Somasila Hills
OM SHREE PROJECTS · Nagarkurnool · RERA P01600002394
SOMASILA HILLS is a plotted development in Waridyala Shivar, Nagarkurnool mandal, Nagarkurnool district, developed by registered promoter OM SHREE PROJECTS. The site covers 44,798.7 sq. m and the layout approval records 143 plots; buildings, floors and plot-size configurations are not disclosed. The project is registered with TG-RERA under P01600002394, with proposed completion on 03/12/2022.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SOMASILA HILLS RERA record |
| Project type | Plotted development RERA record RERA filing |
| Phase / registered portion | Phase not separately identified; TG-RERA certificate covers survey nos. 113/1 and 113/2 |
| TG-RERA registration | P01600002394 RERA record |
| Registration validity | 17/12/2020 to 03/12/2022; certificate records that registration was not extended. This is the registration period, not a statement of completion or occupancy status. RERA record |
| Registered promoter | OM SHREE PROJECTS RERA record RERA filing |
| RERA status in supplied record | New Project; registration validity has ended. No extension record is supplied. RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Waridyala Shivar RERA record Land records |
| Revenue village | Waridyala (also rendered “Varidyala” in title documents) RERA record Land records Document index |
| Mandal / district | Nagarkurnool / Nagarkurnool RERA record RERA filing |
| PIN | 616516 RERA record |
| Project survey numbers and subdivisions | 113/1 and 113/2 RERA record Land records |
| Site extent | 44,798.7 sq. m total and net area in the RERA filing. The layout approval records Ac.11.07 Cents. Land records RERA filing |
| Boundaries in filing | East: ROAD; West: neighbours’ land in Sy. No. 116; North: 60 FT ROAD; South: neighbours’ land in Sy. No. 112. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning (DTCP); approval document states release/approval by Kollapur Municipality is required for legal validity, subject to conditions. Approvals record |
| Principal layout approval | Technical Layout Pattern 264/2019/H, dated 03-12-2019; approval references include file no. DTCP.HT3/OTH/87/2019-HYD Sec-DTCP and proceedings no. L.r.D.Dis.No. 3993/2019/. Approvals record |
| Approved layout extent and plotted yield | Ac.11.07 Cents and 143 plots, as recorded in the DTCP technical layout pattern. |
| Layout area allocation recorded in approval | Open space: 10 % / Ac. 1.107Cents; roads: 34 % / Ac. 3.764Cents. |
| Approved built-up area | 44,798.70 sq. m is entered as “Approved Built up Area” in the RERA fields; the supplied records do not explain its measurement basis. RERA filing |
| Buildings / floors / parking levels | Not disclosed in the supplied records; this is a plotted layout, and no building or parking-level schedule is provided. Document index RERA filing |
Offering and status
| Item | Record |
|---|---|
| Offering | Plots; the technical layout pattern records 143 plots. Plot-size bands, individual plot areas and plot inventory are not supplied. Layout record |
| Booked / available counts | Not supplied. Layout record |
| Construction / development stage | RERA filing labels the project “New Project”; the supplied evidence does not establish current site progress independently. RERA filing RERA record |
| Completion dates | RERA registration record: proposed completion 03/12/2022; a Form B declaration dated 28 May 2020 separately undertakes completion by 31.08.2020. No revised completion date is supplied. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The supplied approval records concern the layout, not an occupancy certificate. Document index Approvals record |
2. The project story
SOMASILA HILLS is recorded with TG-RERA as a plotted development in Waridyala Shivar, Waridyala village, Nagarkurnool mandal and district, on survey nos. 113/1 and 113/2. Its filed layout approval describes 143 plots across Ac.11.07 Cents. The approval also identifies roads and reserved open space, including a park, as parts of the layout. RERA record Land records
The records describe a land-and-layout development rather than an apartment or multi-storey building project. They do not provide plot-size bands, a current sold/unsold schedule, a site-verified construction update, or an occupancy/completion certificate. Accordingly, the RERA “New Project” label and the stated completion dates should not be read as proof of present physical progress or completion. RERA filing Layout record Document index
3. Master plan, architecture & building design
The principal design evidence is the DTCP Technical Layout Pattern for survey nos. 113/1 and 113/2. It records a layout extent of Ac.11.07 Cents, 143 plots, 10 % / Ac. 1.107Cents reserved for open space and 34 % / Ac. 3.764Cents allocated to roads.
