Capital Crown
INDO INFRA DEVELOPERS PRIVATE LIMITED · Nalgonda · RERA P01800002061
CAPITAL CROWN is a plotted development offering open residential plots in Gundram Palle, Chityal Mandal, Nalgonda District. The registered promoter is INDO INFRA DEVELOPERS PRIVATE LIMITED. The registered site extent is 29,946.738 sq. m; the approval letter states 71 plots, and the supplied layout drawing states 80 plots. TG-RERA registration number P01800002061 has a proposed completion date of 11/04/2022.
More from Indo Infra Developers Pvt Ltd · 3 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
14 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | CAPITAL CROWN RERA record |
| Project type | Plotted development / residential layout RERA record RERA filing |
| Phase / registered portion | Phase not separately identified; RERA registration covers the project as registered Approvals record |
| TG-RERA registration number | P01800002061 RERA record |
| Registration validity | 24/08/2020 to 11/04/2022, subject to extension by the Authority; no extension is recorded on the supplied certificate Approvals record |
| Registered promoter | INDO INFRA DEVELOPERS PRIVATE LIMITED RERA record Corporate record |
| RERA status in supplied record | New Project; registration certificate supplied. Current registration status is not established by the certificate alone. RERA record Approvals record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Gundram Palle; the layout approval document identifies Gundrampally village and Gundrampally Gram Panchayat. RERA record |
| Mandal / district / PIN | Chityal / Nalgonda / 508114 RERA record |
| Project survey numbers as filed | SY 602, 603, 604, 605/P & 609/P RERA record RERA filing |
| Survey numbers in supplied layout approval | Sy.No 602, Sy.No 603, Sy.No 604, Sy.No 605, Sy.No 606/P and Sy.No 609/P |
| Registered site extent | 29,946.738 sq. m; net area 29,946.74 sq. m RERA filing |
| Area stated in layout-approval letter | Ac. 7.40 cts; 35,816.0 SYDS |
| Filed boundaries | North: National Highway 65 Road; East, West and South: “OTHERS LAND” RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning (DTCP); the supplied letter describes draft technical layout approval and delegation to Gundrampally Gram Panchayat. Approvals record |
| Principal approval identifier | Draft - TLP.No. 105/2020/H; RERA filing also lists plan approval number 105/2020/H. Approvals record RERA filing |
| Approval date shown in RERA project information | 12/05/2020 RERA filing |
| Approved area / layout land-use figures stated in the approval letter | Layout area: Ac. 7.40 cts; open-space park: Ac. 0.74 cts (10%); roads: Ac. 2.08 cts (28.10%); plotted area: Ac. 4.58 cts (61.90%); mortgage area: Ac. 0.694 cts (15.15%). |
| Approved built-up area | 29,946.74 sq. m is entered as “Approved Built up Area” in the RERA filing; this is a plotted layout, and the supplied material does not explain this field further. RERA filing |
| Buildings / floors | No residential building count or floor configuration is established in the supplied project record. The approval letter describes a plotted layout and detached single-family dwelling houses. |
| Plot count | Approval letter states 71 plots; the layout drawing states 80 plots. The drawing-derived count is not fully verified against its plot schedule. Layout record |
| Parking | No project-wide sanctioned parking count or plot-wise parking allocation is supplied. Document index |
Offering and status
| Field | Record |
|---|---|
| Offer type | Open residential plots RERA record RERA filing |
| RERA-declared completion deadline | 11/04/2022 RERA record RERA filing |
| Construction / development stage | RERA-derived completeness is recorded as 80%; the underlying date and certification detail are not supplied here. This is not independent site verification. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The project is a plotted development; certificate status for the layout or any individual plot/building is not established by the supplied record. Document index Approvals record |
| Plot sizes / booked and available counts | Not disclosed in the supplied RERA unit data; the layout drawing’s plot-size schedule is incomplete. Layout record Document index |
Registration validity, the promoter’s completion deadline and completion-certificate status are separate matters: the certificate records registration through 11/04/2022, the filed completion date is also 11/04/2022, and no completion or occupancy certificate is included in the supplied documents. RERA filing Document index
2. The project story
CAPITAL CROWN is presented in the TG-RERA record as a plotted residential development at Gundram Palle, Chityal Mandal, Nalgonda District. Its registered land description names SY 602, 603, 604, 605/P and 609/P; the supplied DTCP layout-approval letter additionally names Sy.No 606/P. RERA record RERA filing
The approval letter describes a draft layout with plotted land, internal roads and a reserved open-space park, and states that only detached single-family dwelling houses are to be built on individual sites. It also requires roads to remain accessible to neighbouring sites and prohibits shops, business premises and industrial units except on sites specially reserved for such uses in the draft plan. The approval letter states 71 plots; the supplied layout-drawing record gives a stated count of 80, but does not include a complete plot schedule for verification. Layout record
The RERA record gives an 80% completeness figure, but the supplied material does not specify its as-of date, components completed or an independent inspection basis. It should therefore be read as a recorded progress figure, not as independently verified physical completion. No occupancy or completion certificate is supplied. RERA record Document index
3. Master plan, architecture & building design
The supplied DTCP letter is for a draft technical layout pattern, not a multi-storey building plan. It states a layout area of Ac. 7.40 cts (35,816.0 SYDS), comprising a 10% open-space park, 28.10% roads and 61.90% plotted area; it separately identifies a 15.15% mortgage area. The letter requires demarcation on the ground, formation and metalling of roads, drains and nala channelization, rainwater-harvesting pits, avenue planting, street lighting and electricity, sewerage disposal and protected water supply.
