Rainbow City
K.ANJANEYULU AND B.RAMADEVI · Yadadri Bhuvanagiri · RERA P02000010942
RAINBOW CITY is a plotted development in BONDUGULA / Bondugula Village, Rajapeta Mandal, Yadadri Bhuvanagiri District. The registered promoter is K.ANJANEYULU AND B.RAMADEVI. The project records a land extent of 22,004.78 sq. m and a draft technical layout of 59 open plots; buildings, floors and plot-wise configurations are not stated. Its TG-RERA registration is P02000010942, valid from 03/06/2025 to 03/06/2027, and the proposed completion is 03/10/2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | RAINBOW CITY RERA record |
| Project type / phase | Plotted development; the supplied record identifies a new project but does not state a phase number or separately registered portion. RERA record |
| TG-RERA registration | P02000010942; registration validity is 03/06/2025 to 03/06/2027, unless extended by the Authority. RERA record |
| Registered promoter | K.ANJANEYULU AND B.RAMADEVI RERA record |
| RERA status | Registered; the certificate states a two-year validity period. This is registration validity, not a completion certificate or occupancy certificate. RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | BONDUGULA / Bondugula Village RERA record RERA filing |
| Mandal / district / PIN | Rajapeta, Yadadri Bhuvanagiri, 508105 RERA record RERA filing |
| Project survey number and subdivision | 385/P, Bondugula Village. The supplied project identity and RERA-filed approval documents use this survey reference. RERA record RERA filing |
| Registered land extent | 22,004.78 sq. m is recorded in the project land details. RERA filing |
| RERA-filed layout extent | The layout approval extraction states Ac.5-17.50 Gts; 05.4375 Acs; 26,317.50 Sq. Yds. |
| Net area / affected area | RERA land details state Net Area: 13,249.41 sq. m and Area affected in Road widening/FTL of Tanks/Nala Widening: 8,755.37 sq. m. RERA filing |
| Boundaries | North, south, east and west are each recorded as NEIGHBOUR LAND. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority / principal approval | Director of Town and Country Planning, Government of Telangana; TLP No. 56/2025/H, dated 03-06-2025. The filed material describes a draft technical layout and states that a later final-layout release is required. Approvals record |
| Gram Panchayat record | Bondugula Gram Panchayat approval of a draft technical layout, dated 05/01/2026, under TLP No.56/2025/H. |
| Approved built-up area | The RERA filing records 22,004.78 sq. m as “Approved Built up Area”; the supplied material does not clarify its calculation or identify it as a building-area measure for this plotted layout. RERA filing |
| Layout scale and land-use split | The filed plan extraction states scale 1/486.9; 10.00% open space (park), 29.90% roads and 60.10% plotted area. It also identifies 15.36% of plotted area as mortgage area. |
| Plot count | The Director of Town and Country Planning approval extraction records 59 plots. The separate layout-plan extraction has an illegible plot-count field. |
| Buildings / floors / parking levels | Not applicable to the supplied plotted-layout description; no building or parking-level schedule is provided. RERA record Document index |
Offering and status
| Item | Record |
|---|---|
| Offered unit type | Open plots; plot-wise sizes, unit counts by size, and RERA-filed saleable-area schedule are not supplied in the reviewed data. RERA record |
| Booked / available counts | Not disclosed in the supplied evidence. Document index |
| Construction / development stage | No independently verified site-progress record is supplied. The RERA amenity entries include percentage fields for selected infrastructure, which are filing data rather than independent verification. RERA amenities |
| Completion dates | The project header records proposed completion 03/10/2027; the promoter’s Form B declaration undertakes completion by 03-06-2027. RERA record |
| Occupancy / completion certificate status | No occupancy or project completion certificate is established by the supplied document set. The document labelled as an occupancy-certificate upload is extracted as a Gram Panchayat approval of a draft technical layout, not as evidence of completed development. Document index |
2. The project story
- RAINBOW CITY is registered as a plotted development in Bondugula Village, Rajapeta Mandal, Yadadri Bhuvanagiri District, on land identified in the project filing as Survey No. 385/P. The filed planning documents describe an open-plot layout, rather than apartments or buildings. RERA record RERA filing
- The Director of Town and Country Planning approval extraction describes a 59-plot draft technical layout and allocates land to plots, roads and a park/open space. It also identifies plots 18 to 26 as mortgage security for layout-development obligations and says the layout owner/developer must provide infrastructure and transfer the designated park and roads to the Gram Panchayat by registered gift deed before final-layout release.
