VIRAT NAGAR is a plotted development of open plots in palla burzu, Narayanpet Mandal, Mahabubnagar District, developed by the registered promoter ANAND CHARY AND BROTHERS. The registered site area is 8,898.90 sqmts, and the approved layout has 35 plots; no plot configurations are stated. The project is registered with TG-RERA under P01400008571, and the promoter’s Form B declaration undertakes completion by 01.08.2025.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
Project at a glance
Project identity
| Item | Evidence-backed record |
|---|---|
| Registered project name | VIRAT NAGAR |
| Project type | Plotted development / layout with open plots RERA record |
| Phase or registered portion | Phase not separately identified in the supplied record; registration is for the plotted project RERA record |
| TG-RERA registration | P01400008571 |
| Registration validity | Certificate states validity from 27/07/2024 to 01/08/2025, unless extended by the Authority |
| RERA status | Registered; the supplied record does not establish whether registration was later extended or its present portal status |
| Registered promoter | ANAND CHARY AND BROTHERS RERA record |
Land and geographic identity
| Item | Evidence-backed record |
|---|---|
| Locality | palla burzu; also recorded in project documents as PALLABUZURG / Pallabuzurgu RERA record |
| Revenue village | palla burzu; layout drawing identifies PALLABUZURG. A separate approval extraction says “Narayanpet Revenue Village”; the exact revenue-village description should be confirmed against the underlying approved plan and land records. RERA record |
| Mandal / district / PIN | Narayanpet / Mahabubnagar / 509210 RERA record |
| Project survey numbers | 411/A; the layout approval drawing also lists 411. Land records |
| Registered site extent | The RERA land record states total area 8,898.90 sqmts, affected area 2,358.715 sqmts, and net area 6,540.18 sqmts. RERA filing |
| Layout-drawing area statement | Drawing extraction records 8,898.57 sq.mt total layout area and 8,335.32 as “Total net layout” in its land-use table. |
| Boundaries | East: SURVEY NO 411; West and North: EXISTING HOUSES; South: 60 FEET MAIN ROAD. RERA filing |
Development identity
| Item | Evidence-backed record |
|---|---|
| Sanctioning authority | Narayanpet Municipality/Municipal Corporation Approvals record |
| Principal layout approval | Tentative layout approval 0004/LO/3065/2022, dated 01 August, 2023 Approvals record |
| Other approval identifiers on file | Application 009674/LO/DTCP/3065/0011/2022; inward TS/056269/2022; licence G1/Lic-syr/205/NRPT/2019-20 Approvals record |
| Approved development type and scale | Tentative residential plotted layout; 35 plots |
| Built-up area / building configuration | Approval parameters state Net BUA Built Up Area: 0.00 and Proposed Coverage Area: 0.00. This is a plotted layout, not a building plan; no tower, building, floor or parking-level configuration is supplied. |
| Approved parking | Approval parameters state Proposed Number of Parkings: 0; no separate resident or visitor parking provision is identified in the supplied layout extraction. |
Offering and status
| Item | Evidence-backed record |
|---|---|
| Offered product | Open plots; the approved layout drawing records 35 plots. Plot-by-plot dimensions and RERA-filed plot-size range are not available in the supplied data. |
| Booked / available counts | Not disclosed in the supplied evidence. RERA record |
| Construction / development stage | RERA registration record reports 70% completeness; this is a recorded progress figure, not an independent site inspection. RERA record |
| Completion date | Promoter’s Form B declaration undertakes completion by 01.08.2025. The supplied evidence does not establish a revised date or an approved extension. |
| Occupancy / completion certificate | No occupancy or completion certificate is identified in the supplied project documents. This plotted-development record does not provide a tower- or building-wise OC status. Document index |
The project story
- VIRAT NAGAR is registered with TG-RERA as a plotted development at Survey No. 411/A, with the layout drawing also referring to Survey No. 411, in the palla burzu / PALLABUZURG locality of Narayanpet Mandal, Mahabubnagar District. The registered project is an open-plot layout, rather than an apartment or villa scheme. RERA record Land records
- The tentative layout approval identifies 35 plots and reserves land for roads, a park/open space, social infrastructure and utilities. Its conditions require the applicant to develop the layout infrastructure and keep roads accessible to neighbouring sites. The plan also identifies Plots 18–22 as mortgaged to the municipality in connection with development conditions.
