SIYORA SPARKLE CITY is a plotted development in Kondamadugu, Bibinagar mandal, Yadadri Bhuvanagiri district, developed by the registered promoter SIYORA DEVELOPERS, a partnership. The site area is 25867.56 sq.m, with a net site area of 25691.27 sq.m; the supplied records do not disclose a total plot count. The project offers plots, with no plot-wise configurations stated in the RERA records. It is registered under TG-RERA number P02000001400, with a proposed completion date of 27.08.2022.
More from Siyora Developers · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SIYORA SPARKLE CITY RERA record |
| Project type | Plotted development / plotted open layout RERA record |
| Phase or registered portion | No phase name or separate phase identifier disclosed; registration is for the project on Survey Nos. 438/P and 439/P. RERA record |
| TG-RERA registration | P02000001400 RERA record |
| Registration validity | 18/11/2019 to 27/08/2022; the supplied certificate says two years and does not show an extension. Registration validity is separate from the completion undertaking and does not establish completion or occupancy. RERA record |
| Registered promoter | SIYORA DEVELOPERS, a partnership. RERA record Corporate record |
| RERA status | New Project in the registration record. The supplied certificate’s stated validity ended on 27/08/2022; current registration status is not established by the supplied record. RERA record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality | Kondamadugu RERA record |
| Revenue village | Kondamadugu RERA record |
| Mandal | Bibinagar RERA record |
| District | Yadadri Bhuvanagiri RERA record |
| PIN | 508126 RERA record |
| Project survey numbers and subdivisions | 438/P and 439/P; the draft layout also identifies these as 438/PART and 439/PART. RERA record |
| Total site area | 25867.56 sq.m RERA filing |
| Road-affected area | 176.29 sq.m RERA filing |
| Net site area | 25691.27 sq.m RERA filing |
| Boundaries | East: SY NO 455; West: ROAD WIDTH 12; North: SY NO 439 PART 452 AND 453; South: ROAD WIDTH 9. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal approval | 000260/LO/Plg/HMDA/2019, dated 27 August, 2019; the supplied document characterises it as a draft layout Letter. Approvals record |
| Application number | 012943/GHT/LT/U6/HMDA/22062018 |
| Approved built-up area | 15082.08 sq.m is recorded as “Approved Built up Area” in the project information. It is a filed figure, not a measurement of constructed area. RERA filing |
| Buildings and floors | Not disclosed. The registration concerns a plotted layout; no building-count or floor-configuration details are supplied. RERA record Document index |
| Mortgage plots | Plots 19 to 33, stated as 15 plots, with a mortgage area of 2405.51 sq.m in favour of HMDA pending the stated development and release process. RERA filing |
| Plot counts | No RERA-filed total plot or unit count is available in the supplied project record. RERA filing Document index |
Offering and status
| Item | Record |
|---|---|
| Offered type | Plots; plot-wise RERA-filed inventory, sizes and booked/available counts are not included in the supplied data. RERA record RERA filing |
| Construction/development stage | No project progress percentage or independently verified site-progress report is supplied. The RERA header records completeness as 80%, but the basis and measurement date are not specified; it should not be treated as independently verified physical completion. RERA record |
| Completion date | Promoter’s Form B undertaking: 27.08.2022. |
| Revised completion date | Not disclosed in the supplied records. RERA record Document index |
| Occupancy/completion certificate | No occupancy or completion certificate is supplied. The project is a plotted layout; the records provided do not establish an OC for the layout or completion certification for its development works. Document index |
2. The project story
SIYORA SPARKLE CITY is registered as a plotted development at Kondamadugu village, Bibinagar mandal, on parts of Survey Nos. 438/P and 439/P. The HMDA-filed draft layout describes a net site of 25691.27 sq.m and allocates land to plots, roads, open space/park and social infrastructure. It is not a multi-storey residential scheme in the supplied registration materials. RERA record
HMDA’s draft-layout conditions describe infrastructure and development works including roads, storm-water drains, underground drainage with a common septic tank/STP, internal water-supply lines and overhead tank, electrical lines and street lighting, park development, avenue planting and rainwater-harvesting pits. These are approval conditions or prescribed development items, not evidence that the works have been completed. The records supplied contain no independent site verification of construction progress or delivered facilities.
