Hill County Phase IV Sector-C
AVRS Landmark Townships Private Limited · Yadadri Bhuvanagiri · RERA P02000002415
HILL COUNTY PHASE IV SECTOR-C is a plotted residential development in Gowraipalli, Yadagirigutta mandal, Yadadri Bhuvanagiri district, developed by AVRS Landmark Townships Private Limited. The RERA filing records a total area of 18,413.19 sq m, affected area of 7,527.15 sq m and net area of 10,886.04 sq m. The offering is residential plots; the supplied records do not disclose a plot count or plot configurations. The project is registered under TG-RERA number P02000002415, with proposed completion on 26/09/2025.
More from AVRS Landmark Townships Pvt Ltd · 10 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | HILL COUNTY PHASE IV SECTOR-C RERA record |
| Project type | Plotted development / residential plots RERA record RERA filing |
| Phase / registered portion | Phase IV, Sector-C RERA record |
| TG-RERA registration | P02000002415 RERA record Approvals record |
| Registration validity | 17/12/2020 to 26/09/2025; certificate states “4 years.” The supplied record does not show an extension. Approvals record |
| Registered promoter | AVRS Landmark Townships Private Limited, company RERA record Corporate record |
| RERA status | The filed certificate records the registration dates above. Registration validity is distinct from the completion undertaking and from any completion/occupancy certificate; no extension or completion/occupancy certificate is supplied. Document index |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Gowraipalli (also rendered GOWRAIPALLI in the RERA filing) RERA record Promoter website |
| Revenue village | Gowraipalli / Gowraipally RERA record |
| Mandal | Yadagirigutta; the filed drawing text also renders it “Yadagigutta” RERA record |
| District | Yadadri Bhuvanagiri RERA record |
| PIN | 508115 RERA record |
| Project survey numbers / subdivisions | 195/P and 196/P RERA record Land records |
| Registered site extent | Not separately stated in the supplied registration-certificate extraction. The RERA project fields record total area 18,413.19 sq m, affected area 7,527.15 sq m, and net area 10,886.04 sq m. RERA filing |
| Boundaries | East: neighbour land; west: village road; north: neighbour land; south: village road. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority / principal approval | RERA fields name DTCP and approval number 33/2019/H, approved date 26/09/2019. The supplied drawing extraction identifies Gowraipally Grampanchayath and prints GNO 1048/2019/HR0A11 and T.L.P. No. 33/2019/H; the drawing is headed “DRAFT TECHNICAL LAYOUT PATTERN.” RERA filing Approvals record |
| Approved built-up area | RERA fields state 10,886.04 sq m. RERA filing |
| Building / plot count and arrangement | Plot count and a final sanctioned layout drawing are not established by the supplied extracts. Document index |
| Floor configuration / parking levels | Not applicable to the evidenced plotted-development offering; no building floor or parking-level configuration is supplied. RERA record |
| Approved versus RERA-declared unit counts | Not disclosed in the supplied records. Document index |
Offering and status
| Item | Record |
|---|---|
| Offering | Residential plots; plot count, plot-size range and plot-wise inventory are not supplied. RERA record |
| Booked / available | Counts not disclosed in the supplied evidence. Document index |
| Construction / development stage | RERA project header records 80% completeness; this is a filed progress figure, not an independent site verification. RERA record |
| Completion dates | The RERA project header gives proposed completion 26/09/2025. The filed Form B declaration undertakes completion by 20/06/2025. RERA record |
| Occupancy / completion certificate | No project completion certificate or occupancy certificate is included in the supplied documents. Document index |
2. The project story
This is a RERA-registered plotted residential development identified as HILL COUNTY PHASE IV SECTOR-C, in Gowraipalli village, Yadagirigutta mandal, Yadadri Bhuvanagiri district. The registered land identity is Survey Nos. 195/P and 196/P. RERA record Land records
The RERA filing describes a site with 18,413.19 sq m total area, 7,527.15 sq m affected area and 10,886.04 sq m net area. The filed drawing is a draft technical layout pattern for residential plots, but its extracted text does not establish a final sanctioned layout, plot count or plot arrangement. RERA filing
