Sm Srinivas Nilayam
S M BUILDERS · Rangareddy · RERA P02400008712
SM SRINIVAS NILAYAM is a residential apartment project in HAFEEZPET(V), Serilingampally, Ranga Reddy. The registered promoter is S M BUILDERS, recorded as a partnership. The project is on a 554 sq. m site and comprises one residential building with 1 Stilt + 5 upper floors and 10 3BHK units. Its TG-RERA registration number is P02400008712, and the promoter’s completion undertaking is 5 April 2027.
More from S M Builders · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Project record |
|---|---|
| Registered name and type | SM SRINIVAS NILAYAM; residential apartment project. RERA record |
| Phase / registered portion | The record describes one building on the registered site; a separate phase name is not disclosed. RERA filing |
| TG-RERA registration | P02400008712. RERA record |
| Registration validity | 28 August 2024 to 5 April 2027, unless extended by the Authority. This is registration validity, not the building’s OC status. RERA record |
| Registered promoter | S M BUILDERS, recorded as a partnership. RERA filing Corporate record |
| RERA project status | Recorded as New Project. RERA filing |
Land and geographic identity
| Item | Project record |
|---|---|
| Locality / revenue village | HAFEEZPET(V); the approval documents also identify Hafeezpet Village and Deepthi Sree Nagar, Hafeezpet(V). RERA record RERA filing |
| Mandal / district / PIN | Serilingampally, Ranga Reddy, 500049. RERA record RERA filing |
| Survey number(s) | Survey No. 150; no subdivision is stated in the project identity or approval records. Land records |
| Site extent | 554 sq. m total and net site area in the RERA record and building-permit extraction. Land records |
| Boundaries | East: PLOT NOS 401 402; west: PLOT NO 404; north: NEIGHBOURS LAND; south: 18 MT WIDE EXISTING ROAD. RERA filing |
| Parcel/plot reference | Plot No. 403. |
Development identity
| Item | Project record |
|---|---|
| Sanctioning authority / principal permit | Greater Hyderabad Municipal Corporation (GHMC), building permit 5890/GHMC/SLP/2024-BP, approved 6 April 2024. Approvals record |
| Related approval reference | File No. 013414/GHMC/6588/SLP2/2023-BP. |
| Approved building form | One residential building, 1 Stilt + 5 upper floors; permit extraction records a building height of 15 (unit not stated in that field). |
| Approved area figures | Permit extraction: residential upper-floor area 1,280.55 sq. m, stilt area 240.77 sq. m, and total parking area 256.2 (unit not separately stated in the extracted field). The plan extraction separately lists total proposed built-up area 1,280.55 excluding parking and 1,536.75 including parking. These are document-extracted approval figures, not unit saleable or carpet areas. |
| Units | The approved-plan extraction lists 10 residential units; the RERA unit record lists 10 3BHK units. RERA unit table |
| Parking | Parking area is stated in the approval extraction; a sanctioned parking-space count or unit-wise allocation is not supplied. |
Offering and status
| Item | Project record |
|---|---|
| RERA-filed configuration | 3BHK, 10 units; RERA saleable area 167.22 sq. m per unit. RERA unit table RERA unit table |
| Booked / available | 0 booked / 10 available in the portal-derived unit record; it has no as-of date, so counts are indicative. RERA unit table |
| Construction / completion | A GHMC Occupancy Certificate document is on file for the building; it records completion date 7 April 2025 and approval date 27 June 2025. The RERA registration remains valid to 5 April 2027; the promoter’s Form B completion undertaking is 5 April 2027. These dates describe different records and are not interchangeable. |
| OC scope | The OC document identifies the residential building at Plot No. 403, Survey No. 150, Hafeezpet; its stated scope is one stilt floor and five upper floors. |
2. The project story
SM SRINIVAS NILAYAM is recorded with TG-RERA as a residential apartment project in Hafeezpet, Serilingampally Mandal, Ranga Reddy District. The registered site is Plot No. 403 in Survey No. 150, measuring 554 sq. m, and the approval record describes one residential building with a stilt level and five upper floors. RERA record Land records
The RERA unit record lists ten 3BHK apartments. The project file includes both a GHMC building permit and a later GHMC Occupancy Certificate for the identified building. The OC record states that the inspected building is fit for occupation and records completion on 7 April 2025; this is documentary evidence for the building and scope named in that certificate, not a separate statement that every RERA account or unit-level transaction has been completed. RERA unit table
3. Master plan, architecture & building design
The RERA-filed site is 554 sq. m. The GHMC permit describes one residential building on Plot No. 403, with 1 Stilt + 5 upper floors. Its extracted figures include 1,280.55 sq. m residential upper-floor area, 240.77 sq. m stilt area and 256.2 total parking area; the plan extraction also labels 1,536.75 as proposed built-up area including parking. The source does not provide a verified building-footprint figure. Land records
The approved plan extraction describes six floors, a building height of 15.00 MT, 10 residential units and balcony area of 56.55. It lists lift, staircase, parking, rainwater harvesting, overhead water tank, transformer space, garbage house and tot-lot. No supplied drawing-derived record establishes the number of lifts, stairs, flats on each floor, or detailed internal circulation.