- The RERA record reports 70% completeness, while the promoter’s Form B declaration gives 01.08.2025 as the completion undertaking. Neither figure, by itself, establishes independently verified construction or infrastructure completion; no site-inspection report or completion certificate is included in the supplied evidence. RERA record Document index
Master plan, architecture & building design
- The approved drawing describes a plotted layout, not a building scheme. It records 35 plots and the following land-use figures in its table: 4,853.78 for plotted area, 2,358.97 for roads, 809.01 for organized open space/park, 223.70 for social infrastructure and 89.86 for utility land. It records 0.00 for amenity area. The printed percentages are 56.15%, 27.29%, 9.36%, 2.59% and 1.04%, respectively. The drawing’s table labels 8,335.32 as “Total net layout.”
- The drawing extraction also records a total layout area of 8,898.57 sq.mt, while its approval parameters separately state “Net Layout Area: 8644.43,” “Balance Area of Plot: 8420.73,” “Vacant Plot Area: 8644.43,” and “Road Affected Area: 254.14.” These are reproduced as separate drawing fields, not combined into a recalculated site-area figure.
- Recorded road widths include 9.14 M, 12.19 MT WIDE EXISTING, 18.29 MT WIDE PROPOSED ROAD, 6.12(RW), 41.68(RW) and 41.64(RW). The drawing identifies a 734.24 mortgage area; the approval extraction describes this as Plots 18, 19, 20, 21 and 22. No building footprints, floor plans, dwelling-unit mix or building elevations are evidenced.
Homes, configurations & floor plans
This is a plotted layout. The approved drawing records 35 plots, but plot-by-plot dimensions and a plot-size range are not available in the supplied evidence.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Open plots | 35 in the approved layout drawing | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
Two layout sheets are recorded, with no flat floor plans. The supplied floor-plan data contains no measured unit areas. Floor plans Layout record
Parking & vehicle circulation
The approval parameters state Proposed Number of Parkings: 0. The layout drawing provides road areas and widths, but the supplied record does not specify designated resident or visitor parking spaces, vehicle-entry arrangements, ramps, accessible parking, EV charging, or plot-specific parking allocations. The approval’s 0.00 common-parking area is a separate land-use entry.
Amenities, recreation & open spaces
| Description / size | 809.01; drawing prints 9.36% |
|---|---|
| Declared progress / verified status | Approval drawing allocation; the supplied record does not independently verify completion. |
| Description / size | Listed among layout amenities/utilities; no size supplied |
|---|---|
| Declared progress / verified status | Listed in the drawing extraction; completion not independently verified. |
| Description / size | 223.70; drawing prints 2.59% |
|---|---|
| Declared progress / verified status | Reserved land allocation; no specific building or delivered facility is identified. |
| Description / size | 89.86; drawing prints 1.04% |
|---|---|
| Declared progress / verified status | Reserved land allocation; facility completion not independently verified. |
| Description / size | Included as layout infrastructure; no separate facility size supplied |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenities record reports 80%; this is a recorded progress figure, not an independent site verification. |
| Description / size | No additional size beyond the drawing’s park allocation |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenities record reports 100%; independently verified completion is not established by the supplied evidence. |
| Description / size | No separate size beyond the drawing’s park allocation |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA amenities record reports 100%; independently verified completion is not established by the supplied evidence. |
No clubhouse or indoor recreation facility is identified in the supplied project evidence. The RERA amenities record reports 0% for community buildings and for treatment/disposal of sewage and sullage water; this is a progress-field entry, not evidence that a particular facility was separately sanctioned or completed. RERA amenities
Utilities, building services & safety
The tentative layout approval conditions describe proposed layout infrastructure including storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank or sump, an assured water-supply source, electrical supply lines, street lights, avenue planting, park development and rainwater-harvesting pits. The same approval names a water reservoir, septic tank, STP, electric transformer and solid-waste management among reserved or infrastructure provisions. These are approval-condition descriptions; the supplied documents do not verify installed capacity or completion.