The project header reports 80% completeness. This is a RERA-filed progress figure; the supplied materials do not independently verify site conditions or establish which roads, utilities or other works are complete. No completion or occupancy certificate is supplied. RERA record Document index
3. Master plan, architecture & building design
The project is presented as a plotted layout, rather than a multi-storey building development. The RERA fields state total site area of 18,413.19 sq m, affected area of 7,527.15 sq m and net area of 10,886.04 sq m; the filed approved-built-up-area field is 10,886.04 sq m. These are filing figures and are not a substitute for a final, stamped layout plan. RERA filing RERA filing
The available RERA-filed drawing is headed “DRAFT TECHNICAL LAYOUT PATTERN” and names Survey Nos. 195/P and 196/P. It prints GNO 1048/2019/HR0A11, T.L.P. No. 33/2019/H and scale 19900-0. Its extracted text does not establish final approval, sanctioned extent or plot count. The RERA file also lists a layout-plan document request, but no extracted final layout plan is supplied. Document index
Accordingly, plot arrangement, internal road dimensions, plot numbers and sizes, parks or utility-land allocation cannot be described from the supplied drawing evidence. No building footprint, floor configuration or building count is evidenced for this plotted development. Document index
4. Homes, configurations & floor plans
The offering evidenced in the RERA record is residential plots. The supplied data does not provide plot counts, plot-size bands, plot-wise booked or available inventory, or plot-wise RERA saleable areas. RERA record Document index
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
Two drawings are recorded, but both are scans pending review; none has been software-measured. The supplied floor-plan data therefore supports no drawing-based plot or room measurements. Carpet area and apartment common-area loading are not applicable to the evidenced plot offering. Floor plans
5. Parking & vehicle circulation
The RERA filing identifies a plotted development and records “Internal Roads & Footpaths” as available in the amenities list, with 0% progress shown. It does not provide parking-space counts, visitor or accessible parking, parking allocation to individual plots, parking layout, driveway dimensions, vehicle entrances or EV-charging details. RERA record RERA amenities
The supplied material does not establish exclusive parking rights or plot-specific parking arrangements. Document index
6. Amenities, recreation & open spaces
The RERA amenities record contains 14 entries. Six are marked “YES” for availability, with 0% progress recorded for each; the remaining entries have no availability value and also show 0% progress. These are RERA-filed amenity entries, not evidence of independent completion or verification. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Landscape/open space: Green Strip/TOT LOT/Park | Size and area not supplied | RERA amenities | “YES”; 0% recorded; completion not independently verified |
| Landscape/open space: Aggregate area of recreational Open Space | Size not supplied | RERA amenities | 0% recorded; availability not stated; completion not independently verified |
| Sports/recreation | No specific sports or recreation facility described | RERA amenities | Not disclosed |
| Clubhouse/indoor: Community Buildings | No size or facility description supplied | RERA amenities | 0% recorded; availability not stated |
| Convenience/community: Internal Roads & Footpaths | Size and specification not supplied | RERA amenities | “YES”; 0% recorded; completion not independently verified |
| Convenience/community: Street Lighting | Quantity and specification not supplied | RERA amenities | “YES”; 0% recorded; completion not independently verified |
Other filed amenity entries—including water supply, sewerage, storm-water drains, sewage/sullage treatment, solid-waste management, rainwater harvesting, energy management, fire safety and electrical meter/substation/receiving station—are covered under Utilities below. RERA amenities
7. Utilities, building services & safety
The amenities schedule records the following infrastructure. It provides no capacities, technical specifications or independent evidence of completed operation; where an entry is marked “YES,” the same schedule records 0% progress. RERA amenities
| RERA-filed provision | Water Supply |
|---|---|
| Progress / evidence limit | Marked “YES”; 0% recorded. Source, storage, treatment and capacity not supplied. |
| RERA-filed provision | “Sewerage (Chamber, Lines, Septic Tank, STP),” storm-water drains, and treatment/disposal of sewage and sullage water |
