New Town City

MOHAMMED ISMAIL ALI AND MAHAMMED HALEEM ALI · Nagarkurnool · RERA P01600007913

NEW TOWN CITY is a plotted development in NAGANOOL, Nagarkurnool Mandal, Nagarkurnool District, developed by MOHAMMED ISMAIL ALI AND MAHAMMED HALEEM ALI. The project covers 20233.61 sq.m and provides for 100 plots; no towers, blocks, floors or plot configurations are stated in the RERA record. It is registered under TG-RERA number P01600007913, with a proposed completion date of 03d OCT, 2024.

01What we found

Period endedTG-RERA registration ran to 3 Oct 2024 - check its extension on TG-RERA
17documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Naganul, Nagarkurnool, Nagarkurnool · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered project nameNEW TOWN CITY RERA record
Project typePlotted development / proposed DTCP layout RERA record RERA filing
Phase / registered portionNo separate phase is identified; the RERA record covers the plotted project in Sy. Nos. 108/2 and 108/4. RERA record
TG-RERA registrationP01600007913; registered from 20/03/2024 to 03/10/2024. The certificate states the registration may be extended by the Authority under the Act and Rules. RERA record
Registered promoterMOHAMMED ISMAIL ALI AND MAHAMMED HALEEM ALI RERA record RERA filing
RERA project statusRecorded as New Project. The supplied registration period has ended; no extension record is supplied here. RERA filing RERA record
Registration certificateTG-RERA Form C certificate for this project.

Land and geographic identity

ItemProject record
LocalityNAGANOOL; the registration certificate identifies the site at Naganul. RERA filing
Revenue villageNaganul / Naganool Revenue Village RERA record
Mandal / districtNagarkurnool Mandal / Nagarkurnool District RERA record
PIN509209 RERA record RERA filing
Project survey numbers108/2 and 108/4; the RERA record identifies these as SY NOS 108/2 AND 108/4. RERA record RERA filing
Additional survey references in the layout-plan instrumentThe DTCP layout-plan record’s instrument description refers to Sy. Nos. 108/2, 108/4, 109, 108, 65 and 111; the tentative-layout approval record identifies 108/2 and 108/4.
Registered/site extentRERA land details state 20233.61 sq.m total area and 20233.61 sq.m net area, with 0 area affected by road widening/FTL/nala widening. RERA filing
Layout-plan extent20233.61 sq.m in the DTCP layout-plan record. The tentative-layout approval also states 4 Acer 40 Gts 24200 Sq. Yds.
Boundaries recorded in RERAEast: REMAINING OWNERS LAND; West: 24 MT WIDE PROPOSED ROAD; North: OTHERS LAND; South: REMAINING OWNERS LAND. RERA filing

Development identity

ItemProject record
Sanctioning / approval authoritiesDTCP approval record delegated to NAGARKURNOOL MUNICIPALITY; tentative layout approval issued by NAGARKURNOOL Municipality/Municipal Corporation.
Principal approvalDTCP approval G/282/02/KLKY/2021-22, dated 31-08-2022; tentative layout approval 0012/LO/3064/2022, dated 03 October, 2022. Approvals record
Approved development formLayout for 100 plots. No buildings, building floors or tower configuration are identified in the supplied project record.
Approved built-up areaLayout-plan parameters state NET BUA BUILT UP AREA: 0.00; the RERA record lists Approved Built up Area (In Sqmts) 10791.42. These labels are reproduced as recorded; no building configuration is supplied. RERA filing
ParkingLayout-plan parameters state PROPOSED NUMBER OF PARKINGS: 0 and Common Parking Area: 0.00.
Layout roads and land allocationLayout-plan schedule: plotted area 10791.42 sq.m (53.33%); road area 6854.92 sq.m (33.88%); organized open space/park 1823.57 sq.m (9.01%); social infrastructure 506.23 sq.m (2.50%); utility area 202.74 sq.m (1.00%).

Offering and status

ItemProject record
Offered unit typePlots; the tentative layout plan provides for 100 plots.
Plot-size rangeSoftware-read from the approved layout drawing: 54.71–217.3 sq.m (smallest to largest). This is drawing-derived, not a RERA-disclosed plot-size range. Layout record
Booked / availableNo current booked-versus-available inventory count is supplied. A promoter letter in the project file says 10 plots have been sold, but no current inventory statement is provided.
Construction / development stageThe supplied RERA record labels the project New Project. No independent site inspection or verified physical-completion assessment is supplied. RERA filing RERA record
Completion dateForm B records the promoter’s undertaking to complete by 03d OCT, 2024; the RERA registration certificate gives 03/10/2024 as the registration end date. These are completion and registration dates respectively.
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The Form–1A architect completion document contains only “NA” in its extracted text.

