Koundinya Enclave
VANGA · Kamareddy · RERA P00200010959
KOUNDINYA ENCLAVE is a plotted development in Bhiknoor, Bhiknoor mandal, Kamareddy district. The registered promoter is VANGA SUBASH GOUD. The project has a registered site area of 13,405.21 sq. m, and the filed draft layout approval identifies 43 plots; plot configurations are not stated. Its TG-RERA registration number is P00200010959, and the proposed completion date is 30/11/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | KOUNDINYA ENCLAVE RERA record |
| Project type | Plotted development RERA record RERA filing |
| Phase / registered portion | Phase not separately identified in the supplied record; the registration is for the project named above. RERA record |
| TG-RERA registration | P00200010959 RERA record |
| Registration validity | Certificate states validity from 19/04/2024 to 18/04/2026. This is registration validity, not the project completion deadline. |
| Registered promoter | VANGA SUBASH GOUD; the project record also names the promoter as VANGA. Corporate record |
| Project status | Listed as On-Going Project in the RERA project information. RERA filing |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / site description | BHIKNOOR MANDAL; the filed layout approval describes the locality as Bhiknoor Shivar & Grampanchayath. RERA record RERA filing |
| Revenue village | Bhiknoor RERA record RERA filing |
| Mandal / district / PIN | Bhiknoor / Kamareddy / 503101 RERA record RERA filing |
| Project survey numbers and subdivisions | 660/1/1, 660/1/2/2, 660/2, 660/4, 660/5, 660/7/1/1/1/1/1, 660/AA/1, 660/AA/2, 660/E1/1, 660/RU RERA record |
| Registered site area | 13,405.21 sq. m total and net area in the RERA land details. RERA filing |
| Layout area in filed draft approval | Ac 3-12.50 Gts; 16032.50 Sq. Yds |
| Boundaries | East, west, north and south: OTHERS LAND RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | DT&CP; the filed draft approval states delegation to Bhiknoor Gram Panchayat. Approvals record |
| Principal approval reference | Draft - TLP. No. 21/2024/HRO/H1, dated 18.04.2024; the related file reference is Lr.Roc.No.300/2024/HRO/H1. Approvals record |
| Approved development described in the filed document | Draft technical layout pattern for 43 plots. The document says final layout proposals are to be submitted after development works and compliance with its conditions. |
| Approved built-up area | 7,418.02 sq. m is shown in RERA project fields; the supplied material does not identify a building or explain the calculation for this figure. RERA filing |
| Buildings, floors and parking levels | Not disclosed for this plotted development in the supplied records. RERA filing Document index |
| Land-use split in the filed draft approval | Layout area: Ac.3-12.50 Gts; 16032.50 Sq. Yds; open space for park: Ac.0-13.33 Gts; 1612.69 Sq. Yds. (10.06%); roads: Ac.1-05.85 Gts; 5547.92 Sq. Yds. (34.60%); plotted area: Ac.1-33.32 Gts; 8871.89 Sq. Yds. (55.34%); mortgage area: 1368.00 Sq. Yds. (15.41%). |
Offering and status
| Item | Record |
|---|---|
| Offering | Plotted development; the filed draft layout document identifies 43 plots. RERA record |
| Plot sizes / booked and available counts | Plot-size range and booked/available inventory are not available in the supplied records. RERA unit table |
| RERA completion dates | The project information lists proposed and revised completion dates as 30/11/2026. RERA record RERA filing |
| Promoter-declared completion undertaking | Form B states a completion undertaking of 17/04/2026. |
| Construction / development stage | The RERA project status is “On-Going Project”; no independently verified site-progress record or phase-wise construction stage is supplied. RERA filing Document index |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied project documents. The filed layout approval describes a draft layout and calls for a final layout proposal after development and compliance. Document index |
2. The project story
KOUNDINYA ENCLAVE is recorded as a plotted development in Bhiknoor village, Bhiknoor mandal, Kamareddy district. The filed DT&CP document describes a draft technical layout pattern for 43 plots, with land allocated to plotted area, roads, a park/open space and mortgage plots. It states that final layout proposals are to be submitted through the Gram Panchayat after development works and compliance with the stated conditions. RERA record RERA filing
The project is listed as ongoing, but the supplied evidence does not establish how much physical development has been completed or independently verify site progress. The RERA project information gives 30/11/2026 as both proposed and revised completion date; the Form B affidavit separately records a promoter undertaking of 17/04/2026. The RERA registration certificate states validity only through 18/04/2026. These are distinct record items: registration validity, completion dates and a promoter declaration should not be treated as interchangeable. RERA filing
3. Master plan, architecture & building design
The supplied approval document is a Draft Technical Layout Pattern - Approved for 43 plots, not a building or floor-plan set. Its stated layout-area allocation is 55.34% plotted area, 34.60% roads, and 10.06% open space for park; it also identifies 1368.00 Sq. Yds. (15.41%) as mortgage area. The document states that the mortgage plots and gift of open space and roads are conditions associated with release and development of the draft layout, and that final layout proposals follow development and compliance.
