Sign in

Maruthi Township

ADEPUKRISHNAKUMAR AND TWO INDIVIDUALS · Mancherial · RERA P01200009972

MARUTHI TOWNSHIP is a plotted development at Laxmipur, Luxettipet mandal, Mancherial district. The registered promoter is ADEPUKRISHNAKUMAR AND TWO INDIVIDUALS. The project is recorded on 30649.88 sqmts of land, with a proposed 109-plot layout; plot configurations are not stated. It is registered under TG-RERA number P01200009972, with proposed completion on 22/11/2025.

01What we found

Period endedTG-RERA registration ran to 22 Nov 2025 - check its extension on TG-RERA
13documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Laxmipur, Luxettipet, Mancherial · geocoded — approximate.

1. Project at a glance

Project identity

FieldRecord
Registered project nameMARUTHI TOWNSHIP RERA record
Project typePlotted development; the DTCP filing describes a proposed 109-plot layout. RERA record
Phase / registered portionNo separate phase name or phase-wise boundary is disclosed. The RERA certificate identifies Survey No. 386/PART.
TG-RERA registrationP01200009972; certificate states registration was valid from 22/11/2023 to 22/11/2025. The supplied record shows no extension. Registration validity is distinct from the project’s completion date. RERA record
Registered promoterADEPUKRISHNAKUMAR AND TWO INDIVIDUALS; the filing describes the organization type as “Others” and “THREE INDIVIDUALS.” RERA record RERA filing
RERA statusListed as On-Going Project in the supplied project record. RERA record

Land and geographic identity

FieldRecord
Locality / revenue villageLAXMIPUR / Laxmipur RERA record RERA filing
MandalLuxettipet RERA record
DistrictMancherial RERA record
PIN504273 RERA record
Project survey number(s)386/PART in the RERA identity and registration certificate; the DTCP draft layout specifies Sy.No.386/Part. The Gram Panchayat proceedings identify 386/A/1, 386/A/2 and 386/A/3. RERA record
Registered site areaRERA land details state total area 30649.88 sqmts and net area 30649.88 sqmts. RERA filing Land records
Area stated in layout approvalsDTCP draft layout and Gram Panchayat proceedings each state Ac. 7.574 Cents; 36658.16 Sq. Yds.
Boundaries in RERA filingEast: ROAD; West: ROAD; North: OTHERSLAND; South: OTHERS LAND. RERA filing

Development identity

FieldRecord
Sanctioning authorityDirector of Town and Country Planning (DTCP); the draft technical layout was delegated to Laxmipur Gram Panchayat. Gram Panchayat proceedings also record technical layout permission.
Principal approvalDraft Technical Layout Pattern Draft-TLP.No.249/2023/W, approved 22-11-2023; plan approval number filed with RERA: 249/2023. Approvals record
Gram Panchayat proceedingsProc. No.GPI/ 01/Laxmipur/2023, dated 16-01-2024. Approvals record
Approved built-up areaRERA filing reports approved built-up area of 17777.25 sqmts; the supplied layout documents do not describe this as an area for buildings. RERA filing
Layout scale and land-use splitThe DTCP draft layout records 109 Numbers of plots, Ac. 4.393 Cents; 21262.12 Sq.Yds. plotted area, Ac. 2.423 Cents; 11727.32 Sq.Yds. roads, and Ac. 0.758 Cents; 3668.72 Sq.Yds. open space reserved for park purpose.
Buildings / floors / parking levelsNot disclosed in the supplied records. This is a plotted layout, not a multi-storey building description.

Offering and status

FieldRecord
OfferingPlots in a proposed 109-plot layout; plot-wise dimensions, size bands, inventory and sale status are not supplied.
Mortgage-reserved plotsThe DTCP draft layout identifies Plot Nos. 72 to 80, 84 to 92 as mortgaged plots, extent Ac.0.688 Cents; 3329.92 Sq.Yds.
Construction / development stageThe project record gives completeness of 80%; this is a recorded progress figure, not an independent site inspection. RERA record
Completion dateRERA project identity states proposed completion 22/11/2025. The Form B extraction also contains a completion undertaking OCR-read as 22/112035, whose date is not reliably legible. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied in the reviewed project documents. The available approval documents are layout permissions, not an OC. Document index