The building-permit record includes requirements for a fenced tot-lot maintained as greenery, periphery planting, rainwater harvesting, transformer space and a garbage house. These are approval conditions or plan provisions; the supplied material does not independently verify their current on-site completion.
4. Homes, configurations & floor plans
- The TG-RERA unit record lists ten 3BHK apartments, all shown as available in a portal-derived count with no as-of date. The filed saleable area is 167.22 sq. m per unit. RERA unit table RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 167.22 sq. m | 96.4–97.4 sq. m; median 96.9 sq. m | 42% |
- Carpet figures are software-measured from the approved floor-plan drawing, not RERA-filed disclosures, and the measurement record says they need review. The supplied measurement covers four flat designs. The distinction matters: carpet area is the measured usable apartment area; saleable area is the RERA-recorded figure and includes the home’s share of common areas. The drawing extraction also identifies a balcony and utility area, which are excluded from its measured carpet calculation. RERA unit details Floor plans
- The extracted typical plan labels bedrooms, kitchen, living/dining, toilets, puja, balcony and utility. For one illustrated flat, the drawing measurement records a living/dining area of 35.47 sq. m, three bedroom measurements of 12.78 sq. m, 14.64 sq. m and 12.15 sq. m, and a kitchen of 6.71 sq. m. These are drawing-based software measurements, not RERA area disclosures. RERA unit details
5. Parking & vehicle circulation
The approval plan records parking provision, including 256.2 as the total parking area in the building-permit extraction and 256.20 as parking area in the plan extraction. The documents do not state a sanctioned number of car or two-wheeler spaces, visitor or accessible spaces, or a unit-wise parking allocation. A drawn or approved parking provision does not by itself establish an exclusive space allocated to a particular buyer.
The approval records require the stilt parking area to be used exclusively for vehicle parking and not partitioned or repurposed. The plan extraction specifies minimum entry/exit width of 4.5 mts and height clearance of 5 mts. No supplied record establishes a separate parking level, ramp arrangement, pedestrian separation, mechanical parking or EV charging installation at the site.
6. Amenities, recreation & open spaces
| Description / size | Tot-lot is listed in the plan; permit conditions require fencing and maintenance as greenery. No size is supplied. |
|---|---|
| Evidence source | Sanctioned-plan extraction and permit conditions. |
| Declared progress / verified status | Approval condition / plan provision; no independent completion verification supplied. |
| Description / size | Plan and permit conditions refer to planting and a greenery strip around the site. No area or planting quantity is supplied. |
|---|---|
| Declared progress / verified status | Required/provided for in the approval record; on-site status not independently verified. |
| Description / size | Plan lists rainwater harvesting; building permit specifies 1 rainwater-harvesting pit. |
|---|---|
| Declared progress / verified status | Approval provision; installation not independently verified. |
| Description / size | Listed in the plan extraction. |
|---|---|
| Declared progress / verified status | Plan-listed; capacity and installed/operational status not supplied. |
| Description / size | Listed in the plan extraction. |
|---|---|
| Declared progress / verified status | Plan-listed; completion status not separately verified. |
| Description / size | Listed in the plan and building-permit conditions. |
|---|---|
| Declared progress / verified status | Approval provision; completion not independently verified. |
| Description / size | These appear in third-party vendor information only; no size or capacity is supplied. |
|---|---|
| Evidence source | Promoter website |
| Declared progress / verified status | Third-party-listed, not established by the supplied RERA or sanctioned-plan records. |
7. Utilities, building services & safety
- The approved-plan extraction lists an underground static water storage tank of 25,000 litres and a terrace tank of 25,000 litres. It also lists rainwater harvesting, a lift, staircase, transformer space and garbage house. The approval material does not state a water source, treatment capacity, STP capacity, reuse arrangement, backup-power capacity or lift capacity.