2. The project story

NEW TOWN CITY is registered as a plotted development at Naganul/Naganool Revenue Village, Nagarkurnool Mandal and District, on the RERA-identified land in Sy. Nos. 108/2 and 108/4. The filed layout provides for 100 plots, with internal roads, open space/park, social infrastructure and a utility area shown in its area schedule. RERA record RERA filing

The promoter’s Form B declaration gives 03d OCT, 2024 as the intended completion date. The supplied records do not establish the project’s present physical condition, completion of infrastructure, final-layout release, or issuance of an occupancy/completion certificate. Accordingly, the RERA-filed proposed completion date should not be read as proof that the layout works are complete.

3. Master plan, architecture & building design

This is a plotted layout, not a tower or apartment scheme in the supplied approval record. The layout drawing identifies 100 plots and allocates the site among plots, roads, park/open space, social infrastructure and utilities. The DTCP layout-plan schedule records 20233.61 sq.m total/net layout area: 10791.42 sq.m plotted area, 6854.92 sq.m roads, 1823.57 sq.m organized open space/park, 506.23 sq.m social infrastructure and 202.74 sq.m utilities.

The approved drawing’s road schedule includes 9.14M INTERNAL ROAD, 24.00 MT WIDE EXISTING ROAD, 24.00 MT WIDE PROPOSED ROAD and 60'-0" WIDE ROAD. The tentative-layout approval separately requires roads to be opened for neighbouring-site access and records a condition for handing over roads, open space and utilities to the municipality by registered gift deed before release of the tentative layout.

See Development identity above for the built-up-area records. The supplied material does not explain the label’s application to the plotted scheme; it provides no building footprint, floor configuration or apartment plan. RERA filing

4. Homes, configurations & floor plans

The offering recorded in the layout is 100 plots, not apartments. The approved-drawing extraction provides the following software-read plot sizes and distribution; confirm individual plot dimensions against the stamped drawing before relying on them. Layout record

Plot-size band (sq.yd; supplied equivalent sq.m band)Plots
0–100 sq.yd (0–84 sq.m)18
100–150 sq.yd (84–125 sq.m)57
150–200 sq.yd (125–167 sq.m)22
200–250 sq.yd (167–209 sq.m)1
250–300 sq.yd (209–251 sq.m)2

The software-read range is 54.71–217.3 sq.m (smallest to largest), with a median of 111.38 sq.m. These are drawing-measured plot areas, not apartment carpet or saleable areas. The floor-plan record contains two layout sheets and no apartment plans or measured apartments. Layout record Floor plans

5. Parking & vehicle circulation

See Development identity above for the parking figures. The supplied material does not establish designated visitor, accessible or individual plot parking, or a plot-specific parking allocation.

The layout drawing identifies internal roads and road widths, including 9.14M INTERNAL ROAD and the listed 24.00-metre and 60-foot road references. The tentative-layout approval requires the roads to be opened for access to neighbouring sites. No separate pedestrian-circulation plan or vehicle-entry arrangement is supplied.

6. Amenities, recreation & open spaces

The RERA-filed amenity record marks internal roads and footpaths, water supply, sewerage, green strip/tot lot/park, street lighting, rainwater harvesting, and electrical meter room/sub-station/receiving station as YES / 100%. These are filed status entries; they are not independent confirmation of completion. RERA amenities

Internal roads and footpaths
Description / sizeLayout road area 6854.92 sq.m (33.88%); road widths include 9.14M INTERNAL ROAD.
Evidence sourceRERA amenities
Declared progress / verified statusRERA amenity record: YES / 100%; not independently verified.
Park / organized open space
Description / size1823.57 sq.m (9.01%).
Declared progress / verified statusThe approval schedule reserves this area; RERA amenity record lists green strip/tot lot/park as YES / 100%. No independent completion evidence supplied.
Social infrastructure
Description / size506.23 sq.m (2.50%).
Declared progress / verified statusReserved in the layout schedule; the drawing’s amenity/utility text also names “Area for Social Infrastructure.” No delivery verification supplied.
Utility plot
Description / size202.74 sq.m (1.00%).
Declared progress / verified statusReserved in the layout schedule; no independent completion evidence supplied.
Tot-lot / gardens
Description / sizeNamed in the layout-plan amenity/utility text.
Declared progress / verified statusDrawing reference only; no size or completion verification supplied.
Other named places
Description / size“Govt Degree,” “NGKL College,” and “Ruby Edi-Gah” appear in the layout-plan amenity/utility text.
Declared progress / verified statusTheir relationship to project-provided facilities is not further specified in the supplied record.