Kollapur Municipality’s technical remarks state that inspected ground demarcation and measurements tallied with the draft layout and record a park reservation of 10.00% / Ac. 1.07 Cents and road area of 34.00% / Ac. 3.764 cents. The supplied records do not include an extractable final stamped layout drawing showing individual plot dimensions, plot numbering, internal-road widths, utility parcels or the complete layout geometry. The RERA field lists 44,798.70 sq. m as “Approved Built up Area”; no further definition is supplied, so it is not treated here as a measured building area or plot-sale area. RERA filing Document index
No building count, floor configuration, tower heights, building footprint, or building-level floor plans are disclosed. Four floor-plan drawings are noted, but all are scans pending measurement; no plot or home measurements can therefore be reported from them. Floor plans
4. Homes, configurations & floor plans
This is a plotted offering, not a reported apartment configuration schedule. The approval records 143 plots, but the supplied data do not state individual plot areas, plot-size bands, plot numbers, or booked and available counts. Layout record
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 143 (layout approval) | Not supplied | Not supplied | Individual plot areas not supplied | Not applicable / not measured | Not supplied |
The floor-plan record says carpet-area measurement is software-derived from drawing geometry and is not a RERA disclosure; however, all 4 drawings are scans pending measurement, so no software-measured area is available. Floor plans No plot-size or saleable-area schedule is supplied for the individual plots.
5. Parking & vehicle circulation
The supplied records do not state a sanctioned parking-space count, parking allocation by plot, visitor or accessible parking, or a parking layout. This is a plotted development, and the available layout extracts identify roads and open space but do not establish parking arrangements or exclusive parking rights. Document index
The DTCP document requires internal roads to be formed and states that roads and open spaces are to be handed over to the Kollapur Municipal Commissioner by registered gift deed, subject to its conditions. The supplied records do not verify completion of those works or transfer.
6. Amenities, recreation & open spaces
The RERA amenities record marks several facilities as available (“YES”), but lists 0% progress for each entry. “Available” is therefore reported as a filing status, not as independent confirmation of delivery. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / recreational open space | Approval records 10 % / Ac. 1.107Cents open space; municipal technical remarks identify Ac. 1.07 Cents as park/public-purpose reservation. | DTCP layout-pattern approval and municipal technical remarks | Reserved in approval records; delivery not independently verified. |
| Internal roads and footpaths | Size/width not supplied. | RERA amenities record RERA amenities | Marked “YES”; progress 0%. |
| Green strip / tot lot / park | Size and quantity not specified beyond the approved open-space/park figures above. | RERA amenities record RERA amenities | Marked “YES”; progress 0%. |
| Water supply | No source, capacity or distribution details supplied. | RERA amenities record RERA amenities | Marked “YES”; progress 0%. |
| Sewerage | Record lists chambers, lines, septic tank and STP in the amenity label; no capacity or system details supplied. | RERA amenities record RERA amenities | Marked “YES”; progress 0%. |
| Storm-water drains | Size and system details not supplied. | RERA amenities record RERA amenities | Marked “YES”; progress 0%. |
| Street lighting | Quantity and specification not supplied. | RERA amenities record RERA amenities | Marked “YES”; progress 0%. |
| Water conservation / rainwater harvesting | Design and capacity not supplied. | RERA amenities record RERA amenities | Marked “YES”; progress 0%. |
| Fire protection and fire safety | System details not supplied. | RERA amenities record RERA amenities | Marked “YES”; progress 0%. |
| Electrical meter room / sub-station / receiving station | Capacity and equipment details not supplied. | RERA amenities record RERA amenities | Marked “YES”; progress 0%. |
No clubhouse or indoor recreation facility, community-building specification, or sports-facility schedule is supplied. The amenities record lists community buildings and treatment/disposal of sewage, solid-waste management and energy management, but does not mark them “YES” or provide details. RERA amenities
7. Utilities, building services & safety
The RERA amenities record identifies water supply, sewerage, storm-water drains, rainwater harvesting, street lighting, electrical meter room/sub-station/receiving station, and fire protection and fire safety. It does not provide capacities, engineering specifications, service drawings, commissioning records or independently verified completion status; the listed entries show 0% progress. RERA amenities
The sewerage entry names chambers, lines, a septic tank and an STP, but the record does not establish which facilities are installed or their capacity. It also lists sewage/sullage treatment and disposal, solid-waste management and energy management without corresponding “YES” status or specifications. No information is supplied about water source or storage, electrical backup, EV charging, accessibility, CCTV, access control or emergency access. RERA amenities
8. Location, access & connectivity
The official project identity places the site in Waridyala Shivar, Waridyala village, Nagarkurnool mandal and district, Telangana, PIN 616516. The layout approval describes the site as at Waridyala Shivar, Kollapur Municipality; the municipal technical remarks refer to Pebber Main Road within Kollapur municipal limits. RERA record Land records
A supplied location record gives the Financial District (Nanakramguda) as 1.2 km from a cadastral parcel centroid at 17.41528, 78.35459. Location record No further approach-road route, public-transport information, travel time or landmark distances are supplied.