The RERA amenities record reports water supply at 89%, sewerage (chamber, lines, septic tank, STP) at 100%, storm-water drains at 100%, and street lighting at 100%. These are recorded progress percentages, not independent verification. It records 0% for water conservation/rainwater harvesting, energy management, fire protection and safety requirements, and electrical meter room/sub-station/receiving station. RERA amenities
No capacities are supplied for water storage or treatment, STP, transformer, backup power or rainwater harvesting. The supplied layout is not a building-services plan and does not specify lifts, fire systems, escape stairs, CCTV, security arrangements, accessibility features, or EV charging.
Location, access & connectivity
The registered project location is palla burzu, Narayanpet, Mahabubnagar District, Telangana, PIN 509210. The project land is recorded in Survey No. 411/A, with the approved layout drawing also listing Survey No. 411. The RERA land record describes the southern boundary as 60 FEET MAIN ROAD. RERA record Land records
The supplied location data gives an approximate sampled distance of 77.6 km to the nearest sampled Outer Ring Road interchange. No public-transport information, additional measured distances, or project-specific route details are provided. Location record
Developer & development status
The TG-RERA certificate names Anand Chary And Brothers as the registered promoter and gives a promoter address at Dhoolpet, Narayanpet, Mahabubnagar, PIN 509210. The promoter’s entity type is recorded as “Others,” with the description “BROTHERS”; a more specific legal entity type and corporate identifier are not established in the supplied evidence. RERA filing
The separate Form B affidavit is sworn by T. ANAND CHARY, described there as designated partner of SAGAR DEVELOPERS & CONSTRUCTIONS, NARAYANPET DIST. It declares title, states that the land is free from encumbrances, and undertakes completion by 01.08.2025. Those are promoter-side declarations in that document.
The RERA record reports 70% completeness, but the supplied evidence does not include a dated independent site inspection, a revised completion schedule, or an extension order. The registration certificate states the registration validity period separately; it does not itself establish that construction was complete or that an occupancy/completion certificate had issued. RERA record Document index
Approvals, official records & documents
| Identifier / date | P01400008571; validity stated from 27/07/2024 to 01/08/2025 |
|---|---|
| What the supplied record establishes | Registration of VIRAT NAGAR, Survey No. 411/A, promoted by Anand Chary And Brothers |
| Identifier / date | 0004/LO/3065/2022; 01 August, 2023 |
|---|---|
| What the supplied record establishes | Tentative residential plotted-layout approval by Narayanpet Municipality/Municipal Corporation; 35 plots and layout land-use allocations |
| Identifier / date | Inward TS/056269/2022; licence G1/Lic-syr/205/NRPT/2019-20; drawing dated 08-09-2022 in the extraction |
|---|---|
| What the supplied record establishes | Drawing identifies Survey Nos. 411 and 411/A, plots, roads, open space, social infrastructure and utilities |
| Identifier / date | 009674/LO/DTCP/3065/0011/2022 |
|---|---|
| What the supplied record establishes | Application identifier recorded with the layout approval |
| Identifier / date | Deed No. 5553; approval extraction states 19 October, 2022 |
|---|---|
| What the supplied record establishes | Approval record identifies Plots 18–22 as mortgaged to the Municipality/Municipal Corporation in connection with layout-development conditions |
| Identifier / date | 06 day of JUNE,2024 |
|---|---|
| What the supplied record establishes | Promoter-side declaration, including the 01.08.2025 completion undertaking |
| Identifier / date | Not identified in supplied documents |
|---|---|
| What the supplied record establishes | No such certificate is established by the supplied project-document set Document index |
Project at a glance
Project identity
Registered project name: VIRAT NAGAR
Project type: Plotted development / layout with open plots
Phase or registered portion: Phase not separately identified in the supplied record; registration is for the plotted project
TG-RERA registration: P01400008571
Registration validity: Certificate states validity from 27/07/2024 to 01/08/2025, unless extended by the Authority
RERA status: Registered; the supplied record does not establish whether registration was later extended or its present portal status
Registered promoter: ANAND CHARY AND BROTHERS
Land and geographic identity
Locality: palla burzu; also recorded in project documents as PALLABUZURG / Pallabuzurgu
Revenue village: palla burzu; layout drawing identifies PALLABUZURG. A separate approval extraction says “Narayanpet Revenue Village”; the exact revenue-village description should be confirmed against the underlying approved plan and land records.
