West City Grand Phase II
LANDMARK SRIGDHA DEVELOPERS · Sangareddy · RERA P01100008041
West City Grand Phase II is a plotted development in Kamkole village, Munpally mandal, Sangareddy District, developed by registered promoter LANDMARK SRIGDHA DEVELOPERS. The site area is 33285 sqmts, and the project comprises residential plots; the total plot count and plot configurations are not disclosed. The project is registered under TG-RERA registration number P01100008041, with proposed completion recorded as 23/02/2026.
More from Landmark Srigdha Developers · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | West City Grand Phase II RERA record |
| Project type | Plotted development RERA record RERA filing |
| Phase / registered portion | Phase II; the registered land is described in the filed records as parts of Survey Nos. 30 and 43 at Kamkole. RERA record |
| TG-RERA registration | P01100008041 RERA record |
| Registration validity | 08/04/2024 to 23/02/2026, as recorded on the certificate. This is registration validity, not a statement that the project was completed or received an OC. RERA record |
| Registered promoter | LANDMARK SRIGDHA DEVELOPERS RERA record Corporate record |
| RERA status | The record identifies the project as “New Project”; the RERA certificate records registration. A current post-expiry status or extension is not supplied. RERA record |
Land and geographic identity
| Field | Record |
|---|---|
| Registered locality | KAMKOLE (VILLAGE) MUNIPALLY (MANDAL) RERA record RERA filing |
| Revenue village | KAMKOLE RERA record RERA filing |
| Mandal | MUNPALLY RERA record RERA filing |
| District | Sangareddy RERA record |
| PIN | 502345 RERA record |
| Project survey numbers | 30/P AND 40/P, as shown in the project identity and RERA certificate. The filed Form B refers to parts of Survey Nos. 30 and 43, while the layout approval extraction lists 30/P, 40/P and 43/P. The registered survey identity is reproduced here as recorded; the full survey reconciliation is addressed in the land and approvals review. RERA record RERA filing |
| Site extent | Total area 33285 sqmts; net area 33285.00 sqmts; area affected in road widening/FTL of tanks/nala widening 0 sqmts, as recorded in the RERA project fields. RERA filing |
| Boundaries | East: OTHERS LAND; West: ROAD; North: OTHERS LAND; South: ROAD. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Director of Town and Country Planning; the extracted approval states delegation to Kamkole Gram Panchayat. Approvals record |
| Principal layout approval | Draft-TLP.No.31/2024/H; file no. Lr.Roc.No.16247/15/2024/e-PanchaVa\\; application no. 16247/15. The extracted approval date reads “Dt.2442'2024”, which is not a clear calendar date in the supplied text. Approvals record |
| Approval character | The filed document is identified as “Draft Technical Layout Pattern - Approved” for a proposed plotted layout, subject to conditions. |
| Approved built-up area | 19417 sqmts is recorded in the RERA project fields as approved built-up area. The evidence supplied does not explain how this figure applies to the plotted layout. RERA filing |
| Buildings / floor configuration | Not disclosed in the supplied project evidence. The project is recorded as plotted development; no tower count or sanctioned building-floor schedule is provided. RERA record RERA filing |
| Parking | The RERA fields record mortgage area of 2995 sqmts, but no parking count, parking level or parking-allocation schedule is supplied. RERA filing |
| Approved versus RERA-declared plot counts | The extracted approval lists Plot Nos. 103 and 106 to 121 as mortgaged plots. A complete approved plot schedule and total RERA-declared plot count are not supplied. RERA unit table |
Offering and status
| Field | Record |
|---|---|
| Unit type | Residential plots; the project is classified as a plot project. RERA record RERA filing |
| RERA-filed plot sizes | Unit-wise RERA saleable-area figures and plot counts are not available in the supplied unit data. RERA unit table |
| Booked / available | Not disclosed in the supplied evidence. RERA unit table |
| Construction / development stage | RERA filing records show amenity entries with 0% progress; no independently verified site-progress report is supplied. RERA amenities |
| Completion dates | The RERA header records proposed completion as 23/02/2026; Form B declares completion by 24/02/2026. RERA record |
| Occupancy / completion certificate | No project-specific occupancy or completion certificate is supplied. The available Form–1A document is a blank completion-certificate form, not a completed project certificate. Document index |
2. The project story
West City Grand Phase II is registered as a plotted development at Kamkole village, Munpally Mandal, Sangareddy District. The RERA record identifies the project land by Survey Nos. 30/P AND 40/P and states a site area of 33285 sqmts. The filed approval extraction describes a proposed layout in Survey Nos. 30/P, 40/P and 43/P, with roads, open space and plots, and identifies the layout permission as a draft technical layout pattern subject to conditions. RERA record RERA filing
The development is presented in the available records as a land subdivision for residential plots, rather than a project of apartments or towers. The approval extraction lists a 10.00 % open-space component and a 31.65 % roads component, and records certain plots as mortgage security for layout works. It also lists layout utilities including street lighting, electricity facilities, sewerage disposal, protected water supply and rain-water-harvesting pits. These are approval-document provisions or descriptions; the supplied evidence does not establish that they have been completed or independently inspected.
