Sign in

Gsr City

GONE · Mancherial · RERA P01200007049

GSR CITY is a plotted development / tentative residential layout beside Srilaxmi Layout, in Mancherial Revenue Village, Mancherial mandal, Mancherial district. The registered promoter is Gone Shyam Sundar Rao. The project has a registered site extent of 18175.71 sq. m and the tentative layout identifies 58 plots; plot configurations are not provided. Its TG-RERA registration is P01200007049, and the proposed completion date is 11/10/2024.

01What we found

Period endedTG-RERA registration ran to 11 Oct 2024 - check its extension on TG-RERA
12documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameGSR CITY RERA record
Project typePlotted development / tentative residential layout RERA record
Phase or registered portionNot identified as a separate phase in the supplied record; the registration and plan refer to the plotted project on Survey No. 11/1/2. Approvals record
TG-RERA registrationP01200007049 RERA record
Registration validity04/10/2023 to 11/10/2024; the certificate says one year, and the supplied record does not show an extension. This is registration validity, not a completion date. Approvals record
Registered promoterGone Shyam Sundar Rao, as named on the registration certificate; entity type is not identified in the supplied record. Corporate record
RERA statusThe supplied certificate records registration. Current portal status is not established by the supplied evidence. Approvals record

Land and geographic identity

ItemRecord
LocalityBESIDE SRILAXMI LAYOUT RERA record RERA filing
Revenue villageMancherial Revenue Village RERA record
Mandal / district / PINMancherial / Mancherial / 504208 RERA record RERA filing
Project survey number and subdivision11/1/2 RERA record Land records
Registered site extent18175.71 sq. m RERA filing
Net / total area18175.71 sq. m net area and 18175.71 sq. m total area in the RERA land details. RERA filing
BoundariesEast: OTHERS LAND; West: ROAD; North: APPROVED LAYOUT 64 BY 97; South: OTHERS LAND. RERA filing

Development identity

ItemRecord
Sanctioning authorityMancherial Municipality/Municipal Corporation; the RERA filing identifies DTCP as the authority name. Approvals record
Principal layout approvalTentative Layout Plan No. 0019/LO/3026/2022, dated 10/11/2022; application No. 004240/LO/DTCP/3026/0025/2022. Approvals record
Layout extent and plotted areaThe approval drawing states 4 Acer 19.65 Gts 21739 Sq. Yds and identifies 58 No's plots.
Approved built-up area10335.03 sq. m is recorded in the RERA land/build-up details; a separate built-up-area breakdown is not supplied. RERA filing
Buildings, floors and parking levelsNot applicable to the supplied plotted-layout plan; no building count, floor configuration or parking levels are recorded.
Unit countsThe tentative layout plan identifies 58 plots. The supplied RERA evidence does not provide a separate unit-inventory or booked/available count. RERA unit table

Offering and status

ItemRecord
OfferingPlots in a proposed residential layout; RERA-filed plot sizes, unit inventory and booked/available counts are not provided in the supplied evidence. RERA record RERA unit table
Registration validity04/10/2023–11/10/2024; no extension is shown in the supplied certificate.
Completion dateThe RERA record gives 11/10/2024 as the proposed completion date. RERA record RERA filing
Construction / development stageThe supplied record gives 80% completeness, but does not specify the measurement date, activities completed, or whether this is independently verified. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is included in the supplied documents. The approval is for a tentative layout, not an occupancy certificate. Document index

2. The project story

GSR CITY is registered as a plotted-development project in Mancherial village, Mancherial mandal and district, Telangana, on Survey No. 11/1/2. Its filed locality is BESIDE SRILAXMI LAYOUT. The RERA-filed land extent is 18175.71 sq. m. RERA record Land records RERA filing

The municipal approval document describes a tentative residential layout of 58 plots. Its area statement allocates land to plots, roads, a park/open space, social infrastructure and utilities. The approval places responsibility for developing the layout infrastructure on the applicant and specifies eventual handover of designated roads, open space and utility land to the Municipality by registered gift deed.