7. Utilities, building services & safety

The tentative-layout approval lists development works including internal water-supply pipelines, an overhead tank and assured water-supply source; underground drainage and a common septic tank/STP; storm-water drains; electrical supply lines, transformer and street lights; avenue planting; park development; and rainwater-harvesting pits. These are approval conditions/described works, not evidence of completed or commissioned services.

The RERA amenity record marks water supply, sewerage (chambers, lines, septic tank, STP), street lighting, rainwater harvesting and electrical meter room/sub-station/receiving station as YES / 100%; it records storm-water drains, solid-waste management, energy management and fire protection/safety as 0%. No capacities, utility-provider details, fire-system specifications, backup power, security systems, lifts or accessibility features are supplied. RERA amenities

8. Location, access & connectivity

The registered location is Naganul/Naganool Revenue Village, Nagarkurnool Mandal and District, PIN 509209. The RERA boundaries identify a 24 MT WIDE PROPOSED ROAD on the west. The layout plan also refers to internal roads and existing/proposed road widths. RERA record RERA filing RERA filing

A cadastral parcel-centroid location is recorded at 16.47712, 78.30678. The nearest sampled Outer Ring Road interchange is listed at approximately 84.7 km; this is the supplied measured-distance record, not a stated travel time. No public-transport or other landmark connectivity details are supplied. Location record Cadastral map

9. Developer & development status

The registered promoters are MOHAMMED ISMAIL ALI AND MAHAMMED HALEEM ALI, recorded in the RERA project details as two individuals under organization type “Others.” Mohammed Ismail Ali is identified in the project file as an authorized signatory. The supplied evidence does not provide a company registration number, promoter website or official project contact details. RERA record RERA filing

In Form B, Mohammed Ismail Ali declares the project’s title basis, states that the land is free from encumbrances, and undertakes to complete by 03d OCT, 2024. These are promoter declarations. No current verified physical-progress report, updated inventory, or occupancy/completion certificate is supplied; the Form–1A architect completion document’s extracted text is only “NA.”

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C certificate for NEW TOWN CITY, registration P01600007913, valid 20/03/2024–03/10/2024 as recorded.
DTCP layout approvalG/282/02/KLKY/2021-22, dated 31-08-2022; record identifies the layout at Ward No. 17, Naganul and references Sy. Nos. 108/2, 108/4, 109, 108, 65 and 111.
Tentative layout approval0012/LO/3064/2022, dated 03 October, 2022, for 100 plots in Sy. Nos. 108/2 and 108/4; the approval states that tentative layout approval is not proof of land title.
Layout planStamped layout-plan record with area schedule, road widths, plot count and reserved land uses.
Form B declarationPromoter declaration dated 05th day of FEB, 2024, including proposed completion by 03d OCT, 2024.
Agreement/allotment documentsForm-filed proposed sale agreement is partially filled; an allotment-letter declaration dated 4th Mar, 2024 states that proposed terms are within the regulatory framework.
Completion certificate recordForm–1A architect completion document has extracted text “NA”; it does not establish an approval or completion certificate.

Frequently asked questions

Is NEW TOWN CITY registered with Telangana RERA?

Yes. NEW TOWN CITY is registered with the Telangana Real Estate Regulatory Authority as P01600007913; the registration status is New Project.

Who is the developer of NEW TOWN CITY?

The promoter named in the RERA registration is MOHAMMED ISMAIL ALI AND MAHAMMED HALEEM ALI.

Where is NEW TOWN CITY located?

NEW TOWN CITY is in NAGANOOL, Naganul, Nagarkurnool, Telangana (509209).

When will NEW TOWN CITY be completed?

The promoter's proposed date of completion filed with RERA is 03/10/2024. This is the promoter's declaration, not a guarantee.