Al-Quddus
RAJESH BHAGWANI · Adilabad · RERA P00100006575
AL-QUDDUS is a plotted development in Nishat Ghat Village, Adilabad Municipality, Adilabad Urban Mandal, Adilabad District. The registered promoter is RAJESH BHAGWANI, and the registered site extent is 18452.49 sq. m. The approved layout records 73 plots and drawing-derived plot sizes of 131.39–271.51 sq. m (157.1–324.7 sq. yd); no towers or apartment floor configuration are identified. Its TG-RERA registration is P00100006575, and the project-information record lists completion as 30/11/2026.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | AL-QUDDUS |
| Project type | Plotted development |
| Phase / registered portion | Phase is not separately identified; registration covers the project land in the survey numbers listed below. |
| TG-RERA registration | P00100006575 |
| Registration validity | 7 July 2023 to 22 March 2026, unless extended by the Authority. Registration validity is separate from the completion undertaking. |
| Registered promoter | RAJESH BHAGWANI |
| RERA status in supplied record | Registration certificate issued under section 5. The supplied certificate states an end date of 22 March 2026 and does not indicate an extension. The status after that date is not established by the supplied record. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality | Nishat Ghat Village, Adilabad Municipality |
| Revenue village in project record | Nishat Ghat |
| Village wording in layout approval | “ADILABAD Revenue Village” |
| Mandal | Adilabad Urban in the project identity record; the layout approval states “ADILABAD Mandal.” |
| District | Adilabad |
| PIN | 504001 in the TG-RERA certificate and project record. |
| Project survey numbers / subdivisions | 5/2/2, 5/2/1/2, and 5/2/1/1 |
| Registered site extent | 18452.49 sq. m in the project land record. Land records |
| Layout approval extent | 4 Acer 22.39 Gts, 22069 Sq. Yds. |
| Net / total area | RERA land record gives total and net area as 18452.49 sq. m; the layout drawing’s area statement gives a total site area of 18452.01 sq. m. Land records Layout record |
| Boundaries | East: Road; South: Road; West: Others land; North: Others land. Land records |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Adilabad Municipality/Municipal Corporation |
| Principal approval | Tentative Layout Plan No. 0021/LO/3025/2023, dated 23 March 2023. Approvals record |
| Application number | 012691/LO/DTCP/3025/0036/2022. |
| Approved built-up area | 11191.56 sq. m, as recorded in the project information. RERA filing |
| Development arrangement | Plotted layout; no towers or apartment floor configuration are identified. |
| Layout plot count | 73 plots in the approval and layout drawing. Layout record |
| Approved versus RERA-declared unit count | The supplied approval and drawing identify 73 plots. A separate RERA inventory count is not supplied. |
| Building / parking levels | Not applicable to the plotted layout record; no building or parking-level schedule is supplied. |
Offering and status
| Field | Record |
|---|---|
| Unit type | Plots. RERA record |
| Drawing-derived plot sizes | Software-measured from the approved layout drawing: 131.39–271.51 sq. m (157.1–324.7 sq. yd); median 137.96 sq. m (165.0 sq. yd). These are drawing measurements, not RERA-filed saleable-area figures. Layout record |
| Booked / available counts | Not supplied. |
| Construction / development stage | The RERA record classifies the project as “New Project.” No independently verified site-progress report is supplied. RERA record |
| Promoter completion undertaking | Form B declares completion by 23/03/2026. |
| Completion date in project information | 30/11/2026. RERA filing |
| Occupancy / completion certificate status | No occupancy or completion certificate is supplied. The registered development is a plotted layout; the supplied material concerns tentative layout approval and does not establish final layout release or completed infrastructure. Document index |
2. The project story
- AL-QUDDUS is registered with TG-RERA as a plotted development in Nishat Ghat Village, Adilabad Municipality, covering survey numbers 5/2/2, 5/2/1/2, and 5/2/1/1. Its approved layout plan records 73 plots and reserves land for roads, open space, utilities, and social infrastructure. The promoter is responsible for carrying out the layout infrastructure works specified in the approval; the supplied record does not independently verify that those works are complete. RERA record
- The registration certificate runs from 7 July 2023 to 22 March 2026. Separately, the promoter’s Form B declares a completion date of 23 March 2026, while the project-information record lists 30 November 2026. No occupancy/completion certificate or independent construction-progress evidence is supplied. RERA filing
