Sign in

Hanuman Nagar

BARIGELA · Kamareddy · RERA P00200007688

HANUMAN NAGAR is a plotted development in Sadasivanagar, Sadasivanagar mandal, Kamareddy district, developed by registered promoter Barigela Pedda Mallesh. The registered site extent is 5463.25 sq. m, and the layout approval documents describe 17 residential plots; building count, floors and plot configurations are not disclosed. The project is registered under TG-RERA number P00200007688, with a promoter-declared completion date of 21/11/2024.

01What we found

Period endedTG-RERA registration ran to 21 Nov 2024 - check its extension on TG-RERA
13documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameHANUMAN NAGAR RERA record
Project typePlotted development / residential-plot layout RERA record
Phase or registered portionNot separately identified; the registration covers the project land listed below.
TG-RERA registrationP00200007688 Approvals record
Registration validity6 February 2024 to 21 November 2024, as stated in the Form C certificate; this is registration validity, not a statement that the project was completed. Approvals record
Registered promoterBarigela Pedda Mallesh; the promoter’s legal entity type is not disclosed. Corporate record
RERA statusThe supplied registration record identifies the project as registered. No later extension or current registration-status record is supplied. Approvals record

Land and geographic identity

FieldRecord
Locality / revenue villageSadasivanagar (also written as Sadashivanagar in the filed approval documents) RERA record
MandalSadasivanagar RERA record
DistrictKamareddy RERA record
PIN503145 RERA record
Project survey numbers615/A4/1, 617/2/2 and 617/2/1 Land records
Registered site extent5463.25 sq. m (RERA-filed land details) RERA filing
Layout extent stated in approval proceedings6534.00 Sq Yards
Net / total areaRERA filing states net area 5463.25 sq. m and total area 5463.25 sq. m; no separate net-versus-total difference is recorded. RERA filing
Boundaries (RERA filing)North: ROAD WIDTH - 200; South: OTHERS LAND; East: OTHERS LAND; West: OTHERD LAND RERA filing

Development identity

FieldRecord
Sanctioning authorityDistrict Town and Country Planning Officer, Kamareddy (DTCP); Gram Panchayat proceedings concern release/extension of the draft layout permission. Approvals record
Principal layout approvalDraft Technical Layout Pattern Draft-TLP.No.02/2020/DTCPO/KMR, approved 10.03.2020; Gram Panchayat proceedings dated 01/12/2023 refer to TLP No. 02/2020/DTCPO/KMR. Approvals record
Layout approval status in supplied recordsThe filed material describes a draft layout and says final layout release requires outstanding conditions to be fulfilled. The January 2024 proceedings state a one-year extension, with requirements for final approval still to be fulfilled.
Approved built-up area3184.87 sq. m is reported in the RERA project fields; its application to a plotted layout is not further explained in the supplied material. RERA filing
Buildings / floorsNo building count, floor configuration or parking levels are disclosed; this is a plotted layout. RERA filing
PlotsThe approval documents describe 17 plots.
RERA mortgage area566.55 sq. m is stated in the RERA filing. RERA filing

Offering and status

FieldRecord
Purchasable productResidential plots; individual plot numbers, plot-size schedule, and saleable-size range are not established by the supplied RERA data. RERA record
Booked / available countsNot disclosed in the supplied evidence.
Construction / development stageRERA filing labels the project New Project and reports 80% completeness; the underlying measurement, scope and verification method are not supplied. This is a reported figure, not independent site verification. RERA record
Promoter-declared completion date21/11/2024 in the Form B undertaking.
Registration expiry21 November 2024; distinct from the promoter’s completion undertaking.
Occupancy / completion certificateNo occupancy certificate or project completion certificate is supplied. For a plotted layout, the approval record instead refers to release of a final layout after conditions are met. Document index

2. The project story

HANUMAN NAGAR is presented in the TG-RERA record as a residential plotted development in Sadasivanagar, Kamareddy district, covering survey numbers 615/A4/1, 617/2/2 and 617/2/1. The layout documents describe 17 residential plots, along with roads and open space; they do not provide a plot-by-plot schedule or establish which plots are currently available for purchase. RERA record Land records

The filed planning record is for a draft technical layout pattern. Gram Panchayat proceedings dated 1 December 2023 describe release of that draft pattern, while proceedings dated 24 January 2024 extend the permission and state that outstanding requirements for final layout approval remain. The RERA filing reports 80% completeness, but the supplied record does not define the measure or independently verify on-site progress. No occupancy or completion certificate is included. RERA record Document index

