Sign in

Anjanadari Enclave

AMAN TEJA INFRA · Hanamkonda · RERA P00300009073

ANJANADARI ENCLAVE is a residential apartment project in Waddepally, Hanamkonda mandal, Warangal Urban district, developed by the registered promoter AMAN TEJA INFRA. The project covers 805.65 m² and comprises one building, Building A, with 1 Stilt + 5 upper floors and 15 3BHK apartments. Its TG-RERA registration is P00300009073, and the promoter’s proposed completion date is 06/05/2025.

More from Aman Teja Infra · 2 projects →

01What we found

RegisteredTG-RERA
13documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Photo from 99acres.com

1. Project at a glance

Project identity

ItemTG-RERA record
Registered project nameANJANADARI ENCLAVE RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionPhase not separately identified in the supplied record; registration is for the project identified above RERA record
TG-RERA registrationP00300009073 RERA record
Registration validity07/05/2022–06/05/2025; the supplied certificate says validity is not extended. This is the registration period, not a statement of completion or occupancy
Registered promoterAMAN TEJA INFRA RERA record Corporate record
RERA statusProject record identifies the registration; the certificate states its validity ended 06/05/2025 and records no extension RERA record

Land and geographic identity

ItemRecord
LocalityWADDEPALLY, WARD - 61; the building approval identifies PRASHANTH NAGAR, Waddepally RERA filing
Revenue villageWaddepally RERA filing Land records
Mandal / district / PINHanamkonda / Warangal Urban / 506370 RERA record
Project survey number(s)520 NEW; the filed title material also refers to Sy. No. 520 (New) and Survey Nos. 520/1 and 520/2 (New) in the title history. These identifiers are retained as recorded, not treated as interchangeable parcel descriptions RERA filing Land records Document index
Registered site extent805.65 m² in the project record and building-approval site-area entry RERA filing
Net / total areaProject record: total and net area both 805.65 m². Building approval separately records site area 805.65 m² and net area 749.93 m² RERA filing
BoundariesEast: land of Shaik and Sundara Shobha; West: 40 feet wide road; North: open land of others; South: remaining plot of land owners and leads to 30 feet RERA filing

Development identity

ItemRecord
Sanctioning authorityGWMC Municipality/Municipal Corporation Approvals record
Principal building approval0070/BP/3006/2022, dated 07 May 2022; file no. 002162/BP/DTCP/3006/0086/2022 Approvals record
Approved built-up area2,219.80 m² in the project record. The building approval separately lists Residential 5 upper floors: 1,834.20 and Stilt 1: 335.81; those component figures are reproduced as recorded and are not substituted for the filed approved built-up-area figure RERA filing
Building count / configurationOne building; Building A, residential apartment, 1 Stilt + 5 upper floors RERA filing
Height14.8 m in the building approval
Parking levelsStilt is identified; the approval says the approved stilt (and any cellar, if present in the plan) is to be used exclusively for parking. A cellar is not confirmed in the supplied extracted parameters
Unit count15 units declared in the RERA unit record; the building-approval condition says sanctioned unit numbers must not be increased without prior approval. A separate approved unit count is not stated in the supplied approval extraction RERA unit table

Offering and status

ItemRecord
Configuration3BHK; 15 units RERA unit table RERA unit details
RERA saleable area154.83 m² for the filed 3BHK configuration RERA unit table RERA unit details
Booked / available0 booked / 15 available in the portal-derived unit record; no as-of date is supplied, so these counts are indicative RERA unit table RERA unit details
Construction stageNo construction-progress percentage or independently verified site-stage evidence is supplied RERA record RERA amenities
Completion deadlinePromoter’s Form B undertaking: 06/05/2025. This is distinct from registration validity
Occupancy / completion certificateNo occupancy or completion certificate is supplied in the reviewed documents; status is not established by this pack Document index

2. The project story

  • ANJANADARI ENCLAVE is registered as a residential apartment project on Survey No. 520 NEW in Waddepally village, Hanamkonda mandal, Warangal Urban district. The record describes a single residential building, Building A, rather than a multi-tower development. The site is identified as 805.65 m² in the project and approval records, with a 40-feet-wide road on the west boundary. RERA record Land records
  • The building approval describes 1 Stilt + 5 upper floors, with a stated height of 14.8 m. The RERA unit record lists 15 3BHK apartments. The registration certificate ran from 07/05/2022 through 06/05/2025, while the promoter’s Form B separately undertook completion by 06/05/2025. The supplied pack does not establish actual construction progress, completion, or issuance of an occupancy certificate; these should not be inferred from the approval or deadline. RERA unit table