The project’s RERA completion date is recorded as 23/02/2026, while the promoter’s Form B undertaking states 24/02/2026. The supplied material contains no current construction report, verified site inspection, or project-specific completion/occupancy certificate. The RERA amenity entries show 0% progress, which is a filed status rather than an independent physical verification. RERA record RERA amenities Document index
3. Master plan, architecture & building design
The supplied approval extraction describes a plotted layout, not a multi-tower building scheme. It identifies a layout extent of Ac. 8.225 Cents and records the following land-use components: plotted area 58.35 %, stated as Ac. 4.798 Cents; open space 10.00 %, stated as Ac.0.823 cents; and roads area 31.65 %, stated as Ac.2.604 cents. It also identifies Ac. 0.740 Cents / 3581.60 Sq. Yards as mortgaged plots. These are figures as extracted from the filed approval; the supplied record does not provide a complete, legible final layout drawing or an independently reconciled land-use schedule.
The approval extraction identifies Plot Nos. 103 and 106 to 121 as the plots to be mortgaged to Kamkole Gram Panchayat. It further records that the open-space and road areas are to be gifted to the Gram Panchayat by registered gift deed before release of the final layout. The number of total plots, plot-by-plot dimensions, internal-road widths, final layout-release status and final as-built arrangement are not established by the supplied materials.
No towers, building footprints, floor configuration, parking levels, apartment layouts or residential/commercial building mix are evidenced. Although the RERA fields state an approved built-up area of 19417 sqmts, the supplied records do not identify the buildings or components to which that figure relates. RERA filing Document index
4. Homes, configurations & floor plans
This is a plotted project, so apartment configuration and carpet-area measurements are not applicable on the evidence supplied. The RERA unit-type schedule, plot-wise saleable areas, total plot count, bookings and availability are not supplied in the unit data. RERA record RERA unit table
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
Two drawing records are noted, but both are scans pending measurement; 0 drawings have been measured and no layout sheets are recorded. The software-measurement source therefore supplies no plot or home-area measurements for this overview. Floor plans
The promoter’s vendor listing contains plot-size claims from 1302 sq.ft through 3993 sq.ft. These are promoter-marketed figures, not RERA-filed plot areas, and are not used as the project’s registered unit schedule. Promoter website
5. Parking & vehicle circulation
The supplied RERA fields record a 2995 sqmts mortgage area, and the layout approval extraction identifies specified plots mortgaged to the Gram Panchayat as security for layout works. These records do not establish parking provision. No sanctioned parking count, visitor or accessible-parking provision, parking layout, vehicle entry/exit arrangement, internal driveway details, EV charging provision or plot-specific parking allocation is supplied. A plot or layout drawing reference alone would not establish exclusive parking rights. RERA filing
6. Amenities, recreation & open spaces
The filed layout approval identifies open space and layout infrastructure. The RERA amenity register records several items as available, but shows 0% progress; the supplied evidence does not establish delivery or independent verification.
| Description / size | 10.00 %; Ac.0.823 cents |
|---|---|
| Evidence source | Layout approval extraction |
| Declared progress / verified status | Approval document states the area is to be handed over to the Gram Panchayat by registered gift deed before final layout release; completed handover is not evidenced. |
| Description / size | 31.65 %; Ac.2.604 cents |
|---|---|
| Evidence source | Layout approval extraction |
| Declared progress / verified status | Approval document states the area is to be handed over to the Gram Panchayat by registered gift deed before final layout release; completed handover is not evidenced. |
| Description / size | No size supplied |
|---|---|
| Evidence source | RERA amenity register RERA amenities |
| Declared progress / verified status | Marked “YES”; progress 0%; no independent completion verification supplied. |
| Description / size | No dimensions supplied |
|---|---|
| Evidence source | RERA amenity register RERA amenities; layout approval extraction |
| Declared progress / verified status | Marked “YES” in the register; progress 0%; no independent completion verification supplied. |
| Description / size | No size or facility detail supplied |
|---|---|
| Evidence source | RERA amenity register RERA amenities |
| Declared progress / verified status | Progress 0%; no completion or independent verification supplied. |
| Description / size | No additional size supplied |
|---|---|
| Evidence source | RERA amenity register RERA amenities |
| Declared progress / verified status | Marked “YES”; progress 0%; no independent completion verification supplied. |
The filed layout approval also lists street lighting, electricity facilities, sewerage disposal, protected water supply and rain-water-harvesting pits. Their implementation status is not established in the supplied evidence.
