Sign in

Vasavi Meadows- Vasavi Colony

THOTA · Yadadri Bhuvanagiri · RERA P02000007190

VASAVI MEADOWS- VASAVI COLONY is a plotted development in Raigiri Revenue Village, Bhongir Mandal, Yadadri Bhuvanagiri District, developed by registered promoter Thota Rambabu. The project has a RERA-filed site extent of 12,545.17 sq. m and a layout of 42 plots, with drawing-derived plot sizes of 136.15–231.38 sq. m (162.8–276.7 sq. yd); towers, blocks and floors are not disclosed. It is registered under TG-RERA number P02000007190, and the promoter’s declared completion date is 22nd January, 2024.

01What we found

Period endedTG-RERA registration ran to 22 Jan 2024 - check its extension on TG-RERA
14documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered nameVASAVI MEADOWS- VASAVI COLONY RERA record
Project typePlotted development RERA record RERA filing
Phase / registered portionRERA registration is for this plotted project; a separate phase designation is not disclosed. RERA record
TG-RERA registrationP02000007190, granted under section 5; registration certificate dated 27/10/2023.
Registration validity27/10/2023 to 22/01/2024; the certificate states “0 years.” This is the registration-validity period, not a statement of completion or occupancy.
Registered promoterThota Rambabu; the project Form B identifies THOTA RAMBABU, represented by authorized signatory RAMBABU THOTA.
RERA statusThe certificate records the stated validity dates. No extension record is supplied here.

Land and geographic identity

FieldRecord
Locality / revenue villageRaigiri / Raigiri Revenue Village RERA record RERA filing
MandalBhongir RERA record RERA filing
DistrictYadadri Bhuvanagiri RERA record RERA filing
PIN508116 RERA record
Project survey number and subdivision763/P RERA record Land records
RERA-filed site extent12,545.17 sq. m; the RERA land record gives total and net area as 12,545.17 sq. m. Land records RERA filing
Boundaries in RERA recordNorth: ROAD WIDTH 12 M; South: LAND IN SURVEY NO 764; East: OTHERS APPROVED LAYOUT; West: OTHERS AGRICULTURE LAND. RERA filing
Cadastral record contextA Bhu Bharati entry for survey 763/P reports a whole-survey extent of 81,107.94 sq. m; that record’s extent basis is the whole survey, not the RERA-filed project extent. Cadastral map

Development identity

FieldRecord
Sanctioning authority / approval recordDirector of Town and Country Planning; the supplied record is a communicated Draft Technical Layout Pattern, delegated to Bhongir Mpity Gram Panchayat. Approvals record
Principal file / application number3149/Raigiri Revenue/ 2020/0004 Approvals record
Approval date shown22 January, 2021 Approvals record
Layout organization42 plots, as stated in the draft technical layout record; the drawing-derived layout record also counts 42 plots. Layout record
Approved built-up area6,428.75 sq. m is reported in the RERA project fields as “Approved Built up Area”; the supplied record does not identify buildings or residential floor configuration for this plotted project. RERA filing
Mortgage area1,078.58 sq. m in the RERA project fields; the layout record identifies mortgaged plots as security for completion of layout works. RERA filing Layout record
Floors / parking levels / building countNot disclosed in the supplied project record. This is a plotted layout; no building configuration or parking-level schedule is provided. RERA filing Document index

Offering and status

FieldRecord
OfferingPlots; the supplied drawing-derived schedule covers 42 plots. RERA record Layout record
Drawing-derived plot sizes136.15–231.38 sq. m (162.8–276.7 sq. yd); software-read from the layout drawing, not a RERA-filed unit-area schedule. Layout record
Booked / available countsNot disclosed in the supplied evidence. Document index
Construction / development stageNo independent site-progress evidence is supplied. The RERA amenities record marks some layout items as 100% and others as 0%; those are filed progress fields, not an independent site inspection. RERA amenities
Completion deadlinePromoter-declared completion undertaking: 22nd January, 2024.
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The record concerns a plotted layout and does not establish an OC for any building or plot. Document index Approvals record

2. The project story

VASAVI MEADOWS- VASAVI COLONY is registered as a plotted-development project in Raigiri Revenue Village, Bhongir Mandal, Yadadri Bhuvanagiri District, on Survey No. 763/P. Its RERA-filed site extent is 12,545.17 sq. m. RERA record Land records