The RERA record reports 80% completeness, but the supplied information does not define that figure or provide independently verified site progress. The stated completion date is 11/10/2024; no occupancy or completion certificate is supplied. Registration was valid through 11/10/2024, a separate status from the project completion date. RERA record RERA filing

3. Master plan, architecture & building design

The supplied approval is for a tentative plotted layout, not a building or apartment plan. It identifies 58 plots and the following land-use figures from the layout drawing:

Layout componentArea as printed on approvalShare as printed
Plotted area2 Acer 22.16 Gts 12361 Sq. Yds56.86%
Road area1 Acer 13.67 Gts 6494 Sq. Yds29.87%
Open space (park)0 Acer 16.53 Gts 2000 Sq. Yds9.2%
Social infrastructure0 Acer 5.39 Gts 653 Sq. Yds3%
Utilities0 Acer 1.9 Gts 230 Sq. Yds1.06%
Mortgage area0 Acer 16.34 Gts 1977 Sq. Yds15.95% of plotted area

The mortgage area is identified as Plots 45, 28–29 and 44, 30–36, in favour of Mancherial Municipality/Municipal Corporation under Mortgage Deed No. 11243/2022, dated 24 June 2022. The approval describes this mortgage as linked to development compliance and release of the final layout.

RERA-filed total and net land area are each 18175.71 sq. m; the approval separately prints its extent as 4 Acer 19.65 Gts 21739 Sq. Yds. No building footprint, residential floor configuration, building count, or building-level phase plan is supplied. RERA filing

4. Homes, configurations & floor plans

This is a plotted layout, not an apartment configuration schedule. The approval drawing identifies 58 plots, but the supplied evidence does not establish plot-size bands, plot-by-plot dimensions, or booked and available counts. RERA unit table Layout record

OfferingPlot countBookedAvailableRERA-filed plot sizes
Plots58Not providedNot providedNot provided

The two supplied drawing sheets are layout sheets, not floor plans with apartment units. No software-measured carpet-area or room measurements are available. Floor plans

5. Parking & vehicle circulation

The supplied evidence does not state a parking-space count, parking allocation, or separate resident, visitor, accessible or two-wheeler provision. The approval provides for layout roads and states that roads are to be opened for access to neighbouring sites; it does not describe parking bays, driveway dimensions or pedestrian separation. RERA filing

6. Amenities, recreation & open spaces

The approval and RERA amenity list identify proposed or listed layout infrastructure. The supplied progress percentages are 0 where shown; they do not establish that facilities are complete or independently inspected. RERA amenities

Landscape/open space
FacilityPark / organized recreational open space
Description / size0 Acer 16.53 Gts 2000 Sq. Yds; approval states 9.2%
Evidence sourceLayout record
Declared progress / verified statusListed/approved in tentative layout; no completion evidence supplied.
Sports/recreation
FacilityNo specific sports facility identified
Description / sizeNot provided
Evidence sourceRERA amenities
Declared progress / verified statusNot established.
Convenience/community
FacilitySocial infrastructure site
Description / size0 Acer 5.39 Gts 653 Sq. Yds; approval states 3%
Declared progress / verified statusReserved in tentative layout; no specific building or completion evidence supplied.
Site infrastructure
FacilityRoads
Description / size1 Acer 13.67 Gts 6494 Sq. Yds; approval states 29.87%
Evidence sourceLayout record
Declared progress / verified statusListed/approved; no completion evidence supplied.
Site infrastructure
FacilityUtility land
Description / size0 Acer 1.9 Gts 230 Sq. Yds; approval states 1.06%
Evidence sourceLayout record
Declared progress / verified statusReserved in tentative layout; no completion evidence supplied.

7. Utilities, building services & safety

The tentative-layout approval specifies development works including black-top road formation, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines and overhead tank, an assured water-supply source, electrical lines and street lighting, a transformer, avenue planting, park development and rainwater-harvesting pits. These are approval-stated development requirements; the supplied evidence does not verify their installation, capacity or operation.

