Vashishta Dream City

VASHISTA DREAM CITY · Nalgonda · RERA P01800006304

VASHISHTA DREAM CITY is a plotted development / residential layout in Kistapuram, Miryalguda Mandal, Nalgonda District, developed by registered promoter Vashista Dream City, a partnership. The RERA land record states a total and net area of 123178.21 sqmts, and the layout approval records 420 plots; no tower or floor configuration is disclosed. The offering is plots, with plot sizes not available in the supplied material. The project is registered under TG-RERA number P01800006304, with proposed completion on 01/04/2025.

01What we found

Period endedTG-RERA registration ran to 1 Apr 2025 - check its extension on TG-RERA
14documents on file - each fact links to its page
0court cases on this project's land in the court records searched
10items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Kistapuram, Miryalguda, Nalgonda · geocoded — approximate.

Project at a glance

Project identity

FieldRecord
Registered project nameVASHISHTA DREAM CITY
Project typePlotted development / residential layout RERA record
Phase or registered portionNo phase name or phase-wise division disclosed; registration covers the project identified in the certificate by the listed survey numbers
TG-RERA registration numberP01800006304
Registration validity01/04/2023 to 01/04/2025; the certificate states two years and records no extension
Registered promoterVashista Dream City; the RERA record identifies the organization as a partnership RERA filing
RERA project statusThe record identifies the project as “New Project” RERA record
Completion deadline01/04/2025 is the proposed completion date recorded in the project information RERA filing

Land and geographic identity

FieldRecord
LocalityKistapuram; the RERA record also gives the address line Old Venkateshwara Colony RERA filing
Revenue villageKistapuram / Kistapuram Revenue Village RERA filing
MandalMiryalguda RERA record
DistrictNalgonda RERA record
PIN508114 in the project record RERA record
Project survey numbers107/Part, 108/Part, 109/Part, 112/Part, 113/Part, 114/Part RERA record
Registered site extentThe RERA land record states total and net area of 123178.21 sqmts RERA filing
Area affected by road widening / FTL / nala widening0 sqmts, as recorded in the project land fields RERA filing
Sanction document’s stated layout extentAc. 30-17.52 Gts. (or) Ac. 30.438 Cents; 147319.92 Sq.Yds.
Boundaries in the project recordEast: ROAD; West: OTHERS LAND; North: OTHERS LAND; South: OTHERS LAND RERA filing

Development identity

FieldRecord
Sanctioning authorityDirector of Town and Country Planning, Government of Telangana; the document records delegation to Kistapuram Gram Panchayat Approvals record
Principal approvalDraft Technical Layout Pattern Draft-TLP.No. 75/2023/H, approved 1-04-2023 Approvals record
File and application numbersE.P. C.No. 21093/1760/2023/H; e-P.No. 21093/1760 Approvals record
Approved layout scale420 plots
Land-use schedule stated in layout approvalTotal Ac. 30.438 Cents; 147319.92 Sq.Yds.; open space 10.00%, Ac. 3.043 Cents; 14728.12 Sq.Yds.; roads 32.00%, Ac. 9.742 Cents; 47151.28 Sq.Yds.; plotted area 58.00%, Ac. 17.653 Cents; 85440.52 Sq. Yds.
Approved built-up areaThe project fields state 71439.15 sqmts; the record does not identify building or floor configuration for this plotted layout RERA filing
Buildings, floors and parking levelsNot disclosed in the supplied project record; this is a plotted layout, and no building-floor or parking-level schedule is provided

Offering and status

FieldRecord
OfferingPlots; the layout approval records 420 plots
Plot sizes / plot-wise scheduleNot available in the supplied material Document index
Booked and available plotsNot disclosed in the supplied material Document index
Construction or site progressThe RERA project status is “New Project”; no measured or independently verified site-progress record is supplied RERA record
Original proposed completion01/04/2025 RERA filing
Revised completion dateNot disclosed Document index
Occupancy / completion certificateNo occupancy or completion certificate is present in the supplied records; the material does not establish a phase-wise or plot-wise certificate status Document index