9. Developer & development status
The registered promoter is OM SHREE PROJECTS, identified in the RERA filing as a partnership. Its listed partners are Kanthilal Shankla and P Bindu; Srinivas Naidu and Bhagwandas Patel are listed as authorized signatories. The promoter’s entity registration number and a complete registered-office address are not provided in the supplied identity record. RERA filing Parties record Corporate record
A Form B affidavit dated 28 May 2020, made for Om Shree Projects by Srinivas N and B Patel as authorized signatories, declares legal title and that the land is free from encumbrances and undertakes completion by 31.08.2020. These are promoter declarations in that filing, not independent findings.
The RERA header records proposed completion as 03/12/2022; no revised completion date or verified site-progress report is supplied. The registration certificate records validity through 03/12/2022, without an extension in the supplied certificate. No occupancy or completion certificate is supplied. RERA record
10. Approvals, official records & documents
| Record | What it establishes in the supplied material |
|---|---|
| TG-RERA Form C certificate, P01600002394 | Registration for SOMASILA HILLS, promoter Om Shree Projects, survey nos. 113/1 and 113/2; validity 17/12/2020–03/12/2022. |
| DTCP Technical Layout Pattern 264/2019/H, dated 03-12-2019 | Proposed plotted layout on survey nos. 113/1 and 113/2, extent Ac.11.07 Cents, 143 plots, and recorded roads/open space. The document states that legal validity depends on release/approval by the concerned Municipality and fulfilment of layout conditions. |
| Kollapur Municipality technical remarks, file no. G1/155/LP/Kollapur/2019 | Reports that inspected road/open-space demarcation and measurements tallied with the draft layout; records road area and park reservation. |
| RERA Form B declaration, dated 28 May 2020 | Promoter declaration covering title, encumbrance status, separate-account undertakings and completion by 31.08.2020. |
| Additional Form B declaration | Supplied OCR is incomplete; it identifies promoter as “om Sle,” has an OCR-garbled date and completion undertaking, and does not clearly identify the project registration number. |
| Occupancy / completion certificate | Not supplied in the reviewed records. Document index |
| Approved final layout plan | Layout-plan uploads are listed, but the supplied extracts do not provide an extractable final stamped layout drawing. Document index |
The overview describes the TG-RERA and approval records available in the supplied pack; it does not establish the current municipal release status or completion of layout conditions.
1. Project at a glance
Project identity
Registered project name: SOMASILA HILLS
Project type: Plotted development
Phase / registered portion: Phase not separately identified; TG-RERA certificate covers survey nos. 113/1 and 113/2
TG-RERA registration: P01600002394
Registration validity: 17/12/2020 to 03/12/2022; certificate records that registration was not extended. This is the registration period, not a statement of completion or occupancy status.
Registered promoter: OM SHREE PROJECTS
RERA status in supplied record: New Project; registration validity has ended. No extension record is supplied.
Land and geographic identity
Locality: Waridyala Shivar
Revenue village: Waridyala (also rendered “Varidyala” in title documents)
Mandal / district: Nagarkurnool / Nagarkurnool
PIN: 616516
Project survey numbers and subdivisions: 113/1 and 113/2
Site extent: 44,798.7 sq. m total and net area in the RERA filing. The layout approval records Ac.11.07 Cents.
Boundaries in filing: East: ROAD; West: neighbours’ land in Sy. No. 116; North: 60 FT ROAD; South: neighbours’ land in Sy. No. 112.
Development identity
Sanctioning authority: Director of Town and Country Planning (DTCP); approval document states release/approval by Kollapur Municipality is required for legal validity, subject to conditions.
Principal layout approval: Technical Layout Pattern 264/2019/H, dated 03-12-2019; approval references include file no. DTCP.HT3/OTH/87/2019-HYD Sec-DTCP and proceedings no. L.r.D.Dis.No. 3993/2019/.
Approved layout extent and plotted yield: Ac.11.07 Cents and 143 plots, as recorded in the DTCP technical layout pattern.
Layout area allocation recorded in approval: Open space: 10 % / Ac. 1.107Cents; roads: 34 % / Ac. 3.764Cents.
Approved built-up area: 44,798.70 sq. m is entered as “Approved Built up Area” in the RERA fields; the supplied records do not explain its measurement basis.