The registration certificate and the promoter’s Form B state a completion date of 27/08/2022. No revised completion date or occupancy/completion certificate is present in the supplied evidence. The header’s 80% completeness entry does not identify a measurement method or as-of date, so it cannot confirm physical completion. RERA record
3. Master plan, architecture & building design
The project is a plotted layout, so the relevant design evidence is the layout land-use schedule rather than apartment floor plans. The filed land record gives a total site area of 25867.56 sq.m, a road-affected area of 176.29 sq.m and a net site area of 25691.27 sq.m. RERA filing
The layout drawing’s extracted area statement allocates the net layout area as follows. These are drawing-derived figures; the data notes that plot count and sizes read from the drawing require verification. Layout record
| Layout component | Area | Share of net layout area, as supplied |
|---|---|---|
| Plotted area | 15082.08 sq.m | 58.7% Layout record |
| Layout roads | 7794.84 sq.m | 30.3% Layout record |
| Park / organised open space | 2167.76 sq.m | 8.4% Layout record |
| Social infrastructure | 646.56 sq.m | 2.5% Layout record |
| Amenities area | 0.00 sq.m | 0.0% Layout record |
The layout is subject to the HMDA draft approval and its conditions. The supplied approval identifies Peri-Urban Use Zone conditions, including a maximum residential-building ground coverage of 25% of a plot and a maximum residential height of 15 metres and below. These are stated conditions for development on plots, not evidence of any building design or completed structures.
No building footprint, plot-by-plot schedule, final released layout plan, or building-level plans are available in the supplied evidence. A public HMDA approved-layout lookup was not accessible in the evidence pack, so the final layout’s release status is not independently established here. HMDA Document index
4. Homes, configurations & floor plans
This is a plotted project: the relevant offering is land plots, not apartment configurations. The supplied RERA records do not provide plot-wise RERA saleable areas, inventory counts, bookings, availability or unit-level allocation. The available floor-plan data contains no measured plans suitable for establishing plot dimensions or unit areas. RERA record RERA filing Floor plans
A third-party vendor record lists plot-size figures, but these are not RERA-filed inventory or a verified plot schedule and are therefore not presented as the project’s registered offering. The supplied layout extraction also cautions that plot count and sizes read from drawing text should be verified. Promoter website Layout record
5. Parking & vehicle circulation
The supplied records do not establish parking-space counts, visitor or accessible parking, or plot-specific parking allocations. No exclusive parking entitlement should be inferred from the layout materials. Document index
HMDA’s draft-layout conditions specify a road network and require the layout roads to be opened for access to neighbouring sites; the extracted road-width references include 12m, 18 mts and above, and 60 feet and above. The supplied evidence does not identify driveway dimensions, vehicle entry/exit arrangements, pedestrian separation, or EV facilities.
6. Amenities, recreation & open spaces
The table distinguishes layout/draft-approval requirements from facilities listed in the vendor record. Neither source establishes independent completion or delivery. RERA amenities Promoter website
| Description / size | 2167.76 sq.m; shown as 8.44% in the draft approval. |
|---|---|
| Evidence source | HMDA draft layout |
| Declared progress / verified status | Approval requirement/land allocation; completion not independently verified. |
| Description / size | 646.56 sq.m; shown as 2.52% in the draft approval. |
|---|---|
| Evidence source | HMDA draft layout |
| Declared progress / verified status | Land allocation; specific facility and completion status not established. |
| Description / size | Size and capacity not supplied. |
|---|---|
| Evidence source | Vendor-marketed listing Promoter website |
| Declared progress / verified status | Marketing claim only; not established as sanctioned or delivered in the supplied project documents. |
| Description / size | Size and capacity not supplied. |
|---|---|
| Evidence source | Vendor-marketed listing Promoter website |
| Declared progress / verified status | Marketing claim only; not established as sanctioned or delivered in the supplied project documents. |
| Description / size | Sizes and capacities not supplied. |
|---|---|
| Evidence source | Vendor-marketed listing Promoter website |
| Declared progress / verified status | Marketing claims only; completion not independently verified. |
| Description / size | Sizes and quantities not supplied. |
|---|---|
| Evidence source | Vendor-marketed listing Promoter website |
| Declared progress / verified status | Marketing claim only; completion not independently verified. |
| Description / size | Areas beyond the recorded park/open-space allocation are not supplied. |
|---|---|
| Evidence source | Vendor-marketed listing Promoter website |
| Declared progress / verified status | Marketing claims; not independently verified. |
The HMDA draft layout also requires park development and avenue plantation. These are approval conditions, not proof of completed landscaping.