- The plan extraction lists sewerage/STP and storm-water drainage as available at 100% in the RERA amenity-progress record, and lists water supply and rainwater harvesting/water conservation at 100%. That record also shows 0% for fire protection/fire-safety requirements, electrical meter room/sub-station/receiving station, solid-waste management, street lighting, community buildings and aggregate recreational open space. These are recorded progress figures, not independent site inspections. RERA amenities
- The GHMC permit includes conditions concerning rainwater harvesting, transformer space, a garbage house, construction-worker safety, dust control, C&D waste disposal, CCTV installation and road-access ramp/vehicle-cleanliness measures. These are approval conditions; the supplied evidence does not verify that each installation or measure has been completed or is operating.
- The plan extraction refers to fire-safety requirements and EV charging infrastructure conditions, but no supplied record establishes installed systems, clearances, EV chargers, accessibility features or a completed fire-safety inspection for this project.
8. Location, access & connectivity
- The project is registered at HAFEEZPET(V), Serilingampally Mandal, Ranga Reddy District, PIN 500049, at Plot No. 403 in Survey No. 150. The approval material names Deepthi Sree Nagar, Hafeezpet(V) and identifies an 18 MT wide existing road along the south boundary. RERA record RERA filing
- A supplied location record places the cadastral parcel centroid at 17.41528, 78.35459 and lists the Financial District (Nanakramguda) at 1.2 km as an anchor. No additional measured distances or public-transport details are supplied. Location record
9. Developer & development status
- The TG-RERA registered promoter is S M BUILDERS, recorded as a partnership, with GSTIN 36ADJFS6957J1ZB. The supplied project record names Raavi Vasu as an authorised signatory and Raavi Madhavi as a partner. The registered-office details and official promoter contact or website are not sufficiently established in the supplied project identity material. RERA filing Corporate record Parties record
- In its Form B declaration, the promoter’s authorised signatory, Raavi Vasu, declared title to the project land, stated that the land was free from encumbrances, and undertook completion by 05/04/2027. These are promoter declarations in the filed affidavit, not independent findings.
- The RERA record contains a GHMC Occupancy Certificate for the named building at Plot No. 403, Survey No. 150. The certificate records a completion date of 07/04/2025 and approval date of 27/06/2025. The supplied records do not provide a separate current construction-progress report or independent site inspection.
10. Approvals, official records & documents
| Identifier / date | P02400008712; valid 28/08/2024–05/04/2027 |
|---|---|
| What it evidences | Registration of SM SRINIVAS NILAYAM with S M Builders as promoter; identifies Survey No. 150 and registration conditions. |
| Identifier / date | 5890/GHMC/SLP/2024-BP; 06 April 2024; file 013414/GHMC/6588/SLP2/2023-BP |
|---|---|
| What it evidences | Conditional building permission for a residential building at Plot No. 403 on a 554 sq. m site, described as 1 Stilt + 5 upper floors. |
| Identifier / date | LTP licence TS/072460/2023; plan sheet 1 / 1 |
|---|---|
| What it evidences | Plan extraction for the proposed stilt and first-to-fifth-floor residential building at Plot No. 403, Survey No. 150; includes plan parameters and conditions. |
| Identifier / date | 000241/GHMC/00218/SWOC/SLP2/2025; approved 27/06/2025; proceedings 000241/GHMC/00218/SWOC/SLP2/2025 |
|---|---|
| What it evidences | Occupancy certificate record for the residential building at Plot No. 403, Survey No. 150, Hafeezpet; records completion date 07/04/2025. |
| Identifier / date | Declaration dated 10 August 2024 (as extracted) |
|---|---|
| What it evidences | Promoter declaration and completion undertaking for the project. |
The supplied records also list layout reference LP/1139/96 in the building-permit extraction. The materials provided here do not include a separate layout-approval certificate or an independently verified public layout-portal result. HMDA
1. Project at a glance
Project identity
Registered name and type: SM SRINIVAS NILAYAM; residential apartment project.