3. Master plan, architecture & building design
- The approved tentative layout is a plotted plan, not a tower or apartment scheme. The drawing schedule shows 73 plots across two layout sheets; software extracted plot sizes from the drawing, and the supplied note says their total matches the drawing’s plotted-area statement. These are drawing-derived measurements and should be checked against the approved drawing. Layout record
| Layout land use | Area in drawing’s area statement | Share shown |
|---|---|---|
| Plotted area | 11190.95 sq. m | 63.58% |
| Roads | 4096.24 sq. m | 23.27% |
| Parks / open space | 1584.10 sq. m | 9.00% |
| Utilities | 177.12 sq. m | 1.01% |
| Social infrastructure | 551.84 sq. m | 3.14% |
| Amenities | 0.00 sq. m | 0.00% |
Layout record
- The layout approval also records a mortgage area of 1784.16 sq. m, described as plots mortgaged to the approving authority until the layout’s roads, drains, and open spaces are completed. The approval names Plot Nos. 62, 72, 71, 70, 69, 68, 77, 76, 75, 74, and 73 for the mortgage. Layout record
- The approval specifies internal infrastructure and reserved areas, including roads, open space, utility land, and social infrastructure. It does not provide an apartment-style floor, building, or tower schedule.
4. Homes, configurations & floor plans
- This is a plotted development, so apartment configuration and carpet-area fields do not apply. The layout drawing’s plot schedule identifies 73 plots. Software-measured sizes range from 131.39 sq. m (157.1 sq. yd) to 271.51 sq. m (324.7 sq. yd), with a median of 137.96 sq. m (165.0 sq. yd). Measurements are derived from drawing text and are not RERA-filed saleable-area figures. Layout record
| Plot-size band | Plot count |
|---|---|
| 150–200 sq. yd (125–167 sq. m) | 54 |
| 200–250 sq. yd (167–209 sq. m) | 14 |
| 250–300 sq. yd (209–251 sq. m) | 4 |
| 300–400 sq. yd (251–334 sq. m) | 1 |
Layout record
- The two supplied drawing sheets are layout sheets; no home floor plans or measured room areas are supplied. Booked and available plot counts are also not supplied. Floor plans
5. Parking & vehicle circulation
- The supplied records do not establish a sanctioned parking count, visitor or accessible parking spaces, parking allocation to individual plots, or a parking layout. The approved plan identifies internal roads and requires roads to be opened for access to neighbouring sites; it does not establish plot-specific parking rights.
6. Amenities, recreation & open spaces
- The layout approval identifies reserved land and infrastructure requirements. The RERA amenity list marks some facilities “YES” but reports 0% progress; no independent completion verification is supplied. The approval’s listed works are approval requirements, not evidence that they have been delivered. RERA amenities
| Description / size | Roads: 4096.24 sq. m (23.27%) in the layout drawing. Approval requires road formation with black top. |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | RERA amenity marked “YES,” progress 0%; completion not independently verified. RERA amenities |
| Description / size | 1584.10 sq. m in the layout drawing; approval states 0 Acer 15.66 Gts (9%). |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | RERA amenity marked “YES,” progress 0%; handover is specified in the approval, but delivery is not verified. RERA amenities |
| Description / size | 177.12 sq. m in the layout drawing; approval states 0 Acer 1.75 Gts (1.01%). |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | RERA amenity progress 0%; infrastructure completion is not verified. RERA amenities |
| Description / size | 551.84 sq. m in the layout drawing; approval states 0 Acer 5.45 Gts (3.14%). |
|---|---|
| Evidence source | Layout record |
| Declared progress / verified status | Reserved area shown; facility, use, and completion details are not supplied. |
| Description / size | Required by the layout approval. |
|---|---|
| Declared progress / verified status | Required work; completion not verified. |
7. Utilities, building services & safety
- The layout approval requires infrastructure including internal water-supply pipelines, an assured water source, an overhead tank or sump, a common septic tank/STP as applicable, underground drainage lines, storm-water drains, electrical supply lines, street lights, a transformer, rainwater-harvesting pits, park development, and avenue plantation. It also refers to solid-waste management in the description of the utility reservation. These are approval requirements; the supplied record does not provide capacities, commissioning evidence, or independent verification of completion.