Water
Evidence in the recordAssured water-supply source, internal pipelines, overhead tank; water reservoir is listed among utilities.
Status limitationNo source details, storage capacity or completion evidence supplied.
Sewerage and drainage
Evidence in the recordUnderground drainage, common septic tank/STP and storm-water drains are specified.
Status limitationNo capacity, treatment specification, reuse details or completion evidence supplied.
Electrical
Evidence in the recordElectrical supply lines, street lights and transformer are specified.
Status limitationNo load, backup or completion evidence supplied.
Waste
Evidence in the recordSolid Waste Management is listed among the utilities.
Status limitationNo system details or completion evidence supplied.
Rainwater
Evidence in the recordRainwater-harvesting pits are specified.
Status limitationNo quantity, capacity or completion evidence supplied.
Fire/life safety, lifts and accessibility
Evidence in the recordNo project-specific provisions or capacities are established in the supplied evidence.
Status limitationNot established. RERA amenities

8. Location, access & connectivity

The RERA-filed location is BESIDE SRILAXMI LAYOUT, near Saibaba Temple, in Mancherial village, Mancherial mandal, Mancherial district, PIN 504208. The filed site boundaries identify a road to the west and other land to the east and south; the north boundary is recorded as “APPROVED LAYOUT 64 BY 97.” RERA record RERA filing RERA filing

One supplied connectivity record gives the nearest sampled Outer Ring Road interchange at approximately 173.2 km. No other measured distances, public-transport details or approach-road descriptions are provided. Location record

9. Developer & development status

The TG-RERA certificate names Gone Shyam Sundar Rao as the registered promoter. The supplied corporate record gives GSTIN 36AAPHS5424K1ZL; the legal entity type is unknown, and a registered-office address or official contact details are not established in the supplied data. Corporate record

The Form B filing contains a promoter declaration about title, encumbrances, completion, project funds and audits; its completion undertaking is not legible enough to establish a usable date. The RERA project record separately states proposed completion as 11/10/2024 and completeness as 80%, without a supplied progress date or independent site verification. RERA record RERA filing

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01200007049; issued 04/10/2023; valid to 11/10/2024
What the supplied record establishesForm C registration for GSR CITY on Survey No. 11/1/2; certificate includes a separate-account condition.
Tentative layout approval
Identifier / date0019/LO/3026/2022; dated 10/11/2022
What the supplied record establishesApproval document for a tentative 58-plot residential layout on Survey No. 11/1/2, issued by Mancherial Municipality/Municipal Corporation.
Layout application
Identifier / date004240/LO/DTCP/3026/0025/2022
What the supplied record establishesApplication number printed on the tentative layout approval.
Promoter Form B declaration
Identifier / dateDocument 329716; attested 26/5/23 as extracted
What the supplied record establishesForm B affidavit-cum-declaration filed for the project; the supplied extraction identifies the declarant as an authorised signatory and records promoter assertions.
Encumbrance statement
Identifier / dateDocument 358000; statement No. 146387773; searched 01-01-1994 to 24-09-2023
What the supplied record establishesFiled encumbrance statement for Survey No. 11/1/2.
Mortgage deed cited in approval
Identifier / date11243/2022, dated 24 June 2022
What the supplied record establishesCited for the reserved mortgage plots in favour of Mancherial Municipality/Municipal Corporation.
Completion / occupancy certificate
Identifier / dateNot supplied
What the supplied record establishesNo completion or occupancy certificate is established by the documents reviewed here. Document index

Frequently asked questions

Is GSR CITY registered with Telangana RERA?

Yes. GSR CITY is registered with the Telangana Real Estate Regulatory Authority as P01200007049; the registration status is New Project.

Who is the developer of GSR CITY?

The promoter named in the RERA registration is GONE.

Where is GSR CITY located?

GSR CITY is in BESIDE SRILAXMI LAYOUT, Mancherial, Telangana (504208).

When will GSR CITY be completed?

The promoter's proposed date of completion filed with RERA is 11/10/2024. This is the promoter's declaration, not a guarantee.

More projects in Mancherial