7. Utilities, building services & safety
HMDA’s draft-layout conditions describe proposed layout infrastructure, including storm-water drains; underground drainage and a common septic tank/STP; internal water-supply pipelines, overhead tank and an assured water-supply source; electrical supply lines, street lights and transformer; and rainwater-harvesting pits. The conditions also refer to potable-water connectivity to a main trunk/connecting pipeline, septage treatment for layouts under 10 acres, and space for solid-waste disposal and a bio-compost unit. The evidence does not establish these items’ installation, capacity or operational status.
The RERA amenities record marks water supply, sewerage, street lighting, internal roads and footpaths, green strip/park, and water conservation/rainwater harvesting as available “YES,” but reports 0% progress for the listed items. This is a project-filed status field, not independent verification of functioning services. RERA amenities
Fire-protection requirements, energy management, electrical metering/substation facilities, and solid-waste management appear in the RERA amenities list without supplied specifications or evidence of completion. No building-level fire-safety design, lift or accessibility information is supplied; the project is registered as a plotted layout. RERA amenities Document index
8. Location, access & connectivity
The registered location is Kondamadugu village, Bibinagar mandal, Yadadri Bhuvanagiri district, Telangana, PIN 508126. The project record identifies the site in Survey Nos. 438/P and 439/P. RERA record
The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 12.4 km. This is a sampled distance, not a stated travel time. Location record
The HMDA draft layout records west and south boundary roads as “ROAD WIDTH 12” and “ROAD WIDTH 9”; these are boundary descriptions in the project record. No public-transport details or independently verified approach-road route are supplied. RERA filing
9. Developer & development status
The registered promoter is SIYORA DEVELOPERS, identified in the project record as a partnership. The supplied partnership document describes six partners; the RERA record identifies Jaipal Reddy G as authorised signatory. Corporate record Parties record
The registration certificate lists the promoter office as Village: Habsiguda, Mandal: Uppal, District: Medchal-Malkajgiri, Pin: 500039. A different project-information address is also recorded as 2ND FLOOR, KONDAMADUGU, KONDAMADUGU, Bibinagar, Yadadri Bhuvanagiri, 508126. No official website or contact details are supplied. Corporate record
The promoter’s Form B, dated 11# day of November 2019, declares a completion undertaking of 27.08.2022 and makes statements about title, encumbrances and project-fund handling. These are promoter declarations in the filed affidavit. No revised completion undertaking, project-specific progress certificate or independently verified completion record is supplied.