Mandal / district / PIN: Narayanpet / Mahabubnagar / 509210
Project survey numbers: 411/A; the layout approval drawing also lists 411.
Registered site extent: The RERA land record states total area 8,898.90 sqmts, affected area 2,358.715 sqmts, and net area 6,540.18 sqmts.
Layout-drawing area statement: Drawing extraction records 8,898.57 sq.mt total layout area and 8,335.32 as “Total net layout” in its land-use table.
Boundaries: East: SURVEY NO 411; West and North: EXISTING HOUSES; South: 60 FEET MAIN ROAD.
Development identity
Sanctioning authority: Narayanpet Municipality/Municipal Corporation
Principal layout approval: Tentative layout approval 0004/LO/3065/2022, dated 01 August, 2023
Other approval identifiers on file: Application 009674/LO/DTCP/3065/0011/2022; inward TS/056269/2022; licence G1/Lic-syr/205/NRPT/2019-20
Approved development type and scale: Tentative residential plotted layout; 35 plots
Built-up area / building configuration: Approval parameters state Net BUA Built Up Area: 0.00 and Proposed Coverage Area: 0.00. This is a plotted layout, not a building plan; no tower, building, floor or parking-level configuration is supplied.
Approved parking: Approval parameters state Proposed Number of Parkings: 0; no separate resident or visitor parking provision is identified in the supplied layout extraction.
Offering and status
Offered product: Open plots; the approved layout drawing records 35 plots. Plot-by-plot dimensions and RERA-filed plot-size range are not available in the supplied data.
Booked / available counts: Not disclosed in the supplied evidence.
Construction / development stage: RERA registration record reports 70% completeness; this is a recorded progress figure, not an independent site inspection.
Completion date: Promoter’s Form B declaration undertakes completion by 01.08.2025. The supplied evidence does not establish a revised date or an approved extension.
Occupancy / completion certificate: No occupancy or completion certificate is identified in the supplied project documents. This plotted-development record does not provide a tower- or building-wise OC status.
The project story
- VIRAT NAGAR is registered with TG-RERA as a plotted development at Survey No. 411/A, with the layout drawing also referring to Survey No. 411, in the palla burzu / PALLABUZURG locality of Narayanpet Mandal, Mahabubnagar District. The registered project is an open-plot layout, rather than an apartment or villa scheme.
- The tentative layout approval identifies 35 plots and reserves land for roads, a park/open space, social infrastructure and utilities. Its conditions require the applicant to develop the layout infrastructure and keep roads accessible to neighbouring sites. The plan also identifies Plots 18–22 as mortgaged to the municipality in connection with development conditions.
- The RERA record reports 70% completeness, while the promoter’s Form B declaration gives 01.08.2025 as the completion undertaking. Neither figure, by itself, establishes independently verified construction or infrastructure completion; no site-inspection report or completion certificate is included in the supplied evidence.
