Sign in

Green Acres

VAZEER · Mancherial · RERA P01200008273

GREEN ACRES is a residential plotted development at Hajipur, Pantancheruvu, Mancherial District. The registered promoter is Vazeer Sultan. The project covers 9,981.43 sq m and comprises 32 plots on Survey Nos. 42/A, 42/B and 42/C; plot configurations are not disclosed. It is registered under TG-RERA number P01200008273, with proposed completion by 02/12/2024.

01What we found

Period endedTG-RERA registration ran to 2 Dec 2024 - check its extension on TG-RERA
10documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Hajipur, Pantancheruvu, Mancherial · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered project nameGREEN ACRES RERA record
Project typePlotted development / residential layout RERA record
Phase or registered portionNo phase identifier disclosed; the registration covers the plotted project on Survey Nos. 42/A, 42/B and 42/C
TG-RERA registrationP01200008273 Approvals record
Registration validity24/05/2024 to 02/12/2024, unless extended by the Authority Approvals record
Registered promoterVazeer Sultan; the project records also use “VAZEER” Corporate record
Legal entity typeNot disclosed in the supplied records Corporate record
RERA statusRegistered; the supplied certificate states the above validity period. No extension record is supplied here. Registration validity is distinct from the project completion undertaking. Approvals record

Land and geographic identity

FieldProject record
Locality / streetHajipur / HAZIPUR RERA record RERA filing
Revenue villageHajipur RERA record RERA filing
MandalPantancheruvu in the project header and filing fields; approval documents identify Hajipur mandal RERA record RERA filing
DistrictMancherial RERA record RERA filing
PIN504207 RERA record RERA filing
Project survey numbers and subdivisions42/A, 42/B and 42/C RERA record Land records
RERA-filed site area9,981.43 sq m total and net area RERA filing
Layout area stated in approval documents11,938.09 sq yd
Boundaries as filedEast: 12M W ROAD; West: land of Survey No. 41; North: PSathyanarayana Rao and Sabbepalli Shivar; South: land of Survey No. 43 RERA filing

Development identity

FieldProject record
Sanctioning authorityDistrict Town and Country Planning Officer, Mancherial District (DTCP) Approvals record
Principal layout approvalFinal Technical Layout Pattern TLP. No.4/2021/DTCPO/MNCL, dated 11/06/2024 Approvals record
Earlier draft layout recordDraft Technical Layout Pattern Draft-TLP.No.04/2021/DTCPO/MNCL, dated 02-12-2021
Approved built-up area5,891.41 sq m, as reported in the RERA filing RERA filing
Layout plotsFinal approval records 32 plots
Buildings / floor configurationNot applicable to the filed plotted layout; no building count or floor configuration is disclosed
ParkingNo sanctioned parking-space count or plot-wise parking allocation is supplied RERA filing

Offering and status

FieldProject record
Unit typePlots RERA record
Plot count32 in the final layout approval
Plot size rangeNot disclosed in the supplied RERA unit records or extracted layout data RERA unit table Layout record
Booked / available countsNot supplied RERA unit table
RERA-filed saleable-area rangeNot available in the supplied unit-type records RERA unit table
Construction / development stageA RERA-filed project completeness figure of 80% is supplied; it is not independent site verification. RERA record
Completion datePromoter’s Form B undertaking: 02/12/2024
Occupancy / completion certificate statusNot applicable as a building OC status for the plotted-layout offering; no separate project completion certificate is supplied in the reviewed records. The final layout approval is not an OC.

2. The project story

GREEN ACRES is registered as a residential plotted development at Hajipur, Mancherial, covering Survey Nos. 42/A, 42/B and 42/C. The final layout approval describes 32 residential plots and assigns land to plots, roads and open space. It also records plots 14–19 as the layout’s mortgage plots and describes their release by a registered deed.

The RERA filing reports 80% completeness, while the promoter’s Form B undertaking specified completion by 02/12/2024. The supplied information does not identify which individual layout works were complete at the stated percentage, and it does not independently verify the site’s present condition. No building construction progress or occupancy-certified building portion is reported. RERA record

3. Master plan, architecture & building design

This is a plotted layout, not a multi-storey building project in the supplied approval material. The final layout approval records 32 plots across a stated layout area of 11,938.09 sq yd. Its stated allocation is 7,046.31 sq yd (59.04%) for plotted area, 3,694.63 sq yd (30.94%) for roads, and 1,197.15 sq yd (10.02%) for open space.

The approval refers to internal roads, drains and nala channelization, avenue planting, rainwater-harvesting pits, street lighting, electricity facilities, sewerage disposal and protected water supply. The approval conditions also require roads and open spaces to be handed over to the local body by registered deed. These are approval-record descriptions and conditions; they do not, by themselves, establish the present delivery or operational status of the works.

The RERA-filed site-area figure and the approval-document layout-area figure are stated separately above; no area conversion or reconciliation is made in this overview. No individual plot dimensions, plot-size bands, building footprints, floor plans or building configuration are supplied. RERA filing

4. Homes, configurations & floor plans

The offering is plots, rather than apartments. The final layout approval records 32 plots, but the supplied data does not provide plot-by-plot areas, a plot-size range, booking status, availability or a RERA-filed saleable-area schedule. RERA unit table Layout record

The floor-plan dataset contains two drawings, with both scans pending and no software-measured carpet areas. Apartment carpet-area or loading comparisons therefore cannot be reported for this plotted project. Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plots32 approvedNot suppliedNot suppliedNot suppliedNot applicableNot supplied

5. Parking & vehicle circulation

No parking-space count, visitor or accessible parking provision, parking allocation by plot, or dedicated parking arrangement is disclosed in the supplied project records. The layout approval describes internal roads and road widths, including 33-foot roads; a road-width entry does not establish a parking allocation or an exclusive parking right.