10. Approvals, official records & documents
| Details | Form C; project SIYORA SPARKLE CITY, registration P02000001400; validity 18/11/2019–27/08/2022; surveys 438/P, 439/P. |
|---|
| Details | Draft layout Letter 000260/LO/Plg/HMDA/2019, dated 27 August, 2019, for a plotted open layout at Kondamadugu. |
|---|
| Details | 012943/GHT/LT/U6/HMDA/22062018. |
|---|
| Details | Area schedule extracted from the layout drawing; drawing-based plot count and sizes require verification. |
|---|---|
| Evidence | Layout record |
| Details | Promoter affidavit for Siyora Sparkle City, signed by managing partner G Jaipal Reddy; includes a completion undertaking and project-fund declarations. |
|---|
| Details | Advocate’s title opinion dated 30-10-2019 for land in Survey Nos. 438 part and 439 part; detailed title matters are addressed in the Land & Title section. |
|---|
| Details | Project-filed encumbrance statements for the searched period 01-10-2007 to 06-11-2019; they do not establish a current encumbrance position. |
|---|
| Details | No occupancy or completion certificate is included in the supplied documents. |
|---|---|
| Evidence | Document index |
1. Project at a glance
Project identity
Registered project name: SIYORA SPARKLE CITY
Project type: Plotted development / plotted open layout
Phase or registered portion: No phase name or separate phase identifier disclosed; registration is for the project on Survey Nos. 438/P and 439/P.
TG-RERA registration: P02000001400
Registration validity: 18/11/2019 to 27/08/2022; the supplied certificate says two years and does not show an extension. Registration validity is separate from the completion undertaking and does not establish completion or occupancy.
Registered promoter: SIYORA DEVELOPERS, a partnership.
RERA status: New Project in the registration record. The supplied certificate’s stated validity ended on 27/08/2022; current registration status is not established by the supplied record.
Land and geographic identity
Locality: Kondamadugu
Revenue village: Kondamadugu
Mandal: Bibinagar
District: Yadadri Bhuvanagiri
PIN: 508126
Project survey numbers and subdivisions: 438/P and 439/P; the draft layout also identifies these as 438/PART and 439/PART.
Total site area: 25867.56 sq.m
Road-affected area: 176.29 sq.m
Net site area: 25691.27 sq.m
Boundaries: East: SY NO 455; West: ROAD WIDTH 12; North: SY NO 439 PART 452 AND 453; South: ROAD WIDTH 9.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal approval: 000260/LO/Plg/HMDA/2019, dated 27 August, 2019; the supplied document characterises it as a draft layout Letter.
Application number: 012943/GHT/LT/U6/HMDA/22062018
Approved built-up area: 15082.08 sq.m is recorded as “Approved Built up Area” in the project information. It is a filed figure, not a measurement of constructed area.
Buildings and floors: Not disclosed. The registration concerns a plotted layout; no building-count or floor-configuration details are supplied.
Mortgage plots: Plots 19 to 33, stated as 15 plots, with a mortgage area of 2405.51 sq.m in favour of HMDA pending the stated development and release process.
Plot counts: No RERA-filed total plot or unit count is available in the supplied project record.
Offering and status
Offered type: Plots; plot-wise RERA-filed inventory, sizes and booked/available counts are not included in the supplied data.
Construction/development stage: No project progress percentage or independently verified site-progress report is supplied. The RERA header records completeness as 80%, but the basis and measurement date are not specified; it should not be treated as independently verified physical completion.
Completion date: Promoter’s Form B undertaking: 27.08.2022.
Revised completion date: Not disclosed in the supplied records.
Occupancy/completion certificate: No occupancy or completion certificate is supplied. The project is a plotted layout; the records provided do not establish an OC for the layout or completion certification for its development works.
2. The project story
SIYORA SPARKLE CITY is registered as a plotted development at Kondamadugu village, Bibinagar mandal, on parts of Survey Nos. 438/P and 439/P. The HMDA-filed draft layout describes a net site of 25691.27 sq.m and allocates land to plots, roads, open space/park and social infrastructure. It is not a multi-storey residential scheme in the supplied registration materials.
HMDA’s draft-layout conditions describe infrastructure and development works including roads, storm-water drains, underground drainage with a common septic tank/STP, internal water-supply lines and overhead tank, electrical lines and street lighting, park development, avenue planting and rainwater-harvesting pits. These are approval conditions or prescribed development items, not evidence that the works have been completed. The records supplied contain no independent site verification of construction progress or delivered facilities.
The registration certificate and the promoter’s Form B state a completion date of 27/08/2022. No revised completion date or occupancy/completion certificate is present in the supplied evidence. The header’s 80% completeness entry does not identify a measurement method or as-of date, so it cannot confirm physical completion.
