Sun City Opal
SUN CITY OPAL · Yadadri Bhuvanagiri · RERA P02000002905
SUN CITY OPAL is a plotted development in Kolanpaka, Alair Mandal, Yadadri Bhuvanagiri District. The registered promoter developing it is SUN CITY OPAL, identified as a Partnership. The project covers 306144.68 sqmts and the draft layout approval states 1029 plots, with residential plots; buildings, floors and plot-size configurations are not stated. It is registered under TG-RERA number P02000002905, with a proposed completion date of 07/11/2022.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | SUN CITY OPAL RERA record |
| Project type | Plotted development / plotted layout RERA record RERA filing |
| Phase or registered portion | Not separately identified; the registration is for the project as a whole RERA record |
| TG-RERA registration | P02000002905 RERA record |
| Registration validity | 14/05/2021 to 07/11/2022; the supplied certificate records no extension |
| Registered promoter | SUN CITY OPAL; the RERA filing identifies the organization type as Partnership RERA filing Corporate record |
| RERA status in supplied record | Certificate issued; its stated validity ended on 07/11/2022. No extension is recorded in the supplied certificate |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Kolanpaka; the layout approval identifies Kolanpaka Grampanchayat. No separate revenue-village confirmation is supplied RERA record RERA filing |
| Mandal | Alair RERA record RERA filing |
| District | Yadadri Bhuvanagiri RERA record RERA filing |
| PIN | 508101 RERA record RERA filing |
| Project survey numbers | 484, 485, 486, 508, 509 and 511 RERA record RERA filing |
| Subdivisions | Not consistently specified for the project as a whole in the registration identity; individual title instruments refer to subdivisions, including 486/e, 486A, 509/e/2, 509A/2, 509AA/2, 509A/3, 508/1 and 508/2, among others Land records |
| Registered site extent | RERA land details state 306144.68 sqmts total and net area RERA filing |
| Extent in layout approval | Ac. 75.65 cts; 366146 syds |
| Boundaries in RERA filing | East: OTHERS LAND; West: OTHERS LAND; North: OTHERS LAND; South: EXISTING 66 FEET ROAD RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning; delegated to Kolanpaka G.P. Approvals record |
| Principal layout approval | TLP.No. 242 /2020/ H, approved 7-11-2020; file number Lr.Roc.No. 14675/931/2020/H Approvals record |
| Approval status | The supplied approval is a Draft Technical Layout Pattern. Final layout release is not evidenced in the supplied documents Document index |
| Approved built-up area | 177571.71 sqmts is listed in RERA filing fields as approved built-up area; the supplied material does not explain its application to this plotted layout RERA filing |
| Plots in layout approval | 1029 plots |
| Buildings / floors / parking levels | Not applicable to a plotted layout as described in the supplied approval; no building or parking-level schedule is provided RERA filing |
Offering and status
| Field | Project record |
|---|---|
| Offering | Residential plots; plot-by-plot inventory, booked counts and available counts are not supplied RERA amenities |
| RERA-filed plot size range | Not disclosed in the supplied RERA records |
| Construction / development stage | RERA-filed amenity progress records show Internal Roads & Footpaths at 10% and Green Strip/TOT LOT/Park at 30%; other listed progress values are 0%. These are filed progress figures, not independent site verification RERA amenities |
| Original completion date | RERA project fields state 07/11/2022; the Form-B undertaking gives 6 November, 2022 RERA filing |
| Revised completion date | Not supplied |
| Occupancy / completion certificate | Not applicable to the plotted layout in the supplied record; no completion certificate for the layout is supplied. The available layout document remains draft Document index |
2. The project story
- SUN CITY OPAL is registered as a plotted-development project in Kolanpaka, Alair Mandal, Yadadri Bhuvanagiri District. Its project identity covers survey numbers 484, 485, 486, 508, 509 and 511. The Director of Town and Country Planning’s supplied document describes a draft technical layout pattern for 1029 plots over an approval-stated extent of Ac. 75.65 cts; 366146 syds. RERA record
- The approval allocates land to plotted sites, roads, open space, a buffer under an HT line, school sites and convenient shopping. It also sets out infrastructure works to be undertaken by the layout owner or developer. The approval is expressly a draft and describes further steps and works before final layout release.