6. Amenities, recreation & open spaces

The approval documents describe layout-level open space and infrastructure. The RERA amenity data reports some items at 75% and others at 0%; these are reported progress fields, not independent confirmation of completion. RERA amenities

Open space
Description / size1,197.15 sq yd; 10.02% of the layout in the final approval
Evidence sourceFinal layout approval
Declared progress / verified statusApproval-record allocation; no independent completion verification supplied
Internal roads and footpaths
Description / sizeInternal roads; approval also describes roads with sub-surface, curbstones, metalling and side drains
Evidence sourceFinal layout approval RERA amenities
Declared progress / verified statusRERA amenity progress field: 75%; not independently verified
Green strip / park
Description / sizeLayout open space; the RERA amenity record labels “Green Strip/TOT LOT/Park”
Evidence sourceRERA amenities Promoter website
Declared progress / verified statusRERA amenity progress field: 75%; no independent verification
Avenue plantation / greenery
Description / sizeAvenue plantation and greenery are described in layout approval conditions
Evidence sourceFinal layout approval
Declared progress / verified statusApproval-record description; present delivery not verified
Community buildings
Description / sizeNo size or facility details supplied
Evidence sourceRERA amenities Promoter website
Declared progress / verified statusRERA amenity progress field: 0%
Theme park
Description / sizeListed in vendor data only
Evidence sourcePromoter website
Declared progress / verified statusNo RERA progress or approval evidence supplied

7. Utilities, building services & safety

The final layout approval describes protected water supply, water supply, sewerage and drainage disposal systems, nala channelization, rainwater-harvesting structures, street lighting and electricity facilities. It also places responsibility for effective maintenance of services on the local body after handover. The records supplied do not establish current operational status or provide capacities, engineering schedules, or independent completion verification.

Water
Evidence in the supplied recordProtected water supply and water-supply system described in the final layout approval
Status / limitationNo source, storage or capacity details supplied; current operation not independently verified
Sewerage and drainage
Evidence in the supplied recordSewerage disposal, drainage systems, side drains and nala channelization described in the approval
Status / limitationNo treatment capacity or operating evidence supplied
Storm water / rainwater
Evidence in the supplied recordRainwater-harvesting structures and pits described in the approval
Status / limitationNo capacity or completion verification supplied
Electrical / lighting
Evidence in the supplied recordElectricity facilities and street lighting described in the approval
Status / limitationNo supply, substation capacity or backup details supplied
Fire and life safety
Evidence in the supplied recordNo project-specific fire-system details supplied
Status / limitationNot established by the supplied records
Waste management / security / accessibility
Evidence in the supplied recordNo project-specific details supplied
Status / limitationNot established by the supplied records

8. Location, access & connectivity

The registered project location is Hajipur, Mancherial District, Telangana, PIN 504207, in revenue village Hajipur, on Survey Nos. 42/A, 42/B and 42/C. The filed east boundary is described as “12M W ROAD”; the final layout approval also records internal roads, including a 33-foot road entry. RERA record RERA filing RERA filing

The supplied location data lists the nearest sampled Outer Ring Road interchange at approximately 186.1 km. It does not provide other measured distances or travel times. Location record

9. Developer & development status

The TG-RERA certificate names Vazeer Sultan as promoter. The supplied material does not establish the promoter’s legal entity type, corporate registration identifiers, registered office for a corporate entity, or official project contact details. The certificate lists the promoter’s address as House No. 42-51/2, Mandamarry, Mandamarry Mandal, Mancherial, PIN 504231. Corporate record

The RERA header reports 80% completeness, and Form B contains a promoter undertaking to complete the project by 02/12/2024. These are filed/project-declared records, not an independent site progress assessment. The project is a plotted layout; no tower- or building-wise construction stages are supplied. RERA record

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for GREEN ACRES, registration P01200008273, covering Survey Nos. 42/A, 42/B and 42/C; validity stated as 24/05/2024–02/12/2024
Principal layout approvalFinal Technical Layout Pattern TLP. No.4/2021/DTCPO/MNCL, dated 11/06/2024, issued by the District Town and Country Planning Officer, Mancherial District
Draft layout approvalDraft Technical Layout Pattern Draft-TLP.No.04/2021/DTCPO/MNCL, dated 02-12-2021
Layout and infrastructure recordFinal layout approval describes plot, road and open-space allocations and layout-level utility provisions
Promoter declarationForm B affidavit/declaration, dated 02/05,2024, including the promoter’s completion undertaking and project-account declarations
Completion / occupancy recordNo separate project completion certificate or building occupancy certificate supplied in the reviewed materials Document index
Plan and connectivity recordsHMDA Master Plan 2031 zoning sheet is image-only and no survey-specific zone determination is supplied; the public HMDA DPMS layout lookup was unavailable in the supplied evidence HMDA

Frequently asked questions

Is GREEN ACRES registered with Telangana RERA?

Yes. GREEN ACRES is registered with the Telangana Real Estate Regulatory Authority as P01200008273; the registration status is New Project.

Who is the developer of GREEN ACRES?

The promoter named in the RERA registration is VAZEER.

Where is GREEN ACRES located?

GREEN ACRES is in HAZIPUR, Hajipur, Pantancheruvu, Mancherial, Telangana (504207).

When will GREEN ACRES be completed?

The promoter's proposed date of completion filed with RERA is 02/12/2024. This is the promoter's declaration, not a guarantee.