Chennur Hitech City

KSHETHRASAI INFRA AND DEVELOPERS · Mancherial · RERA P01200008625

CHENNUR HITECH CITY is a plotted development with open plots in Chennur, Chennur mandal, Mancherial district, developed by the registered promoter KSHETHRASAI INFRA AND DEVELOPERS. The registered land area is 35018.18 sq. m, and the layout has 116 plots; floors and towers are not disclosed. The offering is open plots, with drawing-derived plot sizes ranging from 137.22 sq. m to 462.58 sq. m. The TG-RERA registration number is P01200008625, and the RERA Form B declares completion by 15th April, 2026.

01What we found

Period endedTG-RERA registration ran to 15 Apr 2026 - check its extension on TG-RERA
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Chennur, Chennur, Mancherial · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project nameCHENNUR HITECH CITY RERA record
Project typePlotted development / layout with open plots RERA record
Phase or registered portionPhase not separately identified; registration covers the plotted layout on the listed survey lands.
TG-RERA registration numberP01200008625 RERA record
Registration validity14 August 2024 to 15 April 2026, unless extended by the Authority. This is the registration period, not a statement of project completion. RERA record
Registered promoterKSHETHRASAI INFRA AND DEVELOPERS RERA record
RERA statusRegistered project; the supplied registration record does not establish its current post-expiry status.

Land and geographic identity

ItemProject record
LocalityChennur RERA record
Revenue villageChennur
MandalChennur RERA record
DistrictMancherial RERA record
PIN504208 RERA record
Project survey numbers and subdivisions583/2, 584/B, 584/C, 585, 585/1/1, 585/1/2, 585/2
Registered site extentRERA-filed total area: 35018.18 sq. m RERA filing
Layout areaDrawing-derived area statement records 35018.18 sq. m; the approval document also states 35018.24 sq. m as its total net layout figure. Layout record
Filed land-area splitTotal area 35018.18 sq. m; area affected in road widening/FTL of tanks/nala widening 8381.90 sq. m; net area 26636.28 sq. m. RERA filing
BoundariesEast: land of others; west: 12M wide road; north: land of Shashipal Reddy and land of others; south: 60M wide road. RERA filing

Development identity

ItemProject record
Sanctioning authorityChennur Municipality/Municipal Corporation; approval document identifies the tentative layout approval and TS-DTCP file TS/011675/2024. Approvals record
Principal layout approvalTentative layout approval 0001/LO/3076/2024, dated 15 April 2024. Approvals record
Application number002100/LO/DTCP/3076/0005/2024 Approvals record
Approved built-up area0.00 proposed built-up area, both excluding and including parking, in the layout approval parameters; this is a plotted layout, not an apartment-building approval.
Plots116 individual sub-plots; approval records mortgage of 19 specified plots for layout conditions. Layout record
Floors, towers and building configurationNot disclosed for this plotted layout.
Roads and reserved landDrawing records road widths of 9.14M, 12.19M, 60.00 MT and 200 FEET; see the layout section below for the recorded land-use schedule.
Parking provisionNo common parking area is recorded in the layout area statement; individual plot parking arrangements are not disclosed.

Offering and status

ItemProject record
Offered unit typeOpen plots; the layout drawing records 116 plots.
Plot-size informationSoftware-read drawing schedule covers all 116 plots; sizes range from 137.22 sq. m to 462.58 sq. m. This is drawing-derived, not an independently verified measurement. Layout record
Booked / available countsNot disclosed in the supplied records.
Construction / development stageNo independently verified site-progress assessment is supplied. The layout approval requires infrastructure and amenities to be completed within its stated period; see the project story.
Completion dates in the recordRERA Form B declares completion by 15th April, 2026; the approval condition also sets 15 April, 2026 for infrastructure and amenities.
Occupancy / completion certificateNot supplied. The evidence concerns a plotted layout and does not establish an occupancy certificate. Document index

2. The project story

CHENNUR HITECH CITY is registered as a plotted development in Chennur village, Chennur mandal, Mancherial district. The RERA certificate identifies the project land by the seven survey/subdivision entries listed above, and the layout approval describes a proposed layout with 116 individual plots.