Master plan, architecture & building design
- The approved drawing describes a plotted layout, not a building scheme. It records 35 plots and the following land-use figures in its table: 4,853.78 for plotted area, 2,358.97 for roads, 809.01 for organized open space/park, 223.70 for social infrastructure and 89.86 for utility land. It records 0.00 for amenity area. The printed percentages are 56.15%, 27.29%, 9.36%, 2.59% and 1.04%, respectively. The drawing’s table labels 8,335.32 as “Total net layout.”
- The drawing extraction also records a total layout area of 8,898.57 sq.mt, while its approval parameters separately state “Net Layout Area: 8644.43,” “Balance Area of Plot: 8420.73,” “Vacant Plot Area: 8644.43,” and “Road Affected Area: 254.14.” These are reproduced as separate drawing fields, not combined into a recalculated site-area figure.
- Recorded road widths include 9.14 M, 12.19 MT WIDE EXISTING, 18.29 MT WIDE PROPOSED ROAD, 6.12(RW), 41.68(RW) and 41.64(RW). The drawing identifies a 734.24 mortgage area; the approval extraction describes this as Plots 18, 19, 20, 21 and 22. No building footprints, floor plans, dwelling-unit mix or building elevations are evidenced.
Homes, configurations & floor plans
This is a plotted layout. The approved drawing records 35 plots, but plot-by-plot dimensions and a plot-size range are not available in the supplied evidence.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Open plots | 35 in the approved layout drawing | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
Two layout sheets are recorded, with no flat floor plans. The supplied floor-plan data contains no measured unit areas.
Parking & vehicle circulation
The approval parameters state Proposed Number of Parkings: 0. The layout drawing provides road areas and widths, but the supplied record does not specify designated resident or visitor parking spaces, vehicle-entry arrangements, ramps, accessible parking, EV charging, or plot-specific parking allocations. The approval’s 0.00 common-parking area is a separate land-use entry.
Amenities, recreation & open spaces
| Description / size | 809.01; drawing prints 9.36% |
|---|---|
| Declared progress / verified status | Approval drawing allocation; the supplied record does not independently verify completion. |
| Description / size | Listed among layout amenities/utilities; no size supplied |
|---|---|
| Declared progress / verified status | Listed in the drawing extraction; completion not independently verified. |
| Description / size | 223.70; drawing prints 2.59% |
|---|---|
| Declared progress / verified status | Reserved land allocation; no specific building or delivered facility is identified. |
| Description / size | 89.86; drawing prints 1.04% |
|---|---|
| Declared progress / verified status | Reserved land allocation; facility completion not independently verified. |
| Description / size | Included as layout infrastructure; no separate facility size supplied |
|---|---|
| Declared progress / verified status | RERA amenities record reports 80%; this is a recorded progress figure, not an independent site verification. |
| Description / size | No additional size beyond the drawing’s park allocation |
|---|---|
| Declared progress / verified status | RERA amenities record reports 100%; independently verified completion is not established by the supplied evidence. |
| Description / size | No separate size beyond the drawing’s park allocation |
|---|---|
| Declared progress / verified status | RERA amenities record reports 100%; independently verified completion is not established by the supplied evidence. |
No clubhouse or indoor recreation facility is identified in the supplied project evidence. The RERA amenities record reports 0% for community buildings and for treatment/disposal of sewage and sullage water; this is a progress-field entry, not evidence that a particular facility was separately sanctioned or completed.
Utilities, building services & safety
The tentative layout approval conditions describe proposed layout infrastructure including storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank or sump, an assured water-supply source, electrical supply lines, street lights, avenue planting, park development and rainwater-harvesting pits. The same approval names a water reservoir, septic tank, STP, electric transformer and solid-waste management among reserved or infrastructure provisions. These are approval-condition descriptions; the supplied documents do not verify installed capacity or completion.
The RERA amenities record reports water supply at 89%, sewerage (chamber, lines, septic tank, STP) at 100%, storm-water drains at 100%, and street lighting at 100%. These are recorded progress percentages, not independent verification. It records 0% for water conservation/rainwater harvesting, energy management, fire protection and safety requirements, and electrical meter room/sub-station/receiving station.
