KALYANI NIVAS is a residential plotted development at Chelpur Gram Panchayat, Chelpur village, Mulug mandal, Jayashankar district. It is being developed by KALYANI INFRA STRUCTURES AND CONSTRUCTIONS. The RERA land area is 42289.65 sq. m, and the draft-layout approval records 141 residential plots; no tower, block, floor or plot configuration is stated. The project is registered under TG-RERA **P00500005737**, issued 09/03/2023, with proposed completion on 09/06/2025.

01What we found

Period endedTG-RERA registration ran to 9 Jun 2025 - check its extension on TG-RERA
21documents on file - each fact links to its page
3court cases on this project's land (survey 30, Chelpur)
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemProject record
Registered nameKALYANI NIVAS RERA record
Project typePlotted development / residential plotted layout RERA record RERA filing
Phase / registered portionNo separate phase name is disclosed. TG-RERA registration identifies the project against survey numbers 32/B, 30/B, 30/B/A/2, 33/B/A and 30/D.
TG-RERA registrationP00500005737, issued 09/03/2023; certificate states validity from 09/03/2023 to 09/06/2025, subject to extension by the Authority.
Registered promoterKALYANI INFRA STRUCTURES AND CONSTRUCTIONS, identified as a partnership in the RERA project information. RERA record RERA filing
RERA status in supplied recordRegistration certificate records the above validity period; no extension is recorded on that certificate.

Land and geographic identity

ItemProject record
LocalityChelpur Gram Panchayat; the RERA locality field describes the site as “CHELPUR G.P, GHANPUR, MULUGU MANDAL, JAYASHANKAR BHUPALAPALLY DIST.” RERA record RERA filing
Revenue villageChelpur. RERA record Land records
MandalMulug in the project identity fields; the layout approval document describes the mandal as Ghanpur Mulugu. RERA record RERA filing
DistrictJayashankar in the project identity fields; the layout approval document gives Jayashankar Bhupalapally. RERA record RERA filing
PIN506169. RERA record
Project survey numbers and subdivisions32/B, 30/B, 30/B/A/2, 33/B/A and 30/D. The title and land records also render some subdivisions as 30/B/es/2, 30/B/e /2, 33/B/e, or 33/B/es; see Land & Title for the document-level record. RERA record Land records
Site extentRERA land details: 42289.65 sq. m total and net area. The draft-layout communication separately records Ac. 10.45 Cents; 50578.00 Sq.Yds. as the layout extent. RERA filing
Boundaries filed with RERAEast: OTHERS LAND; West: ROAD; North: OTHERS LAND; South: OTHERS LAND. RERA filing

Development identity

ItemProject record
Sanctioning authorityDirector of Town and Country Planning, Government of Telangana; the communication delegates the draft layout to Chelpur Gram Panchayat.
Principal layout approvalDraft-TLP.No.200/2022/W, dated 09-06-2022. The document is a draft technical layout approval. Approvals record
Plots and layout distribution in draft approval141 Numbers; open space: Ac. 1.045 Cents; 5057.80 Sq.Yds. (10.00%); roads: Ac. 3.125 Cents; 15125.00 Sq.Yds. (29.90%); plotted area: Ac. 6.28 Cents; 30395.20 Sq. Yds. (60.10%). The document also lists Ac. 0.964 Cents; 4665.76 Sq.Yds. as mortgage on plotted area (15.35%).
Approved built-up areaRERA project information records 25414.25 sq. m as “Approved Built up Area”; the supplied material does not specify a building configuration for this plotted layout. RERA filing
Buildings / floors / parking levelsBuilding count, floor configuration and parking-level information are not disclosed in the supplied project records. RERA filing

Offering and status

ItemProject record
OfferingResidential plots; the draft-layout approval records 141 plots. Plot-size bands, individual plot areas, and booked/available counts are not established in the supplied material. RERA filing
RERA-declared completion undertaking09/06/2025 in the project fields; the Form B declaration states 9-6-2025. RERA record
Occupancy / completion certificateThe supplied RERA-filed Form–1A identifies GWMC Occupancy Certificate 001252/FLT/GWMC/3006/0036/2025, dated 22/05/2025. The certificate’s project/phase scope is not itemised in the extracted text.
Construction stageNo independently verified site-progress measurement is supplied. The architect’s Form–1A states the project was completed in all aspects.
ParkingThe RERA record declares a mortgage area of 3901.16 sq. m; this is not a parking count. Plot-level parking provision or allocation is not disclosed. RERA filing

The project story

  • KALYANI NIVAS is registered as a residential plotted development at Chelpur Gram Panchayat, in Chelpur village, Mulug, Jayashankar district. Its project-land identity covers survey numbers 32/B, 30/B, 30/B/A/2, 33/B/A and 30/D. The RERA-filed layout communication describes a 141-plot draft layout, with land allocated among plots, roads and open space. RERA record Land records
  • The plan record is explicitly a draft technical layout pattern, subject to development conditions and later release of a final layout. It calls for infrastructure works including road formation and drainage, street lighting and electricity, sewerage disposal, protected water supply and rainwater-harvesting pits. These are approval conditions, not evidence that the works have been completed.
  • A RERA-filed architect’s Form–1A, dated 31/12/2025, states that construction work for KALYANI NIVAS was completed in all aspects and identifies a GWMC Occupancy Certificate dated 22/05/2025. The supplied extraction does not itemise which layout elements or phase/portion the certificate covers. This reported completion should therefore be read as the architect’s certification and certificate reference, not as an independently inspected site assessment.

