Sign in

Rk Golden City

Sri. MEDI RAMAKRISHNA AND OTEHRS · Suryapet · RERA P01900007053

RK GOLDEN CITY is a plotted development in Kodad / Kodada Revenue Village, Kodad Mandal, Suryapet District. The registered promoter is Sri. MEDI RAMAKRISHNA AND OTEHRS. The project has a registered site area of 4,494.35 sq. m and a tentative layout of 14 plots; no tower, floor, or apartment count is disclosed. It is registered with TG-RERA under P01900007053, with proposed completion by 29 May 2025.

01What we found

Period endedTG-RERA registration ran to 29 May 2025 - check its extension on TG-RERA
29documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Kodad, Kodad, Suryapet · geocoded — approximate.

1. Project at a glance

Project identity

ItemProject record
Registered nameRK GOLDEN CITY. RERA record
Project type / phasePlotted development; recorded as a new project. A phase or separately named registered portion is not disclosed. RERA record RERA filing
TG-RERA registrationP01900007053; certificate issued 04/10/2023, valid from 04/10/2023 to 29/05/2025. The certificate says validity may be extended by the Authority; the supplied certificate records no extension. Registration validity is separate from the completion date. Approvals record
Registered promoterSri. MEDI RAMAKRISHNA AND OTEHRS (spelled this way in the registration record); the Form-B declaration names MEDI RAMAKRISHNA AND OTHERS, described as joint promoters. Legal entity type is recorded as “Others” / “Joint Developers”; a company or other entity form is not identified. RERA record RERA filing
RERA statusThe project is recorded as registered. The supplied certificate’s stated validity ended on 29/05/2025; current registration status after that date is not established by the supplied evidence. Approvals record

Land and geographic identity

ItemProject record
Locality / revenue villageKodad / Kodada Revenue Village. RERA record
MandalKodad; the layout approval uses “Kodada Mandal.” RERA record
District / PINSuryapet / 508206. RERA record
Project survey numbers as recorded in the RERA header734/AA2, 734/A6, 734/E1, 734/E4, 734/A6, 734/AA1/2, 734/E3, 735/1/7, 734/AA1, 735/2/6, 735/1/3, 736/1/3, 734/A1/1, 735/5/2, 735/1/2736/1/4, 734/E1, 731/E1, 734/E1, 735/1/5/2, 734/E2, 735/5/1, 735/6. The repeated entries and the string “735/1/2736/1/4” are reproduced as recorded; their intended cadastral parsing is not resolved here. RERA record RERA filing
Survey numbers in the RERA registration certificate734/AA2, 734/A6, 734/E1, 734/E4, 734/AA1/2, 734/E3, 735/1/7, 734/AA1, 735/2/6, 735/1/3, 736/1/3, 734/A1/1, 735/5/2, 735/1/2736/1/4, 734/E2, 735/5/1, 735/6.
Survey numbers in the tentative layout approval734/AA2, 734/A6, 734/E1, 734/E4, 734/AA1/2, 734/E3, 735/1/7, 735/2/6, 735/1/3, 736/1/3, 734/A1/1, 735/5/2, 735/1/2736/1/4, 734/AA1, 731/E1, 735/1/5/2, 734/E2, 735/5/1, 735/6.
Registered site / layout area4,494.35 sq. m net area; the RERA record gives total area 4,494.35 sq. m and affected road-widening/FTL/Nala area 0 sq. m. RERA filing Land records
Boundaries (RERA record)East: Road; West: Approved Layout and Road; North: Owners Land; South: Approvd Layout. RERA filing
Layout approval’s area statementApproval document states 1 Acer 4.42 Gts / 5375 Sq. Yds. Its listed allocations are plots 0 Acer 32.26 Gts / 3904 Sq. Yds (72.62%), roads 0 Acer 6.58 Gts / 796 Sq. Yds (14.81%), park/open space 0 Acer 4.02 Gts / 486 Sq. Yds (9.05%), social infrastructure 0 Acer 1.11 Gts / 134 Sq. Yds (2.5%), and utilities 0 Acer 0.45 Gts / 55 Sq. Yds (1.02%).