2. The project story

MARUTHI TOWNSHIP is registered as a plotted development at Laxmipur village in Luxettipet mandal, Mancherial district. Its RERA identity is Survey No. 386/PART; the DTCP draft layout refers to Sy.No.386/Part, and Gram Panchayat proceedings specify 386/A/1, 386/A/2 and 386/A/3. RERA record

The approval documents describe a 109-plot layout, with land identified for plots, roads and a park. The Gram Panchayat proceedings require internal roads and the roads and open spaces to be handed over by registered gift deed; the DTCP conditions also require development works and release of the mortgaged plots before final layout release. The documents describe a layout permission and its conditions, not completed delivery of those works.

The supplied project record reports 80% completeness. No independent site-verification evidence is provided to confirm that progress figure. No plot-wise inventory, booking status, possession information or occupancy/completion certificate is included in the reviewed materials. RERA record Document index

3. Master plan, architecture & building design

The available design evidence concerns a plotted layout, not apartment blocks or villas. The DTCP draft layout records Ac. 7.574 Cents; 36658.16 Sq. Yds. total layout area, including Ac. 4.393 Cents; 21262.12 Sq. Yds. of plotted area, Ac. 2.423 Cents; 11727.32 Sq. Yds. of roads and Ac. 0.758 Cents; 3668.72 Sq. Yds. open space reserved for park purpose. It specifies 109 Numbers of plots.

The same draft layout marks Plot Nos. 72 to 80 and 84 to 92, extent Ac.0.688 Cents; 3329.92 Sq. Yds., as mortgage land in favour of Laxmipur Gram Panchayat. Its conditions state that the mortgaged area is not for sale and require roads and open space to be transferred by registered gift deed before final layout release.

The RERA land-details form reports total and net area of 30649.88 sqmts; the approved layout documents separately state their total extent as above. The RERA filing also reports approved built-up area 17777.25 sqmts, but the supplied drawings do not explain its scope or identify building footprints, floor configurations, building count or a building arrangement. RERA filing RERA filing

4. Homes, configurations & floor plans

The offering identified in the layout approval is 109 plots. The supplied records do not provide plot-size bands, plot-by-plot dimensions, RERA booked and available counts, or a plot inventory schedule. Document index

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Plots109 (layout approval)Not disclosedNot disclosedNot disclosedNot applicable / not suppliedNot disclosed

Two drawing records are listed, but both are scans pending review; no measured floor-plan area or room-level measurement is available. The software-measurement record says measurements are not a RERA disclosure and that the drawings have not yet been measured. Floor plans

5. Parking & vehicle circulation

The supplied layout materials do not state parking counts, visitor or accessible parking, parking allocation to individual plots, or dedicated parking areas. The draft layout requires roads to be formed and opened for access to neighbouring sites, but does not provide road widths or detailed vehicle-circulation arrangements in the extracted information.

6. Amenities, recreation & open spaces

The DTCP draft layout reserves open space for park purpose and requires road, open-space, drainage, greenery, lighting, electricity, sewerage and protected water-supply works. The RERA amenity record reports selected infrastructure as available, but the supplied evidence does not independently verify completed delivery. RERA amenities

Park / open space
Description / sizeAc. 0.758 Cents; 3668.72 Sq.Yds. reserved for park purpose in the DTCP draft layout
Declared progress / verified statusReserved in layout approval; completion and handover not independently verified.
Green strip / tot lot / park
Description / sizeRERA amenity record marks available, 100%
Evidence sourceRERA amenities
Declared progress / verified statusRERA-recorded progress; not independently verified.
Street lighting
Description / sizeRequired by layout conditions; RERA amenity record marks available, 100%
Evidence sourceRERA amenities
Declared progress / verified statusRERA-recorded progress; not independently verified.
Internal roads and footpaths
Description / sizeRERA amenity record marks available, 100%; layout conditions require road formation and access
Evidence sourceRERA amenities
Declared progress / verified statusRERA-recorded progress; not independently verified.