7. Utilities, building services & safety
The layout approval extraction lists street lighting and electricity facilities, a sewerage disposal system, protected water supply and rain water harvesting pits. The RERA amenity register also lists water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, energy management, solid-waste management and disposal, and an electrical meter room/sub-station/receiving station; these entries show 0% progress where a percentage is recorded. No capacities, technical specifications, commissioning records or independent completion verification are supplied. RERA amenities
The RERA amenity register includes a fire-protection and fire-safety entry, but no project-specific fire system design, clearance or completed-installation evidence is supplied. No evidence is provided for lifts, backup power, CCTV, controlled access, accessible routes or ramps. RERA amenities Document index
8. Location, access & connectivity
The registered location is KAMKOLE (VILLAGE) MUNIPALLY (MANDAL), Sangareddy District, 502345. The supplied location record gives a cadastral parcel centroid of 17.64806, 77.81814. The RERA land fields record roads on the west and south boundaries. RERA record RERA filing Location record
The location dataset identifies the nearest sampled Outer Ring Road interchange as approximately 48.6 km away. It does not provide a verified route, travel time or public-transport assessment. Location record
9. Developer & development status
The registered promoter is LANDMARK SRIGDHA DEVELOPERS, identified in the project fields as a partnership. The supplied corporate identifier is GSTIN 36AAKFL0183D1Z2. The project evidence lists partners PALLE RAVINDER REDDY, DUMBALA VIJENDER REDDY and PALLE ROHAN REDDY, with Palle Ravinder Reddy recorded as authorized signatory. Corporate record Parties record RERA filing
The registration certificate lists the promoter address as Village: L.B. Nagar-I, Mandal: Saroornagar, District: Ranga Reddy, Pin: 500098. The RERA project fields separately show a promoter address at FLAT NO 115, DOCTORS COLONY, with locality and street entries referring to Kamkole. The supplied evidence does not provide a verified official contact number or email address. RERA filing
Form B is a promoter declaration dated 11/03/2024 and states a completion undertaking of 24/02/2026. The project header records proposed completion as 23/02/2026. No later extension order, current construction update, site inspection, or completed-project certificate is supplied. The promoter website appears in the evidence as a vendor source, not as the basis for the RERA project profile. RERA record Parties record
10. Approvals, official records & documents
| What it establishes | Registration of West City Grand Phase II and identification of Landmark Srigdha Developers as promoter; records registration validity and standard registration conditions. |
|---|---|
| Scope / limitation | Registration certificate; not an agreement for sale, conveyance deed, or completion certificate. |
| What it establishes | Approval extraction for a proposed plotted layout; records layout components and conditions, including mortgage and future gift-deed requirements. |
|---|---|
| Scope / limitation | The extracted date is unclear (“Dt.2442'2024”); final layout-release status is not supplied. The document expressly states the permission is not proof of title. |
| What it establishes | Promoter declaration concerning title, encumbrances, project funds, pending approvals and completion undertaking. |
|---|---|
| Scope / limitation | A promoter declaration, not independent verification of the statements. |
| What it establishes | Blank form for certification of overall completion and recording occupancy-certificate details. |
|---|---|
| Scope / limitation | Blank form; not evidence that this project is complete or has an OC. |
| What it establishes | Filed project allotment-letter document referring to West City Grand Phase II. |
|---|---|
| Scope / limitation | Allottee, plot number, extent and price are not filled; it does not establish a completed transfer of title. |
| What it establishes | Telangana RERA-style agreement template filed for the project. |
|---|---|
| Scope / limitation | Material project, unit, allottee, price and execution particulars are largely blank. |
| What it establishes | Approval extraction lists Ac. 8.225 Cents, plot/open-space/road components, and layout utilities. |
|---|---|
| Scope / limitation | The supplied evidence does not include a confirmed final layout-release record or project-specific completion/occupancy certificate. |
The HMDA land-use sheet could not be confidently assigned to the stated mandal/locality in the supplied record, and the public approved-layout lookup is recorded as unavailable. These are limits of the available lookup evidence, not findings that an approval was refused. HMDA
1. Project at a glance
Project identity
Registered project name: West City Grand Phase II
Project type: Plotted development
Phase / registered portion: Phase II; the registered land is described in the filed records as parts of Survey Nos. 30 and 43 at Kamkole.