Master plan, architecture & building design

  • This is a plotted layout, rather than a documented apartment or multi-storey building scheme. The draft-layout communication records a total layout extent of Ac. 10.45 Cents; 50578.00 Sq.Yds. and identifies 141 plots, with 10.00% open space, 29.90% roads and 60.10% plotted area. It also records 15.35% mortgage on plotted area.
  • The RERA land-details fields separately state total and net area of 42289.65 sq. m, while the RERA built-up-area field states 25414.25 sq. m as approved built-up area. The supplied records do not define the measurement basis of that built-up-area figure or provide building footprints, plot-size schedules, individual plot geometry, or a final layout drawing that can be described here. RERA filing RERA filing
  • The draft approval gives road widths of 33'-0", 40'-0" and 100'-0". It directs that roads be accessible to neighbouring sites and that open-space and roads areas be transferred to the Gram Panchayat by registered gift deed before final layout release.

Homes, configurations & floor plans

  • The project is a plotted development. The draft-layout approval records 141 plots, but no plot-by-plot area schedule, size bands, sold/unsold inventory, or booked/available counts are included in the supplied records.
  • The supplied floor-plan record contains two drawings, with both scans pending measurement; no dwelling-unit or plot measurements were derived from them. Accordingly, there are no software-measured carpet areas to report. Floor plans
ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plots141 in draft-layout approvalNot disclosedNot disclosedNot disclosedNot applicable / not measuredNot disclosed

Parking & vehicle circulation

  • The supplied RERA records do not establish a count of resident or visitor parking spaces, parking levels, accessible spaces, EV facilities, or parking-allocation arrangements. The RERA “Mortgage Area” figure of 3901.16 sq. m is not identified as parking. RERA filing
  • The draft layout gives road widths of 33'-0", 40'-0" and 100'-0", and requires roads to be opened for accessibility to neighbouring sites. These are layout-road provisions; the extracted records do not describe vehicle-entry arrangements, internal driveway design, pedestrian separation, or plot-specific parking.

Amenities, recreation & open spaces

The draft-layout approval reserves Ac. 1.045 Cents; 5057.80 Sq.Yds. (10.00%) as open space for park purpose. It requires that open space be handed over to the Gram Panchayat by registered gift deed before final layout release. The RERA amenities record marks several site-level infrastructure items as available, but supplies no completion percentages or independently verified completion evidence. RERA amenities

Open space / park
Description / sizeAc. 1.045 Cents; 5057.80 Sq.Yds. (10.00%) of draft layout
Evidence sourceDraft-layout approval
Declared progress / verified statusReserved in draft approval; handover by registered gift deed is required before final layout release. Completion/handover not verified.
Internal roads & footpaths
Description / sizeNo further description or size supplied
Evidence sourceRERA amenities RERA amenities
Declared progress / verified statusRERA amenity record says “YES”; progress 0%.
Green strip / tot lot / park
Description / sizeNo further description or size supplied
Evidence sourceRERA amenities RERA amenities
Declared progress / verified statusRERA amenity record says “YES”; progress 0%.
Community buildings
Description / sizeNo size or facilities specified
Evidence sourceRERA amenities RERA amenities
Declared progress / verified statusListed; progress 0%; availability not stated.
Storm-water drains
Description / sizeNo further description supplied
Evidence sourceRERA amenities RERA amenities; layout conditions
Declared progress / verified statusListed in RERA amenities; progress 0%. Approval conditions call for drains and nala channelisation; completion not verified.
Street lighting
Description / sizeNo quantity or specification supplied
Evidence sourceRERA amenities RERA amenities; layout conditions
Declared progress / verified statusRERA amenity record says “YES”; progress 0%.
Rainwater harvesting
Description / sizeRainwater-harvesting pits are required by the layout conditions; no quantity or capacity supplied
Evidence sourceLayout approval
Declared progress / verified statusRequired by approval condition; completed status not verified.

