Tnr Preston Mall And Multiplex
TNR PRESTON PROJECTS LLP · Rangareddy · RERA P02400004253
TNR PRESTON MALL AND MULTIPLEX is a commercial mall and multiplex in Saroornagar, Saroornagar Mandal, Ranga Reddy District. It is being developed by registered promoter TNR PRESTON PROJECTS LLP on a site area of 12,840.30 m², as one building with 4 cellars for parking, Ground + 6 Upper Floors and 11 screens. The TG-RERA filing records 103 entries under the labels FC, L, LG, LG ANCHOR 01, LG ANCHOR 02, LG ANCHOR 03, PROJECTION and AUDI. Its TG-RERA registration number is P02400004253, and the project header records proposed completion as 03/06/2028.
📘 Project brochure from the promoter’s website ↗01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered project name | TNR PRESTON MALL AND MULTIPLEX |
| Project type | Commercial mall and multiplex |
| Phase / registered portion | One commercial building; no separate phase name is stated in the supplied record. |
| TG-RERA registration | P02400004253, issued 14 March 2022; registration certificate states validity through 03 February 2028, unless extended by the Authority. |
| Registered promoter | TNR PRESTON PROJECTS LLP RERA record Corporate record |
| RERA status | Project is recorded as “New Project.” Registration is shown in the supplied TG-RERA record; no extension is recorded in the supplied evidence. RERA record Approvals record |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / plot | Saroornagar; Plot Nos. 15-19 |
| Revenue villages | Karmanghat and Lingojiguda (also rendered “Lingogiguda” in project records) |
| Mandal / district / PIN | Saroornagar / Ranga Reddy / 500035 |
| Project survey numbers | 313 and 314 of Karmanghat; 20 of Lingojiguda |
| Site area | 12,840.30 m² total; 11,765.01 m² net after the recorded road-affected area |
| Road-affected area | 1,075.29 m², identified for a proposed 60.0 m wide road |
| Boundaries | East, west, north and south are each recorded as “OTHERS LAND.” |
| Cadastral reference | A Bhu Bharati GIS result is supplied for Survey No. 20 of Lingojiguda, with a whole-survey extent of 8,948.75 m²; it is a survey-level reference, not a project-parcel extent. Cadastral map RERA filing |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority | Greater Hyderabad Municipal Corporation (GHMC) |
| Principal building permit | 53636/HO/EZ/Cir-3/2016, dated 04 February 2022; file no. 295903/10/09/2020/HO |
| Approved development | Commercial mall and multiplex building with 11 screens |
| Approved built-up area | 60,535.25 m² is recorded in the RERA project information. The building permit extract separately lists commercial area 35,073.35 m² and four-cellar area 25,461.90 m². These are distinct filed/sanction figures. RERA filing |
| Building / floor configuration | One building; 4 cellars for parking + Ground + 6 Upper Floors; sanctioned height 29.85 m |
| RERA unit-table count | 103 entries in total, including entries not classified as sale homes; the filed labels and indicative booked/available figures are set out in section 4. RERA unit table RERA unit details |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed unit labels | FC, L, LG, LG ANCHOR 01, LG ANCHOR 02, LG ANCHOR 03, PROJECTION, AUDI. The filing does not supply interpretable residential-style configurations; “AUDI” is identified as a common-area entry, while “L” is identified as a floor entry. Other labels are not classified by the normaliser. RERA unit table RERA unit table |
| RERA-filed saleable areas | Filed areas range from 147.7 m² to 1,389.54 m² across the recorded labels; see the itemised table in section 4. RERA unit table |
| Booked / available | Portal-read figures are indicative and carry no as-of date in the supplied record. The filing-derived unit-table total is 63 booked and 40 available, including non-sale/common-area entries. RERA unit table RERA unit table |
| Construction stage | No independent site-progress evidence is supplied. The RERA amenity/progress fields include percentage values for listed infrastructure; these are portal-recorded figures, not an independent site verification. RERA amenities |
| Completion dates | The GHMC permit states construction to be completed before 03 February 2028; the promoter’s Form B also undertakes completion by that date. The project header separately records proposed completion as 03/06/2028. RERA record |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The GHMC permit says an occupancy certificate is compulsory before occupation. |
2. The project story
This is a single-building commercial mall and multiplex project registered with TG-RERA as TNR PRESTON MALL AND MULTIPLEX. The GHMC building permit describes a mall and multiplex with 11 screens, four cellar parking levels and Ground + 6 Upper Floors, on Plot Nos. 15-19 across Survey Nos. 313 and 314 of Karmanghat and Survey No. 20 of Lingojiguda.
