LUCKIE TOWNSHIP THIMMAPUR is a plotted development / residential open-plot layout in Kothur, Kothur Mandal, Ranga Reddy District, developed by SWATHI PROMOTERS PRIVATE LIMITED. The registered site extent is 47,186.11 sq.m.; the supplied records do not disclose a complete plot count or plot configurations. The project is registered under TG-RERA number P02400002523, and the promoter’s Form B declares completion by 12/08/2023.

More from Swathi Promoters Pvt Ltd · 12 projects →

01What we found

Period endedTG-RERA registration ran to 12 Aug 2023 - check its extension on TG-RERA
19documents on file - each fact links to its page
2court cases on this project's land (survey 220, Kothur)
7items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameLUCKIE TOWNSHIP THIMMAPUR RERA record
Project typePlotted development / residential open-plot layout RERA record
Phase / registered portionPhase not separately identified; the registration and layout records refer to the project in Survey Nos. 220 part and 221 part
TG-RERA registrationP02400002523
Registration validity01/02/2021 to 12/08/2023; the certificate states two years. This is registration validity, not the occupancy-certificate date.
Registered promoterSWATHI PROMOTERS PRIVATE LIMITED RERA record
RERA status in supplied recordRegistration certificate supplied; it states validity through 12/08/2023 and that it was not extended. Current registration status is not independently verified here.

Land and geographic identity

FieldRecord
Locality / revenue villageKothur; the layout records refer to Kothur (Kothur) Village. RERA record
Mandal / districtKothur Mandal, Ranga Reddy District RERA record
PIN509228 RERA record
Project survey numbersSurvey No. 220 part and Survey No. 221 part; the RERA certificate records these as 220part and 221part. RERA record
Registered site extent47,186.11 sq.m. RERA filing
Net / total areaTotal site area 47,186.11 sq.m.; net site area 47,186.11 sq.m.
Boundaries as filedEast: vacant land; West: vacant land; North: existing layout; South: vacant land. RERA filing

Development identity

FieldRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal layout approval000084/LO/Plg/HMDA/2020, dated 13 August 2020 (draft layout approval); final layout release recorded on 20 June 2022 under file no. 052205/LT/SMD/FLT/U6/HMDA/05022022.
Approved built-up area24,906.94 sq.m. is recorded as approved built-up area in the RERA filing; the layout drawing separately identifies 24,906.94 sq.m. as plotted area. These are different labels in the supplied record. RERA filing Layout record
Buildings / floorsNot disclosed for this plotted layout; individual dwelling-house permissions are to be considered separately.
Parking provisionParking count and parking arrangement are not disclosed in the supplied project records.
Plots / RERA-declared countThe layout drawing software-read count is 13 printed plot numbers (1–13), but the drawing-derived record says plot sizes are not extracted and the plot count is incomplete. A RERA-declared total plot count is not supplied. Layout record

Offering and status

FieldRecord
Unit typeResidential plots RERA record
RERA-filed saleable size rangeNot available in the supplied RERA unit records.
Booked / available plotsNot available in the supplied RERA unit records.
Original completion undertakingPromoter’s Form B declares completion within three years, by 12/08/2023.
Completion / occupancy recordA filed architect’s certificate states that HMDA issued an occupancy certificate on 20-06-2022, but the supplied extract does not establish the precise plot or phase scope of that certificate.
Construction stageThe RERA file includes an architect’s certificate dated 19-04-2024 listing project infrastructure and completion-related categories; no independently verified current site progress is supplied.

2. The project story

LUCKIE TOWNSHIP THIMMAPUR is registered as a plotted residential development in Kothur, Kothur Mandal, Ranga Reddy District, over Survey Nos. 220 part and 221 part. The approved layout covers 47,186.11 sq.m. and organizes the land into residential plots, roads, park/open space and social-infrastructure land. It is not an apartment or tower project: the final HMDA layout permits residential dwelling houses, with individual building permissions to be considered separately. RERA record

HMDA’s file records draft layout approval in August 2020 and final layout release on 20 June 2022. The final-layout letter records that roads and open spaces were taken over by the local authority through registered gift deeds and that a relinquishment deed concerning mortgaged plots was executed.