The RERA fields separately state an approved built-up area of 7,418.02 sq. m and a mortgage area of 1,143.82 sq. m. The supplied evidence does not provide a readable approved layout drawing or explain the built-up-area basis; building arrangement, plot-by-plot dimensions, road widths, utilities land, and detailed landscaping plans are therefore not established here. RERA filing
4. Homes, configurations & floor plans
This is a plotted project, not an apartment configuration in the supplied records. The filed draft approval identifies 43 plots, but plot-size bands, plot numbers by size, and booked or available inventory counts are not supplied. RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 43 (as stated in filed draft layout approval) | Not disclosed | Not disclosed | Plot areas not disclosed | Not applicable | Not supplied |
Two drawing files are recorded, but both are scans pending measurement; no software-measured carpet or room dimensions are available. Floor plans
5. Parking & vehicle circulation
The supplied records do not state a vehicle-parking count, visitor or accessible parking provision, parking allocation to individual plots, or EV charging provision. The draft layout document identifies roads as Ac.1-05.85 Gts; 5547.92 Sq. Yds. (34.60%), but does not provide road widths or a detailed circulation plan in the material reviewed here. RERA amenities Document index
6. Amenities, recreation & open spaces
The RERA amenity schedule records the following facilities and status percentages. These are filed schedule entries, not independent confirmation of completion. The draft layout separately identifies park/open space of Ac.0-13.33 Gts; 1612.69 Sq. Yds. (10.06%). RERA amenities
| Description / size | Size not stated in amenity schedule; draft approval specifies open space for park of Ac.0-13.33 Gts; 1612.69 Sq. Yds. (10.06%). |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenity schedule: YES, 100%; independent completion verification not supplied. |
| Description / size | Size not stated. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded; completion not independently verified. |
| Description / size | Size not stated. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | YES, 100% in the RERA amenity schedule; independent completion verification not supplied. |
| Description / size | Size/capacity not stated. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | 0% recorded. |
| Description / size | No capacities or technical specifications stated. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Each shown as YES, 100% in the schedule; independent completion verification not supplied. |
| Description / size | No specifications stated. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | Each recorded as 0%. |
7. Utilities, building services & safety
The RERA amenity schedule marks water supply, sewerage infrastructure (chamber, lines, septic tank, STP), storm-water drains, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as YES, 100%. It does not give water sources, storage or treatment capacities, sewerage-treatment capacity or reuse arrangements, drainage design, electrical capacity or backup details. RERA amenities
The same schedule records treatment and disposal of sewage and sullage water, solid-waste management and disposal, energy management, and fire protection/fire-safety requirements at 0%. No detailed service drawings, capacities, safety-system specifications or independent completion verification are supplied. RERA amenities Document index
8. Location, access & connectivity
The registered location is Bhiknoor, Bhiknoor mandal, Kamareddy district, PIN 503101, described in the filed approval as Bhiknoor Shivar & Grampanchayath. The project geocode is identified as a cadastral-parcel centroid at 18.17522, 78.40537. RERA record RERA filing Location record
The only supplied connectivity measurement is Outer Ring Road (nearest sampled interchange, approx): 61.1 km. The record provides no approach-road name, public-transport detail or other landmark distances. Location record
9. Developer & development status