The RERA unit schedule is commercial, but its labels are not consistently explained as shop or unit configurations in the supplied filing-derived data. The portal-derived schedule includes 103 total entries, among them floor and common-area entries; therefore it should not be read as 103 comparable sale units. No verified site inspection or independently measured construction-progress report is supplied. The RERA infrastructure fields record progress percentages for selected items, which are portal data rather than independent confirmation of completion. RERA unit table RERA unit table RERA amenities
3. Master plan, architecture & building design
- The GHMC permit records a site area of 12,840.30 m², a road-affected portion of 1,075.29 m², and a net area of 11,765.01 m². It sanctions one commercial mall and multiplex building, with 4 cellars for parking, Ground + 6 Upper Floors and a height of 29.85 m. The permit extract records commercial area of 35,073.35 m² and four-cellar area of 25,461.90 m²; the RERA project information separately records approved built-up area of 60,535.25 m². These figures retain their respective source labels and are not treated as interchangeable area measures. RERA filing
- The permit records a tot-lot of 1,191.57 m², 10 rainwater-harvesting pits, and requirements for a sewerage treatment plant, transformer space and garbage house. It also specifies setbacks of Front 12.00 m, Rear 8.00 m and Side I 8.00 m. The supplied permit extraction does not provide a floor-by-floor layout, shop-by-shop drawing schedule, building footprint, lift/stair count, or detailed circulation plan. Four floor-plan drawings are listed, but all four remain unmeasured scans in the supplied drawing data. Floor plans
4. Homes, configurations & floor plans
This is a commercial project, not a residential apartment offering. The TG-RERA schedule includes saleable-area entries under the filed labels below. The source normalisation identifies “L” as a floor entry and “AUDI” as a common-area entry; it does not classify the other labels, so they are quoted as filed without assigning them a more specific use. Counts are portal-read and have no supplied as-of date. RERA unit table RERA unit table
| RERA-filed label | Units | Booked | Available | RERA saleable area |
|---|---|---|---|---|
| FC | 26 | 13 | 13 | 252.88 m² |
| L | 44 | 27 | 17 | 284.04 m² |
| LG | 18 | 11 | 7 | 147.7 m² |
| LG ANCHOR 01 | 1 | 1 | 0 | 1,244.7 m² |
| LG ANCHOR 02 | 1 | 0 | 1 | 851.36 m² |
| LG ANCHOR 03 | 1 | 0 | 1 | 760.68 m² |
| PROJECTION | 1 | 1 | 0 | 1,389.54 m² |
| AUDI | 11 | 10 | 1 | 823.15 m² |
No measured carpet-area figures are available: the four supplied floor-plan drawings are scans pending measurement. The listed RERA areas are saleable areas, not measured carpet areas. Floor plans RERA unit details No unit-by-unit room dimensions, orientation or floor arrangement can be established from the supplied drawing data.
5. Parking & vehicle circulation
- The sanctioned plan provides 4 cellars for parking. GHMC conditions state that the approved cellar and stilt areas are to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The permit extract does not provide a sanctioned parking-space count, a visitor or accessible-parking count, or unit-specific parking allocations. A promoter brochure separately markets “Space for 750 cars” and “4-Level parking”; these are marketing claims, not the sanctioned-space count or proof of individual allocation.
- The permit requires one entry and one exit with minimum width 4.5 m and height clearance 5 m. It also refers to a service road wherever required. Detailed ramp geometry, pedestrian separation, EV charging provision and parking-allocation arrangements are not established in the supplied project documents.
6. Amenities, recreation & open spaces
The permit records certain site facilities and infrastructure requirements. The RERA amenity schedule gives progress percentages for listed items, but no independent verification of those percentages is supplied. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green area | 1,191.57 m² | GHMC permit | Sanctioned provision; completion not independently verified. |
| Green Strip/TOT LOT/Park | No separate area stated in this schedule | TG-RERA amenity schedule | 75% recorded; portal figure, not independently verified. RERA amenities |
| Internal roads and footpaths | No dimensions stated | TG-RERA amenity schedule | 100% recorded; portal figure, not independently verified. RERA amenities |
| Storm-water drains | No dimensions stated | TG-RERA amenity schedule | 100% recorded; portal figure, not independently verified. RERA amenities |
| Street lighting | No quantity stated | TG-RERA amenity schedule | 75% recorded; portal figure, not independently verified. RERA amenities |
| Community buildings | No facility details stated | TG-RERA amenity schedule | 0% recorded. RERA amenities |
The project brochure describes food, gaming and cinema facilities, including 11 screens, but these are promoter-marketed descriptions rather than independently verified delivered facilities.