The project record describes a 42-plot layout. The drawing-derived land-use schedule allocates 6,428.75 sq. m to plots, 4,613.86 sq. m to roads, 1,058.40 sq. m to parks/open space, and 315.36 sq. m to social infrastructure; it lists no amenity area. The layout approval communication also identifies 128.8 sq. m of utilities area. Plot count and land-use figures are read from the layout drawing or approval record, rather than independently surveyed on site. Layout record

The promoter declared a completion date of 22 January 2024. The supplied evidence does not verify current physical completion or provide a completion/occupancy certificate. The RERA progress fields show 100% for internal roads and footpaths, sewerage, green strip/play lot/park, water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station; several other listed items are recorded at 0%. These are RERA-filed progress entries, not independently verified completion findings. RERA amenities

3. Master plan, architecture & building design

This is a plotted layout, not a documented apartment or tower scheme. The layout drawing records 42 plots and a total layout area of 12,545.17 sq. m. Its software-read schedule lists plot sizes from 136.15 to 231.38 sq. m, with 35 plots in the 150–200 sq. yd band, 5 in the 200–250 sq. yd band and 2 in the 250–300 sq. yd band. The drawing record says the plot schedule is complete and that plot-area totals match the drawing’s plotted-area statement; these are drawing-derived measurements. Layout record

Layout useAreaShare shown / computed in supplied recordEvidence
Plots6,428.75 sq. m51.24% printed on drawingLayout record
Roads4,613.86 sq. m36.78%Layout record
Parks / open space1,058.40 sq. m8.44%Layout record
Social infrastructure315.36 sq. m2.51%Layout record
Utilities128.8 sq. m1.03% in approval communication
Amenities0.00 sq. m0.00%Layout record

The RERA fields list 6,428.75 sq. m as approved built-up area, but the supplied material does not explain that figure’s application to this plotted layout or provide a building schedule. No tower/block count, floor configuration, building footprint, or apartment plan is available. The drawing-derived record comprises two layout sheets; no flat floor plans are supplied. RERA filing Floor plans Document index

The approval communication is expressly a Draft Technical Layout Pattern-Communicated and says it is not proof of title or a final layout release. It requires development works, including internal water-supply pipelines, an overhead tank, storm-water drains, electrical lines, street lights, a transformer, avenue planting, park development and rainwater harvesting. It also sets out mortgage and handover conditions for roads, open space, social infrastructure and utilities.

4. Homes, configurations & floor plans

The offering evidenced in the RERA and layout records is plots, not flats. No RERA unit-type schedule with booked/available counts or RERA-filed plot saleable areas is supplied. RERA record Document index

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Plots42 (layout drawing count)Not disclosedNot disclosedNot disclosedNot applicableNot supplied

The layout drawing’s software-read plot schedule gives sizes of 136.15–231.38 sq. m (162.8–276.7 sq. yd). These are drawing-derived plot measurements, not RERA-filed saleable-area figures. The supplied floor-plan record contains two layout sheets and no flat floor plans or measured apartment carpet areas. Layout record Floor plans

5. Parking & vehicle circulation

The supplied record does not establish parking-space counts, visitor or accessible parking, parking allocation to individual plots, or any building parking arrangement. A mortgage area of 1,078.58 sq. m is reported in the RERA fields; the layout record describes it as plots mortgaged to the approving authority until layout infrastructure works are completed, not as parking. RERA filing Layout record

The draft layout communication requires roads and other development works but does not provide a parking schedule or evidence of pedestrian/vehicle separation.

6. Amenities, recreation & open spaces

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Internal roads and footpathsLayout infrastructure; road area 4,613.86 sq. mLayout recordRERA amenities record: 100%; not independently verified RERA amenities
Park / green strip / play lotParks/open space: 1,058.40 sq. mLayout recordRERA amenities record: 100%; not independently verified RERA amenities
Social infrastructure315.36 sq. mLayout recordRERA amenities record lists community buildings at 0%; completion not established RERA amenities
Utilities area128.8 sq. mApproval communication identifies the area; completion not established
Avenue plantation / landscapingRequired in the draft layout conditions; no area or quantity statedRequired/proposed in the supplied approval communication; completion not established
Storm-water drainsRequired layout facility; no size/capacity statedRERA amenities record: 0% RERA amenities
Rainwater harvesting / water conservationRequired layout facility; no capacity statedRERA amenities record: 100%; not independently verified RERA amenities

No clubhouse or indoor recreational facility is established in the supplied project record. The drawing-derived layout schedule reports 0.00 sq. m for amenities. Layout record

7. Utilities, building services & safety

The draft technical layout communication lists internal water-supply pipelines, an overhead tank, storm-water drains, underground or common septic tank/STP, electrical supply lines, street lights, a transformer, and rainwater harvesting among the required layout facilities. It provides no capacity figures or evidence that these works are complete.

