EASTERN HI WAY CITY is a plotted development in Tharamathipet, Abdullapurmet Mandal, Ranga Reddy District. The registered promoter is Gyarala Shobha. The project has a total site area of 9,540.44 sq.m and shows 25 residential plots, with drawing-derived areas ranging from 153.01 sq.m (183.0 sq.yd) to 542.65 sq.m (649.0 sq.yd). It is registered under TG-RERA number P02400009260, with proposed completion on 01/04/2028.

01What we found

RegisteredTG-RERA
20documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Tharamathipet, Abdullapurmet, Ranga Reddy · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered nameEASTERN HI WAY CITY RERA record
Project typePlotted development / proposed residential draft layout RERA record
Phase or registered portionA layout in Survey No. 170/PART; separate phase designation not disclosed RERA record
TG-RERA registrationP02400009260 RERA record
Registration validity23/12/2024 to 01/12/2027, unless extended by the Authority
Registered promoterGyarala Shobha
RERA statusRegistered; project record labels it “New Project” RERA record

Land and geographic identity

ItemRecord
Locality / revenue villageTharamathipet; locality field also records ABDULLAPURMET RERA record RERA filing
Mandal / district / PINAbdullapurmet / Ranga Reddy / 501505 RERA record RERA filing
Project survey number and subdivision170/PART RERA record Land records
Registered site area9,540.44 sq.m total site area; 876.17 sq.m affected by master-plan road; 8,664.27 sq.m net site area RERA filing
Boundaries filedEast and north: remaining land of owner in Sy. No. 170A; west: existing 66 wide road; south: neighbour’s land in Sy. No. 178 RERA filing
Cadastral contextBhu Bharati survey entry for 170/PART reports a whole-survey extent of 88,290.92 sq.m; it is not identified as the project’s site extent Cadastral map

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA) Approvals record
Principal layout permit000073/LO/Plg/HMDA/2024, dated 23 December 2024; the filed plan also bears file number 062553/GHT/LT/U6/HMDA/04042024 Approvals record
Approval status / scopeHMDA draft layout letter technically approves and forwards a draft open-plot layout proposal; a final layout release is not evidenced in the supplied record
Plots25 shown on the drawing-derived layout record Layout record
Approved built-up areaNot disclosed; this is a plotted layout, not a building proposal RERA filing
Building count, floors and building-parking levelsNot disclosed; no building configuration is established by the supplied layout records Document index
Layout roads / open space / public-purpose areasThe HMDA draft-letter area statement records net site area 8,664.27 sq.m, layout roads 2,210.61 sq.m, park 768.83 sq.m, and social infrastructure 222.22 sq.m

Offering and status

ItemRecord
OfferingResidential plots; individual plot areas are software-read from the layout drawing, not RERA-filed unit saleable areas Layout record
Plot count and size range25 plots; drawing-derived areas range from 153.01 sq.m (183.0 sq.yd) to 542.65 sq.m (649.0 sq.yd) Layout record
Booked / available plotsNot established in the supplied records RERA record Document index
Construction stageRERA filing labels the project “New Project”; no independent site-progress verification is supplied RERA record
Proposed completion01/04/2028 in the project fields RERA filing
Registration validitySeparately, the registration certificate states validity through 01/12/2027, unless extended
Occupancy / completion certificateNot applicable as a disclosed building status for this plotted-layout record; no project OC or completion certificate is supplied Document index

2. The project story

EASTERN HI WAY CITY is registered as a plotted development in Tharamathipet Village, Abdullapurmet Mandal, Ranga Reddy District. The RERA certificate identifies the registered portion as Survey No. 170/PART, and HMDA’s filed draft-layout material describes a proposed residential open-plot layout on the same survey reference. RERA record