7. Utilities, building services & safety
- The GHMC permit requires provision for a sewerage treatment plant, rainwater-harvesting structures, a transformer space and a garbage house. It also specifies separate underground static water storage of 25,000 litres, a terrace tank of 25,000 litres (the extracted condition says “for Residential buildings”), generator backup, emergency lighting in corridors/common passages and staircases, and specified fire-fighting equipment and systems. These are permit conditions; the supplied record does not independently verify installation or operational status.
- The RERA amenity schedule records water supply at 75%, sewerage at 75%, treatment and disposal of sewage and sullage water at 90%, solid-waste management and disposal at 90%, water conservation/rainwater harvesting at 95%, energy management at 80%, fire protection/fire-safety requirements at 95%, and electrical meter room/sub-station/receiving station at 70%. These are reported progress values, not independent completion certifications. RERA amenities
- The permit also requires services including sanitation, plumbing, fire safety, lifts and electrical installations to be carried out under qualified technical personnel supervision. The supplied sanctioned extract does not state lift counts or capacities, water source or treatment capacity, STP capacity, generator capacity, CCTV coverage, or accessible-circulation details.
8. Location, access & connectivity
- The registered project location is Plot Nos. 15-19, Saroornagar, in Ranga Reddy District, PIN 500035, covering Survey Nos. 313 and 314 of Karmanghat and 20 of Lingojiguda. The RERA certificate identifies the locality as Lingogiguda, Saroornagar; the GHMC permit identifies Plot Nos. 15-19, Saroornagar, and the villages as Karmanghat and Lingojiguda.
- The cadastral parcel-centroid record is at 17.34296154256626, 78.53932512670718. The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 8.9 km. No other independently sourced approach-road or public-transport distances are supplied. Cadastral map Location record
9. Developer & development status
- The registered promoter is TNR PRESTON PROJECTS LLP, an LLP, with GSTIN 36AAKFT3113H1ZA. The project record lists the promoter address as SECOND FLOOR, VASAVI COLONY, Karmanghat & 20 of Lingogiguda, Saroornagar, Saroornagar, Ranga Reddy, 500035. The recorded authorized signatory is NARSIMHA RAO THERATIPALLY. Corporate record Parties record The promoter’s website is prestondevelopers.com. Parties record
- The promoter’s Form B, dated 09.02.2022, declares that the project will be completed by 03 February 2028. The GHMC building permit also states completion before 03 February 2028; the project header records proposed completion as 03/06/2028. No independent construction-progress assessment or occupancy certificate is supplied. RERA record
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for TNR PRESTON MALL AND MULTIPLEX, registration no. P02400004253, issued 14/03/2022, valid through 03/02/2028 unless extended. |
| GHMC building permit | Permit no. 53636/HO/EZ/Cir-3/2016, file no. 295903/10/09/2020/HO, dated 04 February 2022; commercial mall and multiplex, 11 screens, four cellars, Ground + 6 Upper Floors. |
| Earlier permit references listed in the permit | Permit no. 53392/HO/EZ/Cir-3/2016, dated 15.11.2017; previous file no. 35237/07/08/2015/HO. |
| Plan and commencement evidence | The GHMC building permit order is filed as the commencement-certificate document. Separate layout-plan documents are listed in the RERA record, but the supplied entries are not extracted. Document index |
| Occupancy / completion certificate | Not supplied; the GHMC permit requires an occupancy certificate before occupation. |
| Other references stated in GHMC permit | Police NOC 5201/M2/Cinema/RCK/2018-21 (24.09.2021); Fire NOC acknowledgement 2022022002017 (14.07.2020); AAI NOC AAI/HY/ATS-59/NOC-2/2015/9646-47 (23.12.2015); SEIAA order SEIAA/TS/RRD-118/2015-1680 (03.11.2015); JNTUH/BICS letter JNTUH/BICS/PC/81/2021 (02.03.2021). The permit says the relevant conditions are to be followed. |
| Title / RERA filing documents | Form B declaration dated 09.02.2022; GHMC building permit order; TG-RERA Form C registration certificate. |
| Drawing review | Four floor-plan drawings are recorded; none has been software-measured and all are listed as scans pending measurement. Floor plans |
1. Project at a glance
Project identity
Registered project name: TNR PRESTON MALL AND MULTIPLEX
Project type: Commercial mall and multiplex
Phase / registered portion: One commercial building; no separate phase name is stated in the supplied record.