The approval letter specifies a two-year period from Gram Panchayat approval for execution of the draft layout and requires the open space and roads to be transferred to the Gram Panchayat by registered gift deed before final layout release. It also identifies Plot Nos. 1, 2, 4 and 5 as plots to be mortgaged to the Gram Panchayat. The supplied material does not establish the layout’s final release or document completion of those transfers.
A layout drawing is available as one sheet, but its plot schedule is incomplete: the drawing record states 80 plots and reports no plot sizes available for the extracted schedule. The plotted-area count and sizes therefore cannot be reliably described from the supplied drawing-derived data. Layout record The RERA filing’s “Approved Built up Area” entry is 29,946.74 sq. m; no building-by-building or floor-area breakdown is provided, and no separate FSI-counted, gross built-up, saleable or carpet-area figure is supplied. RERA filing
4. Homes, configurations & floor plans
This is a plotted offering rather than an apartment configuration schedule. The supplied RERA material identifies open plots, but does not provide plot-wise RERA saleable areas, plot-size bands, booked plots or available plots. Promoter website Layout record The layout drawing’s extracted plot schedule is incomplete and lists no plot sizes. Layout record
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Open residential plots | Not disclosed in supplied RERA unit data; approval letter states 71 plots | Not disclosed | Not disclosed | Not disclosed | Not applicable to plots | Not supplied |
The separate layout-drawing record states 80 plots, but its plot schedule is incomplete. This is a drawing-derived count, not a RERA unit count. Layout record No apartment floor plans or plot dimensions suitable for a unit-by-unit configuration description are supplied. Floor plans Layout record
5. Parking & vehicle circulation
The supplied material does not establish a sanctioned project-wide parking count, visitor or accessible parking provision, or plot-wise parking allocation. No parking levels, parking ramps or separate vehicle-entry arrangements are documented. Document index
The layout-approval letter requires formation of roads, access to neighbouring sites and corner-site splay-offs at street junctions. These are layout conditions; they do not establish parking spaces or exclusive parking rights for any buyer.
6. Amenities, recreation & open spaces
The layout-approval letter provides for a reserved open-space park, roads and certain layout infrastructure. The promoter’s submitted amenity list additionally describes facilities, but those entries are promoter-provided descriptions and are not evidence that the facilities have been delivered. Promoter website The RERA amenity-progress extract supplies reported percentages; these are not identified as independently inspected measurements. RERA amenities
| Description / size | Approval letter states Ac. 0.74 cts (10%) reserved for open-space park; transfer to Gram Panchayat by registered gift deed is a stated condition before final layout release. |
|---|---|
| Declared progress / verified status | RERA amenity record reports recreational open space 100%; independent completion and handover are not established. RERA amenities |
| Description / size | Promoter-listed facility; no size or capacity supplied. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Promoter-described; no independent completion evidence supplied. |
| Description / size | Promoter-listed facility; no size or capacity supplied. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Promoter-described; RERA amenity record lists community buildings at 0%. Promoter website RERA amenities |
| Description / size | Promoter-listed facility; no size or capacity supplied. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Promoter-described; no independent completion evidence supplied. |
| Description / size | Required in the layout-approval conditions and also promoter-listed. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | RERA amenity record reports Green Strip/TOT LOT/Park at 50%; no independent completion evidence supplied. RERA amenities |
| Description / size | Layout approval requires road formation, suitable gradients, sub-surface work, kerbstones and metalling of carriageways. |
|---|---|
| Declared progress / verified status | RERA amenity record reports 100%; independent verification not supplied. RERA amenities |
| Description / size | Promoter-listed features; no dimensions supplied. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Promoter-described; no independent completion evidence supplied. |
7. Utilities, building services & safety
The layout-approval conditions require drains and nala channelization for storm-water runoff, rainwater-harvesting pits, street lighting and electricity facilities, sewerage disposal, and protected water supply. These are approval conditions; the supplied material does not establish that each has been completed or provide system capacities.