The RERA certificate names VANGA SUBASH GOUD as promoter; the project identity record uses VANGA. A Form B affidavit is signed by VANGA SUBASH GOUD, who declares legal title and states that an owner-promoter development agreement is enclosed. The supplied corporate information does not establish a separate legal entity type, corporate registration identifier, registered office or official project contact details. Corporate record
The RERA project information lists the project as ongoing and gives 30/11/2026 as the proposed and revised completion date. The RERA certificate records registration validity to 18/04/2026, while the promoter’s Form B states a completion undertaking of 17/04/2026. No independently verified progress report or completion/occupancy certificate is supplied. RERA filing Document index
10. Approvals, official records & documents
| Reference / date | P00200010959, Form C; validity 19/04/2024–18/04/2026 |
|---|---|
| What the supplied record establishes | Registration certificate identifies KOUNDINYA ENCLAVE and promoter VANGA SUBASH GOUD. |
| Reference / date | Draft - TLP. No. 21/2024/HRO/H1, dated 18.04.2024; file Lr.Roc.No.300/2024/HRO/H1 |
|---|---|
| What the supplied record establishes | Draft technical layout pattern for 43 plots, subject to recorded conditions; final layout proposals are to follow development and compliance. |
| Reference / date | Lr. Roc. No. 300/2024/HRO/H1, dated 19/04/2024 |
|---|---|
| What the supplied record establishes | Supplied OCR is partial and garbled and does not establish an approval heading, parties or sanctioned terms. |
| Reference / date | 09/12 2025 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title, encumbrances, fund handling and completion undertaking. These are promoter assertions. |
| Reference / date | Not identified in supplied documents |
|---|---|
| What the supplied record establishes | No certificate evidence provided. Document index |
| Reference / date | Not available in supplied material |
|---|---|
| What the supplied record establishes | The readable filed approval is described as a draft technical layout pattern; detailed drawings are not supplied here. HMDA |
1. Project at a glance
Project identity
Registered project name: KOUNDINYA ENCLAVE
Project type: Plotted development
Phase / registered portion: Phase not separately identified in the supplied record; the registration is for the project named above.
TG-RERA registration: P00200010959
Registration validity: Certificate states validity from 19/04/2024 to 18/04/2026. This is registration validity, not the project completion deadline.
Registered promoter: VANGA SUBASH GOUD; the project record also names the promoter as VANGA.
Project status: Listed as On-Going Project in the RERA project information.
Land and geographic identity
Locality / site description: BHIKNOOR MANDAL; the filed layout approval describes the locality as Bhiknoor Shivar & Grampanchayath.
Revenue village: Bhiknoor
Mandal / district / PIN: Bhiknoor / Kamareddy / 503101
Project survey numbers and subdivisions: 660/1/1, 660/1/2/2, 660/2, 660/4, 660/5, 660/7/1/1/1/1/1, 660/AA/1, 660/AA/2, 660/E1/1, 660/RU
Registered site area: 13,405.21 sq. m total and net area in the RERA land details.
Layout area in filed draft approval: Ac 3-12.50 Gts; 16032.50 Sq. Yds
Boundaries: East, west, north and south: OTHERS LAND
Development identity
Sanctioning authority: DT&CP; the filed draft approval states delegation to Bhiknoor Gram Panchayat.
Principal approval reference: Draft - TLP. No. 21/2024/HRO/H1, dated 18.04.2024; the related file reference is Lr.Roc.No.300/2024/HRO/H1.
Approved development described in the filed document: Draft technical layout pattern for 43 plots. The document says final layout proposals are to be submitted after development works and compliance with its conditions.
Approved built-up area: 7,418.02 sq. m is shown in RERA project fields; the supplied material does not identify a building or explain the calculation for this figure.
Buildings, floors and parking levels: Not disclosed for this plotted development in the supplied records.