TG-RERA registration: P01100008041
Registration validity: 08/04/2024 to 23/02/2026, as recorded on the certificate. This is registration validity, not a statement that the project was completed or received an OC.
Registered promoter: LANDMARK SRIGDHA DEVELOPERS
RERA status: The record identifies the project as “New Project”; the RERA certificate records registration. A current post-expiry status or extension is not supplied.
Land and geographic identity
Registered locality: KAMKOLE (VILLAGE) MUNIPALLY (MANDAL)
Revenue village: KAMKOLE
Mandal: MUNPALLY
District: Sangareddy
PIN: 502345
Project survey numbers: 30/P AND 40/P, as shown in the project identity and RERA certificate. The filed Form B refers to parts of Survey Nos. 30 and 43, while the layout approval extraction lists 30/P, 40/P and 43/P. The registered survey identity is reproduced here as recorded; the full survey reconciliation is addressed in the land and approvals review.
Site extent: Total area 33285 sqmts; net area 33285.00 sqmts; area affected in road widening/FTL of tanks/nala widening 0 sqmts, as recorded in the RERA project fields.
Boundaries: East: OTHERS LAND; West: ROAD; North: OTHERS LAND; South: ROAD.
Development identity
Sanctioning authority: Director of Town and Country Planning; the extracted approval states delegation to Kamkole Gram Panchayat.
Principal layout approval: Draft-TLP.No.31/2024/H; file no. Lr.Roc.No.16247/15/2024/e-PanchaVa\\; application no. 16247/15. The extracted approval date reads “Dt.2442'2024”, which is not a clear calendar date in the supplied text.
Approval character: The filed document is identified as “Draft Technical Layout Pattern - Approved” for a proposed plotted layout, subject to conditions.
Approved built-up area: 19417 sqmts is recorded in the RERA project fields as approved built-up area. The evidence supplied does not explain how this figure applies to the plotted layout.
Buildings / floor configuration: Not disclosed in the supplied project evidence. The project is recorded as plotted development; no tower count or sanctioned building-floor schedule is provided.
Parking: The RERA fields record mortgage area of 2995 sqmts, but no parking count, parking level or parking-allocation schedule is supplied.
Approved versus RERA-declared plot counts: The extracted approval lists Plot Nos. 103 and 106 to 121 as mortgaged plots. A complete approved plot schedule and total RERA-declared plot count are not supplied.
Offering and status
Unit type: Residential plots; the project is classified as a plot project.
RERA-filed plot sizes: Unit-wise RERA saleable-area figures and plot counts are not available in the supplied unit data.
Booked / available: Not disclosed in the supplied evidence.
Construction / development stage: RERA filing records show amenity entries with 0% progress; no independently verified site-progress report is supplied.
Completion dates: The RERA header records proposed completion as 23/02/2026; Form B declares completion by 24/02/2026.
Occupancy / completion certificate: No project-specific occupancy or completion certificate is supplied. The available Form–1A document is a blank completion-certificate form, not a completed project certificate.
2. The project story
West City Grand Phase II is registered as a plotted development at Kamkole village, Munpally Mandal, Sangareddy District. The RERA record identifies the project land by Survey Nos. 30/P AND 40/P and states a site area of 33285 sqmts. The filed approval extraction describes a proposed layout in Survey Nos. 30/P, 40/P and 43/P, with roads, open space and plots, and identifies the layout permission as a draft technical layout pattern subject to conditions.
The development is presented in the available records as a land subdivision for residential plots, rather than a project of apartments or towers. The approval extraction lists a 10.00 % open-space component and a 31.65 % roads component, and records certain plots as mortgage security for layout works. It also lists layout utilities including street lighting, electricity facilities, sewerage disposal, protected water supply and rain-water-harvesting pits. These are approval-document provisions or descriptions; the supplied evidence does not establish that they have been completed or independently inspected.