The layout drawing records 25 plots. Its area statement allocates land to plotted area, internal roads, park/open space, utility and social infrastructure. HMDA’s draft layout letter permits sale of plots other than the mortgaged plots, subject to the stated layout conditions; it also says building permissions are not to be released in the layout until development works are completed and the mortgaged land is released. The supplied records do not establish final layout release, actual construction progress, plot bookings or completed on-site facilities. Layout record

The proposed completion date recorded in the RERA project fields is 01/04/2028. This is distinct from the registration certificate’s validity end date of 01/12/2027. RERA filing

3. Master plan, architecture & building design

The HMDA draft layout records a 9,540.44 sq.m total site area, including 876.17 sq.m affected by master-plan road, leaving 8,664.27 sq.m net site area. The drawing-derived layout record describes 5,462.46 sq.m as plotted area, 2,210.61 sq.m as layout roads, 768.83 sq.m as organized open space/park and 222.22 sq.m as social infrastructure. A separate utility area of 116.90 sq.m is identified in the filed drawing extraction. RERA filing

The layout plan shows 25 plots. Its filed road-width information includes a 45.00 abutting road, 20 and 18.86 road entries, and other drawing dimensions; the HMDA draft-letter extraction separately lists road descriptions including an 18 mts road and 60 feet. The plan also identifies a 2M wide cycle / walking track in the RERA-filed drawing extraction. Layout record

This is a plotted layout, so no apartment-building footprint, tower arrangement, floor configuration, building height, lifts or stairs are established by the supplied records. HMDA’s draft letter states a maximum residential building height of 15 mtrs and residential building ground coverage not exceeding 25%; these are approval conditions, not evidence of buildings already constructed.

4. Homes, configurations & floor plans

No apartment configurations or RERA-filed saleable areas are provided. The project is a plotted development.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading
Residential plots25 plots shown on the layout drawing Layout recordNot disclosedNot disclosedNot supplied by plot numberNot applicableNot supplied

Software-measured drawing data records plot areas from 153.01 sq.m (183.0 sq.yd) to 542.65 sq.m (649.0 sq.yd), with median 167.23 sq.m (200.0 sq.yd). These are drawing-derived plot measurements, not a RERA-filed unit-area schedule. Layout record

5. Parking & vehicle circulation

The supplied records do not establish a parking-space count, visitor or accessible parking provision, or an exclusive parking allocation to any plot. The layout includes internal roads and road connections, but does not establish separate vehicle-entry/exit arrangements, pedestrian segregation or EV-charging provision. Layout record

The HMDA draft layout identifies plots 19, 20, 21 and 22, measuring 840.41 sq.m, as mortgaged to HMDA pending layout development requirements. Those plots are not shown as freely saleable under the draft-letter conditions.

6. Amenities, recreation & open spaces

The records describe proposed layout areas and facilities; they do not establish independent completion or operational status.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / organized open space768.83 sq.m in the HMDA draft-letter area statement; the filed drawing extraction separately identifies 651.93 sq.m as park areaHMDA draft layout and RERA-filed layout drawingProposed / shown in layout; completion not verified
Utility area116.90 sq.mRERA-filed drawing extraction and municipal submissionIdentified for utility use; completion not verified
Social infrastructure222.22 sq.mHMDA draft layout and municipal submissionIdentified in layout; completion not verified
Community buildingsNo size or facility detail suppliedRERA amenity record RERA amenitiesListed without progress evidence
Internal roads and footpathsLayout road area 2,210.61 sq.mHMDA draft layout; RERA amenity record RERA amenitiesListed / proposed; completion not verified
Avenue plantationsTrees indicated in the layout materialRERA-filed layout drawing and HMDA draft conditionsPlanned; planting and survival not verified
Cycle / walking track2M wideRERA-filed layout drawing extractionShown in drawing; completion not verified

7. Utilities, building services & safety

The layout material identifies proposed internal water-supply pipelines, an overhead tank, a sump, a common septic tank / STP, underground drainage lines, storm-water drains, electrical supply lines, street lighting, a transformer/transformer yard, percolation and rainwater-harvesting pits, garbage and bio-compost facilities. The RERA amenity record also lists water supply, sewerage, storm-water drainage, solid-waste management, energy management and fire-protection/safety requirements, but does not provide capacities or completion evidence. RERA amenities

HMDA’s draft letter requires layout development works including road formation, drains, underground drainage, common septic tank / STP, internal water supply, an overhead tank, assured water supply source, electrical lines and street lights, transformer, avenue planting, park development and rainwater-harvesting pits. It also states that development works are to be completed within THREE (3) YEARS. These are stated requirements/proposals; the supplied records do not independently verify installation or operation.

