Sign in

Royal Pearl Valley

ZAHED ZUBEDI AND SYED ABDUL HASEEB · Sangareddy · RERA P02500008192

ROYAL PEARL VALLEY is a residential plotted layout at Lingampally, MUNPALLY mandal, Sangareddy district, developed by registered promoters ZAHED ZUBEDI AND SYED ABDUL HASEEB. The layout approval records a total area of Ac.5-00.00 Gts; 24200.00 Sq.Yds and 67 plots; building or floor configurations are not established in the supplied project record. Its TG-RERA registration number is P02500008192, and the promoter’s Form-B declaration states a project completion period ending 29/01/2026.

01What we found

Period endedTG-RERA registration ran to 29 Jan 2026 - check its extension on TG-RERA
33documents on file - each fact links to its page
1court case on this project's land (survey 101, Lingampally)
8items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameROYAL PEARL VALLEY
Project typePlotted development / residential plot layout RERA record
Phase or registered portionNo phase designation is disclosed; registration is for the project identified as Sy.No. 101/P
TG-RERA registrationP02500008192
Registration validityCertificate states validity commencing 05/05/2024 and ending 29/01/2026, unless extended by the Authority. This is registration validity, not a confirmation that the project was completed or that an extension was granted.
Registered promoterZAHED ZUBEDI AND SYED ABDUL HASEEB RERA record
RERA status in supplied recordRegistered. Current status or any extension after the certificate’s stated end date is not established by the supplied record.

Land and geographic identity

ItemProject record
LocalityLingampally / Lingam Pally; the layout approval identifies Lingampally Gram Panchayat
Revenue villageLINGAMPALLY (also written Lingampally in the filed documents)
MandalMUNPALLY (also written Munipally in the approval documents)
DistrictSangareddy
PIN502345
Project survey number(s) filed101/P
Registered site extentRERA land details state total and net area of 20234.28 sq. m Land records. The layout approval documents describe a layout area of Ac.5-00.00 Gts; 24200.00 Sq.Yds.
Approval-documented land splitDraft layout record: buffer Ac.0-00.25 Gts; 30.25 Sq.Yds; net layout Ac.4-39.75 Gts; 24169.75 Sq.Yds; park/open space Ac.0-20.00 Gts; 2420.00 Sq.Yds (10.00%); roads Ac.1-26.42 Gts; 8036.31 Sq.Yds (33.26%); plotted area Ac.2-33.33 Gts; 13713.44 Sq.Yds (56.74%).
Boundaries in RERA land detailsEast: OTHERS LAND SY NO 100; West: SY NO 101 P; North: SY NO 101P; South: EXISTIND WIDE ROAD 60 Land records

Development identity

ItemProject record
Sanctioning authority / local authorityDT&CP approval material delegated to Lingampally Gram Panchayat
Principal layout approvalDraft Technical Layout Pattern approval, TLP. No.03/2024/HRO/H1, dated 30.01.2024. A later filed approval/release document records TLP No. 03/2024/H1RO/H1, dated 10-04-2024.
Plots in approval record67 plots
Approved built-up areaNot disclosed in the supplied evidence as a relevant project measure for this plotted layout.
Buildings / floorsNo buildings or floor configuration are established by the supplied project record.
ParkingNo project-wide parking count or parking-level provision is established by the supplied evidence.

Offering and status

ItemProject record
RERA-filed offeringResidential plotted layout; the filed layout approval records 67 plots.
Plot size range, bookings and availabilityNot established in the supplied RERA evidence.
Construction / development stageThe supplied record includes a draft layout approval and layout-development conditions, but no independently verified site-progress report or completion certification.
Promoter-declared completion deadline29/01/2026, as stated in the Form-B declaration.
Occupancy / completion certificateNo project completion certificate or occupancy certificate is identified in the supplied evidence. For a plotted layout, the supplied records do not establish completion or release of the final layout.
Registration expiry vs completionThe registration certificate states validity to 29/01/2026; the promoter’s Form-B declaration gives the same date as the project completion period. Neither item, by itself, confirms completion.

2. The project story

ROYAL PEARL VALLEY is presented in its TG-RERA record as a residential plotted layout at Lingampally village, Munpally mandal, Sangareddy district, on land identified as Sy.No. 101/P. The filed layout approval records 67 plots and allocates land among plotted area, roads, and park/open space, with a separate buffer area stated in the approval material.

The DT&CP material is described as a Draft Technical Layout Pattern approval. It requires layout development works and provides for handover of roads and open space to the Gram Panchayat and a mortgage of designated plots. The documents do not establish that all development works have been completed, that the mortgage has been released, or that a final layout release or completion certificate has been issued.