Phase / registered portion: The record describes one building on the registered site; a separate phase name is not disclosed.
TG-RERA registration: P02400008712.
Registration validity: 28 August 2024 to 5 April 2027, unless extended by the Authority. This is registration validity, not the building’s OC status.
Registered promoter: S M BUILDERS, recorded as a partnership.
RERA project status: Recorded as New Project.
Land and geographic identity
Locality / revenue village: HAFEEZPET(V); the approval documents also identify Hafeezpet Village and Deepthi Sree Nagar, Hafeezpet(V).
Mandal / district / PIN: Serilingampally, Ranga Reddy, 500049.
Survey number(s): Survey No. 150; no subdivision is stated in the project identity or approval records.
Site extent: 554 sq. m total and net site area in the RERA record and building-permit extraction.
Boundaries: East: PLOT NOS 401 402; west: PLOT NO 404; north: NEIGHBOURS LAND; south: 18 MT WIDE EXISTING ROAD.
Parcel/plot reference: Plot No. 403.
Development identity
Sanctioning authority / principal permit: Greater Hyderabad Municipal Corporation (GHMC), building permit 5890/GHMC/SLP/2024-BP, approved 6 April 2024.
Related approval reference: File No. 013414/GHMC/6588/SLP2/2023-BP.
Approved building form: One residential building, 1 Stilt + 5 upper floors; permit extraction records a building height of 15 (unit not stated in that field).
Approved area figures: Permit extraction: residential upper-floor area 1,280.55 sq. m, stilt area 240.77 sq. m, and total parking area 256.2 (unit not separately stated in the extracted field). The plan extraction separately lists total proposed built-up area 1,280.55 excluding parking and 1,536.75 including parking. These are document-extracted approval figures, not unit saleable or carpet areas.
Units: The approved-plan extraction lists 10 residential units; the RERA unit record lists 10 3BHK units.
Parking: Parking area is stated in the approval extraction; a sanctioned parking-space count or unit-wise allocation is not supplied.
Offering and status
RERA-filed configuration: 3BHK, 10 units; RERA saleable area 167.22 sq. m per unit.
Booked / available: 0 booked / 10 available in the portal-derived unit record; it has no as-of date, so counts are indicative.
Construction / completion: A GHMC Occupancy Certificate document is on file for the building; it records completion date 7 April 2025 and approval date 27 June 2025. The RERA registration remains valid to 5 April 2027; the promoter’s Form B completion undertaking is 5 April 2027. These dates describe different records and are not interchangeable.
OC scope: The OC document identifies the residential building at Plot No. 403, Survey No. 150, Hafeezpet; its stated scope is one stilt floor and five upper floors.
2. The project story
SM SRINIVAS NILAYAM is recorded with TG-RERA as a residential apartment project in Hafeezpet, Serilingampally Mandal, Ranga Reddy District. The registered site is Plot No. 403 in Survey No. 150, measuring 554 sq. m, and the approval record describes one residential building with a stilt level and five upper floors.
The RERA unit record lists ten 3BHK apartments. The project file includes both a GHMC building permit and a later GHMC Occupancy Certificate for the identified building. The OC record states that the inspected building is fit for occupation and records completion on 7 April 2025; this is documentary evidence for the building and scope named in that certificate, not a separate statement that every RERA account or unit-level transaction has been completed.
3. Master plan, architecture & building design
The RERA-filed site is 554 sq. m. The GHMC permit describes one residential building on Plot No. 403, with 1 Stilt + 5 upper floors. Its extracted figures include 1,280.55 sq. m residential upper-floor area, 240.77 sq. m stilt area and 256.2 total parking area; the plan extraction also labels 1,536.75 as proposed built-up area including parking. The source does not provide a verified building-footprint figure.
