Sign in

Sln County

Sri Greencover India Private Limited · Yadadri Bhuvanagiri · RERA P02000002243

SLN COUNTY is a plotted development in Ramajipet, Yadagirigutta mandal, Yadadri Bhuvanagiri district, developed by the registered promoter Sri Greencover India Private Limited. The registered site extent is 23459.627 sq mts, comprising survey subdivisions 107/P, 108/P and 109/P; the project is for plots, with no plot count or plot-size configurations disclosed. Its TG-RERA registration is P02000002243, and the proposed completion date is 01/05/2019.

01What we found

RegisteredTG-RERA
11documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Ramajipet, Yadagirigutta, Yadadri Bhuvanagiri · geocoded — approximate.

1. Project at a glance

Project identity

FieldProject record
Registered nameSLN COUNTY RERA record
Project type / registered portionPlotted development; the registration refers to survey subdivisions 107/P, 108/P and 109/P. No separate phase name or phase-wise scope is disclosed. RERA record RERA filing
TG-RERA registrationP02000002243 RERA record
Registered promoterSri Greencover India Private Limited RERA record
RERA statusThe project data describes it as “On-Going Project.” The registration certificate states issue/commencement on 30/10/2020 and an end date of 01/05/2019, with no extension recorded; the stated dates are reproduced as filed and do not establish current registration validity. RERA record

Land and geographic identity

FieldProject record
Locality / revenue villageLocality: RAMAJIPET; revenue village: Ramajipet. The registration certificate also labels the locality “Yadagirigutta.” RERA record RERA filing
Mandal / district / PINYadagirigutta mandal; Yadadri Bhuvanagiri district; PIN 508286. RERA record RERA filing
Project survey numbers and subdivisions107/P, 108/P, 109/P. The DTCP draft-layout record names parent Survey Nos. 107, 108 and 109. RERA record Land records
Registered site extentRERA land record: 23459.627 sq mts total area, 17441.95 sq mts affected in road widening/FTL of tanks/nala widening, and 6017.68 sq mts net area. RERA filing
Layout-area figure in approval recordThe DTCP document records “Total Layout Area – Ac.11.23 cents” and separately states an extent of “Ac.11.9.57Gts.”
Boundaries in RERA recordEast, north and south: agriculture lands; west: National Highway. RERA filing

Development identity

FieldProject record
Sanctioning authority / principal recordDirector of Town and Country Planning, Government of Telangana; Draft Technical Layout Pattern DTLP.No. 852/ 31 /2018 /H, dated 20-04-2018. Approvals record
Approval stage stated in documentThe record is for a draft technical layout pattern. It requires demarcation and submission for final approval; the document does not establish final layout approval.
Approved built-up areaRERA filing records 23459 sqmts as “Approved Built up Area.” No building configuration or building count is supplied. RERA filing
Sanctioned floors / parking levelsNot disclosed in the supplied project records.
Approved vs RERA-declared plot countNot disclosed.

Offering and status

FieldProject record
Unit typePlots; no plot count, plot-size range, or unit-level inventory figures are supplied. RERA record RERA filing
Booked / available countsNot disclosed in the supplied records.
Construction / completion statusRERA project data says “On-Going Project” and records proposed and revised completion dates as 01/05/2019. A separate vendor entry says “Completed,” but it is not a TG-RERA record. No independent site verification is supplied. RERA record RERA filing Promoter website
Occupancy / completion certificateNo project completion certificate or occupancy certificate is included in the supplied documents; phase/tower-specific certificate status is not established. Document index

2. The project story

SLN COUNTY is registered as a plotted development in Ramajipet village, Yadagirigutta mandal, Yadadri Bhuvanagiri district. Its registered land identity is Survey Nos. 107/P, 108/P and 109/P; the DTCP draft-layout document identifies the corresponding parent surveys as 107, 108 and 109. RERA record Land records

The project record describes land of 23459.627 sq mts, including a stated 17441.95 sq mts affected area and a 6017.68 sq mts net area. The DTCP filing describes a draft technical layout pattern, with 10.0% shown for open space and 38.47% for roads, and requires ground demarcation and submission for final approval. The supplied evidence does not include a final approved layout drawing or a plot schedule, so the plots’ arrangement, count, dimensions and availability cannot be described here. RERA filing