The promoter’s RERA Form B undertook completion by 12/08/2023. Separately, a filed architect’s certificate records an HMDA occupancy certificate dated 20-06-2022 and states that the project was completed in all aspects. The supplied extract does not specify the exact scope covered by that certificate, and it is not an independent site inspection.

3. Master plan, architecture & building design

The HMDA-approved layout is a plotted plan over a total and net site area of 47,186.11 sq.m. The drawing-derived land-use schedule reports:

Layout useAreaShare of net layout areaEvidence
Plotted area24,906.94 sq.m.52.8%Layout record
Roads17,026.20 sq.m.36.1%Layout record
Parks / open space4,065.45 sq.m.8.6%Layout record
Social infrastructure1,186.53 sq.m.2.5%Layout record
Amenities area0.00 sq.m. in the drawing-derived schedule0.0%Layout record
  • The layout record reads 13 printed plot numbers (1–13), but marks the count as incomplete; plot sizes were not extracted. The approved layout also identifies roads of 18 metres and above and 60 feet and above. Layout record
  • The draft approval identified 25 plots—Nos. 1–6, 20–27, 42–47 and 62–66—totalling 5,098.88 sq.m., as mortgaged to HMDA. The final-layout letter records a later relinquishment deed concerning the mortgaged plots.
  • This is a layout approval, not an approval of individual house designs. The supplied material does not describe house footprints, heights, floor configurations, or a common building arrangement.

4. Homes, configurations & floor plans

  • This is a plotted project. The supplied RERA-filed unit schedule does not provide plot-wise configurations, saleable area, booking status or availability. The layout drawing record indicates 13 printed plot numbers (1–13), but does not provide a complete plot-size schedule. Layout record
  • A third-party listing gives plot sizes of 1,259–4,413 sq.ft.; this is not a RERA-filed plot-size schedule and is not used here as the project’s registered offering. Promoter website
  • The three supplied drawing sheets are layout sheets; none is recorded as an individual home floor plan. No software-measured carpet areas or room dimensions are available. Floor plans

5. Parking & vehicle circulation

No project parking-space count, visitor or accessible parking provision, plot-specific parking allocation, or parking-level arrangement is disclosed in the supplied records. The approved layout includes internal roads; the draft HMDA conditions also refer to road accessibility and pedestrian footpaths, but do not establish individual plot parking rights.

6. Amenities, recreation & open spaces

The following facilities appear in the supplied project records. Approval conditions describe required development works; a filed architect’s certificate lists infrastructure categories and reports progress, but the extracts do not independently verify present-day delivery.

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / organised open space4,065.45 sq.m.Layout recordIncluded in layout area schedule; final-layout letter records open spaces taken over by the local authority. Current condition not independently verified.
Social infrastructure land1,186.53 sq.m.Layout recordShown in the layout schedule; present use or facilities on the land are not specified.
Green strip / tot lot / parkNo separate size suppliedRERA amenitiesRERA amenities record marks “YES” and 100%; this is a filed declaration, not independent verification.
Internal roads and footpathsRoad area: 17,026.20 sq.m.RERA amenitiesRERA amenities record marks “YES” and 100%; current physical condition not independently verified.
Cycling tracksNo size suppliedIncluded among draft approval development conditions; completion not independently verified.
Community buildingsNo size or facility description suppliedRERA amenitiesNo completion percentage supplied in the RERA amenities record.
Kids’ play areas / tennis courtNo size or capacity suppliedPromoter websiteThird-party listing only; not established as sanctioned or delivered by the supplied project records.

The draft HMDA conditions also refer to avenue plantation and park development. The final layout records that the roads and open spaces were handed over to the local authority through registered gift deeds.

7. Utilities, building services & safety

  • The draft HMDA layout conditions specify development works including internal water-supply pipelines, an overhead tank and an assured water-supply source; underground drainage lines and a common septic tank / STP; storm-water drains; electrical lines, streetlights and a transformer; and rainwater-harvesting pits. They also call for underground ducting of utilities, a transformer yard, LED street lighting, solid-waste disposal space, a bio-compost unit and source segregation. These are approval conditions, not confirmation of current installation or capacity.
  • The final-layout record describes water supply, sewerage and drainage-disposal systems, street lighting, rainwater-harvesting structure and other civic amenities, with maintenance assigned to the local body. The architect’s filed certificate lists internal roads and footpaths, water supply, sewerage, storm-water drains, landscaping, street lighting, sewage treatment and disposal, solid-waste management, water conservation, energy management, fire-safety requirements and electrical infrastructure. The extract does not provide capacities or independently verified completion details for those services.
  • The supplied records do not specify fire-system equipment or clearances for the layout as a whole, security systems, accessible routes, or EV charging. The final layout does specify a minimum 3-metre safety distance between buildings and high-tension electricity lines when individual residential building permissions are considered.