The project’s RERA completion date is recorded as 23/02/2026, while the promoter’s Form B undertaking states 24/02/2026. The supplied material contains no current construction report, verified site inspection, or project-specific completion/occupancy certificate. The RERA amenity entries show 0% progress, which is a filed status rather than an independent physical verification.
3. Master plan, architecture & building design
The supplied approval extraction describes a plotted layout, not a multi-tower building scheme. It identifies a layout extent of Ac. 8.225 Cents and records the following land-use components: plotted area 58.35 %, stated as Ac. 4.798 Cents; open space 10.00 %, stated as Ac.0.823 cents; and roads area 31.65 %, stated as Ac.2.604 cents. It also identifies Ac. 0.740 Cents / 3581.60 Sq. Yards as mortgaged plots. These are figures as extracted from the filed approval; the supplied record does not provide a complete, legible final layout drawing or an independently reconciled land-use schedule.
The approval extraction identifies Plot Nos. 103 and 106 to 121 as the plots to be mortgaged to Kamkole Gram Panchayat. It further records that the open-space and road areas are to be gifted to the Gram Panchayat by registered gift deed before release of the final layout. The number of total plots, plot-by-plot dimensions, internal-road widths, final layout-release status and final as-built arrangement are not established by the supplied materials.
No towers, building footprints, floor configuration, parking levels, apartment layouts or residential/commercial building mix are evidenced. Although the RERA fields state an approved built-up area of 19417 sqmts, the supplied records do not identify the buildings or components to which that figure relates.
4. Homes, configurations & floor plans
This is a plotted project, so apartment configuration and carpet-area measurements are not applicable on the evidence supplied. The RERA unit-type schedule, plot-wise saleable areas, total plot count, bookings and availability are not supplied in the unit data.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Residential plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable / not supplied | Not supplied |
Two drawing records are noted, but both are scans pending measurement; 0 drawings have been measured and no layout sheets are recorded. The software-measurement source therefore supplies no plot or home-area measurements for this overview.
The promoter’s vendor listing contains plot-size claims from 1302 sq.ft through 3993 sq.ft. These are promoter-marketed figures, not RERA-filed plot areas, and are not used as the project’s registered unit schedule.
5. Parking & vehicle circulation
The supplied RERA fields record a 2995 sqmts mortgage area, and the layout approval extraction identifies specified plots mortgaged to the Gram Panchayat as security for layout works. These records do not establish parking provision. No sanctioned parking count, visitor or accessible-parking provision, parking layout, vehicle entry/exit arrangement, internal driveway details, EV charging provision or plot-specific parking allocation is supplied. A plot or layout drawing reference alone would not establish exclusive parking rights.
6. Amenities, recreation & open spaces
The filed layout approval identifies open space and layout infrastructure. The RERA amenity register records several items as available, but shows 0% progress; the supplied evidence does not establish delivery or independent verification.
| Description / size | 10.00 %; Ac.0.823 cents |
|---|---|
| Evidence source | Layout approval extraction |
| Declared progress / verified status | Approval document states the area is to be handed over to the Gram Panchayat by registered gift deed before final layout release; completed handover is not evidenced. |
| Description / size | 31.65 %; Ac.2.604 cents |
|---|---|
| Evidence source | Layout approval extraction |
| Declared progress / verified status | Approval document states the area is to be handed over to the Gram Panchayat by registered gift deed before final layout release; completed handover is not evidenced. |
| Description / size | No size supplied |
|---|---|
| Evidence source | RERA amenity register |
| Declared progress / verified status | Marked “YES”; progress 0%; no independent completion verification supplied. |
| Description / size | No dimensions supplied |
|---|---|
| Evidence source | RERA amenity register; layout approval extraction |
| Declared progress / verified status | Marked “YES” in the register; progress 0%; no independent completion verification supplied. |
| Description / size | No size or facility detail supplied |
|---|---|
| Evidence source | RERA amenity register |
| Declared progress / verified status | Progress 0%; no completion or independent verification supplied. |
| Description / size | No additional size supplied |
|---|---|
| Evidence source | RERA amenity register |
| Declared progress / verified status | Marked “YES”; progress 0%; no independent completion verification supplied. |
The filed layout approval also lists street lighting, electricity facilities, sewerage disposal, protected water supply and rain-water-harvesting pits. Their implementation status is not established in the supplied evidence.
7. Utilities, building services & safety
The layout approval extraction lists street lighting and electricity facilities, a sewerage disposal system, protected water supply and rain water harvesting pits. The RERA amenity register also lists water supply, sewerage, storm-water drains, water conservation/rainwater harvesting, energy management, solid-waste management and disposal, and an electrical meter room/sub-station/receiving station; these entries show 0% progress where a percentage is recorded. No capacities, technical specifications, commissioning records or independent completion verification are supplied.