RERA records the project as ongoing, with completion dates of 01/05/2019. The available material does not independently verify construction progress or establish completion/occupancy certification. RERA record RERA filing Document index

3. Master plan, architecture & building design

This is a plotted layout, not a documented multi-storey residential building scheme. The RERA filing lists a built-up-area field of 23459 sqmts; the supplied evidence does not define that figure further or provide building plans, building footprints, floors, parking levels, or a building count. RERA filing Document index

The DTCP document is a draft technical layout pattern for Survey Nos. 107, 108 and 109. It records Total Layout Area – Ac.11.23 cents, Open Space (10.0%) – Ac. 1.123 cents, and Roads Area (38.47) – Ac.4.32 cents. It calls for a certificate of demarcation and submission of a demarcated plan for final approval; a final layout plan is not present in the supplied evidence.

No RERA-filed plot schedule, plot arrangement drawing, utility-land allocation, or final sanctioned layout sheet was supplied. The available material therefore does not support describing individual plot dimensions or the layout’s detailed road and open-space configuration. Document index

4. Homes, configurations & floor plans

The project is a plotted development. The supplied RERA records do not include a plot count, plot-size bands, plot-wise booking or availability figures, or RERA saleable-area figures.

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
PlotsNot disclosedNot disclosedNot disclosedNot disclosedNot applicable / not suppliedNot supplied

The supplied floor-plan data indicates two drawings in the file set: one layout sheet is pending scan and one drawing is recorded as having no flats; no carpet measurements were produced. The file describes any drawing-based measurements as software-measured and not a RERA disclosure. Floor plans

5. Parking & vehicle circulation

The project filing does not provide parking counts, parking locations or levels, visitor or accessible parking, vehicle entry/exit arrangements, internal-driveway details, or plot-wise parking allocations. A vendor record lists “Open Parking” and “Covered Parking,” but supplies no counts or allocation evidence. Promoter website Document index

The DTCP draft-layout document records a roads-area allocation of Ac.4.32 cents; it does not provide a detailed circulation plan or establish parking arrangements.

6. Amenities, recreation & open spaces

The amenity records list 14 infrastructure and common-facility items with percentage values. These are recorded as project data; the supplied materials do not identify the basis of those percentages or provide independent verification of completion.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal Roads & FootpathsSize not suppliedRERA amenitiesListed as available; 90%. Independent verification not supplied.
Water SupplySource and capacity not suppliedRERA amenitiesListed as available; 100%. Independent verification not supplied.
Sewerage (Chamber, Lines, Septic Tank, STP)Capacity and component details not suppliedRERA amenitiesListed as available; 100%. Independent verification not supplied.
Storm Water DrainsDetails not suppliedRERA amenitiesListed as available; 100%. Independent verification not supplied.
Green Strip/TOT LOT/ParkArea and facility details not suppliedRERA amenitiesListed as available; 100%. Independent verification not supplied.
Street LightingDetails not suppliedRERA amenitiesListed as available; 90%. Independent verification not supplied.
Community BuildingsUse, size and number not suppliedRERA amenitiesListed as available; 85%. Independent verification not supplied.
Treatment and Disposal of Sewage and Sullage WaterSystem and capacity not suppliedRERA amenitiesListed as available; 100%. Independent verification not supplied.
Solid Waste Management and DisposalSystem details not suppliedRERA amenitiesListed as available; 100%. Independent verification not supplied.
Water Conservation, Rain water HarvestingDetails not suppliedRERA amenitiesListed as available; 100%. Independent verification not supplied.
Energy managementDetails not suppliedRERA amenitiesListed as available; 100%. Independent verification not supplied.
Fire Protection and Fire Safety RequirementsSystem details not suppliedRERA amenitiesListed as available; 100%. Independent verification not supplied.
Electrical Meter Room, Sub-Station, Receiving StationDetails not suppliedRERA amenitiesListed as available; 100%. Independent verification not supplied.
Aggregate area of recreational Open SpaceArea not suppliedRERA amenitiesListed as available; 90%. Independent verification not supplied.