The RERA amenity-progress extract reports water supply at 50%, sewerage (chamber, lines, septic tank, STP) at 60%, street lighting at 10%, and an electrical meter room/sub-station/receiving station at 50%. Storm-water drains, sewage/sullage treatment and disposal, solid-waste management, water conservation/rainwater harvesting and energy management are each shown at 0%. Fire protection and fire-safety requirements are shown at 90%. These are reported progress values; no independent inspection or detailed design/capacity documents are supplied. RERA amenities
The promoter’s submitted specifications list water supply to each plot, underground drainage, electricity and street lights. These are promoter descriptions and do not establish completion, source, storage capacity, treatment arrangements, backup power, waste segregation, security systems, accessibility provisions or fire-system compliance. Promoter website
8. Location, access & connectivity
The registered project location is Gundram Palle, Chityal Mandal, Nalgonda District, PIN 508114. The RERA land record gives National Highway 65 Road as the north boundary. RERA record RERA filing The layout-approval letter identifies Gundrampally village and Gundrampally Gram Panchayat.
A supplied location record gives the nearest sampled Outer Ring Road interchange at 40.8 km (approx.) from the project’s cadastral parcel centroid. Location record The promoter separately describes the project as abutting the Hyderabad–Vijayawada Highway and near Panthangi Tollgate and the Regional Ring Road; these are promoter claims, not independently verified distances or travel times. Promoter website
9. Developer & development status
The registered promoter is INDO INFRA DEVELOPERS PRIVATE LIMITED, a company, with GSTIN 36AACCI8151M1Z8. The RERA filing lists Madhava Rao Mallem as a director and Siva Ganesh Babu Mallem as an authorized signatory. Corporate record Parties record
The project record lists the promoter’s address as 1ST FLOOR, STREET NO 2, RTC COLONY, GUNDRAM PALLE, GUNDRAM PALLE, Chityal, Nalgonda, 508114. Parties record The supplied registration certificate separately records the promoter office as “Village: Mandal: District: Ranga Reddy, Pin: 500074.” The promoter website supplied in the record is https://www.indoinfra.in/property-details/capital-crown. Parties record
The promoter’s Form B declaration, dated 13 July 2020, states a completion undertaking of 11 April 2022 and describes its undertakings on title, encumbrances, project funds and pending approvals. These are promoter declarations. The RERA record separately reports 80% completeness; the supplied evidence does not identify the certification date or an independent inspection. RERA record No occupancy or completion certificate is included in the supplied documents. Document index
10. Approvals, official records & documents
| Record | Supplied evidence and scope |
|---|---|
| TG-RERA registration | Form C certificate for CAPITAL CROWN, P01800002061, issued 24/08/2020 and valid through 11/04/2022 unless extended by the Authority; no extension is recorded on the supplied certificate. |
| Layout approval | DTCP letter Draft - TLP.No. 105/2020/H, file Lr.Roc.No. 10421/609/2020/H, for a draft technical layout at Gundrampally, Chityal Mandal, Nalgonda District. The letter identifies the applicant/developer as M/s Indo Infra Developers Pvt. Ltd. and delegates to Gundrampally Gram Panchayat. |
| RERA-filed plan identifier | Plan approval number 105/2020/H is entered in the RERA project information. RERA filing |
| Layout drawing | One-sheet layout drawing is listed; extracted plot count and plot-size schedule are incomplete. Layout record |
| Promoter declaration | Form B affidavit-cum-declaration by M. Shiva Ganesh Babu representing Indo Infra Developers Private Limited, dated 13 July 2020. |
| Title and encumbrance documents | Title reports and encumbrance statements are present in the supplied project file; their detailed title and encumbrance analysis is addressed in the relevant report sections. Document index |
| Completion / occupancy certificate | No such certificate is included in the supplied document set. Document index |
1. Project at a glance
Project identity
Registered project name: CAPITAL CROWN
Project type: Plotted development / residential layout
Phase / registered portion: Phase not separately identified; RERA registration covers the project as registered
TG-RERA registration number: P01800002061
Registration validity: 24/08/2020 to 11/04/2022, subject to extension by the Authority; no extension is recorded on the supplied certificate
Registered promoter: INDO INFRA DEVELOPERS PRIVATE LIMITED
RERA status in supplied record: New Project; registration certificate supplied. Current registration status is not established by the certificate alone.