- The RERA filing gives a proposed completion date of 07/11/2022, while the promoter’s Form-B declaration undertakes completion by 6 November, 2022. The supplied record does not include a revised completion timeline or independently verified current site inspection. Reported amenity progress is therefore limited to the filed percentages identified above. RERA filing RERA amenities
3. Master plan, architecture & building design
This is a land subdivision rather than a building or apartment scheme. The draft layout approval identifies 1029 plots and gives the following land-use schedule. The figures are reported as stated in the approval; the approval also describes Ac. 75.65 cts; 366146 syds as the layout area.
| Layout component | Area / allocation in supplied approval |
|---|---|
| Layout area | Ac. 75.65 cts; 366146 syds |
| Site reserved for open space (park) | Ac. 7.565 cts; 36615 syds (10%) |
| Roads area | Ac. 23.933 cts; 115836 syds (31.64%) |
| Buffer under HT line | Ac. 0.273 cts; 1321 syds (0.36%) |
| Plotted area | Ac. 43.879 cts; 212374 syds (58.00%) |
| Primary school | Ac. 1.503 cts; 7275 syds |
| Nursery school | Ac. 0.25 cts; 1210 syds |
| Convenient shopping | Ac. 0.557 cts; 2696 syds |
| Mortgage area | Ac. 6.68 cts; 32331 syds (15.25%) |
The approval requires the developer to provide roads, side drains, storm-water channelization, greenery and avenue planting, rainwater-harvesting pits, street lighting, electricity, sewerage disposal and protected water supply. These are approval conditions and proposed works, not evidence that each item has been completed.
No building footprints, floor configurations, apartment layouts or building-level design information are supplied. The floor-plan dataset reports two drawings, with none measured and two scans pending; it provides no measured home or room areas. Floor plans
4. Homes, configurations & floor plans
This project is presented in the supplied RERA records as a plotted layout. The draft layout approval states 1029 plots, but the supplied records do not provide RERA-filed plot-size bands, a plot-by-plot schedule, or booked and available counts. RERA amenities
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Residential plots | 1029 stated in draft layout approval | Not supplied | Not supplied | Not supplied | Not applicable | Not supplied |
The floor-plan record says its measurements would be software-measured from approved floor-plan drawings and are not a RERA disclosure; it also notes that two scans are pending and no areas were measured. No drawing-based carpet measurements can therefore be reported. Floor plans
5. Parking & vehicle circulation
- The supplied approval describes layout roads and requires roads to be opened for access to neighbouring sites. It does not provide a count of parking spaces, visitor or accessible parking provision, parking structures, vehicle entry arrangements, EV charging, or plot-specific parking allocations. Document index
- The approval identifies plots reserved for mortgage to Kolanpaka Gram Panchayat, including Plot Nos. 124 to 177, 528 to 583, 874 to 929 and 961 to 993, with a stated extent of Ac 6.68 Cents, or 32331 Sq. Yards. It says the mortgaged area is not for sale.