TG-RERA registration: P02400004253, issued 14 March 2022; registration certificate states validity through 03 February 2028, unless extended by the Authority.
Registered promoter: TNR PRESTON PROJECTS LLP
RERA status: Project is recorded as “New Project.” Registration is shown in the supplied TG-RERA record; no extension is recorded in the supplied evidence.
Land and geographic identity
Locality / plot: Saroornagar; Plot Nos. 15-19
Revenue villages: Karmanghat and Lingojiguda (also rendered “Lingogiguda” in project records)
Mandal / district / PIN: Saroornagar / Ranga Reddy / 500035
Project survey numbers: 313 and 314 of Karmanghat; 20 of Lingojiguda
Site area: 12,840.30 m² total; 11,765.01 m² net after the recorded road-affected area
Road-affected area: 1,075.29 m², identified for a proposed 60.0 m wide road
Boundaries: East, west, north and south are each recorded as “OTHERS LAND.”
Cadastral reference: A Bhu Bharati GIS result is supplied for Survey No. 20 of Lingojiguda, with a whole-survey extent of 8,948.75 m²; it is a survey-level reference, not a project-parcel extent.
Development identity
Sanctioning authority: Greater Hyderabad Municipal Corporation (GHMC)
Principal building permit: 53636/HO/EZ/Cir-3/2016, dated 04 February 2022; file no. 295903/10/09/2020/HO
Approved development: Commercial mall and multiplex building with 11 screens
Approved built-up area: 60,535.25 m² is recorded in the RERA project information. The building permit extract separately lists commercial area 35,073.35 m² and four-cellar area 25,461.90 m². These are distinct filed/sanction figures.
Building / floor configuration: One building; 4 cellars for parking + Ground + 6 Upper Floors; sanctioned height 29.85 m
RERA unit-table count: 103 entries in total, including entries not classified as sale homes; the filed labels and indicative booked/available figures are set out in section 4.
Offering and status
RERA-filed unit labels: FC, L, LG, LG ANCHOR 01, LG ANCHOR 02, LG ANCHOR 03, PROJECTION, AUDI. The filing does not supply interpretable residential-style configurations; “AUDI” is identified as a common-area entry, while “L” is identified as a floor entry. Other labels are not classified by the normaliser.
RERA-filed saleable areas: Filed areas range from 147.7 m² to 1,389.54 m² across the recorded labels; see the itemised table in section 4.
Booked / available: Portal-read figures are indicative and carry no as-of date in the supplied record. The filing-derived unit-table total is 63 booked and 40 available, including non-sale/common-area entries.
Construction stage: No independent site-progress evidence is supplied. The RERA amenity/progress fields include percentage values for listed infrastructure; these are portal-recorded figures, not an independent site verification.
Completion dates: The GHMC permit states construction to be completed before 03 February 2028; the promoter’s Form B also undertakes completion by that date. The project header separately records proposed completion as 03/06/2028.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The GHMC permit says an occupancy certificate is compulsory before occupation.
2. The project story
This is a single-building commercial mall and multiplex project registered with TG-RERA as TNR PRESTON MALL AND MULTIPLEX. The GHMC building permit describes a mall and multiplex with 11 screens, four cellar parking levels and Ground + 6 Upper Floors, on Plot Nos. 15-19 across Survey Nos. 313 and 314 of Karmanghat and Survey No. 20 of Lingojiguda.
The RERA unit schedule is commercial, but its labels are not consistently explained as shop or unit configurations in the supplied filing-derived data. The portal-derived schedule includes 103 total entries, among them floor and common-area entries; therefore it should not be read as 103 comparable sale units. No verified site inspection or independently measured construction-progress report is supplied. The RERA infrastructure fields record progress percentages for selected items, which are portal data rather than independent confirmation of completion.