Utilities, building services & safety

  • The RERA amenities record lists water supply, sewerage, storm-water drains, street lighting, solid-waste management, water conservation/rainwater harvesting, energy management, fire protection, and an electrical meter room/sub-station/receiving station. Except where noted, the record gives no design specifications, capacities or completion evidence; listed items should not be taken as confirmation of installation or operation. RERA amenities
  • Water: RERA amenities record lists Water Supply: YES. The draft-layout approval requires protected water supply; source, storage, treatment and capacity are not disclosed. RERA amenities
  • Sewerage and drainage: The RERA record lists Sewerage (Chamber, Lines, Septic Tank, STP): YES and also lists storm-water drains. The draft-layout approval requires a sewerage-disposal system, drains and channelisation of nalas. No system design, capacity, or completion verification is supplied. RERA amenities
  • Rainwater harvesting: RERA amenities lists water conservation/rainwater harvesting; approval conditions require rainwater-harvesting pits. No quantity or completion verification is supplied. RERA amenities
  • Electrical: RERA amenities lists street lighting as YES and lists an electrical meter room/sub-station/receiving station. The layout approval requires street lighting and electricity facilities and shifting electrical lines along roads during layout formation. Completion and technical details are not supplied. RERA amenities
  • Waste and energy: Solid-waste management and disposal, and energy management, are listed in RERA amenities; the record provides no specifications or progress beyond 0%. RERA amenities
  • Fire and accessibility: Fire protection and fire-safety requirements are listed in RERA amenities, without supporting system details or completion evidence. Accessible spaces, ramps and accessible circulation are not disclosed. RERA amenities

Location, access & connectivity

The registered project location is Chelpur Gram Panchayat, Chelpur village, described in the RERA fields as “CHELPUR G.P, GHANPUR, MULUGU MANDAL, JAYASHANKAR BHUPALAPALLY DIST.”; the PIN is 506169. The project records place it across survey numbers 32/B, 30/B, 30/B/A/2, 33/B/A and 30/D. RERA record RERA filing

The draft-layout approval specifies internal road widths of 33'-0", 40'-0" and 100'-0", and requires the roads to be opened for access to neighbouring sites. The available location record supplies a cadastral parcel centroid of 17.41528, 78.35459 and identifies Financial District (Nanakramguda), 1.2 km as a connectivity anchor. No further public-transport or landmark details are provided. Location record

Developer & development status

  • The registered promoter is KALYANI INFRA STRUCTURES AND CONSTRUCTIONS, identified in the RERA project fields as a partnership. The supplied corporate identifier is GSTIN 36AAYFK3484GIZP. The project record names LINGAMPALLY VENKATESHWAR RAO as authorised signatory and lists him and other partners in the promoter information. RERA record RERA filing Corporate record Parties record
  • The Form B declaration by the authorised signatory undertakes project completion by 9-6-2025. The project fields give the proposed completion date as 09/06/2025. The separate TG-RERA registration certificate states its validity period as 09/03/2023 to 09/06/2025, subject to extension by the Authority. These are different records of the completion undertaking and registration validity; neither alone establishes current registration status. RERA record
  • The architect’s Form–1A, dated 31/12/2025, certifies the project as completed in all aspects and identifies a GWMC Occupancy Certificate dated 22/05/2025. No independent site-progress assessment is supplied.

Approvals, official records & documents

RecordWhat the supplied document establishes
TG-RERA registration certificateForm C grants P00500005737 to KALYANI NIVAS under section 5; certificate validity is stated as 09/03/2023–09/06/2025, subject to extension.
Draft layout approvalDraft-TLP.No.200/2022/W, dated 09-06-2022, issued by the Director of Town and Country Planning, Government of Telangana, for a residential plotted layout in the specified Chelpur survey numbers. It records 141 plots and conditions for infrastructure development, mortgage, open-space/road transfer and final layout release.
Form B declarationPromoter declaration covering title, encumbrances, fund use, audit, pending approvals and a completion undertaking of 9-6-2025.
Architect’s completion certificate / OC referenceForm–1A dated 31/12/2025 states completion in all aspects and identifies GWMC Occupancy Certificate 001252/FLT/GWMC/3006/0036/2025, dated 22/05/2025.
Title and development documents filed with RERAThe filed records include a Development Agreement-cum-Irrevocable GPA, title-search report, revenue/survey extracts, NALA conversion order and encumbrance statements. These are indexed for full examination in Land & Title. Document index
Project-plan portal recordThe RERA-filed principal layout number is TLP.No.200/2022/W. The public HMDA DPMS lookup is reported unavailable; this is not evidence of approval or refusal. Approvals record HMDA

Frequently asked questions

Is KALYANI NIVAS registered with Telangana RERA?

Yes. KALYANI NIVAS is registered with the Telangana Real Estate Regulatory Authority as P00500005737; the registration status is New Project.

Who is the developer of KALYANI NIVAS?

The promoter named in the RERA registration is KALYANI INFRA STRUCTURES AND CONSTRUCTIONS.

Where is KALYANI NIVAS located?

KALYANI NIVAS is in CHELPUR G.P , GHANPUR , MULUGU MANDAL , JAYASHANKAR BHUPALAPALLY DIST., Mulug, Jayashankar Bhupalpally, Telangana (506169).

When will KALYANI NIVAS be completed?

The promoter's proposed date of completion filed with RERA is 09/06/2025. This is the promoter's declaration, not a guarantee.