Development identity

ItemProject record
Principal layout sanctionTentative Layout Plan 0007/LO/3046/2023, approved 29 May 2023 by KODADA Municipality/Municipal Corporation. Application number: 004083/LO/DTCP/3046/0013/2023. The RERA record also labels the authority as DTCP. Approvals record
Development form and countThe filed approval is for a plotted layout of 14 plots. No building, tower, floor, or apartment count is disclosed for this plotted project. Layout record
Approved built-up areaThe RERA record lists 3,263.82 sq. m as approved built-up area; the layout is a plotted development and the supplied information does not describe this as a building-by-building or saleable-area figure. RERA filing
Mortgage areaRERA records 508.90 sq. m as mortgage area. The layout approval identifies Plots 1 and 8, mortgaged to the Municipality/Municipal Corporation pending development conditions. RERA filing

Offering and status

ItemProject record
OfferingPlots in a 14-plot tentative layout. The supplied drawing-derived schedule reports plot sizes for all 14 plots; see section 4. Layout record
Completion dateThe promoter’s Form-B declaration undertakes completion by 29 May 2025; the RERA header gives the same proposed completion date. This is the declared completion deadline, not a statement that completion or an occupancy/completion certificate was achieved. RERA record
Construction / development stageRERA completeness is recorded as 80%; amenity records mark roads/footpaths, water supply, sewerage, storm-water drains and green strip/tot lot/park as 80%. These are filed progress figures, not independent site verification. RERA record RERA amenities
Occupancy / completion certificateNot disclosed in the supplied project documents. For a plotted layout, the available record is a tentative layout approval; no final layout release or completion certificate is provided here. Document index

2. The project story

RK GOLDEN CITY is registered with TG-RERA as a plotted development in Kodad, Suryapet District. Its filed tentative layout approval provides for 14 plots, internal roads, park/open space, a social-infrastructure site and a utilities site. The approval places responsibility for layout infrastructure and development works on the applicant.

The RERA record identifies the land as Kodad/Kodada Revenue Village, Kodad Mandal, Suryapet District, and records 4,494.35 sq. m as both total and net area. The project’s registration certificate and layout approval list survey numbers; the full RERA-header list, including repeated and unusually joined entries, is reproduced above rather than silently normalized. RERA record RERA filing

The promoter undertook completion by 29 May 2025. RERA records 80% completeness, and several layout infrastructure items also carry 80% progress entries; these are reported filing figures, not an independent inspection or confirmation of completed works. The supplied record does not establish a final layout release, completion certificate, or occupancy certificate. RERA record RERA amenities Document index

3. Master plan, architecture & building design

The principal plan evidence is the Municipality/Municipal Corporation’s tentative layout approval, LP No. 0007/LO/3046/2023, dated 29 May 2023. It shows a plotted layout, not an apartment or tower scheme. No building footprints, floor configuration, tower heights, flats per floor, lifts, stairs, or basement/podium parking levels are supplied. Approvals record

The approval document’s area statement allocates the stated layout extent among plots (72.62%), roads (14.81%), park/open space (9.05%), social infrastructure (2.5%) and utilities (1.02%). It identifies plots 1 and 8, totaling 0 Acer 5.03 Gts / 609 Sq. Yds, as mortgage area—recorded as 15.55% of plotted area—in favour of the Municipality/Municipal Corporation. The approval describes this as a condition intended to secure completion of layout infrastructure.

A separate software reading of the approved layout drawing reports a net layout area of 4,494.35 sq. m and land-use areas of plots 3,263.82 sq. m, roads 665.55 sq. m, parks/open space 406.74 sq. m, utilities 45.88 sq. m, and social infrastructure 112.36 sq. m; amenities are listed as 0 sq. m. These are drawing-derived measurements, not separate RERA unit-area disclosures. The RERA record lists approved built-up area as 3,263.82 sq. m; it does not provide a building schedule or clarify that area as residential building gross area. Layout record RERA filing

The plan also reserves open space, utilities and roads to be handed over to the Municipality/Municipal Corporation by registered gift deed before release of the tentative layout. The approval’s stated infrastructure works include road formation with black top, storm-water drains, underground drainage, common septic tank/STP, internal water-supply pipelines, overhead tank, electrical supply lines, street lights, transformer, avenue plantation, park development and rainwater-harvesting pits. These are approval conditions/provisions, not confirmation that the works have been completed.