No capacities are supplied for water storage or treatment, STP, transformer, backup power or rainwater harvesting. The supplied layout is not a building-services plan and does not specify lifts, fire systems, escape stairs, CCTV, security arrangements, accessibility features, or EV charging.
Location, access & connectivity
The registered project location is palla burzu, Narayanpet, Mahabubnagar District, Telangana, PIN 509210. The project land is recorded in Survey No. 411/A, with the approved layout drawing also listing Survey No. 411. The RERA land record describes the southern boundary as 60 FEET MAIN ROAD.
The supplied location data gives an approximate sampled distance of 77.6 km to the nearest sampled Outer Ring Road interchange. No public-transport information, additional measured distances, or project-specific route details are provided.
Developer & development status
The TG-RERA certificate names Anand Chary And Brothers as the registered promoter and gives a promoter address at Dhoolpet, Narayanpet, Mahabubnagar, PIN 509210. The promoter’s entity type is recorded as “Others,” with the description “BROTHERS”; a more specific legal entity type and corporate identifier are not established in the supplied evidence.
The separate Form B affidavit is sworn by T. ANAND CHARY, described there as designated partner of SAGAR DEVELOPERS & CONSTRUCTIONS, NARAYANPET DIST. It declares title, states that the land is free from encumbrances, and undertakes completion by 01.08.2025. Those are promoter-side declarations in that document.
The RERA record reports 70% completeness, but the supplied evidence does not include a dated independent site inspection, a revised completion schedule, or an extension order. The registration certificate states the registration validity period separately; it does not itself establish that construction was complete or that an occupancy/completion certificate had issued.
Approvals, official records & documents
| Identifier / date | P01400008571; validity stated from 27/07/2024 to 01/08/2025 |
|---|---|
| What the supplied record establishes | Registration of VIRAT NAGAR, Survey No. 411/A, promoted by Anand Chary And Brothers |
| Identifier / date | 0004/LO/3065/2022; 01 August, 2023 |
|---|---|
| What the supplied record establishes | Tentative residential plotted-layout approval by Narayanpet Municipality/Municipal Corporation; 35 plots and layout land-use allocations |
| Identifier / date | Inward TS/056269/2022; licence G1/Lic-syr/205/NRPT/2019-20; drawing dated 08-09-2022 in the extraction |
|---|---|
| What the supplied record establishes | Drawing identifies Survey Nos. 411 and 411/A, plots, roads, open space, social infrastructure and utilities |
| Identifier / date | 009674/LO/DTCP/3065/0011/2022 |
|---|---|
| What the supplied record establishes | Application identifier recorded with the layout approval |
| Identifier / date | Deed No. 5553; approval extraction states 19 October, 2022 |
|---|---|
| What the supplied record establishes | Approval record identifies Plots 18–22 as mortgaged to the Municipality/Municipal Corporation in connection with layout-development conditions |
| Identifier / date | 06 day of JUNE,2024 |
|---|---|
| What the supplied record establishes | Promoter-side declaration, including the 01.08.2025 completion undertaking |
| Identifier / date | Not identified in supplied documents |
|---|---|
| What the supplied record establishes | No such certificate is established by the supplied project-document set |
Frequently asked questions
Is VIRAT NAGAR registered with Telangana RERA?
Yes. VIRAT NAGAR is registered with the Telangana Real Estate Regulatory Authority as P01400008571; the registration status is New Project.
Who is the developer of VIRAT NAGAR?
The promoter named in the RERA registration is ANAND CHARY AND BROTHERS.
Where is VIRAT NAGAR located?
VIRAT NAGAR is in NARAYANPET, palla burzu, Mahabubnagar, Telangana (509210).
When will VIRAT NAGAR be completed?
The promoter's proposed date of completion filed with RERA is 01/08/2025. This is the promoter's declaration, not a guarantee.