3. Master plan, architecture & building design
- The GHMC permit records a site area of 12,840.30 m², a road-affected portion of 1,075.29 m², and a net area of 11,765.01 m². It sanctions one commercial mall and multiplex building, with 4 cellars for parking, Ground + 6 Upper Floors and a height of 29.85 m. The permit extract records commercial area of 35,073.35 m² and four-cellar area of 25,461.90 m²; the RERA project information separately records approved built-up area of 60,535.25 m². These figures retain their respective source labels and are not treated as interchangeable area measures.
- The permit records a tot-lot of 1,191.57 m², 10 rainwater-harvesting pits, and requirements for a sewerage treatment plant, transformer space and garbage house. It also specifies setbacks of Front 12.00 m, Rear 8.00 m and Side I 8.00 m. The supplied permit extraction does not provide a floor-by-floor layout, shop-by-shop drawing schedule, building footprint, lift/stair count, or detailed circulation plan. Four floor-plan drawings are listed, but all four remain unmeasured scans in the supplied drawing data.
4. Homes, configurations & floor plans
This is a commercial project, not a residential apartment offering. The TG-RERA schedule includes saleable-area entries under the filed labels below. The source normalisation identifies “L” as a floor entry and “AUDI” as a common-area entry; it does not classify the other labels, so they are quoted as filed without assigning them a more specific use. Counts are portal-read and have no supplied as-of date.
| RERA-filed label | Units | Booked | Available | RERA saleable area |
|---|---|---|---|---|
| FC | 26 | 13 | 13 | 252.88 m² |
| L | 44 | 27 | 17 | 284.04 m² |
| LG | 18 | 11 | 7 | 147.7 m² |
| LG ANCHOR 01 | 1 | 1 | 0 | 1,244.7 m² |
| LG ANCHOR 02 | 1 | 0 | 1 | 851.36 m² |
| LG ANCHOR 03 | 1 | 0 | 1 | 760.68 m² |
| PROJECTION | 1 | 1 | 0 | 1,389.54 m² |
| AUDI | 11 | 10 | 1 | 823.15 m² |
No measured carpet-area figures are available: the four supplied floor-plan drawings are scans pending measurement. The listed RERA areas are saleable areas, not measured carpet areas. No unit-by-unit room dimensions, orientation or floor arrangement can be established from the supplied drawing data.
5. Parking & vehicle circulation
- The sanctioned plan provides 4 cellars for parking. GHMC conditions state that the approved cellar and stilt areas are to be used exclusively for vehicle parking, without partition walls or rolling shutters, and not converted to another use. The permit extract does not provide a sanctioned parking-space count, a visitor or accessible-parking count, or unit-specific parking allocations. A promoter brochure separately markets “Space for 750 cars” and “4-Level parking”; these are marketing claims, not the sanctioned-space count or proof of individual allocation.
- The permit requires one entry and one exit with minimum width 4.5 m and height clearance 5 m. It also refers to a service road wherever required. Detailed ramp geometry, pedestrian separation, EV charging provision and parking-allocation arrangements are not established in the supplied project documents.
6. Amenities, recreation & open spaces
The permit records certain site facilities and infrastructure requirements. The RERA amenity schedule gives progress percentages for listed items, but no independent verification of those percentages is supplied.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Tot-lot / green area | 1,191.57 m² | GHMC permit | Sanctioned provision; completion not independently verified. |
| Green Strip/TOT LOT/Park | No separate area stated in this schedule | TG-RERA amenity schedule | 75% recorded; portal figure, not independently verified. |
| Internal roads and footpaths | No dimensions stated | TG-RERA amenity schedule | 100% recorded; portal figure, not independently verified. |
| Storm-water drains | No dimensions stated | TG-RERA amenity schedule | 100% recorded; portal figure, not independently verified. |
| Street lighting | No quantity stated | TG-RERA amenity schedule | 75% recorded; portal figure, not independently verified. |
| Community buildings | No facility details stated | TG-RERA amenity schedule | 0% recorded. |
The project brochure describes food, gaming and cinema facilities, including 11 screens, but these are promoter-marketed descriptions rather than independently verified delivered facilities.
7. Utilities, building services & safety
- The GHMC permit requires provision for a sewerage treatment plant, rainwater-harvesting structures, a transformer space and a garbage house. It also specifies separate underground static water storage of 25,000 litres, a terrace tank of 25,000 litres (the extracted condition says “for Residential buildings”), generator backup, emergency lighting in corridors/common passages and staircases, and specified fire-fighting equipment and systems. These are permit conditions; the supplied record does not independently verify installation or operational status.