Land and geographic identity
Locality / revenue village: Gundram Palle; the layout approval document identifies Gundrampally village and Gundrampally Gram Panchayat.
Mandal / district / PIN: Chityal / Nalgonda / 508114
Project survey numbers as filed: SY 602, 603, 604, 605/P & 609/P
Survey numbers in supplied layout approval: Sy.No 602, Sy.No 603, Sy.No 604, Sy.No 605, Sy.No 606/P and Sy.No 609/P
Registered site extent: 29,946.738 sq. m; net area 29,946.74 sq. m
Area stated in layout-approval letter: Ac. 7.40 cts; 35,816.0 SYDS
Filed boundaries: North: National Highway 65 Road; East, West and South: “OTHERS LAND”
Development identity
Sanctioning authority: Director of Town and Country Planning (DTCP); the supplied letter describes draft technical layout approval and delegation to Gundrampally Gram Panchayat.
Principal approval identifier: Draft - TLP.No. 105/2020/H; RERA filing also lists plan approval number 105/2020/H.
Approval date shown in RERA project information: 12/05/2020
Approved area / layout land-use figures stated in the approval letter: Layout area: Ac. 7.40 cts; open-space park: Ac. 0.74 cts (10%); roads: Ac. 2.08 cts (28.10%); plotted area: Ac. 4.58 cts (61.90%); mortgage area: Ac. 0.694 cts (15.15%).
Approved built-up area: 29,946.74 sq. m is entered as “Approved Built up Area” in the RERA filing; this is a plotted layout, and the supplied material does not explain this field further.
Buildings / floors: No residential building count or floor configuration is established in the supplied project record. The approval letter describes a plotted layout and detached single-family dwelling houses.
Plot count: Approval letter states 71 plots; the layout drawing states 80 plots. The drawing-derived count is not fully verified against its plot schedule.
Parking: No project-wide sanctioned parking count or plot-wise parking allocation is supplied.
Offering and status
Offer type: Open residential plots
RERA-declared completion deadline: 11/04/2022
Construction / development stage: RERA-derived completeness is recorded as 80%; the underlying date and certification detail are not supplied here. This is not independent site verification.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The project is a plotted development; certificate status for the layout or any individual plot/building is not established by the supplied record.
Plot sizes / booked and available counts: Not disclosed in the supplied RERA unit data; the layout drawing’s plot-size schedule is incomplete.
Registration validity, the promoter’s completion deadline and completion-certificate status are separate matters: the certificate records registration through 11/04/2022, the filed completion date is also 11/04/2022, and no completion or occupancy certificate is included in the supplied documents.
2. The project story
CAPITAL CROWN is presented in the TG-RERA record as a plotted residential development at Gundram Palle, Chityal Mandal, Nalgonda District. Its registered land description names SY 602, 603, 604, 605/P and 609/P; the supplied DTCP layout-approval letter additionally names Sy.No 606/P.
The approval letter describes a draft layout with plotted land, internal roads and a reserved open-space park, and states that only detached single-family dwelling houses are to be built on individual sites. It also requires roads to remain accessible to neighbouring sites and prohibits shops, business premises and industrial units except on sites specially reserved for such uses in the draft plan. The approval letter states 71 plots; the supplied layout-drawing record gives a stated count of 80, but does not include a complete plot schedule for verification.
The RERA record gives an 80% completeness figure, but the supplied material does not specify its as-of date, components completed or an independent inspection basis. It should therefore be read as a recorded progress figure, not as independently verified physical completion. No occupancy or completion certificate is supplied.