The project story

VASHISHTA DREAM CITY is registered as a plotted residential layout in Kistapuram Revenue Village, Miryalguda Mandal, Nalgonda District. Its registered land identity is Sy. Nos. 107/Part, 108/Part, 109/Part, 112/Part, 113/Part and 114/Part. The filed project record calls it a new project, while the DTCP document is a Draft Technical Layout Pattern approval for a 420-plot layout. The supplied documents do not establish current on-site construction progress or completed, occupied, or occupancy-certified portions. RERA record RERA filing

The layout approval describes the land as divided into plotted area, roads and public open space. It also requires specified plots to be mortgaged to Kistapuram Gram Panchayat and identifies those plots as not for sale. The approval lists infrastructure and development works as conditions; those conditions describe required or proposed works, not proof that the works have been completed.

Master plan, architecture & building design

This is a plotted layout rather than a tower or apartment development. The DTCP document records 420 plots and a land-use schedule of 10.00% open space, 32.00% roads, and 58.00% plotted area. It also requires the roads to remain accessible to neighboring sites and prohibits a compound wall or fencing around the site. No plot-wise plan, plot dimensions, road widths, layout-sheet drawing, or measured site plan is available in the supplied material.

The project record gives a total and net land area of 123178.21 sqmts; the layout approval separately states Ac. 30-17.52 Gts. (or) Ac. 30.438 Cents; 147319.92 Sq.Yds. The record also reports 71439.15 sqmts as approved built-up area, but supplies no building schedule or explanation of how that figure applies to the plotted layout. No FSI-counted area, saleable-area schedule, carpet-area schedule, or building footprint is supplied. RERA filing RERA filing

The approval identifies a reserved park-purpose open space and plots designated for mortgage to the Gram Panchayat. It does not provide enough drawing detail to describe plot arrangement, internal circulation dimensions, entrances, or the location and configuration of utility land.

Homes, configurations & floor plans

The registered offering is plotted development, not apartments. The layout approval states 420 plots, but plot sizes, plot-wise availability, bookings and a RERA-filed saleable-area schedule are not present in the supplied material. Accordingly, apartment configuration, carpet-area, balcony and loading figures do not apply or are not disclosed here. Document index

The available drawing records comprise two floor-plan files, both marked as scans pending; none has been software-measured. No plot-layout sheet is recorded in the drawing data. Therefore, there are no software-measured plot or room dimensions to report. Floor plans

Parking & vehicle circulation

No sanctioned parking-space count, visitor or accessible parking provision, parking location, vehicle-entry arrangement or plot-specific parking allocation is disclosed in the supplied records. The layout approval requires roads to be formed and opened for accessibility to neighboring sites, but does not provide road widths or a detailed vehicle-circulation plan. A plot drawing or road layout is not available here to establish exclusive parking rights for any buyer. Document index

Amenities, recreation & open spaces

The DTCP layout approval identifies 10.00% of the layout as open space reserved for park purpose and lists development works including greenery and avenue planting, rainwater-harvesting pits, fencing of open spaces, street lighting, and electricity facilities. It also lists sewerage disposal and protected water supply. These are approval conditions or specified provisions; the supplied material does not verify their completion.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Public open space / park10.00%; Ac. 3.043 Cents; 14728.12 Sq.Yds.DTCP layout approvalReserved in the approval; completion not independently verified
Internal roads32.00%; Ac. 9.742 Cents; 47151.28 Sq.Yds.DTCP layout approvalRoad formation and access are approval conditions; completion not independently verified
Greenery and avenue plantingNo size or quantity statedDTCP layout approvalRequired/proposed; completion not verified
Rainwater-harvesting pitsNo count or capacity statedDTCP layout approvalRequired/proposed; completion not verified
Fencing of open spacesNo length or specification statedDTCP layout approvalRequired/proposed; completion not verified
Street lightingNo quantity or specification statedDTCP layout approvalRequired/proposed; completion not verified
Community buildingsNo size, capacity or description statedRERA amenity record RERA amenitiesNo progress value supplied; completion not verified
Recreational open spaceNo separate size beyond the approved park allocation statedRERA amenity record RERA amenitiesListed as available in the amenity field, with 0 progress; completion not independently verified

Utilities, building services & safety

The layout approval lists protected water supply, sewerage disposal, storm-water drainage and channelization of nalas, street lighting and electricity facilities as layout-development requirements. It also requires shifting electrical lines along roads during layout formation. These are approval conditions, not evidence that the systems have been installed, connected, commissioned or independently inspected. No supply source, storage or treatment capacity, sewage-treatment capacity, reuse arrangement, storm-water capacity, electrical-substation details, backup provision, waste-management design, security system, accessibility provision, or fire-safety design is supplied.