- The RERA amenity schedule records water supply at 75%, sewerage at 75%, treatment and disposal of sewage and sullage water at 90%, solid-waste management and disposal at 90%, water conservation/rainwater harvesting at 95%, energy management at 80%, fire protection/fire-safety requirements at 95%, and electrical meter room/sub-station/receiving station at 70%. These are reported progress values, not independent completion certifications.
- The permit also requires services including sanitation, plumbing, fire safety, lifts and electrical installations to be carried out under qualified technical personnel supervision. The supplied sanctioned extract does not state lift counts or capacities, water source or treatment capacity, STP capacity, generator capacity, CCTV coverage, or accessible-circulation details.
8. Location, access & connectivity
- The registered project location is Plot Nos. 15-19, Saroornagar, in Ranga Reddy District, PIN 500035, covering Survey Nos. 313 and 314 of Karmanghat and 20 of Lingojiguda. The RERA certificate identifies the locality as Lingogiguda, Saroornagar; the GHMC permit identifies Plot Nos. 15-19, Saroornagar, and the villages as Karmanghat and Lingojiguda.
- The cadastral parcel-centroid record is at 17.34296154256626, 78.53932512670718. The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 8.9 km. No other independently sourced approach-road or public-transport distances are supplied.
9. Developer & development status
- The registered promoter is TNR PRESTON PROJECTS LLP, an LLP, with GSTIN 36AAKFT3113H1ZA. The project record lists the promoter address as SECOND FLOOR, VASAVI COLONY, Karmanghat & 20 of Lingogiguda, Saroornagar, Saroornagar, Ranga Reddy, 500035. The recorded authorized signatory is NARSIMHA RAO THERATIPALLY. The promoter’s website is prestondevelopers.com.
- The promoter’s Form B, dated 09.02.2022, declares that the project will be completed by 03 February 2028. The GHMC building permit also states completion before 03 February 2028; the project header records proposed completion as 03/06/2028. No independent construction-progress assessment or occupancy certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration: Form C for TNR PRESTON MALL AND MULTIPLEX, registration no. P02400004253, issued 14/03/2022, valid through 03/02/2028 unless extended.
GHMC building permit: Permit no. 53636/HO/EZ/Cir-3/2016, file no. 295903/10/09/2020/HO, dated 04 February 2022; commercial mall and multiplex, 11 screens, four cellars, Ground + 6 Upper Floors.
Earlier permit references listed in the permit: Permit no. 53392/HO/EZ/Cir-3/2016, dated 15.11.2017; previous file no. 35237/07/08/2015/HO.
Plan and commencement evidence: The GHMC building permit order is filed as the commencement-certificate document. Separate layout-plan documents are listed in the RERA record, but the supplied entries are not extracted.
Occupancy / completion certificate: Not supplied; the GHMC permit requires an occupancy certificate before occupation.
Other references stated in GHMC permit: Police NOC 5201/M2/Cinema/RCK/2018-21 (24.09.2021); Fire NOC acknowledgement 2022022002017 (14.07.2020); AAI NOC AAI/HY/ATS-59/NOC-2/2015/9646-47 (23.12.2015); SEIAA order SEIAA/TS/RRD-118/2015-1680 (03.11.2015); JNTUH/BICS letter JNTUH/BICS/PC/81/2021 (02.03.2021). The permit says the relevant conditions are to be followed.
Title / RERA filing documents: Form B declaration dated 09.02.2022; GHMC building permit order; TG-RERA Form C registration certificate.
Drawing review: Four floor-plan drawings are recorded; none has been software-measured and all are listed as scans pending measurement.
Frequently asked questions
Is TNR PRESTON MALL AND MULTIPLEX registered with Telangana RERA?
Yes. TNR PRESTON MALL AND MULTIPLEX is registered with the Telangana Real Estate Regulatory Authority as P02400004253; the registration status is New Project.
Who is the developer of TNR PRESTON MALL AND MULTIPLEX?
The promoter named in the RERA registration is TNR PRESTON PROJECTS LLP.
Where is TNR PRESTON MALL AND MULTIPLEX located?
TNR PRESTON MALL AND MULTIPLEX is in Saroornagar, Lingogiguda, Rangareddy, Telangana (500035).
When will TNR PRESTON MALL AND MULTIPLEX be completed?
The promoter's proposed date of completion filed with RERA is 03/06/2028. This is the promoter's declaration, not a guarantee.