- The project is RERA-registered, but the supplied records do not establish that layout development is complete or independently verify on-site progress. The registration term, the promoter’s completion undertaking and the presence of draft-layout approval records are separate matters; none, by itself, establishes completed infrastructure or a final completion/occupancy certificate.
3. Master plan, architecture & building design
- This is a plotted layout, so the filed design evidence concerns the division of the site into plots, roads and open space—not building arrangements, floors or apartment plans. The Director of Town and Country Planning extraction gives a total layout extent of 05.4375 Acs / 26,317.50 Sq. Yds, with 10.00% for park/open space, 29.90% for roads and 60.10% as plotted area. It identifies Plot Nos. 18 to 26 as the mortgage area, recorded as 15.36% of plotted area.
- The layout conditions include demarcating plots and open spaces on the ground, keeping the mortgaged plots from sale, opening roads for access to neighbouring sites, and handing the park and roads to the Gram Panchayat by registered gift deed before final-layout release. They also require greenery including avenue planting, rainwater-harvesting pits, street lighting, electricity, sewerage disposal and protected water supply. These are stated approval conditions; the supplied data does not independently verify their completion.
- The filed extraction records 59 plots, but the separate layout-plan extraction’s plot-count field is illegible. No plot-wise schedule, plot dimensions, detailed drawing geometry, building footprint or building/floor configuration is available in the supplied material. Floor plans
4. Homes, configurations & floor plans
The offering is described as open plots, not homes. The supplied evidence does not include a plot inventory by plot number or size, booked and available counts, or a RERA-filed saleable-area schedule. RERA record Document index
| Units | 59 plots are stated in the Director of Town and Country Planning approval extraction; plot-wise schedule not supplied |
|---|---|
| Booked | Not disclosed |
| Available | Not disclosed |
| RERA saleable area | Not disclosed |
| Measured carpet area | Not applicable |
| Loading (if supplied) | Not supplied |
Two drawing files are listed, but both remain scans pending measurement; no software-measured areas or plot dimensions are available. The plot count is sourced to the approval-document extraction, not a plot-by-plot independent count. Floor plans
5. Parking & vehicle circulation
- The supplied records do not state a sanctioned parking count or provide plot-level parking allocations. The layout approval extraction identifies roads as 29.90% of layout area and requires roads to be opened for access to neighbouring sites, but it does not provide road widths, driveway geometry, visitor parking, accessible spaces, or vehicle-circulation drawings.
- The approval conditions identify Plot Nos. 18 to 26 as mortgaged plots that are not for sale while held as security for development obligations. This is not an allocation of parking or a buyer’s parking entitlement.
6. Amenities, recreation & open spaces
The layout approval extraction reserves 10.00% of the layout for park/open space. The separate RERA amenity record includes progress-percentage fields for certain infrastructure items; these are recorded filing values, not independent confirmation of completed facilities. RERA amenities
| Description / size | 10.00%; filed layout extraction states 2,631.75 Sq. Yds. Approval conditions require transfer to the Gram Panchayat by registered gift deed before final-layout release. |
|---|---|
| Declared progress / verified status | RERA amenities record: Green Strip/TOT LOT/Park 28%. No independent completion verification supplied. RERA amenities |
| Description / size | Roads account for 29.90% of layout area; the approval conditions require roads to be opened for access to neighbouring sites. |
|---|---|
| Declared progress / verified status | RERA amenities record: 33%. No independent completion verification supplied. RERA amenities |
| Description / size | Approval conditions call for rainwater-harvesting pits. |
|---|---|
| Declared progress / verified status | RERA amenities record: 34%. No independent completion verification supplied. RERA amenities |
| Description / size | Approval condition requires street lighting and electricity facilities. |
|---|---|
| Declared progress / verified status | RERA amenities record lists Street Lighting at 0%. No independent completion verification supplied. RERA amenities |
| Description / size | No facility details or size are supplied in the approval extraction. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenities record: 0%. |
| Description / size | No clubhouse, indoor facility or sports facility is specified in the supplied layout evidence. |
|---|---|
| Evidence source | Document index RERA amenities |
| Declared progress / verified status | Not disclosed. |