|---|---|
| Progress / evidence limit | Sewerage entry marked “YES”; 0% recorded. No treatment capacity, reuse details or completion verification supplied. |
| RERA-filed provision | Water Conservation, Rain water Harvesting |
|---|---|
| Progress / evidence limit | 0% recorded; availability not stated. System details and capacity not supplied. |
| RERA-filed provision | Energy management; Electrical Meter Room, Sub-Station, Receiving Station |
|---|---|
| Progress / evidence limit | 0% recorded; availability not stated. Electrical capacity, backup and system details not supplied. |
| RERA-filed provision | Fire Protection and Fire Safety Requirements |
|---|---|
| Progress / evidence limit | 0% recorded; availability not stated. No specific system, approval or compliance evidence supplied. |
| RERA-filed provision | Solid Waste Management and Disposal |
|---|---|
| Progress / evidence limit | 0% recorded; availability not stated. No collection or processing details supplied. |
| RERA-filed provision | No lift, accessibility, CCTV or access-control details supplied |
|---|---|
| Progress / evidence limit | Not disclosed. |
These entries describe filed provisions only; they do not establish that the facilities are completed or that statutory requirements have been met. RERA amenities
8. Location, access & connectivity
The registered location is Gowraipalli, Yadagirigutta mandal, Yadadri Bhuvanagiri district, PIN 508115. The project is identified in Survey Nos. 195/P and 196/P. The RERA fields describe the east and north boundaries as neighbour land, and the west and south boundaries as village road. RERA record RERA filing
A location record gives the cadastral parcel-centroid coordinates as 17.67209731048593, 78.94007098781704. It lists the nearest sampled Outer Ring Road interchange at approximately 37.0 km; no route or travel time is supplied. Location record
9. Developer & development status
The registered promoter is AVRS Landmark Townships Private Limited, recorded as a company. The supplied promoter information lists its address as Flat No. 401, H.No. 3-12-73, Harsha Towers, Mansoorabad, Gowraipalli, Yadagirigutta, Yadadri Bhuvanagiri, PIN 508115. The promoter website recorded in the project data is https://www.landmarktownships.in. RERA record Corporate record RERA filing
The RERA project header reports 80% completeness. This is a declared/filed progress figure, not an independent inspection. The registration certificate records validity to 26/09/2025; the project header also gives proposed completion 26/09/2025, while the Form B declaration undertakes completion by 20/06/2025. No registration extension or completion/occupancy certificate is present in the supplied materials. RERA record
The RERA filing identifies Ravindar Reddy Palle as an authorized signatory. The Form B declaration is made through P. Ravinder Reddy on behalf of the promoter. Parties record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for HILL COUNTY PHASE IV SECTOR-C, registration P02000002415, dated 17/12/2020, valid through 26/09/2025; no extension is shown. |
| Principal layout / plan identifier | RERA fields list DTCP approval 33/2019/H, dated 26/09/2019. The filed drawing also prints GNO 1048/2019/HR0A11 and T.L.P. No. 33/2019/H, but is headed “DRAFT TECHNICAL LAYOUT PATTERN.” Approvals record RERA filing |
| Layout-plan evidence | RERA file lists a layout-plan document request; the supplied extraction does not establish a final stamped or sanctioned layout plan. Document index |
| Commencement / completion / occupancy | A document is labelled “Commencement Certificates for each building in each phase,” but the extracted content is a draft technical layout pattern and does not establish a final commencement certificate. No completion or occupancy certificate is supplied. Document index |
| Promoter declaration | Form B affidavit-cum-declaration by AVRS Landmark Townships Private Limited, through P. Ravinder Reddy, dated 27/01/2020; it includes the promoter’s title and encumbrance declarations and completion undertaking. These are promoter declarations. |
| Other drawing evidence | Two floor-plan drawings are recorded; both are scans pending review, with no measurements produced. Floor plans |
1. Project at a glance
Project identity
Registered project name: HILL COUNTY PHASE IV SECTOR-C
Project type: Plotted development / residential plots
Phase / registered portion: Phase IV, Sector-C
TG-RERA registration: P02000002415
Registration validity: 17/12/2020 to 26/09/2025; certificate states “4 years.” The supplied record does not show an extension.