Land-use split in the filed draft approval: Layout area: Ac.3-12.50 Gts; 16032.50 Sq. Yds; open space for park: Ac.0-13.33 Gts; 1612.69 Sq. Yds. (10.06%); roads: Ac.1-05.85 Gts; 5547.92 Sq. Yds. (34.60%); plotted area: Ac.1-33.32 Gts; 8871.89 Sq. Yds. (55.34%); mortgage area: 1368.00 Sq. Yds. (15.41%).
Offering and status
Offering: Plotted development; the filed draft layout document identifies 43 plots.
Plot sizes / booked and available counts: Plot-size range and booked/available inventory are not available in the supplied records.
RERA completion dates: The project information lists proposed and revised completion dates as 30/11/2026.
Promoter-declared completion undertaking: Form B states a completion undertaking of 17/04/2026.
Construction / development stage: The RERA project status is “On-Going Project”; no independently verified site-progress record or phase-wise construction stage is supplied.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied project documents. The filed layout approval describes a draft layout and calls for a final layout proposal after development and compliance.
2. The project story
KOUNDINYA ENCLAVE is recorded as a plotted development in Bhiknoor village, Bhiknoor mandal, Kamareddy district. The filed DT&CP document describes a draft technical layout pattern for 43 plots, with land allocated to plotted area, roads, a park/open space and mortgage plots. It states that final layout proposals are to be submitted through the Gram Panchayat after development works and compliance with the stated conditions.
The project is listed as ongoing, but the supplied evidence does not establish how much physical development has been completed or independently verify site progress. The RERA project information gives 30/11/2026 as both proposed and revised completion date; the Form B affidavit separately records a promoter undertaking of 17/04/2026. The RERA registration certificate states validity only through 18/04/2026. These are distinct record items: registration validity, completion dates and a promoter declaration should not be treated as interchangeable.
3. Master plan, architecture & building design
The supplied approval document is a Draft Technical Layout Pattern - Approved for 43 plots, not a building or floor-plan set. Its stated layout-area allocation is 55.34% plotted area, 34.60% roads, and 10.06% open space for park; it also identifies 1368.00 Sq. Yds. (15.41%) as mortgage area. The document states that the mortgage plots and gift of open space and roads are conditions associated with release and development of the draft layout, and that final layout proposals follow development and compliance.
The RERA fields separately state an approved built-up area of 7,418.02 sq. m and a mortgage area of 1,143.82 sq. m. The supplied evidence does not provide a readable approved layout drawing or explain the built-up-area basis; building arrangement, plot-by-plot dimensions, road widths, utilities land, and detailed landscaping plans are therefore not established here.
4. Homes, configurations & floor plans
This is a plotted project, not an apartment configuration in the supplied records. The filed draft approval identifies 43 plots, but plot-size bands, plot numbers by size, and booked or available inventory counts are not supplied.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | 43 (as stated in filed draft layout approval) | Not disclosed | Not disclosed | Plot areas not disclosed | Not applicable | Not supplied |
Two drawing files are recorded, but both are scans pending measurement; no software-measured carpet or room dimensions are available.
5. Parking & vehicle circulation
The supplied records do not state a vehicle-parking count, visitor or accessible parking provision, parking allocation to individual plots, or EV charging provision. The draft layout document identifies roads as Ac.1-05.85 Gts; 5547.92 Sq. Yds. (34.60%), but does not provide road widths or a detailed circulation plan in the material reviewed here.
6. Amenities, recreation & open spaces
The RERA amenity schedule records the following facilities and status percentages. These are filed schedule entries, not independent confirmation of completion. The draft layout separately identifies park/open space of Ac.0-13.33 Gts; 1612.69 Sq. Yds. (10.06%).