The RERA amenity record also lists water supply, storm-water drains, sewerage, sewage/sullage treatment and disposal, solid-waste management, energy management, fire safety, electrical meter room/sub-station/receiving station and aggregate recreational open space. The stated percentage fields are: Water Supply 29%; Storm Water Drains 27%; Sewerage 0%; Treatment and Disposal of Sewage and Sullage Water 0%; Solid Waste Management and Disposal 0%; Energy management 0%; Fire Protection and Fire Safety Requirements 22%; Electrical Meter Room, Sub-Station, Receiving Station 0%; Aggregate area of recreational Open Space 0%. These are filing entries, not independently verified completion statuses. RERA amenities
7. Utilities, building services & safety
- The layout approval conditions call for a protected water supply system, sewerage disposal system, rainwater-harvesting pits, street lighting and electricity facilities. They also require greenery, including avenue plantation in public open spaces. The supplied evidence does not specify water source or storage capacity, sewage-treatment capacity, reuse arrangements, storm-water design details, electrical substation capacity, backup systems, or waste-management arrangements.
- The RERA amenity record includes water supply, storm-water drains, sewerage and sewage/sullage treatment, solid-waste management, energy management, fire protection and electrical meter room/sub-station/receiving station entries. It supplies percentage fields for these items but no technical specifications or independent inspection evidence. No building-level fire systems, lifts, accessible routes or building occupancy arrangements are provided for this plotted development. RERA amenities Document index
8. Location, access & connectivity
The registered project location is BONDUGULA, Bondugula Village, Rajapeta Mandal, Yadadri Bhuvanagiri District, Telangana 508105. The cadastral parcel centroid supplied for the project is 17.76736603046502, 78.97357278858466; this is identified as a parcel centroid, not a surveyed project entrance. RERA record RERA filing Cadastral map
The location record gives the nearest sampled Outer Ring Road interchange as approximately 47.0 km away. No other approach-road, public-transport or landmark distances are supplied. The layout approval conditions require roads to be opened for access to neighbouring sites, but do not provide road names, widths or a route description. Location record
9. Developer & development status
- The registered promoter is K.ANJANEYULU AND B.RAMADEVI. The entity type is recorded as “Others”, with the description “OTHERS”; a more specific legal-entity form and corporate registration identifier are not disclosed in the supplied project identity data. The project filing gives a promoter address in KUNCHAM, KP ROAD, BONDUGULA, Rajapeta, Yadadri Bhuvanagiri, 508105. The RERA certificate lists the promoters at an address with 508101; no official contact number, email or project website is supplied here. RERA record RERA filing Parties record
- The RERA certificate is valid from 03/06/2025 to 03/06/2027 unless extended. Separately, the project header records proposed completion as 03/10/2027, while the promoter’s Form B affidavit, dated 13 February 2026, undertakes completion by 03-06-2027. No independent site-progress verification or final completion/occupancy certificate is supplied. RERA record
10. Approvals, official records & documents
| What the supplied evidence establishes | Form C certificate for RAINBOW CITY, registration P02000010942, identifying K.ANJANEYULU AND B.RAMADEVI and validity 03/06/2025–03/06/2027, unless extended. |
|---|
| What the supplied evidence establishes | TLP No. 56/2025/H, dated 03-06-2025; extraction describes a draft technical layout for 59 plots in Sy. No. 385/P, Bondugula Village, with conditions and a later final-layout release requirement. |
|---|
| What the supplied evidence establishes | Bondugula Gram Panchayat record dated 05/01/2026, describing approval of a draft technical layout for open plots in Survey No. 385/P under TLP No.56/2025/H. |
|---|
| What the supplied evidence establishes | Promoter’s authorized signatory declares title support, reports encumbrances as “NIL,” and undertakes completion by 03-06-2027. This is a promoter declaration. |
|---|
| What the supplied evidence establishes | No project completion or occupancy certificate is established in the supplied records; the file labelled as an occupancy-certificate document is extracted as a draft-layout approval. |
|---|
| What the supplied evidence establishes | Filed plan extraction includes the land-use allocation and identifies plots 18 to 26 as the mortgage area, with park and road transfer conditions. |
|---|
1. Project at a glance
Project identity
Registered project name: RAINBOW CITY
Project type / phase: Plotted development; the supplied record identifies a new project but does not state a phase number or separately registered portion.