6. Amenities, recreation & open spaces
Clubhouse / indoor
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | No specific facility or size stated | RERA amenity progress record RERA amenities | 0%; no independent verification supplied |
Sports / recreation
| Description / size | Site reserved: Ac. 7.565 cts; 36615 syds (10%) |
|---|---|
| Evidence source | Draft layout approval |
| Declared progress / verified status | RERA amenity record reports Green Strip/TOT LOT/Park at 30%; not independently verified RERA amenities |
Landscape / open space
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | Approval reserves Ac. 7.565 cts; 36615 syds (10%) for open space | Draft layout approval | 30% in RERA amenity progress record; not independently verified RERA amenities |
| Greenery and avenue planting | Required as layout-development work; the approval does not state a planting quantity | Draft layout approval | Completion not independently verified |
| Open-space fencing | Required by the approval | Draft layout approval | Completion not independently verified |
Convenience / community
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Primary school site | Ac. 1.503 cts; 7275 syds | Draft layout approval | Progress not supplied |
| Nursery school site | Ac. 0.25 cts; 1210 syds | Draft layout approval | Progress not supplied |
| Convenient shopping site | Ac. 0.557 cts; 2696 syds | Draft layout approval | Progress not supplied |
The RERA amenity record also lists Internal Roads & Footpaths (10%), Water Supply (0%), Sewerage (0%), Storm Water Drains (0%), Street Lighting (0%), Treatment and Disposal of Sewage and Sullage Water (0%), Solid Waste Management and Disposal (0%), Water Conservation/Rain Water Harvesting (0%), Energy Management (0%), Fire Protection and Fire Safety Requirements (0%), Electrical Meter Room/Sub-Station/Receiving Station (0%), and Aggregate Area of Recreational Open Space (0%). These percentages are filed progress entries, not independently verified completion findings. RERA amenities
7. Utilities, building services & safety
The draft layout approval requires the developer to provide protected water supply, sewerage disposal, storm-water drainage and nala channelization, street lighting and electricity facilities, and rainwater-harvesting pits. It also requires suitable road gradients, road formation, drains and greenery. The supplied evidence does not give water sources or storage capacities, sewerage-treatment or reuse capacity, electrical capacity, backup systems, waste-management arrangements, security systems, fire systems or accessibility specifications. The approval requirements should not be read as confirmation that the works have been completed.
The RERA amenity progress record lists Water Supply, Sewerage, Storm Water Drains, Street Lighting, Water Conservation/Rain Water Harvesting and an Electrical Meter Room/Sub-Station/Receiving Station, each at 0% in that record. No independent site verification is supplied. RERA amenities
8. Location, access & connectivity
The registered project location is Kolanpaka, Alair Mandal, Yadadri Bhuvanagiri District, Telangana 508101. The layout approval describes the site as being in Kolanpaka Grampanchayat and records an existing 66 feet road along the south boundary. It requires all roads within the layout to be opened for access to neighbouring sites. RERA record RERA filing RERA filing
The supplied registered-location record does not establish measured distances to landmarks or public transport, travel times, or a detailed approach-road network. No such connectivity measures are stated here. Location record
9. Developer & development status
- The registered promoter is SUN CITY OPAL, identified in the RERA filing as a partnership. The filing names JADAPALLI NARAYANA as authorized signatory and JADAPALLI NARAYANAMMA as partner. Corporate record Parties record RERA filing
- The RERA registration certificate lists the promoter office as Village: Vikas nagar, Mandal: Saroornagar, District: Ranga Reddy, Pin: 500060. The project address fields separately give Gayatri Palace, Vikas Nagar, Kolanpaka, Alair, Yadadri Bhuvanagiri, 508101; the supplied record does not provide official contact details or an official website. Parties record
- The Form-B affidavit dated 23'd, April, 2021 records the promoter’s completion undertaking as 6" November, 2022. The RERA project fields state 07/11/2022 as the proposed completion date. No revised completion date or independently verified construction-status report is supplied. RERA filing
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA registration certificate, P02000002905 | Form “C” registration for SUN CITY OPAL, commencing 14/05/2021 and ending 07/11/2022; no extension is recorded on the supplied certificate |