No clubhouse or indoor facility, sports facility, or community-building provision is identified in the supplied RERA amenity record. RERA amenities

7. Utilities, building services & safety

The layout approval conditions call for storm-water drains and nala channelization, rainwater-harvesting pits, street lighting, electricity facilities, a sewerage-disposal system and protected water supply. These are stated development requirements; the documents provided do not establish that the systems are complete or specify capacities, treatment processes, storage, backup power, waste management, security, fire systems or accessibility provisions.

The RERA amenity record marks water supply, sewerage (chambers, lines, septic tank/STP), and water conservation/rainwater harvesting as available at 100%. Its entries show 0% for storm-water drains, treatment and disposal of sewage and sullage water, solid-waste management, energy management, fire protection and safety, and electrical meter room/sub-station/receiving station. These are RERA-recorded amenity statuses, not independent verification of services on site. RERA amenities

8. Location, access & connectivity

The registered project location is Laxmipur, Luxettipet mandal, Mancherial district, Telangana 504273. The RERA land record describes roads on the east and west boundaries. The location record supplies one sampled connectivity reference: Outer Ring Road (nearest sampled interchange, approx), 163.3 km. No public-transport information or additional measured landmark distances are supplied. RERA record RERA filing RERA filing Location record

9. Developer & development status

The registered promoter is ADEPUKRISHNAKUMAR AND TWO INDIVIDUALS, recorded as organization type “Others” and described in the filing as “THREE INDIVIDUALS.” A RERA-filed authorization resolution for Maruthi Township records partners’ consent to apply for registration and authorizes ADEPU KRISHNA KUMAR to sign and execute project documents. The supplied evidence does not identify a separate incorporated legal entity type or provide a project website or official project contact details. RERA record RERA filing

The project record states completeness of 80% and proposed completion of 22/11/2025. These are recorded project particulars; no independent site inspection or phase-wise progress schedule is supplied. The RERA registration certificate states validity through 22/11/2025; that registration period is separate from completion and from the absence of an OC in the reviewed documents. RERA record Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01200009972; certificate issue date 23/08/2025; validity 22/11/2023–22/11/2025
What the supplied record establishesForm C identifies MARUTHI TOWNSHIP and its registered promoter; it states registration conditions, including the separate-account requirement.
DTCP draft layout approval
Identifier / dateDraft-TLP.No.249/2023/W; 22-11-2023; application e-P.No.11024/2598; proceedings E.P. C.No.11024/2598/2023/V
What the supplied record establishesDraft technical layout for a proposed 109-plot layout in Sy.No.386/Part, Laxmipur; includes land-use areas and approval conditions.
Gram Panchayat technical-layout proceedings
Identifier / dateProc. No.GPI/ 01/Laxmipur/2023; 16-01-2024; file e-Panchayat file No 11024/2598/2023
What the supplied record establishesProceedings identify Sy.Nos. 386/A/1, 386/A/2 and 386/A/3 and state layout conditions, including road and open-space handover.
RERA-filed Form B declaration
Identifier / dateDocument 576931
What the supplied record establishesContains title and encumbrance declarations and an OCR-read completion undertaking of 22/112035; the extraction does not clearly identify the promoter or registration number.
RERA-filed layout / building-plan entries
Identifier / dateDocuments 576926 and 576928
What the supplied record establishesThe supplied document register includes layout-plan and building-floor-plan entries, but the underlying files are not extracted as approved drawings. Document index
Occupancy / completion certificate
Identifier / dateNot supplied in the reviewed records
What the supplied record establishesNo OC or completion certificate is included in the available project documents. Document index

Frequently asked questions

Is MARUTHI TOWNSHIP registered with Telangana RERA?

Yes. MARUTHI TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P01200009972; the registration status is On-Going Project.

Who is the developer of MARUTHI TOWNSHIP?

The promoter named in the RERA registration is ADEPUKRISHNAKUMAR AND TWO INDIVIDUALS.

Where is MARUTHI TOWNSHIP located?

MARUTHI TOWNSHIP is in LAXMIPUR, Luxettipet, Mancherial, Telangana (504273).

When will MARUTHI TOWNSHIP be completed?

The promoter's proposed date of completion filed with RERA is 22/11/2025. This is the promoter's declaration, not a guarantee.

More projects in Luxettipet