TG-RERA registration: P02000010942; registration validity is 03/06/2025 to 03/06/2027, unless extended by the Authority.
Registered promoter: K.ANJANEYULU AND B.RAMADEVI
RERA status: Registered; the certificate states a two-year validity period. This is registration validity, not a completion certificate or occupancy certificate.
Land and geographic identity
Locality / revenue village: BONDUGULA / Bondugula Village
Mandal / district / PIN: Rajapeta, Yadadri Bhuvanagiri, 508105
Project survey number and subdivision: 385/P, Bondugula Village. The supplied project identity and RERA-filed approval documents use this survey reference.
Registered land extent: 22,004.78 sq. m is recorded in the project land details.
RERA-filed layout extent: The layout approval extraction states Ac.5-17.50 Gts; 05.4375 Acs; 26,317.50 Sq. Yds.
Net area / affected area: RERA land details state Net Area: 13,249.41 sq. m and Area affected in Road widening/FTL of Tanks/Nala Widening: 8,755.37 sq. m.
Boundaries: North, south, east and west are each recorded as NEIGHBOUR LAND.
Development identity
Sanctioning authority / principal approval: Director of Town and Country Planning, Government of Telangana; TLP No. 56/2025/H, dated 03-06-2025. The filed material describes a draft technical layout and states that a later final-layout release is required.
Gram Panchayat record: Bondugula Gram Panchayat approval of a draft technical layout, dated 05/01/2026, under TLP No.56/2025/H.
Approved built-up area: The RERA filing records 22,004.78 sq. m as “Approved Built up Area”; the supplied material does not clarify its calculation or identify it as a building-area measure for this plotted layout.
Layout scale and land-use split: The filed plan extraction states scale 1/486.9; 10.00% open space (park), 29.90% roads and 60.10% plotted area. It also identifies 15.36% of plotted area as mortgage area.
Plot count: The Director of Town and Country Planning approval extraction records 59 plots. The separate layout-plan extraction has an illegible plot-count field.
Buildings / floors / parking levels: Not applicable to the supplied plotted-layout description; no building or parking-level schedule is provided.
Offering and status
Offered unit type: Open plots; plot-wise sizes, unit counts by size, and RERA-filed saleable-area schedule are not supplied in the reviewed data.
Booked / available counts: Not disclosed in the supplied evidence.
Construction / development stage: No independently verified site-progress record is supplied. The RERA amenity entries include percentage fields for selected infrastructure, which are filing data rather than independent verification.
Completion dates: The project header records proposed completion 03/10/2027; the promoter’s Form B declaration undertakes completion by 03-06-2027.
Occupancy / completion certificate status: No occupancy or project completion certificate is established by the supplied document set. The document labelled as an occupancy-certificate upload is extracted as a Gram Panchayat approval of a draft technical layout, not as evidence of completed development.
2. The project story
- RAINBOW CITY is registered as a plotted development in Bondugula Village, Rajapeta Mandal, Yadadri Bhuvanagiri District, on land identified in the project filing as Survey No. 385/P. The filed planning documents describe an open-plot layout, rather than apartments or buildings.
- The Director of Town and Country Planning approval extraction describes a 59-plot draft technical layout and allocates land to plots, roads and a park/open space. It also identifies plots 18 to 26 as mortgage security for layout-development obligations and says the layout owner/developer must provide infrastructure and transfer the designated park and roads to the Gram Panchayat by registered gift deed before final-layout release.
- The project is RERA-registered, but the supplied records do not establish that layout development is complete or independently verify on-site progress. The registration term, the promoter’s completion undertaking and the presence of draft-layout approval records are separate matters; none, by itself, establishes completed infrastructure or a final completion/occupancy certificate.