3. Master plan, architecture & building design
The supplied DTCP letter is for a draft technical layout pattern, not a multi-storey building plan. It states a layout area of Ac. 7.40 cts (35,816.0 SYDS), comprising a 10% open-space park, 28.10% roads and 61.90% plotted area; it separately identifies a 15.15% mortgage area. The letter requires demarcation on the ground, formation and metalling of roads, drains and nala channelization, rainwater-harvesting pits, avenue planting, street lighting and electricity, sewerage disposal and protected water supply.
The approval letter specifies a two-year period from Gram Panchayat approval for execution of the draft layout and requires the open space and roads to be transferred to the Gram Panchayat by registered gift deed before final layout release. It also identifies Plot Nos. 1, 2, 4 and 5 as plots to be mortgaged to the Gram Panchayat. The supplied material does not establish the layout’s final release or document completion of those transfers.
A layout drawing is available as one sheet, but its plot schedule is incomplete: the drawing record states 80 plots and reports no plot sizes available for the extracted schedule. The plotted-area count and sizes therefore cannot be reliably described from the supplied drawing-derived data. The RERA filing’s “Approved Built up Area” entry is 29,946.74 sq. m; no building-by-building or floor-area breakdown is provided, and no separate FSI-counted, gross built-up, saleable or carpet-area figure is supplied.
4. Homes, configurations & floor plans
This is a plotted offering rather than an apartment configuration schedule. The supplied RERA material identifies open plots, but does not provide plot-wise RERA saleable areas, plot-size bands, booked plots or available plots. The layout drawing’s extracted plot schedule is incomplete and lists no plot sizes.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Open residential plots | Not disclosed in supplied RERA unit data; approval letter states 71 plots | Not disclosed | Not disclosed | Not disclosed | Not applicable to plots | Not supplied |
The separate layout-drawing record states 80 plots, but its plot schedule is incomplete. This is a drawing-derived count, not a RERA unit count. No apartment floor plans or plot dimensions suitable for a unit-by-unit configuration description are supplied.
5. Parking & vehicle circulation
The supplied material does not establish a sanctioned project-wide parking count, visitor or accessible parking provision, or plot-wise parking allocation. No parking levels, parking ramps or separate vehicle-entry arrangements are documented.
The layout-approval letter requires formation of roads, access to neighbouring sites and corner-site splay-offs at street junctions. These are layout conditions; they do not establish parking spaces or exclusive parking rights for any buyer.
6. Amenities, recreation & open spaces
The layout-approval letter provides for a reserved open-space park, roads and certain layout infrastructure. The promoter’s submitted amenity list additionally describes facilities, but those entries are promoter-provided descriptions and are not evidence that the facilities have been delivered. The RERA amenity-progress extract supplies reported percentages; these are not identified as independently inspected measurements.
| Description / size | Approval letter states Ac. 0.74 cts (10%) reserved for open-space park; transfer to Gram Panchayat by registered gift deed is a stated condition before final layout release. |
|---|---|
| Declared progress / verified status | RERA amenity record reports recreational open space 100%; independent completion and handover are not established. |
| Description / size | Promoter-listed facility; no size or capacity supplied. |
|---|---|
| Declared progress / verified status | Promoter-described; no independent completion evidence supplied. |
| Description / size | Promoter-listed facility; no size or capacity supplied. |
|---|---|
| Declared progress / verified status | Promoter-described; RERA amenity record lists community buildings at 0%. |
| Description / size | Promoter-listed facility; no size or capacity supplied. |
|---|---|
| Declared progress / verified status | Promoter-described; no independent completion evidence supplied. |
| Description / size | Required in the layout-approval conditions and also promoter-listed. |
|---|---|
| Declared progress / verified status | RERA amenity record reports Green Strip/TOT LOT/Park at 50%; no independent completion evidence supplied. |
| Description / size | Layout approval requires road formation, suitable gradients, sub-surface work, kerbstones and metalling of carriageways. |
|---|---|
| Declared progress / verified status | RERA amenity record reports 100%; independent verification not supplied. |
| Description / size | Promoter-listed features; no dimensions supplied. |
|---|---|
| Declared progress / verified status | Promoter-described; no independent completion evidence supplied. |
7. Utilities, building services & safety
The layout-approval conditions require drains and nala channelization for storm-water runoff, rainwater-harvesting pits, street lighting and electricity facilities, sewerage disposal, and protected water supply. These are approval conditions; the supplied material does not establish that each has been completed or provide system capacities.