3. Master plan, architecture & building design
The project is a plotted layout, so the relevant design evidence is the layout land-use schedule rather than apartment floor plans. The filed land record gives a total site area of 25867.56 sq.m, a road-affected area of 176.29 sq.m and a net site area of 25691.27 sq.m.
The layout drawing’s extracted area statement allocates the net layout area as follows. These are drawing-derived figures; the data notes that plot count and sizes read from the drawing require verification.
| Layout component | Area | Share of net layout area, as supplied |
|---|---|---|
| Plotted area | 15082.08 sq.m | 58.7% |
| Layout roads | 7794.84 sq.m | 30.3% |
| Park / organised open space | 2167.76 sq.m | 8.4% |
| Social infrastructure | 646.56 sq.m | 2.5% |
| Amenities area | 0.00 sq.m | 0.0% |
The layout is subject to the HMDA draft approval and its conditions. The supplied approval identifies Peri-Urban Use Zone conditions, including a maximum residential-building ground coverage of 25% of a plot and a maximum residential height of 15 metres and below. These are stated conditions for development on plots, not evidence of any building design or completed structures.
No building footprint, plot-by-plot schedule, final released layout plan, or building-level plans are available in the supplied evidence. A public HMDA approved-layout lookup was not accessible in the evidence pack, so the final layout’s release status is not independently established here.
4. Homes, configurations & floor plans
This is a plotted project: the relevant offering is land plots, not apartment configurations. The supplied RERA records do not provide plot-wise RERA saleable areas, inventory counts, bookings, availability or unit-level allocation. The available floor-plan data contains no measured plans suitable for establishing plot dimensions or unit areas.
A third-party vendor record lists plot-size figures, but these are not RERA-filed inventory or a verified plot schedule and are therefore not presented as the project’s registered offering. The supplied layout extraction also cautions that plot count and sizes read from drawing text should be verified.
5. Parking & vehicle circulation
The supplied records do not establish parking-space counts, visitor or accessible parking, or plot-specific parking allocations. No exclusive parking entitlement should be inferred from the layout materials.
HMDA’s draft-layout conditions specify a road network and require the layout roads to be opened for access to neighbouring sites; the extracted road-width references include 12m, 18 mts and above, and 60 feet and above. The supplied evidence does not identify driveway dimensions, vehicle entry/exit arrangements, pedestrian separation, or EV facilities.
6. Amenities, recreation & open spaces
The table distinguishes layout/draft-approval requirements from facilities listed in the vendor record. Neither source establishes independent completion or delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / open space | 2167.76 sq.m; shown as 8.44% in the draft approval. | HMDA draft layout | Approval requirement/land allocation; completion not independently verified. |
| Social infrastructure | 646.56 sq.m; shown as 2.52% in the draft approval. | HMDA draft layout | Land allocation; specific facility and completion status not established. |
| Clubhouse | Size and capacity not supplied. | Vendor-marketed listing | Marketing claim only; not established as sanctioned or delivered in the supplied project documents. |
| Swimming pool | Size and capacity not supplied. | Vendor-marketed listing | Marketing claim only; not established as sanctioned or delivered in the supplied project documents. |
| Gym and indoor games | Sizes and capacities not supplied. | Vendor-marketed listing | Marketing claims only; completion not independently verified. |
| Children’s zones / play areas | Sizes and quantities not supplied. | Vendor-marketed listing | Marketing claim only; completion not independently verified. |
| Landscaped gardens / large green area | Areas beyond the recorded park/open-space allocation are not supplied. | Vendor-marketed listing | Marketing claims; not independently verified. |
The HMDA draft layout also requires park development and avenue plantation. These are approval conditions, not proof of completed landscaping.
7. Utilities, building services & safety
HMDA’s draft-layout conditions describe proposed layout infrastructure, including storm-water drains; underground drainage and a common septic tank/STP; internal water-supply pipelines, overhead tank and an assured water-supply source; electrical supply lines, street lights and transformer; and rainwater-harvesting pits. The conditions also refer to potable-water connectivity to a main trunk/connecting pipeline, septage treatment for layouts under 10 acres, and space for solid-waste disposal and a bio-compost unit. The evidence does not establish these items’ installation, capacity or operational status.