Buildings / floors / parking levels: Not disclosed in the supplied records; this is a plotted layout, and no building or parking-level schedule is provided.
Offering and status
Offering: Plots; the technical layout pattern records 143 plots. Plot-size bands, individual plot areas and plot inventory are not supplied.
Booked / available counts: Not supplied.
Construction / development stage: RERA filing labels the project “New Project”; the supplied evidence does not establish current site progress independently.
Completion dates: RERA registration record: proposed completion 03/12/2022; a Form B declaration dated 28 May 2020 separately undertakes completion by 31.08.2020. No revised completion date is supplied.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The supplied approval records concern the layout, not an occupancy certificate.
2. The project story
SOMASILA HILLS is recorded with TG-RERA as a plotted development in Waridyala Shivar, Waridyala village, Nagarkurnool mandal and district, on survey nos. 113/1 and 113/2. Its filed layout approval describes 143 plots across Ac.11.07 Cents. The approval also identifies roads and reserved open space, including a park, as parts of the layout.
The records describe a land-and-layout development rather than an apartment or multi-storey building project. They do not provide plot-size bands, a current sold/unsold schedule, a site-verified construction update, or an occupancy/completion certificate. Accordingly, the RERA “New Project” label and the stated completion dates should not be read as proof of present physical progress or completion.
3. Master plan, architecture & building design
The principal design evidence is the DTCP Technical Layout Pattern for survey nos. 113/1 and 113/2. It records a layout extent of Ac.11.07 Cents, 143 plots, 10 % / Ac. 1.107Cents reserved for open space and 34 % / Ac. 3.764Cents allocated to roads.
Kollapur Municipality’s technical remarks state that inspected ground demarcation and measurements tallied with the draft layout and record a park reservation of 10.00% / Ac. 1.07 Cents and road area of 34.00% / Ac. 3.764 cents. The supplied records do not include an extractable final stamped layout drawing showing individual plot dimensions, plot numbering, internal-road widths, utility parcels or the complete layout geometry. The RERA field lists 44,798.70 sq. m as “Approved Built up Area”; no further definition is supplied, so it is not treated here as a measured building area or plot-sale area.
No building count, floor configuration, tower heights, building footprint, or building-level floor plans are disclosed. Four floor-plan drawings are noted, but all are scans pending measurement; no plot or home measurements can therefore be reported from them.
4. Homes, configurations & floor plans
This is a plotted offering, not a reported apartment configuration schedule. The approval records 143 plots, but the supplied data do not state individual plot areas, plot-size bands, plot numbers, or booked and available counts.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 143 (layout approval) | Not supplied | Not supplied | Individual plot areas not supplied | Not applicable / not measured | Not supplied |
The floor-plan record says carpet-area measurement is software-derived from drawing geometry and is not a RERA disclosure; however, all 4 drawings are scans pending measurement, so no software-measured area is available. No plot-size or saleable-area schedule is supplied for the individual plots.
5. Parking & vehicle circulation
The supplied records do not state a sanctioned parking-space count, parking allocation by plot, visitor or accessible parking, or a parking layout. This is a plotted development, and the available layout extracts identify roads and open space but do not establish parking arrangements or exclusive parking rights.
The DTCP document requires internal roads to be formed and states that roads and open spaces are to be handed over to the Kollapur Municipal Commissioner by registered gift deed, subject to its conditions. The supplied records do not verify completion of those works or transfer.
6. Amenities, recreation & open spaces
The RERA amenities record marks several facilities as available (“YES”), but lists 0% progress for each entry. “Available” is therefore reported as a filing status, not as independent confirmation of delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / recreational open space | Approval records 10 % / Ac. 1.107Cents open space; municipal technical remarks identify Ac. 1.07 Cents as park/public-purpose reservation. | DTCP layout-pattern approval and municipal technical remarks | Reserved in approval records; delivery not independently verified. |
| Internal roads and footpaths | Size/width not supplied. | RERA amenities record | Marked “YES”; progress 0%. |
| Green strip / tot lot / park | Size and quantity not specified beyond the approved open-space/park figures above. | RERA amenities record | Marked “YES”; progress 0%. |
| Water supply | No source, capacity or distribution details supplied. | RERA amenities record | Marked “YES”; progress 0%. |
| Sewerage | Record lists chambers, lines, septic tank and STP in the amenity label; no capacity or system details supplied. | RERA amenities record | Marked “YES”; progress 0%. |
| Storm-water drains | Size and system details not supplied. | RERA amenities record | Marked “YES”; progress 0%. |
| Street lighting | Quantity and specification not supplied. | RERA amenities record | Marked “YES”; progress 0%. |
| Water conservation / rainwater harvesting | Design and capacity not supplied. | RERA amenities record | Marked “YES”; progress 0%. |
| Fire protection and fire safety | System details not supplied. | RERA amenities record | Marked “YES”; progress 0%. |
| Electrical meter room / sub-station / receiving station | Capacity and equipment details not supplied. | RERA amenities record | Marked “YES”; progress 0%. |
No clubhouse or indoor recreation facility, community-building specification, or sports-facility schedule is supplied. The amenities record lists community buildings and treatment/disposal of sewage, solid-waste management and energy management, but does not mark them “YES” or provide details.