Registered promoter: AVRS Landmark Townships Private Limited, company
RERA status: The filed certificate records the registration dates above. Registration validity is distinct from the completion undertaking and from any completion/occupancy certificate; no extension or completion/occupancy certificate is supplied.
Land and geographic identity
Locality: Gowraipalli (also rendered GOWRAIPALLI in the RERA filing)
Revenue village: Gowraipalli / Gowraipally
Mandal: Yadagirigutta; the filed drawing text also renders it “Yadagigutta”
District: Yadadri Bhuvanagiri
PIN: 508115
Project survey numbers / subdivisions: 195/P and 196/P
Registered site extent: Not separately stated in the supplied registration-certificate extraction. The RERA project fields record total area 18,413.19 sq m, affected area 7,527.15 sq m, and net area 10,886.04 sq m.
Boundaries: East: neighbour land; west: village road; north: neighbour land; south: village road.
Development identity
Sanctioning authority / principal approval: RERA fields name DTCP and approval number 33/2019/H, approved date 26/09/2019. The supplied drawing extraction identifies Gowraipally Grampanchayath and prints GNO 1048/2019/HR0A11 and T.L.P. No. 33/2019/H; the drawing is headed “DRAFT TECHNICAL LAYOUT PATTERN.”
Approved built-up area: RERA fields state 10,886.04 sq m.
Building / plot count and arrangement: Plot count and a final sanctioned layout drawing are not established by the supplied extracts.
Floor configuration / parking levels: Not applicable to the evidenced plotted-development offering; no building floor or parking-level configuration is supplied.
Approved versus RERA-declared unit counts: Not disclosed in the supplied records.
Offering and status
Offering: Residential plots; plot count, plot-size range and plot-wise inventory are not supplied.
Booked / available: Counts not disclosed in the supplied evidence.
Construction / development stage: RERA project header records 80% completeness; this is a filed progress figure, not an independent site verification.
Completion dates: The RERA project header gives proposed completion 26/09/2025. The filed Form B declaration undertakes completion by 20/06/2025.
Occupancy / completion certificate: No project completion certificate or occupancy certificate is included in the supplied documents.
2. The project story
This is a RERA-registered plotted residential development identified as HILL COUNTY PHASE IV SECTOR-C, in Gowraipalli village, Yadagirigutta mandal, Yadadri Bhuvanagiri district. The registered land identity is Survey Nos. 195/P and 196/P.
The RERA filing describes a site with 18,413.19 sq m total area, 7,527.15 sq m affected area and 10,886.04 sq m net area. The filed drawing is a draft technical layout pattern for residential plots, but its extracted text does not establish a final sanctioned layout, plot count or plot arrangement.
The project header reports 80% completeness. This is a RERA-filed progress figure; the supplied materials do not independently verify site conditions or establish which roads, utilities or other works are complete. No completion or occupancy certificate is supplied.
3. Master plan, architecture & building design
The project is presented as a plotted layout, rather than a multi-storey building development. The RERA fields state total site area of 18,413.19 sq m, affected area of 7,527.15 sq m and net area of 10,886.04 sq m; the filed approved-built-up-area field is 10,886.04 sq m. These are filing figures and are not a substitute for a final, stamped layout plan.