3. Master plan, architecture & building design

  • The building-construction approval identifies one residential block, Building A, arranged as 1 Stilt + 5 upper floors, with height 14.8 m. It records a site area of 805.65 m² and net area of 749.93 m²; the RERA project record instead gives total and net area as 805.65 m². These are reported as separate filed entries, without reconciling them here. RERA filing
  • The approval extraction lists Residential 5 upper floors at 1,834.20 and Stilt 1 at 335.81, while the RERA project record reports approved built-up area of 2,219.80 m². The evidence does not identify these entries as FSI-counted area, carpet area, or saleable area; those measures should not be inferred. RERA filing
  • The approval requires construction to follow the sanctioned plan and specifies conditions including periphery greenery, a tot-lot maintained as greenery before occupancy certification, a rainwater-harvesting structure, transformer space and a garbage house. The extracted approval does not provide a floor-by-floor apartment arrangement, footprint, lifts, stair details, internal circulation plan, or quantified landscape/open-space area.

4. Homes, configurations & floor plans

  • The RERA filing lists 15 3BHK apartments, each with saleable area of 154.83 m². The portal-derived record shows 0 booked and 15 available, but supplies no count date. RERA unit details RERA unit table
ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK15015154.83 m²Software-measured: median 107.9 m²; range 91.3–121.8 m²30%

The carpet-area figures are software measurements from approved floor-plan drawing geometry, not RERA-filed disclosures; the measurement record marks all three measured designs as needing review. The RERA saleable area is a separate filing measure and is not interchangeable with carpet area. The supplied room schedule for one second-floor plan identifies bedrooms, living/kitchen, puja, toilets and a utility; the utility is marked excluded from the measured carpet area. The extraction does not provide a complete room schedule for every design. Floor plans RERA unit details

5. Parking & vehicle circulation

The building approval identifies a stilt and states that approved stilt parking (and any cellar parking shown on the plan) must remain exclusively for vehicle parking and not be partitioned or repurposed. The supplied extracted records do not establish a parking-space count, visitor or accessible parking, allocation to individual apartments, parking dimensions, ramps, or internal vehicle circulation. A drawing or general approval condition alone does not establish an exclusive parking right for a particular apartment. RERA unit details

6. Amenities, recreation & open spaces

The RERA amenity record lists facilities and gives 0% progress for every listed item; it does not establish completion. “YES” entries indicate availability in the filing, not independently verified delivery. The building approval also sets conditions concerning greenery, tot-lot and rainwater harvesting. RERA amenities

Community/open-space and recreation
Description / sizeGreen Strip/TOT LOT/Park; aggregate recreational open-space item; no area supplied
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity progress 0%; approval requires a fenced tot-lot maintained as greenery before occupancy certification. Completion not verified
Internal access
Description / sizeInternal Roads & Footpaths; no dimensions supplied
Evidence sourceRERA amenities
Declared progress / verified statusProgress 0%; completion not verified
Water and environmental services
Description / sizeWater Supply; Sewerage (Chamber, Lines, Septic Tank, STP); Storm Water Drains; Treatment and Disposal of Sewage and Sullage Water; Water Conservation/Rain Water Harvesting
Evidence sourceRERA amenities
Declared progress / verified statusWater supply, sewerage, storm-water drainage and rainwater-harvesting items are marked “YES” where recorded; listed progress is 0%. No completed status verified
Site/community services
Description / sizeStreet Lighting; Community Buildings; Solid Waste Management and Disposal; Energy Management
Evidence sourceRERA amenities
Declared progress / verified statusProgress 0%; completion not verified
Electrical and safety provision
Description / sizeElectrical Meter Room/Sub-Station/Receiving Station; Fire Protection and Fire Safety Requirements
Evidence sourceRERA amenities
Declared progress / verified statusElectrical item marked “YES”; progress 0%. Fire-safety item progress 0%; no completed status verified