| Description / size | Size not stated in amenity schedule; draft approval specifies open space for park of Ac.0-13.33 Gts; 1612.69 Sq. Yds. (10.06%). |
|---|---|
| Declared progress / verified status | RERA amenity schedule: YES, 100%; independent completion verification not supplied. |
| Description / size | Size not stated. |
|---|---|
| Declared progress / verified status | 0% recorded; completion not independently verified. |
| Description / size | Size not stated. |
|---|---|
| Declared progress / verified status | YES, 100% in the RERA amenity schedule; independent completion verification not supplied. |
| Description / size | Size/capacity not stated. |
|---|---|
| Declared progress / verified status | 0% recorded. |
| Description / size | No capacities or technical specifications stated. |
|---|---|
| Declared progress / verified status | Each shown as YES, 100% in the schedule; independent completion verification not supplied. |
| Description / size | No specifications stated. |
|---|---|
| Declared progress / verified status | Each recorded as 0%. |
7. Utilities, building services & safety
The RERA amenity schedule marks water supply, sewerage infrastructure (chamber, lines, septic tank, STP), storm-water drains, water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as YES, 100%. It does not give water sources, storage or treatment capacities, sewerage-treatment capacity or reuse arrangements, drainage design, electrical capacity or backup details.
The same schedule records treatment and disposal of sewage and sullage water, solid-waste management and disposal, energy management, and fire protection/fire-safety requirements at 0%. No detailed service drawings, capacities, safety-system specifications or independent completion verification are supplied.
8. Location, access & connectivity
The registered location is Bhiknoor, Bhiknoor mandal, Kamareddy district, PIN 503101, described in the filed approval as Bhiknoor Shivar & Grampanchayath. The project geocode is identified as a cadastral-parcel centroid at 18.17522, 78.40537.
The only supplied connectivity measurement is Outer Ring Road (nearest sampled interchange, approx): 61.1 km. The record provides no approach-road name, public-transport detail or other landmark distances.
9. Developer & development status
The RERA certificate names VANGA SUBASH GOUD as promoter; the project identity record uses VANGA. A Form B affidavit is signed by VANGA SUBASH GOUD, who declares legal title and states that an owner-promoter development agreement is enclosed. The supplied corporate information does not establish a separate legal entity type, corporate registration identifier, registered office or official project contact details.
The RERA project information lists the project as ongoing and gives 30/11/2026 as the proposed and revised completion date. The RERA certificate records registration validity to 18/04/2026, while the promoter’s Form B states a completion undertaking of 17/04/2026. No independently verified progress report or completion/occupancy certificate is supplied.
10. Approvals, official records & documents
| Reference / date | P00200010959, Form C; validity 19/04/2024–18/04/2026 |
|---|---|
| What the supplied record establishes | Registration certificate identifies KOUNDINYA ENCLAVE and promoter VANGA SUBASH GOUD. |
| Reference / date | Draft - TLP. No. 21/2024/HRO/H1, dated 18.04.2024; file Lr.Roc.No.300/2024/HRO/H1 |
|---|---|
| What the supplied record establishes | Draft technical layout pattern for 43 plots, subject to recorded conditions; final layout proposals are to follow development and compliance. |
| Reference / date | Lr. Roc. No. 300/2024/HRO/H1, dated 19/04/2024 |
|---|---|
| What the supplied record establishes | Supplied OCR is partial and garbled and does not establish an approval heading, parties or sanctioned terms. |
| Reference / date | 09/12 2025 |
|---|---|
| What the supplied record establishes | Promoter declaration concerning title, encumbrances, fund handling and completion undertaking. These are promoter assertions. |
| Reference / date | Not identified in supplied documents |
|---|---|
| What the supplied record establishes | No certificate evidence provided. |
| Reference / date | Not available in supplied material |
|---|---|
| What the supplied record establishes | The readable filed approval is described as a draft technical layout pattern; detailed drawings are not supplied here. |
Frequently asked questions
Is KOUNDINYA ENCLAVE registered with Telangana RERA?
Yes. KOUNDINYA ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P00200010959; the registration status is On-Going Project.
Who is the developer of KOUNDINYA ENCLAVE?
The promoter named in the RERA registration is VANGA.
Where is KOUNDINYA ENCLAVE located?
KOUNDINYA ENCLAVE is in BHIKNOOR MANDAL, Bhiknoor, Kamareddy, Telangana (503101).
When will KOUNDINYA ENCLAVE be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.