| Draft Technical Layout Pattern approval, TLP.No. 242 /2020/ H | Director of Town and Country Planning approval dated 7-11-2020 for a 1029-plot layout in survey numbers 484, 485, 486, 508, 509 and 511 at Kolanpaka; the document describes draft approval and conditions before final layout release |
| Layout-plan document in the RERA filing | A layout-plan item is listed, but the supplied document record is not extracted Document index |
| Form-B affidavit | Promoter declaration dated 23'd, April, 2021, including title and encumbrance assertions and a completion undertaking |
| RERA amenity progress record | Progress percentages for listed layout infrastructure and amenities; not an independent site inspection RERA amenities |
| Completion / occupancy certificate | No such certificate is supplied for the layout Document index |
1. Project at a glance
Project identity
Registered project name: SUN CITY OPAL
Project type: Plotted development / plotted layout
Phase or registered portion: Not separately identified; the registration is for the project as a whole
TG-RERA registration: P02000002905
Registration validity: 14/05/2021 to 07/11/2022; the supplied certificate records no extension
Registered promoter: SUN CITY OPAL; the RERA filing identifies the organization type as Partnership
RERA status in supplied record: Certificate issued; its stated validity ended on 07/11/2022. No extension is recorded in the supplied certificate
Land and geographic identity
Locality / revenue village: Kolanpaka; the layout approval identifies Kolanpaka Grampanchayat. No separate revenue-village confirmation is supplied
Mandal: Alair
District: Yadadri Bhuvanagiri
PIN: 508101
Project survey numbers: 484, 485, 486, 508, 509 and 511
Subdivisions: Not consistently specified for the project as a whole in the registration identity; individual title instruments refer to subdivisions, including 486/e, 486A, 509/e/2, 509A/2, 509AA/2, 509A/3, 508/1 and 508/2, among others
Registered site extent: RERA land details state 306144.68 sqmts total and net area
Extent in layout approval: Ac. 75.65 cts; 366146 syds
Boundaries in RERA filing: East: OTHERS LAND; West: OTHERS LAND; North: OTHERS LAND; South: EXISTING 66 FEET ROAD
Development identity
Sanctioning authority: Director of Town and Country Planning; delegated to Kolanpaka G.P.
Principal layout approval: TLP.No. 242 /2020/ H, approved 7-11-2020; file number Lr.Roc.No. 14675/931/2020/H
Approval status: The supplied approval is a Draft Technical Layout Pattern. Final layout release is not evidenced in the supplied documents
Approved built-up area: 177571.71 sqmts is listed in RERA filing fields as approved built-up area; the supplied material does not explain its application to this plotted layout
Plots in layout approval: 1029 plots
Buildings / floors / parking levels: Not applicable to a plotted layout as described in the supplied approval; no building or parking-level schedule is provided
Offering and status
Offering: Residential plots; plot-by-plot inventory, booked counts and available counts are not supplied
RERA-filed plot size range: Not disclosed in the supplied RERA records
Construction / development stage: RERA-filed amenity progress records show Internal Roads & Footpaths at 10% and Green Strip/TOT LOT/Park at 30%; other listed progress values are 0%. These are filed progress figures, not independent site verification
Original completion date: RERA project fields state 07/11/2022; the Form-B undertaking gives 6 November, 2022
Revised completion date: Not supplied
Occupancy / completion certificate: Not applicable to the plotted layout in the supplied record; no completion certificate for the layout is supplied. The available layout document remains draft
2. The project story
- SUN CITY OPAL is registered as a plotted-development project in Kolanpaka, Alair Mandal, Yadadri Bhuvanagiri District. Its project identity covers survey numbers 484, 485, 486, 508, 509 and 511. The Director of Town and Country Planning’s supplied document describes a draft technical layout pattern for 1029 plots over an approval-stated extent of Ac. 75.65 cts; 366146 syds.
- The approval allocates land to plotted sites, roads, open space, a buffer under an HT line, school sites and convenient shopping. It also sets out infrastructure works to be undertaken by the layout owner or developer. The approval is expressly a draft and describes further steps and works before final layout release.
- The RERA filing gives a proposed completion date of 07/11/2022, while the promoter’s Form-B declaration undertakes completion by 6 November, 2022. The supplied record does not include a revised completion timeline or independently verified current site inspection. Reported amenity progress is therefore limited to the filed percentages identified above.