- The RERA amenity list includes water supply, sewerage, storm-water drainage, rainwater harvesting, solid-waste management, energy management, fire protection, and an electrical meter room/substation/receiving station. It reports 0% progress for the listed entries; the record does not establish that these systems have been installed or commissioned. RERA amenities
8. Location, access & connectivity
- The project record places AL-QUDDUS in Nishat Ghat Village, Adilabad Municipality, Adilabad Urban Mandal, Adilabad District, PIN 504001. The approved layout describes the site as lying in Adilabad Revenue Village, Adilabad Mandal. RERA record
- The recorded boundaries are road access on the east and south, with other land to the west and north. The approval requires roads to be opened for access to neighbouring sites. No verified public-transport details, landmark distances, or travel times are supplied. Land records
9. Developer & development status
- The registered promoter is RAJESH BHAGWANI. The RERA record classifies the organisation type as “Others” and gives “MOHD ABDUL MASOOD” as the description for that type; the legal entity form and corporate identifiers are not established in the supplied information. RERA record RERA filing Corporate record
- The promoter’s Form B is an affidavit-cum-declaration that states a legal-title basis, declares the land free from encumbrances, and undertakes completion by 23 March 2026. These are promoter declarations. The supplied material does not include independent verification of project progress, plot sales, or completed layout infrastructure.
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C certificate for AL-QUDDUS, registration P00100006575, issued 7 July 2023; stated validity ends 22 March 2026. |
| Tentative layout approval | Adilabad Municipality/Municipal Corporation approval, Tentative LP No. 0021/LO/3025/2023, dated 23 March 2023; application No. 012691/LO/DTCP/3025/0036/2022. |
| Layout plan / drawing-derived schedule | Two layout sheets; 73 plots and land-use figures extracted from the drawing. Layout record |
| Form B declaration | Promoter declaration dated 29 March 2023, including the stated completion undertaking and other RERA declarations. |
| Occupancy / completion certificate | None supplied. |
| Final layout release | Not established by the supplied documents. |
1. Project at a glance
Project identity
Registered project name: AL-QUDDUS
Project type: Plotted development
Phase / registered portion: Phase is not separately identified; registration covers the project land in the survey numbers listed below.
TG-RERA registration: P00100006575
Registration validity: 7 July 2023 to 22 March 2026, unless extended by the Authority. Registration validity is separate from the completion undertaking.
Registered promoter: RAJESH BHAGWANI
RERA status in supplied record: Registration certificate issued under section 5. The supplied certificate states an end date of 22 March 2026 and does not indicate an extension. The status after that date is not established by the supplied record.
Land and geographic identity
Locality: Nishat Ghat Village, Adilabad Municipality
Revenue village in project record: Nishat Ghat
Village wording in layout approval: “ADILABAD Revenue Village”
Mandal: Adilabad Urban in the project identity record; the layout approval states “ADILABAD Mandal.”
District: Adilabad
PIN: 504001 in the TG-RERA certificate and project record.
Project survey numbers / subdivisions: 5/2/2, 5/2/1/2, and 5/2/1/1
Registered site extent: 18452.49 sq. m in the project land record.
Layout approval extent: 4 Acer 22.39 Gts, 22069 Sq. Yds.
Net / total area: RERA land record gives total and net area as 18452.49 sq. m; the layout drawing’s area statement gives a total site area of 18452.01 sq. m.
Boundaries: East: Road; South: Road; West: Others land; North: Others land.
Development identity
Sanctioning authority: Adilabad Municipality/Municipal Corporation
Principal approval: Tentative Layout Plan No. 0021/LO/3025/2023, dated 23 March 2023.
Application number: 012691/LO/DTCP/3025/0036/2022.
Approved built-up area: 11191.56 sq. m, as recorded in the project information.
Development arrangement: Plotted layout; no towers or apartment floor configuration are identified.