The approved plan extraction describes six floors, a building height of 15.00 MT, 10 residential units and balcony area of 56.55. It lists lift, staircase, parking, rainwater harvesting, overhead water tank, transformer space, garbage house and tot-lot. No supplied drawing-derived record establishes the number of lifts, stairs, flats on each floor, or detailed internal circulation.
The building-permit record includes requirements for a fenced tot-lot maintained as greenery, periphery planting, rainwater harvesting, transformer space and a garbage house. These are approval conditions or plan provisions; the supplied material does not independently verify their current on-site completion.
4. Homes, configurations & floor plans
- The TG-RERA unit record lists ten 3BHK apartments, all shown as available in a portal-derived count with no as-of date. The filed saleable area is 167.22 sq. m per unit.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| 3BHK | 10 | 0 | 10 | 167.22 sq. m | 96.4–97.4 sq. m; median 96.9 sq. m | 42% |
- Carpet figures are software-measured from the approved floor-plan drawing, not RERA-filed disclosures, and the measurement record says they need review. The supplied measurement covers four flat designs. The distinction matters: carpet area is the measured usable apartment area; saleable area is the RERA-recorded figure and includes the home’s share of common areas. The drawing extraction also identifies a balcony and utility area, which are excluded from its measured carpet calculation.
- The extracted typical plan labels bedrooms, kitchen, living/dining, toilets, puja, balcony and utility. For one illustrated flat, the drawing measurement records a living/dining area of 35.47 sq. m, three bedroom measurements of 12.78 sq. m, 14.64 sq. m and 12.15 sq. m, and a kitchen of 6.71 sq. m. These are drawing-based software measurements, not RERA area disclosures.
5. Parking & vehicle circulation
The approval plan records parking provision, including 256.2 as the total parking area in the building-permit extraction and 256.20 as parking area in the plan extraction. The documents do not state a sanctioned number of car or two-wheeler spaces, visitor or accessible spaces, or a unit-wise parking allocation. A drawn or approved parking provision does not by itself establish an exclusive space allocated to a particular buyer.
The approval records require the stilt parking area to be used exclusively for vehicle parking and not partitioned or repurposed. The plan extraction specifies minimum entry/exit width of 4.5 mts and height clearance of 5 mts. No supplied record establishes a separate parking level, ramp arrangement, pedestrian separation, mechanical parking or EV charging installation at the site.
6. Amenities, recreation & open spaces
| Description / size | Tot-lot is listed in the plan; permit conditions require fencing and maintenance as greenery. No size is supplied. |
|---|---|
| Evidence source | Sanctioned-plan extraction and permit conditions. |
| Declared progress / verified status | Approval condition / plan provision; no independent completion verification supplied. |
| Description / size | Plan and permit conditions refer to planting and a greenery strip around the site. No area or planting quantity is supplied. |
|---|---|
| Declared progress / verified status | Required/provided for in the approval record; on-site status not independently verified. |
| Description / size | Plan lists rainwater harvesting; building permit specifies 1 rainwater-harvesting pit. |
|---|---|
| Declared progress / verified status | Approval provision; installation not independently verified. |
| Description / size | Listed in the plan extraction. |
|---|---|
| Declared progress / verified status | Plan-listed; capacity and installed/operational status not supplied. |
| Description / size | Listed in the plan extraction. |
|---|---|
| Declared progress / verified status | Plan-listed; completion status not separately verified. |
| Description / size | Listed in the plan and building-permit conditions. |
|---|---|
| Declared progress / verified status | Approval provision; completion not independently verified. |
| Description / size | These appear in third-party vendor information only; no size or capacity is supplied. |
|---|---|
| Declared progress / verified status | Third-party-listed, not established by the supplied RERA or sanctioned-plan records. |
7. Utilities, building services & safety
- The approved-plan extraction lists an underground static water storage tank of 25,000 litres and a terrace tank of 25,000 litres. It also lists rainwater harvesting, a lift, staircase, transformer space and garbage house. The approval material does not state a water source, treatment capacity, STP capacity, reuse arrangement, backup-power capacity or lift capacity.
- The plan extraction lists sewerage/STP and storm-water drainage as available at 100% in the RERA amenity-progress record, and lists water supply and rainwater harvesting/water conservation at 100%. That record also shows 0% for fire protection/fire-safety requirements, electrical meter room/sub-station/receiving station, solid-waste management, street lighting, community buildings and aggregate recreational open space. These are recorded progress figures, not independent site inspections.