3. Master plan, architecture & building design
This is a land subdivision rather than a building or apartment scheme. The draft layout approval identifies 1029 plots and gives the following land-use schedule. The figures are reported as stated in the approval; the approval also describes Ac. 75.65 cts; 366146 syds as the layout area.
Layout area: Ac. 75.65 cts; 366146 syds
Site reserved for open space (park): Ac. 7.565 cts; 36615 syds (10%)
Roads area: Ac. 23.933 cts; 115836 syds (31.64%)
Buffer under HT line: Ac. 0.273 cts; 1321 syds (0.36%)
Plotted area: Ac. 43.879 cts; 212374 syds (58.00%)
Primary school: Ac. 1.503 cts; 7275 syds
Nursery school: Ac. 0.25 cts; 1210 syds
Convenient shopping: Ac. 0.557 cts; 2696 syds
Mortgage area: Ac. 6.68 cts; 32331 syds (15.25%)
The approval requires the developer to provide roads, side drains, storm-water channelization, greenery and avenue planting, rainwater-harvesting pits, street lighting, electricity, sewerage disposal and protected water supply. These are approval conditions and proposed works, not evidence that each item has been completed.
No building footprints, floor configurations, apartment layouts or building-level design information are supplied. The floor-plan dataset reports two drawings, with none measured and two scans pending; it provides no measured home or room areas.
4. Homes, configurations & floor plans
This project is presented in the supplied RERA records as a plotted layout. The draft layout approval states 1029 plots, but the supplied records do not provide RERA-filed plot-size bands, a plot-by-plot schedule, or booked and available counts.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading |
|---|---|---|---|---|---|---|
| Residential plots | 1029 stated in draft layout approval | Not supplied | Not supplied | Not supplied | Not applicable | Not supplied |
The floor-plan record says its measurements would be software-measured from approved floor-plan drawings and are not a RERA disclosure; it also notes that two scans are pending and no areas were measured. No drawing-based carpet measurements can therefore be reported.
5. Parking & vehicle circulation
- The supplied approval describes layout roads and requires roads to be opened for access to neighbouring sites. It does not provide a count of parking spaces, visitor or accessible parking provision, parking structures, vehicle entry arrangements, EV charging, or plot-specific parking allocations.
- The approval identifies plots reserved for mortgage to Kolanpaka Gram Panchayat, including Plot Nos. 124 to 177, 528 to 583, 874 to 929 and 961 to 993, with a stated extent of Ac 6.68 Cents, or 32331 Sq. Yards. It says the mortgaged area is not for sale.
6. Amenities, recreation & open spaces
Clubhouse / indoor
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Community buildings | No specific facility or size stated | RERA amenity progress record | 0%; no independent verification supplied |
Sports / recreation
| Description / size | Site reserved: Ac. 7.565 cts; 36615 syds (10%) |
|---|---|
| Evidence source | Draft layout approval |
| Declared progress / verified status | RERA amenity record reports Green Strip/TOT LOT/Park at 30%; not independently verified |
Landscape / open space
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Green strip / tot lot / park | Approval reserves Ac. 7.565 cts; 36615 syds (10%) for open space | Draft layout approval | 30% in RERA amenity progress record; not independently verified |
| Greenery and avenue planting | Required as layout-development work; the approval does not state a planting quantity | Draft layout approval | Completion not independently verified |
| Open-space fencing | Required by the approval | Draft layout approval | Completion not independently verified |
Convenience / community
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Primary school site | Ac. 1.503 cts; 7275 syds | Draft layout approval | Progress not supplied |
| Nursery school site | Ac. 0.25 cts; 1210 syds | Draft layout approval | Progress not supplied |
| Convenient shopping site | Ac. 0.557 cts; 2696 syds | Draft layout approval | Progress not supplied |
The RERA amenity record also lists Internal Roads & Footpaths (10%), Water Supply (0%), Sewerage (0%), Storm Water Drains (0%), Street Lighting (0%), Treatment and Disposal of Sewage and Sullage Water (0%), Solid Waste Management and Disposal (0%), Water Conservation/Rain Water Harvesting (0%), Energy Management (0%), Fire Protection and Fire Safety Requirements (0%), Electrical Meter Room/Sub-Station/Receiving Station (0%), and Aggregate Area of Recreational Open Space (0%). These percentages are filed progress entries, not independently verified completion findings.