Layout plot count: 73 plots in the approval and layout drawing.
Approved versus RERA-declared unit count: The supplied approval and drawing identify 73 plots. A separate RERA inventory count is not supplied.
Building / parking levels: Not applicable to the plotted layout record; no building or parking-level schedule is supplied.
Offering and status
Unit type: Plots.
Drawing-derived plot sizes: Software-measured from the approved layout drawing: 131.39–271.51 sq. m (157.1–324.7 sq. yd); median 137.96 sq. m (165.0 sq. yd). These are drawing measurements, not RERA-filed saleable-area figures.
Booked / available counts: Not supplied.
Construction / development stage: The RERA record classifies the project as “New Project.” No independently verified site-progress report is supplied.
Promoter completion undertaking: Form B declares completion by 23/03/2026.
Completion date in project information: 30/11/2026.
Occupancy / completion certificate status: No occupancy or completion certificate is supplied. The registered development is a plotted layout; the supplied material concerns tentative layout approval and does not establish final layout release or completed infrastructure.
2. The project story
- AL-QUDDUS is registered with TG-RERA as a plotted development in Nishat Ghat Village, Adilabad Municipality, covering survey numbers 5/2/2, 5/2/1/2, and 5/2/1/1. Its approved layout plan records 73 plots and reserves land for roads, open space, utilities, and social infrastructure. The promoter is responsible for carrying out the layout infrastructure works specified in the approval; the supplied record does not independently verify that those works are complete.
- The registration certificate runs from 7 July 2023 to 22 March 2026. Separately, the promoter’s Form B declares a completion date of 23 March 2026, while the project-information record lists 30 November 2026. No occupancy/completion certificate or independent construction-progress evidence is supplied.
3. Master plan, architecture & building design
- The approved tentative layout is a plotted plan, not a tower or apartment scheme. The drawing schedule shows 73 plots across two layout sheets; software extracted plot sizes from the drawing, and the supplied note says their total matches the drawing’s plotted-area statement. These are drawing-derived measurements and should be checked against the approved drawing.
| Layout land use | Area in drawing’s area statement | Share shown |
|---|---|---|
| Plotted area | 11190.95 sq. m | 63.58% |
| Roads | 4096.24 sq. m | 23.27% |
| Parks / open space | 1584.10 sq. m | 9.00% |
| Utilities | 177.12 sq. m | 1.01% |
| Social infrastructure | 551.84 sq. m | 3.14% |
| Amenities | 0.00 sq. m | 0.00% |
- The layout approval also records a mortgage area of 1784.16 sq. m, described as plots mortgaged to the approving authority until the layout’s roads, drains, and open spaces are completed. The approval names Plot Nos. 62, 72, 71, 70, 69, 68, 77, 76, 75, 74, and 73 for the mortgage.
- The approval specifies internal infrastructure and reserved areas, including roads, open space, utility land, and social infrastructure. It does not provide an apartment-style floor, building, or tower schedule.
4. Homes, configurations & floor plans
- This is a plotted development, so apartment configuration and carpet-area fields do not apply. The layout drawing’s plot schedule identifies 73 plots. Software-measured sizes range from 131.39 sq. m (157.1 sq. yd) to 271.51 sq. m (324.7 sq. yd), with a median of 137.96 sq. m (165.0 sq. yd). Measurements are derived from drawing text and are not RERA-filed saleable-area figures.
150–200 sq. yd (125–167 sq. m): 54
200–250 sq. yd (167–209 sq. m): 14
250–300 sq. yd (209–251 sq. m): 4
300–400 sq. yd (251–334 sq. m): 1
- The two supplied drawing sheets are layout sheets; no home floor plans or measured room areas are supplied. Booked and available plot counts are also not supplied.
5. Parking & vehicle circulation
- The supplied records do not establish a sanctioned parking count, visitor or accessible parking spaces, parking allocation to individual plots, or a parking layout. The approved plan identifies internal roads and requires roads to be opened for access to neighbouring sites; it does not establish plot-specific parking rights.