The RERA amenities record marks water supply, sewerage, street lighting, internal roads and footpaths, green strip/park, and water conservation/rainwater harvesting as available “YES,” but reports 0% progress for the listed items. This is a project-filed status field, not independent verification of functioning services.
Fire-protection requirements, energy management, electrical metering/substation facilities, and solid-waste management appear in the RERA amenities list without supplied specifications or evidence of completion. No building-level fire-safety design, lift or accessibility information is supplied; the project is registered as a plotted layout.
8. Location, access & connectivity
The registered location is Kondamadugu village, Bibinagar mandal, Yadadri Bhuvanagiri district, Telangana, PIN 508126. The project record identifies the site in Survey Nos. 438/P and 439/P.
The supplied location data gives the nearest sampled Outer Ring Road interchange at approximately 12.4 km. This is a sampled distance, not a stated travel time.
The HMDA draft layout records west and south boundary roads as “ROAD WIDTH 12” and “ROAD WIDTH 9”; these are boundary descriptions in the project record. No public-transport details or independently verified approach-road route are supplied.
9. Developer & development status
The registered promoter is SIYORA DEVELOPERS, identified in the project record as a partnership. The supplied partnership document describes six partners; the RERA record identifies Jaipal Reddy G as authorised signatory.
The registration certificate lists the promoter office as Village: Habsiguda, Mandal: Uppal, District: Medchal-Malkajgiri, Pin: 500039. A different project-information address is also recorded as 2ND FLOOR, KONDAMADUGU, KONDAMADUGU, Bibinagar, Yadadri Bhuvanagiri, 508126. No official website or contact details are supplied.
The promoter’s Form B, dated 11# day of November 2019, declares a completion undertaking of 27.08.2022 and makes statements about title, encumbrances and project-fund handling. These are promoter declarations in the filed affidavit. No revised completion undertaking, project-specific progress certificate or independently verified completion record is supplied.
10. Approvals, official records & documents
| Details | Form C; project SIYORA SPARKLE CITY, registration P02000001400; validity 18/11/2019–27/08/2022; surveys 438/P, 439/P. |
|---|
| Details | Draft layout Letter 000260/LO/Plg/HMDA/2019, dated 27 August, 2019, for a plotted open layout at Kondamadugu. |
|---|
| Details | 012943/GHT/LT/U6/HMDA/22062018. |
|---|
| Details | Area schedule extracted from the layout drawing; drawing-based plot count and sizes require verification. |
|---|
| Details | Promoter affidavit for Siyora Sparkle City, signed by managing partner G Jaipal Reddy; includes a completion undertaking and project-fund declarations. |
|---|
| Details | Advocate’s title opinion dated 30-10-2019 for land in Survey Nos. 438 part and 439 part; detailed title matters are addressed in the Land & Title section. |
|---|
| Details | Project-filed encumbrance statements for the searched period 01-10-2007 to 06-11-2019; they do not establish a current encumbrance position. |
|---|
| Details | No occupancy or completion certificate is included in the supplied documents. |
|---|
Frequently asked questions
Is SIYORA SPARKLE CITY registered with Telangana RERA?
Yes. SIYORA SPARKLE CITY is registered with the Telangana Real Estate Regulatory Authority as P02000001400; the registration status is New Project.
Who is the developer of SIYORA SPARKLE CITY?
The promoter named in the RERA registration is SIYORA DEVELOPERS.
Where is SIYORA SPARKLE CITY located?
SIYORA SPARKLE CITY is in KONDAMADUGU, Bibinagar, Yadadri Bhuvanagiri, Telangana (508126).
When will SIYORA SPARKLE CITY be completed?
The promoter's proposed date of completion filed with RERA is 27/08/2022. This is the promoter's declaration, not a guarantee.