RERA’s amenities record lists sewerage (chamber, lines, septic tank, STP) at 100%, water supply and storm-water drains at 0%, street lighting at 0%, water conservation/rainwater harvesting at 100%, and electrical meter room/sub-station/receiving station at 100%. These are filed progress entries, not independent verification. The supplied evidence does not establish water source, treatment/reuse arrangements, electrical backup, fire systems, CCTV/security, accessible circulation, or service capacities. RERA amenities

8. Location, access & connectivity

The registered project location is Raigiri, PIN 508116, in Bhongir Mandal, Yadadri Bhuvanagiri District. The cadastral parcel centroid is recorded at 17.53938072415059, 78.91950414970447. The RERA-filed north boundary is a 12 m-wide road; the other stated boundaries are Survey No. 764 to the south, an approved layout to the east and agricultural land to the west. RERA record RERA filing RERA filing Cadastral map

The supplied location record identifies the nearest sampled Outer Ring Road interchange at approximately 27.3 km. No project-specific public-transport or landmark distances are supplied in the RERA evidence. Location record

9. Developer & development status

The registered promoter is Thota Rambabu. The Form B declaration identifies RAMBABU THOTA as the authorized signatory representing THOTA RAMBABU and states the promoter’s undertaking to complete the project by 22 January 2024. The legal entity type and a project-specific official website or contact details are not established in the supplied evidence. Corporate record

The RERA registration certificate records validity through 22/01/2024; the promoter’s declared completion deadline is also 22 January 2024. These are distinct records: neither establishes a completion/occupancy certificate. No extension, current site inspection, or independent construction-progress report is supplied. Document index

10. Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02000007190; issued 27/10/2023; validity to 22/01/2024
What the supplied material establishesFORM ‘C’ registration for VASAVI MEADOWS- VASAVI COLONY; includes the promoter’s obligations.
Draft technical layout communication
Identifier / dateFile/application 3149/Raigiri Revenue/ 2020/0004; dated 22 January, 2021
What the supplied material establishesDirector of Town and Country Planning communication for the proposed 42-plot layout in Survey No. 763/P; identified as draft technical layout pattern, not final layout release.
Layout drawing
Identifier / dateDocument 336391; two sheets
What the supplied material establishesDrawing-derived plot schedule and land-use information; the document extraction is not available in the supplied record. Layout record Document index
Promoter Form B declaration
Identifier / dateDated 11 August, 2023
What the supplied material establishesPromoter’s title, encumbrance, account, audit and completion-date declarations.
Legal title opinion
Identifier / dateDated 20 September, 2023
What the supplied material establishesAdvocate’s opinion on Survey No. 763/P based on supplied copies; the opinion itself notes the 60-year link-document search is incomplete.
Registered sale deed
Identifier / dateDocument 8814/2017
What the supplied material establishesSale deed cited in the title record; see Land & Title for the deed particulars and title-chain treatment.
Mortgage deed
Identifier / dateDocument 8080 of 2020
What the supplied material establishesMortgage concerning the stated 1,290 sq. yd. / 1,078.58 sq. m. layout plots, as described in the filed material.
Occupancy / completion certificate
Identifier / dateNot supplied
What the supplied material establishesNo such certificate is established by the available project documents. Document index

Frequently asked questions

Is VASAVI MEADOWS- VASAVI COLONY registered with Telangana RERA?

Yes. VASAVI MEADOWS- VASAVI COLONY is registered with the Telangana Real Estate Regulatory Authority as P02000007190; the registration status is New Project.

Who is the developer of VASAVI MEADOWS- VASAVI COLONY?

The promoter named in the RERA registration is THOTA.

Where is VASAVI MEADOWS- VASAVI COLONY located?

VASAVI MEADOWS- VASAVI COLONY is in Raigiri, Bhongir, Yadadri Bhuvanagiri, Telangana (508116).

When will VASAVI MEADOWS- VASAVI COLONY be completed?

The promoter's proposed date of completion filed with RERA is 22/01/2024. This is the promoter's declaration, not a guarantee.

More projects in Raigiri