6. Amenities, recreation & open spaces
- The layout approval identifies reserved land and infrastructure requirements. The RERA amenity list marks some facilities “YES” but reports 0% progress; no independent completion verification is supplied. The approval’s listed works are approval requirements, not evidence that they have been delivered.
| Description / size | Roads: 4096.24 sq. m (23.27%) in the layout drawing. Approval requires road formation with black top. |
|---|---|
| Declared progress / verified status | RERA amenity marked “YES,” progress 0%; completion not independently verified. |
| Description / size | 1584.10 sq. m in the layout drawing; approval states 0 Acer 15.66 Gts (9%). |
|---|---|
| Declared progress / verified status | RERA amenity marked “YES,” progress 0%; handover is specified in the approval, but delivery is not verified. |
| Description / size | 177.12 sq. m in the layout drawing; approval states 0 Acer 1.75 Gts (1.01%). |
|---|---|
| Declared progress / verified status | RERA amenity progress 0%; infrastructure completion is not verified. |
| Description / size | 551.84 sq. m in the layout drawing; approval states 0 Acer 5.45 Gts (3.14%). |
|---|---|
| Declared progress / verified status | Reserved area shown; facility, use, and completion details are not supplied. |
| Description / size | Required by the layout approval. |
|---|---|
| Declared progress / verified status | Required work; completion not verified. |
7. Utilities, building services & safety
- The layout approval requires infrastructure including internal water-supply pipelines, an assured water source, an overhead tank or sump, a common septic tank/STP as applicable, underground drainage lines, storm-water drains, electrical supply lines, street lights, a transformer, rainwater-harvesting pits, park development, and avenue plantation. It also refers to solid-waste management in the description of the utility reservation. These are approval requirements; the supplied record does not provide capacities, commissioning evidence, or independent verification of completion.
- The RERA amenity list includes water supply, sewerage, storm-water drainage, rainwater harvesting, solid-waste management, energy management, fire protection, and an electrical meter room/substation/receiving station. It reports 0% progress for the listed entries; the record does not establish that these systems have been installed or commissioned.
8. Location, access & connectivity
- The project record places AL-QUDDUS in Nishat Ghat Village, Adilabad Municipality, Adilabad Urban Mandal, Adilabad District, PIN 504001. The approved layout describes the site as lying in Adilabad Revenue Village, Adilabad Mandal.
- The recorded boundaries are road access on the east and south, with other land to the west and north. The approval requires roads to be opened for access to neighbouring sites. No verified public-transport details, landmark distances, or travel times are supplied.
9. Developer & development status
- The registered promoter is RAJESH BHAGWANI. The RERA record classifies the organisation type as “Others” and gives “MOHD ABDUL MASOOD” as the description for that type; the legal entity form and corporate identifiers are not established in the supplied information.
- The promoter’s Form B is an affidavit-cum-declaration that states a legal-title basis, declares the land free from encumbrances, and undertakes completion by 23 March 2026. These are promoter declarations. The supplied material does not include independent verification of project progress, plot sales, or completed layout infrastructure.
10. Approvals, official records & documents
TG-RERA registration: Form C certificate for AL-QUDDUS, registration P00100006575, issued 7 July 2023; stated validity ends 22 March 2026.
Tentative layout approval: Adilabad Municipality/Municipal Corporation approval, Tentative LP No. 0021/LO/3025/2023, dated 23 March 2023; application No. 012691/LO/DTCP/3025/0036/2022.
Layout plan / drawing-derived schedule: Two layout sheets; 73 plots and land-use figures extracted from the drawing.
Form B declaration: Promoter declaration dated 29 March 2023, including the stated completion undertaking and other RERA declarations.
Occupancy / completion certificate: None supplied.
Final layout release: Not established by the supplied documents.
Frequently asked questions
Is AL-QUDDUS registered with Telangana RERA?
Yes. AL-QUDDUS is registered with the Telangana Real Estate Regulatory Authority as P00100006575; the registration status is New Project.
Who is the developer of AL-QUDDUS?
The promoter named in the RERA registration is RAJESH BHAGWANI.
Where is AL-QUDDUS located?
AL-QUDDUS is in Nishat Ghat Village, Adilabad Municipality, Adilabad Urban, Adilabad, Telangana (504001).
When will AL-QUDDUS be completed?
The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.