7. Utilities, building services & safety
The RERA amenities record identifies water supply, sewerage, storm-water drains, rainwater harvesting, street lighting, electrical meter room/sub-station/receiving station, and fire protection and fire safety. It does not provide capacities, engineering specifications, service drawings, commissioning records or independently verified completion status; the listed entries show 0% progress.
The sewerage entry names chambers, lines, a septic tank and an STP, but the record does not establish which facilities are installed or their capacity. It also lists sewage/sullage treatment and disposal, solid-waste management and energy management without corresponding “YES” status or specifications. No information is supplied about water source or storage, electrical backup, EV charging, accessibility, CCTV, access control or emergency access.
8. Location, access & connectivity
The official project identity places the site in Waridyala Shivar, Waridyala village, Nagarkurnool mandal and district, Telangana, PIN 616516. The layout approval describes the site as at Waridyala Shivar, Kollapur Municipality; the municipal technical remarks refer to Pebber Main Road within Kollapur municipal limits.
A supplied location record gives the Financial District (Nanakramguda) as 1.2 km from a cadastral parcel centroid at 17.41528, 78.35459. No further approach-road route, public-transport information, travel time or landmark distances are supplied.
9. Developer & development status
The registered promoter is OM SHREE PROJECTS, identified in the RERA filing as a partnership. Its listed partners are Kanthilal Shankla and P Bindu; Srinivas Naidu and Bhagwandas Patel are listed as authorized signatories. The promoter’s entity registration number and a complete registered-office address are not provided in the supplied identity record.
A Form B affidavit dated 28 May 2020, made for Om Shree Projects by Srinivas N and B Patel as authorized signatories, declares legal title and that the land is free from encumbrances and undertakes completion by 31.08.2020. These are promoter declarations in that filing, not independent findings.
The RERA header records proposed completion as 03/12/2022; no revised completion date or verified site-progress report is supplied. The registration certificate records validity through 03/12/2022, without an extension in the supplied certificate. No occupancy or completion certificate is supplied.
10. Approvals, official records & documents
TG-RERA Form C certificate, P01600002394: Registration for SOMASILA HILLS, promoter Om Shree Projects, survey nos. 113/1 and 113/2; validity 17/12/2020–03/12/2022.
DTCP Technical Layout Pattern 264/2019/H, dated 03-12-2019: Proposed plotted layout on survey nos. 113/1 and 113/2, extent Ac.11.07 Cents, 143 plots, and recorded roads/open space. The document states that legal validity depends on release/approval by the concerned Municipality and fulfilment of layout conditions.
Kollapur Municipality technical remarks, file no. G1/155/LP/Kollapur/2019: Reports that inspected road/open-space demarcation and measurements tallied with the draft layout; records road area and park reservation.
RERA Form B declaration, dated 28 May 2020: Promoter declaration covering title, encumbrance status, separate-account undertakings and completion by 31.08.2020.
Additional Form B declaration: Supplied OCR is incomplete; it identifies promoter as “om Sle,” has an OCR-garbled date and completion undertaking, and does not clearly identify the project registration number.
Occupancy / completion certificate: Not supplied in the reviewed records.
Approved final layout plan: Layout-plan uploads are listed, but the supplied extracts do not provide an extractable final stamped layout drawing.
The overview describes the TG-RERA and approval records available in the supplied pack; it does not establish the current municipal release status or completion of layout conditions.
Frequently asked questions
Is SOMASILA HILLS registered with Telangana RERA?
Yes. SOMASILA HILLS is registered with the Telangana Real Estate Regulatory Authority as P01600002394; the registration status is New Project.
Who is the developer of SOMASILA HILLS?
The promoter named in the RERA registration is OM SHREE PROJECTS.
Where is SOMASILA HILLS located?
SOMASILA HILLS is in Waridyala Shivar, Nagarkurnool, Telangana (616516).
When will SOMASILA HILLS be completed?
The promoter's proposed date of completion filed with RERA is 03/12/2022. This is the promoter's declaration, not a guarantee.