4. Homes, configurations & floor plans

The offering is plots, not homes with apartment configurations. The software-read plot schedule reports 14 plots, with sizes from 198.27 sq. m (237.1 sq. yd) to 310.63 sq. m (371.5 sq. yd); median size is 222.87 sq. m (266.6 sq. yd). These are drawing-derived readings and should be checked against the approved drawing; the RERA filing does not provide a plot-by-plot unit schedule in the supplied data. Layout record

Plot-size bandNumber of plots
200–250 sq. yd (167–209 sq. m)1
250–300 sq. yd (209–251 sq. m)12
300–400 sq. yd (251–334 sq. m)1

The drawing-derived schedule reports eight plots of 222.87 sq. m, two of 246.39 sq. m, and two of 239.59 sq. m. The supplied data does not identify the sizes of the remaining two plots in this common-size summary. No carpet area, apartment saleable area, or loading figure applies to this plotted offering. Layout record

No reliable booked/available plot count is supplied in the structured unit data. A promoter response to a TG-RERA shortfall notice lists 14 plot entries as sold or part sold, but the supplied extraction does not establish a current inventory count; another filed response lists seven plots as sold. These are promoter statements in submitted correspondence, not a verified current availability schedule.

5. Parking & vehicle circulation

This is a plotted layout. The RERA rules-data fields supplied here do not establish a sanctioned count of resident, visitor, accessible, or two-wheeler parking spaces, nor a parking allocation for individual plots. The vendor record lists open parking as 0 sq. m and covered parking as 0, but this is a vendor specification, not evidence of an approved parking schedule. Promoter website

The tentative layout approval requires road access and says roads are to be opened for accessibility to neighbouring sites. It also specifies that the applicant must not construct a compound wall or fencing around the site. No ramp, separate pedestrian route, driveway dimension, or EV-charging provision is documented.

6. Amenities, recreation & open spaces

The layout approval provides land allocations and infrastructure conditions. TG-RERA amenity progress entries mark some items at 80%; other listed items are at 0%. These figures are filing data, not independent verification of delivery.

Clubhouse / indoor
Description / sizeNo clubhouse or indoor recreation facility is identified.
Evidence sourceRERA amenities
Declared progress / verified statusNot disclosed.
Sports / recreation
Description / sizePark/open-space land: 0 Acer 4.02 Gts / 486 Sq. Yds, stated as 9.05% in the approval; software-read area 406.74 sq. m.
Evidence sourceLayout record
Declared progress / verified statusRERA lists “Green Strip/TOT LOT/Park” at 80%; independently verified completion is not supplied. RERA amenities
Landscape / open space
Description / sizePark/open-space land as above; avenue plantation and park development are among the approval’s stated works.
Declared progress / verified statusFiling progress for the green strip/tot lot/park is 80%; no independent completion verification is supplied. RERA amenities
Convenience / community
Description / sizeSocial-infrastructure land: 0 Acer 1.11 Gts / 134 Sq. Yds (2.5%); utilities land: 0 Acer 0.45 Gts / 55 Sq. Yds (1.02%). “Community Buildings” is listed without a documented facility description.
Evidence sourceRERA amenities
Declared progress / verified statusSocial-infrastructure area is approved as a land reservation; community-building progress is listed as 0%. Completion is not independently verified. RERA amenities

7. Utilities, building services & safety

The tentative approval specifies infrastructure works for the layout, including internal water-supply pipelines and an overhead tank or sump, an assured water-supply source, underground drainage with a common septic tank/STP, storm-water drains, electrical supply lines, transformer, street lighting, solid-waste-management provision and rainwater-harvesting pits. It also describes protected water supply. These are approval requirements or stated provisions; the supplied evidence does not confirm installed capacities, operational status, service connections, or completion.