The promoter’s Form-B declaration states a project completion period ending 29/01/2026; this is a promoter declaration, not independent verification of progress or completion. No site-progress measurements or certified completion evidence are supplied here.

3. Master plan, architecture & building design

The project is a plot layout, rather than a disclosed apartment or multi-building scheme. The layout approval material identifies 67 plots and gives the following land-use allocation:

Layout componentFiled area / share
Total layout areaAc.5-00.00 Gts; 24200.00 Sq.Yds
Buffer areaAc.0-00.25 Gts; 30.25 Sq.Yds
Net layout areaAc.4-39.75 Gts; 24169.75 Sq.Yds
Plotted areaAc.2-33.33 Gts; 13713.44 Sq.Yds (56.74%)
RoadsAc.1-26.42 Gts; 8036.31 Sq.Yds (33.26%)
Park/open spaceAc.0-20.00 Gts; 2420.00 Sq.Yds (10.00%)
Mortgage area2057.00 Sq.Yds (15.00%), identified as Plot Nos. 14 to 23

The approval record describes layout development works including road formation, drains and nala channelization, greenery and avenue planting, rainwater-harvesting pits, fencing of open spaces, street lighting, electricity, sewerage disposal and protected water supply. These are approval-condition requirements; the supplied material does not establish their completed or independently inspected status.

No building footprint, building count, floor configuration, building height or apartment/common-area plan is established in the supplied project evidence. The two listed floor-plan drawings remain scans pending measurement; no drawing-based carpet measurements are available Floor plans.

4. Homes, configurations & floor plans

The RERA-filed project is a plotted layout, and the approval documents state 67 plots. The supplied record does not provide a plot-by-plot schedule, plot-size bands, unit-wise booking status, or available-plot count.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plots67 plots in layout approvalNot disclosedNot disclosedNot disclosedNot applicable / not establishedNot disclosed

Two floor-plan drawings are listed, but both are scans pending measurement; no software-measured carpet area or room dimensions can be reported Floor plans. Vendor-listed configurations and sizes are not used here as RERA-filed project offering figures.

5. Parking & vehicle circulation

The supplied project documents do not establish a sanctioned parking count, visitor or accessible parking provision, parking allocation to individual plots, or any mechanical, basement, stilt or surface parking arrangement. The layout approval calls for roads to be opened for access to neighbouring sites and describes road formation as a required layout-development work; completed road and vehicle-circulation status is not verified.

6. Amenities, recreation & open spaces

The filed layout approval includes a 10% park/open-space allocation and lists layout-development requirements. These requirements should not be read as confirmation that the facilities are complete.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / open spaceAc.0-20.00 Gts; 2420.00 Sq.Yds (10.00%)Draft layout approvalHandover to Gram Panchayat and development are required by the approval conditions; completion is not verified.
RoadsAc.1-26.42 Gts; 8036.31 Sq.Yds (33.26%)Draft layout approvalRoad formation and accessibility are specified requirements; completion is not verified.
Greenery / avenue plantingNo size or quantity statedDraft layout approvalRequired in the layout; completion is not verified.
Rainwater-harvesting pitsNo quantity or capacity statedDraft layout approvalRequired in the layout; completion is not verified.
Open-space fencingNo dimensions statedDraft layout approvalRequired by the approval material; completion is not verified.
Community buildings / recreational open-space aggregateNo size or description suppliedRERA amenity record RERA amenitiesListed without a supplied progress figure; completion is not verified.

The RERA amenity record also lists internal roads and footpaths, water supply, sewerage, storm-water drains, street lighting and water conservation/rainwater harvesting as available (“YES”), while the associated progress figures shown are 0 RERA amenities. The record does not independently establish on-site completion.

7. Utilities, building services & safety

The layout approval specifies the following works, but the supplied evidence does not verify their completed installation or operating capacity:

Water supply
Evidence in supplied recordProtected water supply system is a listed layout-development requirement. RERA amenities also list water supply as “YES” RERA amenities.
Status supported by evidenceRequired / recorded as available in the RERA amenity list; source, storage, treatment and operating capacity are not disclosed or independently verified.
Sewerage and drainage
Evidence in supplied recordSewerage disposal system, drains and nala channelization are specified; storm-water drains are listed in RERA amenities RERA amenities.
Status supported by evidenceRequired / listed; STP details, capacity, reuse and completed status are not established.
Rainwater management
Evidence in supplied recordRainwater-harvesting pits are specified in the approval; water conservation/rainwater harvesting is listed in RERA amenities RERA amenities.
Status supported by evidenceRequired / listed; quantity, capacity and completion are not established.
Electricity and lighting
Evidence in supplied recordElectricity facilities and street lighting are listed as layout works; electrical meter room/sub-station/receiving station is listed in RERA amenities RERA amenities.
Status supported by evidenceListed or required; supply arrangements, installed capacity and completion are not established.
Fire and life safety
Evidence in supplied recordFire-protection and fire-safety requirements appear in the RERA amenity list RERA amenities.
Status supported by evidenceNo system design, clearance or completed provision is established by the supplied evidence.
Waste management
Evidence in supplied recordSolid-waste management and disposal appears in the RERA amenity list RERA amenities.
Status supported by evidenceNo collection, processing or disposal details, capacity or completion status are supplied.
Security / accessibility
Evidence in supplied recordNo project-filed design or operational details are supplied.
Status supported by evidenceNot established.

8. Location, access & connectivity

The registered location is LINGAMPALLY, MUNPALLY, Sangareddy, 502345, with the layout documents identifying Lingampally Gram Panchayat. RERA land details describe the southern boundary as “EXISTIND WIDE ROAD 60” Land records. The draft layout conditions require roads to be opened for accessibility to neighbouring sites.

A supplied location record gives an approximate distance of 51.5 km to the nearest sampled Outer Ring Road interchange Location record. No public-transport route, measured distance to local services, or project-specific travel time is established in the supplied evidence.

9. Developer & development status

The registered promoters are ZAHED ZUBEDI AND SYED ABDUL HASEEB. The RERA record identifies their organisation type as “Others”; a more specific legal-entity form and corporate registration identifier are not established in the supplied evidence RERA record RERA filing.

The RERA registration certificate records the project location and registration number P02500008192. A Form-B affidavit signed by Zahed Zubedi declares legal title, states that the land is free from encumbrances, and undertakes a completion period ending 29/01/2026; these are promoter declarations. The available project record does not establish current site progress, final layout release, or completion.

10. Approvals, official records & documents

TG-RERA registration certificate
Reference / scopeP02500008192
What the supplied record establishesCertificate for ROYAL PEARL VALLEY; states validity commencing 05/05/2024 and ending 29/01/2026 unless extended.
Draft Technical Layout Pattern approval
Reference / scopeTLP. No.03/2024/HRO/H1, dated 30.01.2024; DT&CP material delegated to Lingampally Gram Panchayat
What the supplied record establishesDraft layout approval material for Sy.No. 101/P, recording 67 plots and layout conditions.
Draft layout approval / release record
Reference / scopeTLP No. 03/2024/H1RO/H1, dated 10-04-2024
What the supplied record establishesRecords a 5.00 Gts layout with 67 plots and states open space is to be handed over before final layout release.
Panchayat permission / layout material
Reference / scopeLr.Roc.No. 53/2024/HRO/H1; E. Panchayath No. 16249/177
What the supplied record establishesIncludes layout area, land-use breakdown, mortgage and gift-transfer requirements, and the statement that the permission is not proof of land title.
Filed project declaration
Reference / scopeForm-B, signed by Zahed Zubedi; declaration date stated as 10 April 2024
What the supplied record establishesPromoter-declared title, encumbrance, separate-account and completion undertakings.
Building or commencement approval
Reference / scopeNo project building approval or separate building commencement certificate is established in the supplied evidence.
What the supplied record establishesNot established for this plotted-layout profile.
Completion / occupancy certificate
Reference / scopeNo completion certificate or occupancy certificate identified in the supplied evidence.
What the supplied record establishesCompletion or final layout release is not established.

Frequently asked questions

Is ROYAL PEARL VALLEY registered with Telangana RERA?

Yes. ROYAL PEARL VALLEY is registered with the Telangana Real Estate Regulatory Authority as P02500008192; the registration status is New Project.

Who is the developer of ROYAL PEARL VALLEY?

The promoter named in the RERA registration is ZAHED ZUBEDI AND SYED ABDUL HASEEB.

Where is ROYAL PEARL VALLEY located?

ROYAL PEARL VALLEY is in LINGAM PALLY, LINGAMPALLY, MUNPALLY, Sangareddy, Telangana (502345).

When will ROYAL PEARL VALLEY be completed?

The promoter's proposed date of completion filed with RERA is 29/01/2026. This is the promoter's declaration, not a guarantee.

More projects in Lingampally