The RERA amenity-progress extract reports water supply at 50%, sewerage (chamber, lines, septic tank, STP) at 60%, street lighting at 10%, and an electrical meter room/sub-station/receiving station at 50%. Storm-water drains, sewage/sullage treatment and disposal, solid-waste management, water conservation/rainwater harvesting and energy management are each shown at 0%. Fire protection and fire-safety requirements are shown at 90%. These are reported progress values; no independent inspection or detailed design/capacity documents are supplied.
The promoter’s submitted specifications list water supply to each plot, underground drainage, electricity and street lights. These are promoter descriptions and do not establish completion, source, storage capacity, treatment arrangements, backup power, waste segregation, security systems, accessibility provisions or fire-system compliance.
8. Location, access & connectivity
The registered project location is Gundram Palle, Chityal Mandal, Nalgonda District, PIN 508114. The RERA land record gives National Highway 65 Road as the north boundary. The layout-approval letter identifies Gundrampally village and Gundrampally Gram Panchayat.
A supplied location record gives the nearest sampled Outer Ring Road interchange at 40.8 km (approx.) from the project’s cadastral parcel centroid. The promoter separately describes the project as abutting the Hyderabad–Vijayawada Highway and near Panthangi Tollgate and the Regional Ring Road; these are promoter claims, not independently verified distances or travel times.
9. Developer & development status
The registered promoter is INDO INFRA DEVELOPERS PRIVATE LIMITED, a company, with GSTIN 36AACCI8151M1Z8. The RERA filing lists Madhava Rao Mallem as a director and Siva Ganesh Babu Mallem as an authorized signatory.
The project record lists the promoter’s address as 1ST FLOOR, STREET NO 2, RTC COLONY, GUNDRAM PALLE, GUNDRAM PALLE, Chityal, Nalgonda, 508114. The supplied registration certificate separately records the promoter office as “Village: Mandal: District: Ranga Reddy, Pin: 500074.” The promoter website supplied in the record is https://www.indoinfra.in/property-details/capital-crown.
The promoter’s Form B declaration, dated 13 July 2020, states a completion undertaking of 11 April 2022 and describes its undertakings on title, encumbrances, project funds and pending approvals. These are promoter declarations. The RERA record separately reports 80% completeness; the supplied evidence does not identify the certification date or an independent inspection. No occupancy or completion certificate is included in the supplied documents.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for CAPITAL CROWN, P01800002061, issued 24/08/2020 and valid through 11/04/2022 unless extended by the Authority; no extension is recorded on the supplied certificate.
Layout approval: DTCP letter Draft - TLP.No. 105/2020/H, file Lr.Roc.No. 10421/609/2020/H, for a draft technical layout at Gundrampally, Chityal Mandal, Nalgonda District. The letter identifies the applicant/developer as M/s Indo Infra Developers Pvt. Ltd. and delegates to Gundrampally Gram Panchayat.
RERA-filed plan identifier: Plan approval number 105/2020/H is entered in the RERA project information.
Layout drawing: One-sheet layout drawing is listed; extracted plot count and plot-size schedule are incomplete.
Promoter declaration: Form B affidavit-cum-declaration by M. Shiva Ganesh Babu representing Indo Infra Developers Private Limited, dated 13 July 2020.
Title and encumbrance documents: Title reports and encumbrance statements are present in the supplied project file; their detailed title and encumbrance analysis is addressed in the relevant report sections.
Completion / occupancy certificate: No such certificate is included in the supplied document set.
Frequently asked questions
Is CAPITAL CROWN registered with Telangana RERA?
Yes. CAPITAL CROWN is registered with the Telangana Real Estate Regulatory Authority as P01800002061; the registration status is New Project.
Who is the developer of CAPITAL CROWN?
The promoter named in the RERA registration is INDO INFRA DEVELOPERS PRIVATE LIMITED.
Where is CAPITAL CROWN located?
CAPITAL CROWN is in GUNDRAM PALLE, Chityal, Nalgonda, Telangana (508114).
When will CAPITAL CROWN be completed?
The promoter's proposed date of completion filed with RERA is 11/04/2022. This is the promoter's declaration, not a guarantee.