7. Utilities, building services & safety

The RERA amenity record marks water supply, sewerage, storm-water drains, rainwater harvesting, and an electrical meter room/sub-station/receiving-station item as available; the listed progress for each is 0%. The building approval specifies 7 rainwater-harvesting structures (RWHPs) and requires transformer space, a garbage house and periphery planting. These are filed or approval-recorded provisions, not evidence that the services have been installed or commissioned. RERA amenities

The approval makes occupancy certification compulsory before occupation and requires completion notice and an occupancy certificate after building completion. It also places responsibility for structural and fire-safety requirements on the owner/builder and technical professionals and refers to fire-fighting installations under the cited building-code conditions. The supplied records do not establish installed fire systems, lift numbers or capacities, water-storage or treatment capacity, STP capacity, backup power, CCTV, access control, accessible routes, or completed utility connections.

8. Location, access & connectivity

The registered location is Waddepally, Ward - 61, Hanamkonda mandal, Warangal Urban district, Telangana, PIN 506370. The building approval further identifies PRASHANTH NAGAR, Waddepally. The project record gives the west boundary as a 40 feet wide road and the south boundary as remaining land of the landowners leading to 30 feet. RERA record RERA filing RERA filing

A location record lists the nearest sampled Outer Ring Road interchange at approximately 155.4 km. This is a sampled map-distance entry, not a stated travel time or a direct measurement of journey conditions. No public-transport details or additional landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is AMAN TEJA INFRA, recorded as a partnership, with GSTIN 36ACFFA5368N1ZW. The listed partners are VILASAGARAM RAMAN KANTH, ERRABELLI KAVITHA and KAKULAMARRI NIKHIL; CHEPYALA AMAN RAO is identified as authorized signatory. The supplied project record gives the promoter address as AMANTEJA PRIDE APARTMENTS, Jeedimetla, Prashanth Nagar, Waddepally, Ward - 61, Hanamkonda, Warangal Urban, 506370. No official contact details or promoter website are supplied here. Corporate record RERA record Parties record RERA filing

Form B, signed by the authorized signatory, declares the project land free from encumbrances and undertakes completion by 06/05/2025. These are promoter declarations. The pack supplies no verified construction-progress update, completion evidence, or occupancy certificate. Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP00300009073; issued 26/11/2024; validity stated as 07/05/2022–06/05/2025
Scope and evidenceForm C for ANJANADARI ENCLAVE; certificate records the project survey number as 520 NEW and the 70% separate-account condition. It states no extension in the supplied record.
Building-construction approval
Identifier / date0070/BP/3006/2022; 07 May 2022
Scope and evidenceGWMC Municipality/Municipal Corporation approval for Building A, 1 Stilt + 5 upper floors, on Survey No. 520 NEW; file no. 002162/BP/DTCP/3006/0086/2022.
Project declaration
Identifier / dateForm B
Scope and evidencePromoter declaration, including completion undertaking of 06/05/2025 and declared encumbrance position.
Floor-plan filing
Identifier / dateDocument 490717
Scope and evidenceFiled building-floor-plan record; drawing-based measurements are described as software-measured and require review.
Title material filed with RERA
Identifier / dateDocuments 490713, 490718, 490719, 490720
Scope and evidenceFiled development agreement/GPA and title-history documents, including sale and relinquishment-deed material. Document index
Advocate’s title search report
Identifier / dateDocument 506724, dated 13-10-2024
Scope and evidenceSearch report concerning 897 Sq. Yards of open land in Sy.No.520 New, Waddepally.
Occupancy / completion certificate
Identifier / dateNot supplied
Scope and evidenceThe reviewed pack does not establish issuance. Document index

Frequently asked questions

Is ANJANADARI ENCLAVE registered with Telangana RERA?

Yes. ANJANADARI ENCLAVE is registered with the Telangana Real Estate Regulatory Authority as P00300009073; the registration status is New Project.

Who is the developer of ANJANADARI ENCLAVE?

The promoter named in the RERA registration is AMAN TEJA INFRA.

Where is ANJANADARI ENCLAVE located?

ANJANADARI ENCLAVE is in WADDEPALLY,WARD - 61, Waddepally, Hanamkonda, Telangana (506370).

When will ANJANADARI ENCLAVE be completed?

The promoter's proposed date of completion filed with RERA is 06/05/2025. This is the promoter's declaration, not a guarantee.

More projects in Waddepally