The RERA amenity register includes a fire-protection and fire-safety entry, but no project-specific fire system design, clearance or completed-installation evidence is supplied. No evidence is provided for lifts, backup power, CCTV, controlled access, accessible routes or ramps.
8. Location, access & connectivity
The registered location is KAMKOLE (VILLAGE) MUNIPALLY (MANDAL), Sangareddy District, 502345. The supplied location record gives a cadastral parcel centroid of 17.64806, 77.81814. The RERA land fields record roads on the west and south boundaries.
The location dataset identifies the nearest sampled Outer Ring Road interchange as approximately 48.6 km away. It does not provide a verified route, travel time or public-transport assessment.
9. Developer & development status
The registered promoter is LANDMARK SRIGDHA DEVELOPERS, identified in the project fields as a partnership. The supplied corporate identifier is GSTIN 36AAKFL0183D1Z2. The project evidence lists partners PALLE RAVINDER REDDY, DUMBALA VIJENDER REDDY and PALLE ROHAN REDDY, with Palle Ravinder Reddy recorded as authorized signatory.
The registration certificate lists the promoter address as Village: L.B. Nagar-I, Mandal: Saroornagar, District: Ranga Reddy, Pin: 500098. The RERA project fields separately show a promoter address at FLAT NO 115, DOCTORS COLONY, with locality and street entries referring to Kamkole. The supplied evidence does not provide a verified official contact number or email address.
Form B is a promoter declaration dated 11/03/2024 and states a completion undertaking of 24/02/2026. The project header records proposed completion as 23/02/2026. No later extension order, current construction update, site inspection, or completed-project certificate is supplied. The promoter website appears in the evidence as a vendor source, not as the basis for the RERA project profile.
10. Approvals, official records & documents
| What it establishes | Registration of West City Grand Phase II and identification of Landmark Srigdha Developers as promoter; records registration validity and standard registration conditions. |
|---|---|
| Scope / limitation | Registration certificate; not an agreement for sale, conveyance deed, or completion certificate. |
| What it establishes | Approval extraction for a proposed plotted layout; records layout components and conditions, including mortgage and future gift-deed requirements. |
|---|---|
| Scope / limitation | The extracted date is unclear (“Dt.2442'2024”); final layout-release status is not supplied. The document expressly states the permission is not proof of title. |
| What it establishes | Promoter declaration concerning title, encumbrances, project funds, pending approvals and completion undertaking. |
|---|---|
| Scope / limitation | A promoter declaration, not independent verification of the statements. |
| What it establishes | Blank form for certification of overall completion and recording occupancy-certificate details. |
|---|---|
| Scope / limitation | Blank form; not evidence that this project is complete or has an OC. |
| What it establishes | Filed project allotment-letter document referring to West City Grand Phase II. |
|---|---|
| Scope / limitation | Allottee, plot number, extent and price are not filled; it does not establish a completed transfer of title. |
| What it establishes | Telangana RERA-style agreement template filed for the project. |
|---|---|
| Scope / limitation | Material project, unit, allottee, price and execution particulars are largely blank. |
| What it establishes | Approval extraction lists Ac. 8.225 Cents, plot/open-space/road components, and layout utilities. |
|---|---|
| Scope / limitation | The supplied evidence does not include a confirmed final layout-release record or project-specific completion/occupancy certificate. |
The HMDA land-use sheet could not be confidently assigned to the stated mandal/locality in the supplied record, and the public approved-layout lookup is recorded as unavailable. These are limits of the available lookup evidence, not findings that an approval was refused.
Other registrations of West City Grand
Frequently asked questions
Is West City Grand Phase II registered with Telangana RERA?
Yes. West City Grand Phase II is registered with the Telangana Real Estate Regulatory Authority as P01100008041; the registration status is New Project.
Who is the developer of West City Grand Phase II?
The promoter named in the RERA registration is LANDMARK SRIGDHA DEVELOPERS.
Where is West City Grand Phase II located?
West City Grand Phase II is in KAMKOLE (VILLAGE) MUNIPALLY (MANDAL), KAMKOLE, MUNPALLY, Sangareddy, Telangana (502345).
When will West City Grand Phase II be completed?
The promoter's proposed date of completion filed with RERA is 23/02/2026. This is the promoter's declaration, not a guarantee.