3. Master plan, architecture & building design
- This is a plotted layout, so the filed design evidence concerns the division of the site into plots, roads and open space—not building arrangements, floors or apartment plans. The Director of Town and Country Planning extraction gives a total layout extent of 05.4375 Acs / 26,317.50 Sq. Yds, with 10.00% for park/open space, 29.90% for roads and 60.10% as plotted area. It identifies Plot Nos. 18 to 26 as the mortgage area, recorded as 15.36% of plotted area.
- The layout conditions include demarcating plots and open spaces on the ground, keeping the mortgaged plots from sale, opening roads for access to neighbouring sites, and handing the park and roads to the Gram Panchayat by registered gift deed before final-layout release. They also require greenery including avenue planting, rainwater-harvesting pits, street lighting, electricity, sewerage disposal and protected water supply. These are stated approval conditions; the supplied data does not independently verify their completion.
- The filed extraction records 59 plots, but the separate layout-plan extraction’s plot-count field is illegible. No plot-wise schedule, plot dimensions, detailed drawing geometry, building footprint or building/floor configuration is available in the supplied material.
4. Homes, configurations & floor plans
The offering is described as open plots, not homes. The supplied evidence does not include a plot inventory by plot number or size, booked and available counts, or a RERA-filed saleable-area schedule.
| Units | 59 plots are stated in the Director of Town and Country Planning approval extraction; plot-wise schedule not supplied |
|---|---|
| Booked | Not disclosed |
| Available | Not disclosed |
| RERA saleable area | Not disclosed |
| Measured carpet area | Not applicable |
| Loading (if supplied) | Not supplied |
Two drawing files are listed, but both remain scans pending measurement; no software-measured areas or plot dimensions are available. The plot count is sourced to the approval-document extraction, not a plot-by-plot independent count.
5. Parking & vehicle circulation
- The supplied records do not state a sanctioned parking count or provide plot-level parking allocations. The layout approval extraction identifies roads as 29.90% of layout area and requires roads to be opened for access to neighbouring sites, but it does not provide road widths, driveway geometry, visitor parking, accessible spaces, or vehicle-circulation drawings.
- The approval conditions identify Plot Nos. 18 to 26 as mortgaged plots that are not for sale while held as security for development obligations. This is not an allocation of parking or a buyer’s parking entitlement.
6. Amenities, recreation & open spaces
The layout approval extraction reserves 10.00% of the layout for park/open space. The separate RERA amenity record includes progress-percentage fields for certain infrastructure items; these are recorded filing values, not independent confirmation of completed facilities.
| Description / size | 10.00%; filed layout extraction states 2,631.75 Sq. Yds. Approval conditions require transfer to the Gram Panchayat by registered gift deed before final-layout release. |
|---|---|
| Declared progress / verified status | RERA amenities record: Green Strip/TOT LOT/Park 28%. No independent completion verification supplied. |
| Description / size | Roads account for 29.90% of layout area; the approval conditions require roads to be opened for access to neighbouring sites. |
|---|---|
| Declared progress / verified status | RERA amenities record: 33%. No independent completion verification supplied. |
| Description / size | Approval conditions call for rainwater-harvesting pits. |
|---|---|
| Declared progress / verified status | RERA amenities record: 34%. No independent completion verification supplied. |
| Description / size | Approval condition requires street lighting and electricity facilities. |
|---|---|
| Declared progress / verified status | RERA amenities record lists Street Lighting at 0%. No independent completion verification supplied. |
| Description / size | No facility details or size are supplied in the approval extraction. |
|---|---|
| Declared progress / verified status | RERA amenities record: 0%. |
| Description / size | No clubhouse, indoor facility or sports facility is specified in the supplied layout evidence. |
|---|---|
| Declared progress / verified status | Not disclosed. |
The RERA amenity record also lists water supply, storm-water drains, sewerage, sewage/sullage treatment and disposal, solid-waste management, energy management, fire safety, electrical meter room/sub-station/receiving station and aggregate recreational open space. The stated percentage fields are: Water Supply 29%; Storm Water Drains 27%; Sewerage 0%; Treatment and Disposal of Sewage and Sullage Water 0%; Solid Waste Management and Disposal 0%; Energy management 0%; Fire Protection and Fire Safety Requirements 22%; Electrical Meter Room, Sub-Station, Receiving Station 0%; Aggregate area of recreational Open Space 0%. These are filing entries, not independently verified completion statuses.