- The GHMC permit includes conditions concerning rainwater harvesting, transformer space, a garbage house, construction-worker safety, dust control, C&D waste disposal, CCTV installation and road-access ramp/vehicle-cleanliness measures. These are approval conditions; the supplied evidence does not verify that each installation or measure has been completed or is operating.
- The plan extraction refers to fire-safety requirements and EV charging infrastructure conditions, but no supplied record establishes installed systems, clearances, EV chargers, accessibility features or a completed fire-safety inspection for this project.
8. Location, access & connectivity
- The project is registered at HAFEEZPET(V), Serilingampally Mandal, Ranga Reddy District, PIN 500049, at Plot No. 403 in Survey No. 150. The approval material names Deepthi Sree Nagar, Hafeezpet(V) and identifies an 18 MT wide existing road along the south boundary.
- A supplied location record places the cadastral parcel centroid at 17.41528, 78.35459 and lists the Financial District (Nanakramguda) at 1.2 km as an anchor. No additional measured distances or public-transport details are supplied.
9. Developer & development status
- The TG-RERA registered promoter is S M BUILDERS, recorded as a partnership, with GSTIN 36ADJFS6957J1ZB. The supplied project record names Raavi Vasu as an authorised signatory and Raavi Madhavi as a partner. The registered-office details and official promoter contact or website are not sufficiently established in the supplied project identity material.
- In its Form B declaration, the promoter’s authorised signatory, Raavi Vasu, declared title to the project land, stated that the land was free from encumbrances, and undertook completion by 05/04/2027. These are promoter declarations in the filed affidavit, not independent findings.
- The RERA record contains a GHMC Occupancy Certificate for the named building at Plot No. 403, Survey No. 150. The certificate records a completion date of 07/04/2025 and approval date of 27/06/2025. The supplied records do not provide a separate current construction-progress report or independent site inspection.
10. Approvals, official records & documents
| Identifier / date | P02400008712; valid 28/08/2024–05/04/2027 |
|---|---|
| What it evidences | Registration of SM SRINIVAS NILAYAM with S M Builders as promoter; identifies Survey No. 150 and registration conditions. |
| Identifier / date | 5890/GHMC/SLP/2024-BP; 06 April 2024; file 013414/GHMC/6588/SLP2/2023-BP |
|---|---|
| What it evidences | Conditional building permission for a residential building at Plot No. 403 on a 554 sq. m site, described as 1 Stilt + 5 upper floors. |
| Identifier / date | LTP licence TS/072460/2023; plan sheet 1 / 1 |
|---|---|
| What it evidences | Plan extraction for the proposed stilt and first-to-fifth-floor residential building at Plot No. 403, Survey No. 150; includes plan parameters and conditions. |
| Identifier / date | 000241/GHMC/00218/SWOC/SLP2/2025; approved 27/06/2025; proceedings 000241/GHMC/00218/SWOC/SLP2/2025 |
|---|---|
| What it evidences | Occupancy certificate record for the residential building at Plot No. 403, Survey No. 150, Hafeezpet; records completion date 07/04/2025. |
| Identifier / date | Declaration dated 10 August 2024 (as extracted) |
|---|---|
| What it evidences | Promoter declaration and completion undertaking for the project. |
The supplied records also list layout reference LP/1139/96 in the building-permit extraction. The materials provided here do not include a separate layout-approval certificate or an independently verified public layout-portal result.
Frequently asked questions
Is SM SRINIVAS NILAYAM registered with Telangana RERA?
Yes. SM SRINIVAS NILAYAM is registered with the Telangana Real Estate Regulatory Authority as P02400008712; the registration status is New Project.
Who is the developer of SM SRINIVAS NILAYAM?
The promoter named in the RERA registration is S M BUILDERS.
Where is SM SRINIVAS NILAYAM located?
SM SRINIVAS NILAYAM is in HAFEEZPET(V), Serilingampally, Rangareddy, Telangana (500049).
When will SM SRINIVAS NILAYAM be completed?
The promoter's proposed date of completion filed with RERA is 05/08/2027. This is the promoter's declaration, not a guarantee.
More projects in Hafeezpet