The drawing’s area statement allocates land to plots, roads, park/open space, social infrastructure and utilities. It also identifies “Tot-lot” and “SOCIAL INFRA” as layout features; the supplied material does not provide detailed specifications or establish that these have been completed. Layout record

The promoter’s RERA declaration gives 15th April, 2026 as the project completion undertaking. Separately, the municipal tentative-layout conditions require infrastructure and amenities within two years from approval, also stating 15 April, 2026. These are declared/approval timelines, not independent confirmation of construction progress or delivery.

3. Master plan, architecture & building design

This is a plotted layout rather than a development of apartment towers or villas. The approved-plan record states 116 individual sub-plots and 0.00 proposed built-up area, both excluding and including parking. No building count, building height, floor configuration, building footprint, or apartment-floor plan is supplied.

The layout’s drawing-derived land-use schedule is:

Layout useAreaShare shown
Plotted area22162.73 sq. m63.29%
Road area8381.90 sq. m23.94%
Organized open space/park area3238.17 sq. m9.25%
Social infrastructure area879.60 sq. m2.51%
Utility area355.84 sq. m1.02%
Amenity area0.00 sq. m0.00%
Total net layout35018.24 sq. m100.00%

The approval document also identifies road widths of 9.14M, 12.19M, 60.00 MT and 200 FEET. It identifies a 10 M BUILDING LINE in the plan extraction.

The park/open-space, utility and road areas are subject to the approval condition requiring handover to the municipality by registered gift deed before release of the tentative layout. The supplied evidence does not establish that those handovers have occurred.

The layout plot schedule was read by software from the approved drawing. The extracted plot count and sizes should be checked against the drawing itself; the source states that the plot-area sum matches the drawing’s area statement. Layout record

4. Homes, configurations & floor plans

This is a plotted project, so the offering is plots rather than apartment configurations. The approved layout drawing states 116 plots, and the software-read schedule includes a size for each plot. Layout record

Plot informationDrawing-derived record
Plot count116
Smallest plot137.22 sq. m (164.1 sq. yd)
Median plot183.95 sq. m (220.0 sq. yd)
Largest plot462.58 sq. m (553.2 sq. yd)

Layout record

Plot size bandNumber of plots
150–200 sq. yd11
200–250 sq. yd89
250–300 sq. yd9
300–400 sq. yd6
500–1000 sq. yd1

Layout record

These counts and sizes are software-read from the layout drawing, not RERA-filed carpet-area figures. No booked/available plot counts, plot-wise allotment schedule, or registered sale agreements for individual plots are supplied. Layout record Document index

5. Parking & vehicle circulation

The layout approval’s area schedule records 0.00 common parking area. No parking-space count, visitor or accessible parking provision, parking allocation to individual plots, or EV charging provision is established by the supplied records. RERA amenities

The plan extraction records roads of 9.14M, 12.19M, 60.00 MT and 200 FEET. The tentative-layout conditions state that roads are to remain open for access to neighbouring sites and that the layout owner/developer is not to construct a compound wall or fencing around the site. These are approval conditions; the supplied evidence does not verify their implementation on site.

6. Amenities, recreation & open spaces

The layout approval identifies park/open space, social infrastructure, utilities, a tot-lot and “SOCIAL INFRA.” The table below distinguishes recorded provisions from their delivery status.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / organized open space3238.17 sq. m; 9.25% in the layout area statementLayout recordIncluded in tentative layout approval; completion and handover are not independently verified.
Tot-lotNamed in the layout amenities/utilities extraction; no size suppliedDrawing/approval record only; delivery not verified.
Social infrastructure879.60 sq. m; 2.51%Layout recordArea is reserved in the layout record; facility details and completion are not established.
Community buildingsNo description or size suppliedRERA amenitiesNo progress or completion evidence supplied.
Utility-reserved land355.84 sq. m; 1.02%Layout recordReserved area; the approval lists possible utility uses, but installation/completion is not verified.

The layout approval requires the open space and social/utility-related land to be handed over to the municipality by registered gift deed as a condition before release of the tentative layout. The supplied record does not confirm that the deeds or the facilities have been completed.