7. Utilities, building services & safety
- The layout approval conditions call for a protected water supply system, sewerage disposal system, rainwater-harvesting pits, street lighting and electricity facilities. They also require greenery, including avenue plantation in public open spaces. The supplied evidence does not specify water source or storage capacity, sewage-treatment capacity, reuse arrangements, storm-water design details, electrical substation capacity, backup systems, or waste-management arrangements.
- The RERA amenity record includes water supply, storm-water drains, sewerage and sewage/sullage treatment, solid-waste management, energy management, fire protection and electrical meter room/sub-station/receiving station entries. It supplies percentage fields for these items but no technical specifications or independent inspection evidence. No building-level fire systems, lifts, accessible routes or building occupancy arrangements are provided for this plotted development.
8. Location, access & connectivity
The registered project location is BONDUGULA, Bondugula Village, Rajapeta Mandal, Yadadri Bhuvanagiri District, Telangana 508105. The cadastral parcel centroid supplied for the project is 17.76736603046502, 78.97357278858466; this is identified as a parcel centroid, not a surveyed project entrance.
The location record gives the nearest sampled Outer Ring Road interchange as approximately 47.0 km away. No other approach-road, public-transport or landmark distances are supplied. The layout approval conditions require roads to be opened for access to neighbouring sites, but do not provide road names, widths or a route description.
9. Developer & development status
- The registered promoter is K.ANJANEYULU AND B.RAMADEVI. The entity type is recorded as “Others”, with the description “OTHERS”; a more specific legal-entity form and corporate registration identifier are not disclosed in the supplied project identity data. The project filing gives a promoter address in KUNCHAM, KP ROAD, BONDUGULA, Rajapeta, Yadadri Bhuvanagiri, 508105. The RERA certificate lists the promoters at an address with 508101; no official contact number, email or project website is supplied here.
- The RERA certificate is valid from 03/06/2025 to 03/06/2027 unless extended. Separately, the project header records proposed completion as 03/10/2027, while the promoter’s Form B affidavit, dated 13 February 2026, undertakes completion by 03-06-2027. No independent site-progress verification or final completion/occupancy certificate is supplied.
10. Approvals, official records & documents
| What the supplied evidence establishes | Form C certificate for RAINBOW CITY, registration P02000010942, identifying K.ANJANEYULU AND B.RAMADEVI and validity 03/06/2025–03/06/2027, unless extended. |
|---|
| What the supplied evidence establishes | TLP No. 56/2025/H, dated 03-06-2025; extraction describes a draft technical layout for 59 plots in Sy. No. 385/P, Bondugula Village, with conditions and a later final-layout release requirement. |
|---|
| What the supplied evidence establishes | Bondugula Gram Panchayat record dated 05/01/2026, describing approval of a draft technical layout for open plots in Survey No. 385/P under TLP No.56/2025/H. |
|---|
| What the supplied evidence establishes | Promoter’s authorized signatory declares title support, reports encumbrances as “NIL,” and undertakes completion by 03-06-2027. This is a promoter declaration. |
|---|
| What the supplied evidence establishes | No project completion or occupancy certificate is established in the supplied records; the file labelled as an occupancy-certificate document is extracted as a draft-layout approval. |
|---|
| What the supplied evidence establishes | Filed plan extraction includes the land-use allocation and identifies plots 18 to 26 as the mortgage area, with park and road transfer conditions. |
|---|
Frequently asked questions
Is RAINBOW CITY registered with Telangana RERA?
Yes. RAINBOW CITY is registered with the Telangana Real Estate Regulatory Authority as P02000010942; the registration status is New Project.
Who is the developer of RAINBOW CITY?
The promoter named in the RERA registration is K.ANJANEYULU AND B.RAMADEVI.
Where is RAINBOW CITY located?
RAINBOW CITY is in BONDUGULA, Rajapeta, Yadadri Bhuvanagiri, Telangana (508105).
When will RAINBOW CITY be completed?
The promoter's proposed date of completion filed with RERA is 03/10/2027. This is the promoter's declaration, not a guarantee.
More projects in Bondugula