3. Master plan, architecture & building design

This is a plotted layout, not a multi-storey residential building in the supplied plans. The DTCP draft layout record identifies 17 plots and allocates the stated layout area as follows:

Layout componentApproval-document figure
Layout areaAc. 1.35 cents; 6534.00 Sq. Yds.
Plotted areaAc. 0.787 Cents; 3809.08 Sq. Yds. (58.30%)
Road areaAc. 0.428 Cents; 2071.52 Sq. Yds. (31.70%)
Open spaceAc. 0.135 Cents; 653.40 Sq. Yds. (10.00%)
Mortgage areaAc. 0.140 Cents; 677.60 Sq. Yds. (17.78%), as listed in the approval extraction

The documents refer to roads marked 33' ROAD WIDE, 200º WIDE N.H.44 ROAD, and 36'-6* WIDE. These are transcribed plan labels; the supplied evidence does not establish the as-built road dimensions.

The approval conditions require roads to remain accessible to neighbouring sites, prohibit a compound wall or fencing around the site, and require the open-space and road areas to be handed to the Gram Panchayat by registered gift deed before release of the final layout. The supplied records do not establish that these works or transfers have been completed. No building arrangement, floor plans, or plot-size schedule is supplied.

4. Homes, configurations & floor plans

The RERA and approval records describe a 17-plot residential layout, but do not provide plot-by-plot dimensions, plot-size bands, or booked and available plot counts. The supplied drawing register has one drawing, still marked as a scan pending measurement; no measured unit or plot areas are available. Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plots17 in the draft-layout approval recordNot disclosedNot disclosedNot disclosedNot applicable / not suppliedNot supplied

For this plotted project, apartment carpet-area and common-area-loading figures are not applicable on the evidence provided. The 17-plot count is from the layout approval document, not a record of current inventory or sales.

5. Parking & vehicle circulation

The supplied project evidence does not establish sanctioned parking-space counts, visitor or accessible parking, parking allocation to individual plots, or a separate parking area. The draft layout refers to internal roads and road access but does not provide verified as-built circulation or parking details. A plotted layout’s roads should not be treated as an allotment of exclusive parking.

6. Amenities, recreation & open spaces

The RERA amenity fields mark several layout facilities as available, but report 0% progress for each listed amenity. These are filing entries, not confirmation that facilities have been delivered or independently inspected. RERA amenities

Landscape / open space: Green Strip/TOT LOT/Park
Description / sizeRERA amenity entry; approval record specifies open space of 653.40 Sq. Yards. RERA amenities
Evidence sourceRERA amenity entry and draft layout approval RERA amenities
Declared progress / verified statusRERA entry shows 0%; completion not independently verified.
Community buildings
Description / sizeNo size or description supplied. RERA amenities
Evidence sourceRERA amenity entry RERA amenities
Declared progress / verified statusProgress shown as 0%; status not independently verified.
Sports / recreation: Aggregate area of recreational Open Space
Description / sizeNo separate size supplied; the approval document identifies 10% open space. RERA amenities
Evidence sourceRERA amenity entry and draft layout approval RERA amenities
Declared progress / verified statusProgress shown as 0%; transfer and completion not verified.
Convenience / community: Internal Roads & Footpaths
Description / sizeRERA entry marked YES; approval conditions specify road formation and access. RERA amenities
Evidence sourceRERA amenity entry and draft layout approval RERA amenities
Declared progress / verified statusProgress shown as 0%; as-built completion not verified.
Convenience / community: Street Lighting
Description / sizeRERA entry marked YES; also listed in the approval conditions. RERA amenities
Evidence sourceRERA amenity entry and draft layout approval RERA amenities
Declared progress / verified statusProgress shown as 0%; installation not independently verified.

7. Utilities, building services & safety

The RERA amenity schedule marks water supply, sewerage, storm-water drains, rainwater harvesting and an electrical meter room/sub-station/receiving station as available; each supplied amenity entry has 0% progress. The approval conditions also call for protected water supply, sewerage disposal, drains, street lighting, electricity facilities, rainwater-harvesting pits, and storm-water channelization. These are proposed or required facilities in the supplied records; no capacities, commissioning evidence or independent completion checks are provided. RERA amenities