The RERA amenity record lists water supply, sewerage, storm-water drains, solid-waste management and disposal, energy management, and fire protection and fire-safety requirements, but supplies no facility descriptions or progress figures for these items. Their listing does not establish delivery or statutory compliance. RERA amenities

Location, access & connectivity

The registered site is in Kistapuram Revenue Village, Miryalguda Mandal, Nalgonda District, Telangana, PIN 508114. The project fields give KISTAPURAM as locality and identify OLD VENKATESHWARA COLONY in the address details. The project record describes the east boundary as a road and the other three boundaries as “OTHERS LAND.” RERA record RERA filing RERA filing

The layout approval requires roads to be formed and opened for access to neighboring sites, but the supplied material does not specify road names, widths, public-transport services or nearby landmarks. The location record gives the nearest sampled Outer Ring Road interchange at approximately 117.7 km; this is a sampled distance, not a travel-time estimate. Location record

Developer & development status

The registered promoter is Vashista Dream City, identified in the project record as a partnership, with GSTIN 36AAVFV2665F1ZM. The RERA record names Bandaru Prasad as an authorized signatory and Lingaswamy Yellendulla as a partner. The certificate lists the promoter’s office as “Village: Mandal: District: Nalgonda, Pin: 508001”; the village and mandal are not filled in that office-address field. RERA filing RERA filing Parties record

The project filing records proposed completion on 01/04/2025 and the registration certificate’s stated validity runs through 01/04/2025. No revised completion date, extension record, current progress measurement, or occupancy/completion certificate is supplied. The Form B declaration contains promoter statements about project-account withdrawals, annual audit, pending approvals and non-discrimination; the available extract does not identify the registration number or declaration date. These are promoter declarations, not independent verification of performance. RERA filing

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01800006304; valid 01/04/2023–01/04/2025; certificate issue date 03/12/2024
What the supplied record establishesForm C registers VASHISHTA DREAM CITY and lists the six project survey numbers; it records no extension
DTCP draft layout approval
Identifier / dateDraft-TLP.No. 75/2023/H, dated 1-04-2023
What the supplied record establishesDraft Technical Layout Pattern for a 420-plot residential layout in the six listed survey-number portions; includes development conditions and expressly states the permission is not proof of land title
DTCP file number
Identifier / dateE.P. C.No. 21093/1760/2023/H
What the supplied record establishesFile reference appearing in the layout approval
DTCP application number
Identifier / datee-P.No. 21093/1760
What the supplied record establishesApplication reference appearing in the layout approval
Form B declaration
Identifier / dateDocument 330144, page 2
What the supplied record establishesExtracted page of a promoter affidavit-cum-declaration; available text contains declarations but omits the project registration number and declaration date
Layout drawing / approved layout plan copy
Identifier / dateNot available in the supplied material
What the supplied record establishesThe RERA document list includes a layout-plan item, but the file is marked not extracted; no layout sheet is available for review Document index

The supplied material includes no occupancy or completion certificate, and no separate building commencement certificate or building-level plan is identified. The approval document is a draft layout approval and should be read as such. Document index

Frequently asked questions

Is VASHISHTA DREAM CITY registered with Telangana RERA?

Yes. VASHISHTA DREAM CITY is registered with the Telangana Real Estate Regulatory Authority as P01800006304; the registration status is New Project.

Who is the developer of VASHISHTA DREAM CITY?

The promoter named in the RERA registration is VASHISTA DREAM CITY.

Where is VASHISHTA DREAM CITY located?

VASHISHTA DREAM CITY is in KISTAPURAM, Miryalguda, Nalgonda, Telangana (508114).

When will VASHISHTA DREAM CITY be completed?

The promoter's proposed date of completion filed with RERA is 01/04/2025. This is the promoter's declaration, not a guarantee.

More projects in Miryalguda