The available RERA-filed drawing is headed “DRAFT TECHNICAL LAYOUT PATTERN” and names Survey Nos. 195/P and 196/P. It prints GNO 1048/2019/HR0A11, T.L.P. No. 33/2019/H and scale 19900-0. Its extracted text does not establish final approval, sanctioned extent or plot count. The RERA file also lists a layout-plan document request, but no extracted final layout plan is supplied.
Accordingly, plot arrangement, internal road dimensions, plot numbers and sizes, parks or utility-land allocation cannot be described from the supplied drawing evidence. No building footprint, floor configuration or building count is evidenced for this plotted development.
4. Homes, configurations & floor plans
The offering evidenced in the RERA record is residential plots. The supplied data does not provide plot counts, plot-size bands, plot-wise booked or available inventory, or plot-wise RERA saleable areas.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
Two drawings are recorded, but both are scans pending review; none has been software-measured. The supplied floor-plan data therefore supports no drawing-based plot or room measurements. Carpet area and apartment common-area loading are not applicable to the evidenced plot offering.
5. Parking & vehicle circulation
The RERA filing identifies a plotted development and records “Internal Roads & Footpaths” as available in the amenities list, with 0% progress shown. It does not provide parking-space counts, visitor or accessible parking, parking allocation to individual plots, parking layout, driveway dimensions, vehicle entrances or EV-charging details.
The supplied material does not establish exclusive parking rights or plot-specific parking arrangements.
6. Amenities, recreation & open spaces
The RERA amenities record contains 14 entries. Six are marked “YES” for availability, with 0% progress recorded for each; the remaining entries have no availability value and also show 0% progress. These are RERA-filed amenity entries, not evidence of independent completion or verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Landscape/open space: Green Strip/TOT LOT/Park | Size and area not supplied | “YES”; 0% recorded; completion not independently verified | |
| Landscape/open space: Aggregate area of recreational Open Space | Size not supplied | 0% recorded; availability not stated; completion not independently verified | |
| Sports/recreation | No specific sports or recreation facility described | Not disclosed | |
| Clubhouse/indoor: Community Buildings | No size or facility description supplied | 0% recorded; availability not stated | |
| Convenience/community: Internal Roads & Footpaths | Size and specification not supplied | “YES”; 0% recorded; completion not independently verified | |
| Convenience/community: Street Lighting | Quantity and specification not supplied | “YES”; 0% recorded; completion not independently verified |
Other filed amenity entries—including water supply, sewerage, storm-water drains, sewage/sullage treatment, solid-waste management, rainwater harvesting, energy management, fire safety and electrical meter/substation/receiving station—are covered under Utilities below.
7. Utilities, building services & safety
The amenities schedule records the following infrastructure. It provides no capacities, technical specifications or independent evidence of completed operation; where an entry is marked “YES,” the same schedule records 0% progress.
| RERA-filed provision | Water Supply |
|---|---|
| Progress / evidence limit | Marked “YES”; 0% recorded. Source, storage, treatment and capacity not supplied. |
| RERA-filed provision | “Sewerage (Chamber, Lines, Septic Tank, STP),” storm-water drains, and treatment/disposal of sewage and sullage water |
|---|---|
| Progress / evidence limit | Sewerage entry marked “YES”; 0% recorded. No treatment capacity, reuse details or completion verification supplied. |
| RERA-filed provision | Water Conservation, Rain water Harvesting |
|---|---|
| Progress / evidence limit | 0% recorded; availability not stated. System details and capacity not supplied. |
| RERA-filed provision | Energy management; Electrical Meter Room, Sub-Station, Receiving Station |
|---|---|
| Progress / evidence limit | 0% recorded; availability not stated. Electrical capacity, backup and system details not supplied. |
| RERA-filed provision | Fire Protection and Fire Safety Requirements |
|---|---|
| Progress / evidence limit | 0% recorded; availability not stated. No specific system, approval or compliance evidence supplied. |
| RERA-filed provision | Solid Waste Management and Disposal |
|---|---|
| Progress / evidence limit | 0% recorded; availability not stated. No collection or processing details supplied. |
| RERA-filed provision | No lift, accessibility, CCTV or access-control details supplied |
|---|---|
| Progress / evidence limit | Not disclosed. |
These entries describe filed provisions only; they do not establish that the facilities are completed or that statutory requirements have been met.
