition is not evidence of completed provision.

The available material does not specify ramp design, parking entry/exit arrangements, or pedestrian separation. A sanctioned parking count does not by itself establish exclusive allocation or ownership of a particular bay.

6. Amenities, recreation & open spaces

The following are plan or RERA-filed provisions. Progress is shown as 0% in the supplied amenity record where a percentage is reported; the record does not independently verify completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Landscape/open space: Green Strip / Tot Lot / ParkArea not stated; approval conditions call for a fenced tot-lot and peripheral greeneryRERA amenitiesRERA amenity progress 0%; installation not independently verified
Landscape/open space: Trees10 trees recorded in permit parametersPermit-recorded provision; completed status not supplied
Convenience/community: Water supplyRERA amenity record marks “YES”; no source or capacity statedRERA amenitiesProgress 0%; completion not independently verified
Convenience/community: Electrical meter room / sub-station / receiving stationRERA amenity record marks “YES”; no capacity statedRERA amenitiesProgress 0%; completion not independently verified
Convenience/community: Community buildingsNo description or size suppliedRERA amenitiesRERA amenity progress 0%
Convenience/community: Street lightingNo quantity or specification suppliedRERA amenitiesRERA amenity progress 0%
Convenience/community: Internal roads and footpathsNo dimensions or layout details suppliedRERA amenitiesRERA amenity progress 0%
Convenience/community: SecurityThird-party vendor listing only; details not suppliedPromoter websiteMarketing/vendor claim; completion not verified
Convenience/community: CCTV camera and entry/exit gateThird-party vendor listing only; details not suppliedPromoter websiteMarketing/vendor claim; completion not verified
Sports/recreation: Kids’ play areaThird-party vendor listing only; no size or equipment details suppliedPromoter websiteMarketing/vendor claim; completion not verified

The vendor listing also mentions water storage, power backup, a lift, reserved parking and fire-fighting equipment; the supplied project amenity record does not establish their installed capacity or completion. These vendor-listed items are not treated here as verified delivered facilities. Promoter website

7. Utilities, building services & safety

The permit and RERA amenity record refer to water supply, a percolation-pit rainwater-harvesting structure, sewerage, storm-water drains, sewage/sullage treatment and disposal, and solid-waste management. The permit lists septic provision and two rainwater-harvesting pits; it also requires a transformer space and garbage house. No water source, tank capacity, treatment capacity, STP specification, reuse plan, drainage capacity or installation status is supplied. RERA amenities

The approval conditions address fire and life safety, including structural safety, means of escape and fire-fighting installations, and state that an occupancy fire NOC is to be obtained before an occupancy certificate. A separate amenity entry lists fire protection and fire-safety requirements, with 0% progress in the supplied record. No fire-system specifications, escape-stair details, lift capacities, backup-power capacity, accessibility features or completed statutory clearances are supplied. The conditions and amenity listing do not establish completed systems or compliance. RERA amenities

8. Location, access & connectivity

The registered location is Vasavi Enclave, Pragathi Nagar, Bachupally, Medchal-Malkajgiri, Telangana 500090. The supplied geocode places the location at 17.5303144, 78.3915818. RERA record Location record

The site-boundary record identifies 30 feet wide roads on the north and west sides. The approval-plan extraction also records 9.0 m road widths and labels a 9m Wide Main Road and 9m Wide Sub Road. The location record lists HITEC City: 9.8 km. RERA filing Location record

A vendor listing gives distances to nearby schools, a bus stop, a railway station, shops and a hospital; these are third-party listing claims, not independently verified measurements in the supplied project record. Promoter website

9. Developer & development status

The registered promoter is M/s S K M INFRA DEVELOPERS, a partnership, with GSTIN 36ABWFM3618D1Z1. The RERA record identifies Srinivasa Rao Meda as the promoter’s representative/authorized signatory and lists Kalyani Meda as a partner. The recorded promoter address is Sri Ganapathi Homes, 1st Floor, Srinivasana Nagar Colony, Vasavi Enclave, Pragathi Nagar, Bachupally, Medchal-Malkajgiri, 500090. No official website or contact details are supplied in the project record. Corporate record RERA record

The building permit names Kumar Associates, represented by D. Venkata Siva Naga Prasad, as developer/builder. This is a role stated in the permit and is distinct from the RERA-registered promoter.

The promoter’s Form B declaration states a completion undertaking of 12.11.2028; the RERA project-information field lists 12/03/2029 as the proposed completion date. No independently verified construction-progress figure or occupancy certificate is supplied. RERA filing

10. Approvals, official records & documents

TG-RERA registration certificate
DetailsForm C certificate; project BALAJI NILAYAM, registration P02200010701, valid 12/11/2025–12/11/2028
Principal building permit / plan
DetailsHMDA file 007725/HMDA/02303/SWBP/MDL1/2025, dated 12/11/2025; residential building, 1 Stilt + 5 Floors
SourceApprovals record
Additional permit number in filing
Details0997/HMDA/SWBP/2025, recorded under Nizampet Municipal Corporation
SourceApprovals record
Approved layout reference
Details4557/LO/PLG/HMDA/2008 is cited in the permit record
Commencement / completion status
DetailsPermit sets construction commencement before 11/05/2026 and completion before 12/11/2028; supplied extraction says completion is not certified
Occupancy certificate
DetailsNot supplied; permit conditions require an occupancy certificate before occupation and public utility connections
Mortgage record cited in permit
DetailsMortgage Deed 24703/2025, dated 03/11/2025, over 116.67 sq.m on the fifth floor in favour of the Metropolitan Commissioner, HMDA
Promoter declaration
DetailsForm B affidavit dated 11 March 2026, including the promoter’s stated title, encumbrance and completion declarations
Filed allotment and agreement templates
DetailsPartially completed allotment letter and agreement-for-sale template are recorded; the supplied extracts do not identify a completed buyer-specific agreement
SourceDocument index

The HMDA layout lookup is reported as publicly unavailable in the supplied record; this indicates that the public lookup could not be completed, not that approval was refused. No occupancy/completion certificate appears in the supplied evidence. HMDA Document index

Frequently asked questions

Is BALAJI NILAYAM registered with Telangana RERA?

Yes. BALAJI NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02200010701; the registration status is New Project.

Who is the developer of BALAJI NILAYAM?

The promoter named in the RERA registration is M/s S K M INFRA DEVELOPERS.

Where is BALAJI NILAYAM located?

BALAJI NILAYAM is in PRAGATHI NAGAR, Bachupally, Medchal-Malkajgiri, Telangana (500090).

When will BALAJI NILAYAM be completed?

The promoter's proposed date of completion filed with RERA is 12/03/2029. This is the promoter's declaration, not a guarantee.

More projects in Pragathi Nagar