7. Utilities, building services & safety

The tentative-layout approval lists the following proposed infrastructure and utility works: water reservoir, septic tank, Sewerage Treatment Plant, electric transformer, solid-waste management, storm-water drains, underground drainage lines, internal water-supply pipelines, overhead tank, street lights, avenue plantation, park development and rainwater-harvesting pits. These are approval-record items; completion, capacity and operating status are not established by the supplied evidence.

The RERA amenity record also lists water supply, sewerage (chambers, lines, septic tank, STP), storm-water drains, street lighting, solid-waste management/disposal, water conservation/rainwater harvesting, energy management, fire protection and electrical meter room/sub-station/receiving station. The records do not provide capacities or verify that these services are installed or operational. RERA amenities

No evidence is supplied on potable-water source, treatment capacity, electrical backup, fire-system design or clearances, CCTV/security, accessibility features, or utility-service capacities. RERA amenities Document index

8. Location, access & connectivity

The registered project location is Chennur, Chennur mandal, Mancherial district, Telangana 504208, in Chennur revenue village. The layout drawing identifies the project land in survey numbers 583/2, 584/B, 584/C, 585, 585/1/1, 585/1/2 and 585/2. RERA record

The layout boundaries recorded in the RERA land details are east: land of others; west: 12M wide road; north: land of Shashipal Reddy and land of others; south: 60M wide road. The approval drawing records road widths of 9.14M, 12.19M, 60.00 MT and 200 FEET. RERA filing

The supplied location data lists the nearest sampled Outer Ring Road interchange at approximately 194.3 km. No other verified distances, public-transport details, landmarks or travel times are supplied. Location record

9. Developer & development status

The registered legal promoter is KSHETHRASAI INFRA AND DEVELOPERS, identified in the project record as a partnership. Its supplied address is 5-555, IQBAL AHMED NAGAR, CHENNUR, Chennur, Mancherial, 504208; GSTIN is 36ABAFK6909P1ZS. RERA record Corporate record Parties record

The RERA-filed Form B declaration is made by Mulkalla Shashipal Reddy and Godisela Praveen Kumar and undertakes project completion by 15th April, 2026.

The tentative-layout approval places responsibility for layout development on the applicant and requires infrastructure and amenities to be completed within the stated two-year period ending 15 April, 2026. The supplied evidence does not include an independent construction-progress report or proof of completion.

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01200008625, dated 14 August 2024
Scope and evidenceForm C record for CHENNUR HITECH CITY; identifies the promoter, project location and survey numbers, and states registration validity through 15 April 2026, unless extended.
Tentative layout approval
Identifier / date0001/LO/3076/2024, 15 April 2024
Scope and evidenceIssued by Chennur Municipality/Municipal Corporation for a 116-plot layout in the identified survey numbers; includes layout conditions and mortgage details.
Layout plan / file reference
Identifier / dateTS/011675/2024
Scope and evidencePlan record identifies the layout, area statement, plots and roads; approval-document extraction identifies TS-DTCP.
Application reference
Identifier / date002100/LO/DTCP/3076/0005/2024
Scope and evidenceListed in the tentative-layout approval record.
Mortgage deed reference in approval
Identifier / date2902/2024, dated 13 March 2024
Scope and evidenceApproval records 19 specified plots mortgaged in favour of Chennur Municipality/Municipal Corporation.
RERA Form B declaration
Identifier / dateDeclaration in the project file
Scope and evidencePromoter declaration includes the completion undertaking and project-account disclosures.
Completion / occupancy certificate
Identifier / dateNot supplied
Scope and evidenceThe supplied documents do not establish a completion or occupancy certificate for the layout. Document index

Frequently asked questions

Is CHENNUR HITECH CITY registered with Telangana RERA?

Yes. CHENNUR HITECH CITY is registered with the Telangana Real Estate Regulatory Authority as P01200008625; the registration status is New Project.

Who is the developer of CHENNUR HITECH CITY?

The promoter named in the RERA registration is KSHETHRASAI INFRA AND DEVELOPERS.

Where is CHENNUR HITECH CITY located?

CHENNUR HITECH CITY is in CHENNUR, Mancherial, Telangana (504208).

When will CHENNUR HITECH CITY be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.