The filed drawing extraction additionally identifies Harvesting pits 4'X4'X6', a septic tank plan and a percolation pit. No supplied record establishes water-source yield, storage capacity, treatment capacity, backup power, security systems, accessibility arrangements or building fire-system design.

8. Location, access & connectivity

The registered location is Tharamathipet, Abdullapurmet Mandal, Ranga Reddy District, Telangana, PIN 501505. The project fields describe the west boundary as an existing 66 wide road. The layout records internal roads and a 45.00 abutting road. RERA record RERA filing RERA filing

The supplied location data places the cadastral parcel centroid at 17.3700324138337, 78.69857469250782 and records the nearest sampled Outer Ring Road interchange at approximately 9.1 km. Cadastral map Location record

9. Developer & development status

The TG-RERA registration certificate names Gyarala Shobha as promoter. The project identity data uses “GYARALA” as promoter, while the certificate identifies the individual promoter; legal entity type and corporate identifiers are not established in the supplied records. RERA record Corporate record

The RERA project fields state a proposed completion date of 01/04/2028. The registration certificate states registration validity to 01/12/2027, unless extended. The Form-B extraction contains promoter undertakings concerning separate-account withdrawals, annual audit, pending approvals and non-discrimination; its OCR does not establish the promoter, project registration number, title basis or completion undertaking. No independently verified construction progress or occupancy/completion certification is supplied. RERA filing

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C registration certificate for EASTERN HI WAY CITY, P02400009260, identifying Gyarala Shobha and Survey No. 170/PART; valid 23/12/2024 to 01/12/2027 unless extended
HMDA draft layoutDraft layout letter dated 23 December, 2024, permit 000073/LO/Plg/HMDA/2024, application 062553/GHT/LT/U6/HMDA/04042024, for a proposed layout in Survey No. 170/PART
Layout drawingRERA-filed layout-plan drawing extraction, showing 25 plots and layout-area information; drawing sheets are available in the project record Layout record
Municipal submissions / gift-deed referencesSubmission material records road-widening gift deed Doc. No. 9006/2024 and open-areas gift deed Doc. No. 9005/2024; the submission itself is not an approval or title-transfer deed
Mortgage referenceHMDA draft-layout material records mortgage deed Doc. No. 9007/2024, dated 21/11/2024, covering plots 19–22 and 840.41 sq.m
Commencement / building approvalsNo building commencement certificate or building-plan approval is established by the supplied records for this plotted layout Document index
Occupancy / completion certificateNone supplied Document index

The HMDA DPMS approved-layout lookup is recorded as unavailable to public access in the supplied evidence; this does not establish approval refusal. HMDA

Frequently asked questions

Is EASTERN HI WAY CITY registered with Telangana RERA?

Yes. EASTERN HI WAY CITY is registered with the Telangana Real Estate Regulatory Authority as P02400009260; the registration status is New Project.

Who is the developer of EASTERN HI WAY CITY?

The promoter named in the RERA registration is GYARALA.

Where is EASTERN HI WAY CITY located?

EASTERN HI WAY CITY is in ABDULLAPURMET, Tharamathipet, Rangareddy, Telangana (501505).

When will EASTERN HI WAY CITY be completed?

The promoter's proposed date of completion filed with RERA is 01/04/2028. This is the promoter's declaration, not a guarantee.

More projects in Tharamathipet