8. Location, access & connectivity

  • The registered project location is Kothur, Kothur Mandal, Ranga Reddy District, PIN 509228, on Survey Nos. 220 part and 221 part. The layout record identifies Kothur (Kothur) Village. RERA record
  • The HMDA draft approval requires roads to remain open for accessibility to neighbouring sites and describes layout roads of 18 metres and above and 60 feet and above. No verified project-specific approach-road distance, public-transport service, or measured distance to landmarks is supplied.

9. Developer & development status

  • The registered legal promoter is SWATHI PROMOTERS PRIVATE LIMITED, a private limited company. Its supplied GSTIN is 36AAJCS9335A1ZC. The project record gives the promoter address as SVSS Nivas, Flat No. 402, Czech Colony, near Gokul Theatre, Kothur, Ranga Reddy District, Telangana 509228. RERA record Corporate record Parties record
  • The registration certificate separately lists a promoter-office address in Ameerpet, Hyderabad, PIN 500018. An official contact number, email address or company website is not supplied.
  • The promoter’s Form B declares a completion deadline of 12/08/2023. The supplied RERA file also contains an architect’s certificate dated 19-04-2024 and a separate certificate extract reporting an HMDA occupancy certificate dated 20-06-2022. The supplied extracts do not establish a phase-by-phase scope or a current independent site assessment.

10. Approvals, official records & documents

TG-RERA registration certificate (Form C)
Identifier / dateP02400002523; 01/02/2021–12/08/2023
What it establishesRegistration of LUCKIE TOWNSHIP THIMMAPUR; certificate states validity and conditions.
HMDA draft layout letter
Identifier / date000084/LO/Plg/HMDA/2020; 13 August 2020
What it establishesDraft technical approval for the open-plot layout in Survey Nos. 220 part and 221 part.
HMDA final layout letter
Identifier / dateFile 052205/LT/SMD/FLT/U6/HMDA/05022022; 20 June 2022
What it establishesFinal residential open-plot layout release for the recorded 47,186.11 sq.m. site.
Recorded road/open-space gift deeds
Identifier / date9044/2021, dated 29/11/2021; 2364/2022, dated 26/03/2022
What it establishesFinal-layout letter records handover of roads and open spaces to the local authority.
Recorded relinquishment deed
Identifier / date4092/2022, dated 25.05.2022
What it establishesFinal-layout letter records relinquishment concerning mortgaged plots.
Architect’s certificate
Identifier / date19-04-2024; RERA no. P02400002523
What it establishesFiled certificate relating to project progress and listed infrastructure categories.
Architect’s certificate / OC record
Identifier / date052205/LT/SMD/FLT/U6/HMDA/05022022, dated 20-06-2022
What it establishesFiled extract reports an HMDA occupancy certificate; precise scope is not established by the supplied extract.
Promoter Form B
Identifier / dateCompletion undertaking to 12/08/2023
What it establishesPromoter declaration covering title basis, encumbrance disclosure, separate-account commitments and completion timeline.

Frequently asked questions

Is LUCKIE TOWNSHIP THIMMAPUR registered with Telangana RERA?

Yes. LUCKIE TOWNSHIP THIMMAPUR is registered with the Telangana Real Estate Regulatory Authority as P02400002523; the registration status is New Project.

Who is the developer of LUCKIE TOWNSHIP THIMMAPUR?

The promoter named in the RERA registration is SWATHI PROMOTERS PRIVATE LIMITED.

Where is LUCKIE TOWNSHIP THIMMAPUR located?

LUCKIE TOWNSHIP THIMMAPUR is in KOTHUR, Rangareddy, Telangana (509228).

When will LUCKIE TOWNSHIP THIMMAPUR be completed?

The promoter's proposed date of completion filed with RERA is 12/08/2023. This is the promoter's declaration, not a guarantee.