8. Location, access & connectivity
The registered location is Gowraipalli, Yadagirigutta mandal, Yadadri Bhuvanagiri district, PIN 508115. The project is identified in Survey Nos. 195/P and 196/P. The RERA fields describe the east and north boundaries as neighbour land, and the west and south boundaries as village road.
A location record gives the cadastral parcel-centroid coordinates as 17.67209731048593, 78.94007098781704. It lists the nearest sampled Outer Ring Road interchange at approximately 37.0 km; no route or travel time is supplied.
9. Developer & development status
The registered promoter is AVRS Landmark Townships Private Limited, recorded as a company. The supplied promoter information lists its address as Flat No. 401, H.No. 3-12-73, Harsha Towers, Mansoorabad, Gowraipalli, Yadagirigutta, Yadadri Bhuvanagiri, PIN 508115. The promoter website recorded in the project data is https://www.landmarktownships.in.
The RERA project header reports 80% completeness. This is a declared/filed progress figure, not an independent inspection. The registration certificate records validity to 26/09/2025; the project header also gives proposed completion 26/09/2025, while the Form B declaration undertakes completion by 20/06/2025. No registration extension or completion/occupancy certificate is present in the supplied materials.
The RERA filing identifies Ravindar Reddy Palle as an authorized signatory. The Form B declaration is made through P. Ravinder Reddy on behalf of the promoter.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for HILL COUNTY PHASE IV SECTOR-C, registration P02000002415, dated 17/12/2020, valid through 26/09/2025; no extension is shown.
Principal layout / plan identifier: RERA fields list DTCP approval 33/2019/H, dated 26/09/2019. The filed drawing also prints GNO 1048/2019/HR0A11 and T.L.P. No. 33/2019/H, but is headed “DRAFT TECHNICAL LAYOUT PATTERN.”
Layout-plan evidence: RERA file lists a layout-plan document request; the supplied extraction does not establish a final stamped or sanctioned layout plan.
Commencement / completion / occupancy: A document is labelled “Commencement Certificates for each building in each phase,” but the extracted content is a draft technical layout pattern and does not establish a final commencement certificate. No completion or occupancy certificate is supplied.
Promoter declaration: Form B affidavit-cum-declaration by AVRS Landmark Townships Private Limited, through P. Ravinder Reddy, dated 27/01/2020; it includes the promoter’s title and encumbrance declarations and completion undertaking. These are promoter declarations.
Other drawing evidence: Two floor-plan drawings are recorded; both are scans pending review, with no measurements produced.
Other registrations of Hill County
Frequently asked questions
Is HILL COUNTY PHASE IV SECTOR-C registered with Telangana RERA?
Yes. HILL COUNTY PHASE IV SECTOR-C is registered with the Telangana Real Estate Regulatory Authority as P02000002415; the registration status is New Project.
Who is the developer of HILL COUNTY PHASE IV SECTOR-C?
The promoter named in the RERA registration is AVRS Landmark Townships Private Limited.
Where is HILL COUNTY PHASE IV SECTOR-C located?
HILL COUNTY PHASE IV SECTOR-C is in GOWRAIPALLI, Yadagirigutta, Yadadri Bhuvanagiri, Telangana (508115).
When will HILL COUNTY PHASE IV SECTOR-C be completed?
The promoter's proposed date of completion filed with RERA is 26/09/2025. This is the promoter's declaration, not a guarantee.