The draft-layout document specifies open space of Ac. 1.123 cents (10.0%). It does not identify specific recreation facilities or establish their delivered condition.

7. Utilities, building services & safety

The project’s RERA amenity schedule lists water supply, sewerage and sewage/sullage treatment and disposal, storm-water drains, rainwater harvesting, solid-waste management, energy management, fire protection and fire-safety requirements, and an electrical meter room/sub-station/receiving station. The schedule gives percentage values but no capacities, technical specifications, system designs, or independent completion verification. RERA amenities

The supplied records do not state water sources or storage, STP capacity or reuse arrangements, power-supply or backup capacity, fire-system specifications, emergency-access design, security/CCTV provisions, or accessibility features. These details are not established by the available evidence. RERA amenities Document index

8. Location, access & connectivity

The registered location is Ramajipet village, Yadagirigutta mandal, Yadadri Bhuvanagiri district, PIN 508286. The RERA land record describes agriculture lands to the east, north and south, and a National Highway to the west. RERA record RERA filing RERA filing

The project location record includes a cadastral-parcel centroid at 17.415275719570207, 78.35458902767974 and lists Financial District (Nanakramguda) at 1.2 km as a connectivity anchor. These are supplied location-data entries; no route, travel time, or independent distance verification is provided. Location record

9. Developer & development status

The registered promoter is Sri Greencover India Private Limited, recorded as a company. The supplied promoter record gives the address as K Anuradha, Kukatpally, RAMAJIPET, RAMAJIPET, Yadagirigutta, Yadadri Bhuvanagiri, 508286. A RERA registration-certificate field separately records the promoter office as “Village: Mandal: Serilingampally, District: Ranga Reddy, Pin: 500072.” RERA record Corporate record Parties record

The RERA filing names VENKAT GOLUGURI as authorized signatory and identifies one RERA landowner, also named VENKAT GOLUGURI, under a RevenueShare agreement. Parties record

RERA records the project as ongoing, with original and revised completion dates both 01/05/2019. The supplied evidence does not establish independently verified construction progress or a phase-wise completion/occupancy status. The separate vendor entry describing the development as completed is not used to establish RERA status. RERA record RERA filing Promoter website

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationFORM ‘C’ certificate for SLN COUNTY, registration P02000002243, issued 30/10/2020. The certificate states validity from 30/10/2020 to 01/05/2019 and records no extension.
Principal layout recordDTCP Draft Technical Layout Pattern DTLP.No. 852/ 31 /2018 /H, dated 20-04-2018, for parent Survey Nos. 107, 108 and 109 at Ramajipet. It requires demarcation and submission for final approval.
Related reference numbersReference letter Lr.Roc.No.45/2018/DTCPO/YDRB, dated 27.02.2018; proceedings number Lr.Roc..No.852/2018/H.
Promoter Form B declarationAffidavit-cum-declaration by G. Venkat Rayudu, dated “10 day of october” (year not legible in the supplied extraction). It declares legal title and that the land is free from encumbrances; this is a promoter declaration.
Completion / occupancy certificateNot present in the supplied documents. Document index

The available approval material is a draft layout-pattern record, not a final stamped layout plan. No building-plan approval, plot schedule, or completion/occupancy certificate was supplied for this overview. Document index

Frequently asked questions

Is SLN COUNTY registered with Telangana RERA?

Yes. SLN COUNTY is registered with the Telangana Real Estate Regulatory Authority as P02000002243; the registration status is On-Going Project.

Who is the developer of SLN COUNTY?

The promoter named in the RERA registration is Sri Greencover India Private Limited.

Where is SLN COUNTY located?

SLN COUNTY is in RAMAJIPET, Yadagirigutta, Yadadri Bhuvanagiri, Telangana (508286).

When will SLN COUNTY be completed?

The promoter's proposed date of completion filed with RERA is 01/05/2019. This is the promoter's declaration, not a guarantee.

More projects in Ramajipet