Water
Supplied recordWater Supply marked YES; approval conditions refer to protected water supply. RERA amenities
Evidence limitationSource, storage, treatment and capacity not disclosed; progress shown as 0%.
Sewerage and drainage
Supplied recordSewerage (Chamber, Lines, Septic Tank, STP) and Storm Water Drains marked YES; approval conditions call for sewerage disposal and storm-water drains/channelization. RERA amenities
Evidence limitationSpecific system, capacity, reuse and completion status not established; progress shown as 0%.
Rainwater harvesting
Supplied recordWater Conservation, Rain water Harvesting marked YES; approval conditions refer to rainwater-harvesting pits. RERA amenities
Evidence limitationQuantity, capacity and completion not supplied; progress shown as 0%.
Electrical
Supplied recordElectrical Meter Room, Sub-Station, Receiving Station marked YES; approval conditions refer to street lighting and electricity facilities. RERA amenities
Evidence limitationSupply arrangements, backup, capacity and completed status not supplied; progress shown as 0%.
Waste management
Supplied recordSolid Waste Management and Disposal appears in the RERA amenity list, with no YES value or progress above 0%. RERA amenities
Evidence limitationFacilities and operating arrangements not disclosed.
Fire and safety
Supplied recordFire Protection and Fire Safety Requirements appears in the RERA amenity list, with no YES value or progress above 0%. RERA amenities
Evidence limitationNo project-specific fire-system details or clearance supplied.
Energy management
Supplied recordListed in the RERA amenity schedule; no YES value or progress above 0%. RERA amenities
Evidence limitationDesign and implementation details not supplied.

No building lifts, accessible circulation, CCTV, security arrangements or fire-access details are disclosed in the supplied project evidence.

8. Location, access & connectivity

The registered location is Sadasivanagar village and locality, Sadasivanagar mandal, Kamareddy district, Telangana, PIN 503145. RERA record A cadastral parcel-centroid location is supplied at 17.62056, 77.96255. Location record

The draft layout labels road widths as 33' ROAD WIDE, 200º WIDE N.H.44 ROAD, and 36'-6* WIDE; these are plan labels, not independent confirmation of completed access. The nearest sampled Outer Ring Road interchange is reported as approximately 33.1 km from the supplied location point. Location record No public-transport details, neighbourhood landmarks or other measured connectivity distances are supplied.

9. Developer & development status

The registered promoter is Barigela Pedda Mallesh. The supplied material does not identify a legal-entity type, corporate registration number, or official project website or contact details. The RERA certificate lists the promoter’s address as House No.: 14-71/4, Village: Balkonda, Mandal: BALKONDA, District: Nizamabad, Pin: 503217 State of Telangana. The promoter address is distinct from the registered project location in Sadasivanagar, Kamareddy. RERA record

In Form B, the promoter declares title to the project land, that the land is free from encumbrances, and an undertaking to complete by 21/11/2024. Those are promoter declarations, not independent findings in this overview. The RERA filing reports 80% completeness, without supplying the measurement basis or independent site verification. RERA record The supplied evidence contains no later completion-status update or occupancy/completion certificate. Document index

10. Approvals, official records & documents

RecordSupplied evidence and scope
TG-RERA registrationForm C certificate for HANUMAN NAGAR, registration P00200007688, identifying Barigela Pedda Mallesh and the project survey numbers and location. Validity is stated as 6 February 2024 to 21 November 2024.
DTCP draft layout approvalDistrict Town and Country Planning Officer, Kamareddy; Draft-TLP.No.02/2020/DTCPO/KMR, dated 10.03.2020, for a residential-plot layout in survey numbers 615/A4/1, 617/2/2 and 617/2/1.
Gram Panchayat proceedingsProceedings dated 01/12/2023 refer to release of the DTCP-approved draft technical layout pattern and 17 plots; they require handover of open space before final layout release.
Permission extension / renewalSadashivanagar Gram Panchayat proceedings dated 24/01/2024 extend permission for one year and refer to outstanding requirements for final layout approval.
Filed layout-plan documentDraft technical layout plan filed with the RERA application; it states that the layout is legally valid only on release/approval by the concerned Gram Panchayat and records mortgage conditions for development works.
Form B declarationPromoter affidavit-cum-declaration containing title, encumbrance and completion undertakings.
Occupancy / completion certificateNone supplied. The supplied layout records instead refer to a final layout release, which is not established in the materials provided. Document index

Frequently asked questions

Is HANUMAN NAGAR registered with Telangana RERA?

Yes. HANUMAN NAGAR is registered with the Telangana Real Estate Regulatory Authority as P00200007688; the registration status is New Project.

Who is the developer of HANUMAN NAGAR?

The promoter named in the RERA registration is BARIGELA.

Where is HANUMAN NAGAR located?

HANUMAN NAGAR is in SADASHIVANAGAR, Sadasivanagar, Kamareddy, Telangana (503145).

When will HANUMAN NAGAR be completed?

The promoter's proposed date of completion filed with RERA is 21/11/2024. This is the promoter's declaration, not a guarantee.

More projects in Sadasivanagar