RERA’s amenity progress data marks water supply, sewerage, storm-water drains and roads/footpaths at 80%; street lighting, sewage/sullage treatment and disposal, solid-waste management, rainwater harvesting and the electrical meter room/sub-station/receiving station are each listed at 0%. These are project-filed progress entries; the underlying works have not been independently verified in the supplied material. No fire-protection system, lift, accessible circulation, CCTV/security system, or backup-power specification is established for this plotted layout. RERA amenities

8. Location, access & connectivity

The project’s official revenue location is Kodad/Kodada Revenue Village, Kodad Mandal, Suryapet District, Telangana, PIN 508206. The layout approval gives the project locality as Kodada and names the Municipality/Municipal Corporation as approving authority. RERA record

The layout approval requires roads to be opened for accessibility to neighbouring sites. The only supplied measured connectivity point is the nearest sampled Outer Ring Road interchange, at an approximate distance of 146.6 km. No other approach-road, public-transport, landmark, or travel-time details are established in the supplied location data. Location record

9. Developer & development status

The registered promoter is Sri. MEDI RAMAKRISHNA AND OTEHRS; the RERA record describes the organization type as “Others” and its description as “Joint Developers.” The Form-B declaration identifies MEDI RAMAKRISHNA AND OTHERS as joint promoters and MEDI RAMA KRISHNA as an authorized signatory. It declares legal title to the proposed development land, no encumbrances, and an undertaking to complete by 29 May 2025; these are promoter declarations in the registration file. RERA filing

The registration certificate gives the promoter office as Village: Gudibanda, Mandal: Kodad, District: Suryapet, Pin: 508206. The broader address record lists 4-79/C/14/A/1, Gudibanda Road, Kodad, Kodad, Kodad, Suryapet, 508206. No separate company registration number, official website, or contact details are established in the supplied evidence. Parties record RERA filing

The project’s declared completion date was 29 May 2025. RERA completeness and several infrastructure progress entries are 80%, but the supplied documents do not establish a subsequent extension, current completion status, final layout release, or completion/occupancy certificate. RERA record RERA amenities Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01900007053, issued 04/10/2023; stated validity through 29/05/2025
Scope and what the supplied record establishesForm C for RK GOLDEN CITY; includes a separate-account condition. The supplied certificate records no extension.
Tentative layout approval
Identifier / dateLP 0007/LO/3046/2023, 29 May 2023; application 004083/LO/DTCP/3046/0013/2023
Scope and what the supplied record establishesKODADA Municipality/Municipal Corporation tentative layout approval for 14 plots at Kodada Revenue Village. It contains land-use allocations, mortgage condition and infrastructure requirements.
Mortgage deeds in favour of Municipality/Municipal Corporation
Identifier / date3880/2023 and 3881/2023, both dated 11 May 2023
Scope and what the supplied record establishesApproval record identifies Plots 1 and 8 as mortgage plots pending layout development conditions.
Form-B promoter declaration
Identifier / dateDeclaration dated “279 day of July 2023” in the extracted document
Scope and what the supplied record establishesPromoter declaration identifying project land, stating title and no encumbrances, and undertaking completion by 29 May 2025. The extracted date is reproduced as written.
Other approval-file receipts
Identifier / dateTS/10678/2023, TS/10679/2023 (15 April 2023); TS/10694/2023 (13 May 2023)
Scope and what the supplied record establishesReceipts listed in the tentative layout approval.
Layout drawing
Identifier / dateDocument 338814, two layout sheets
Scope and what the supplied record establishesSoftware extraction reports 14 plots and a drawing-based area schedule; the source itself is an approved-layout drawing, not a RERA unit-area disclosure. Layout record

No final layout release or completion/occupancy certificate is included in the supplied project records. The tentative approval states that development works are to be completed and the mortgaged land released before final layout release; full conditions remain in the approval document. Document index

Frequently asked questions

Is RK GOLDEN CITY registered with Telangana RERA?

Yes. RK GOLDEN CITY is registered with the Telangana Real Estate Regulatory Authority as P01900007053; the registration status is New Project.

Who is the developer of RK GOLDEN CITY?

The promoter named in the RERA registration is Sri. MEDI RAMAKRISHNA AND OTEHRS.

Where is RK GOLDEN CITY located?

RK GOLDEN CITY is in Kodad, Suryapet, Telangana (508206).

When will RK GOLDEN CITY be completed?

The promoter's proposed date of completion filed with RERA is 29/05/2025. This is the promoter's declaration, not a guarantee.

More projects in Kodad