7. Utilities, building services & safety
The draft layout approval requires the developer to provide protected water supply, sewerage disposal, storm-water drainage and nala channelization, street lighting and electricity facilities, and rainwater-harvesting pits. It also requires suitable road gradients, road formation, drains and greenery. The supplied evidence does not give water sources or storage capacities, sewerage-treatment or reuse capacity, electrical capacity, backup systems, waste-management arrangements, security systems, fire systems or accessibility specifications. The approval requirements should not be read as confirmation that the works have been completed.
The RERA amenity progress record lists Water Supply, Sewerage, Storm Water Drains, Street Lighting, Water Conservation/Rain Water Harvesting and an Electrical Meter Room/Sub-Station/Receiving Station, each at 0% in that record. No independent site verification is supplied.
8. Location, access & connectivity
The registered project location is Kolanpaka, Alair Mandal, Yadadri Bhuvanagiri District, Telangana 508101. The layout approval describes the site as being in Kolanpaka Grampanchayat and records an existing 66 feet road along the south boundary. It requires all roads within the layout to be opened for access to neighbouring sites.
The supplied registered-location record does not establish measured distances to landmarks or public transport, travel times, or a detailed approach-road network. No such connectivity measures are stated here.
9. Developer & development status
- The registered promoter is SUN CITY OPAL, identified in the RERA filing as a partnership. The filing names JADAPALLI NARAYANA as authorized signatory and JADAPALLI NARAYANAMMA as partner.
- The RERA registration certificate lists the promoter office as Village: Vikas nagar, Mandal: Saroornagar, District: Ranga Reddy, Pin: 500060. The project address fields separately give Gayatri Palace, Vikas Nagar, Kolanpaka, Alair, Yadadri Bhuvanagiri, 508101; the supplied record does not provide official contact details or an official website.
- The Form-B affidavit dated 23'd, April, 2021 records the promoter’s completion undertaking as 6" November, 2022. The RERA project fields state 07/11/2022 as the proposed completion date. No revised completion date or independently verified construction-status report is supplied.
10. Approvals, official records & documents
TG-RERA registration certificate, P02000002905: Form “C” registration for SUN CITY OPAL, commencing 14/05/2021 and ending 07/11/2022; no extension is recorded on the supplied certificate
Draft Technical Layout Pattern approval, TLP.No. 242 /2020/ H: Director of Town and Country Planning approval dated 7-11-2020 for a 1029-plot layout in survey numbers 484, 485, 486, 508, 509 and 511 at Kolanpaka; the document describes draft approval and conditions before final layout release
Layout-plan document in the RERA filing: A layout-plan item is listed, but the supplied document record is not extracted
Form-B affidavit: Promoter declaration dated 23'd, April, 2021, including title and encumbrance assertions and a completion undertaking
RERA amenity progress record: Progress percentages for listed layout infrastructure and amenities; not an independent site inspection
Completion / occupancy certificate: No such certificate is supplied for the layout
Frequently asked questions
Is SUN CITY OPAL registered with Telangana RERA?
Yes. SUN CITY OPAL is registered with the Telangana Real Estate Regulatory Authority as P02000002905; the registration status is New Project.
Who is the developer of SUN CITY OPAL?
The promoter named in the RERA registration is SUN CITY OPAL.
Where is SUN CITY OPAL located?
SUN CITY OPAL is in Kolanpaka, Alair, Yadadri Bhuvanagiri, Telangana (508101).
When will SUN CITY OPAL be completed?
The promoter's proposed date of completion filed with RERA is 07/11/2022. This is the promoter's declaration, not a guarantee.