Luckie Township Thimmapur
SWATHI PROMOTERS PRIVATE LIMITED · Rangareddy · RERA P02400002523
LUCKIE TOWNSHIP THIMMAPUR is a plotted development / residential open-plot layout in Kothur, Kothur Mandal, Ranga Reddy District, developed by SWATHI PROMOTERS PRIVATE LIMITED. The registered site extent is 47,186.11 sq.m.; the supplied records do not disclose a complete plot count or plot configurations. The project is registered under TG-RERA number P02400002523, and the promoter’s Form B declares completion by 12/08/2023.
More from Swathi Promoters Pvt Ltd · 12 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | LUCKIE TOWNSHIP THIMMAPUR RERA record |
| Project type | Plotted development / residential open-plot layout RERA record |
| Phase / registered portion | Phase not separately identified; the registration and layout records refer to the project in Survey Nos. 220 part and 221 part |
| TG-RERA registration | P02400002523 |
| Registration validity | 01/02/2021 to 12/08/2023; the certificate states two years. This is registration validity, not the occupancy-certificate date. |
| Registered promoter | SWATHI PROMOTERS PRIVATE LIMITED RERA record |
| RERA status in supplied record | Registration certificate supplied; it states validity through 12/08/2023 and that it was not extended. Current registration status is not independently verified here. |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Kothur; the layout records refer to Kothur (Kothur) Village. RERA record |
| Mandal / district | Kothur Mandal, Ranga Reddy District RERA record |
| PIN | 509228 RERA record |
| Project survey numbers | Survey No. 220 part and Survey No. 221 part; the RERA certificate records these as 220part and 221part. RERA record |
| Registered site extent | 47,186.11 sq.m. RERA filing |
| Net / total area | Total site area 47,186.11 sq.m.; net site area 47,186.11 sq.m. |
| Boundaries as filed | East: vacant land; West: vacant land; North: existing layout; South: vacant land. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) |
| Principal layout approval | 000084/LO/Plg/HMDA/2020, dated 13 August 2020 (draft layout approval); final layout release recorded on 20 June 2022 under file no. 052205/LT/SMD/FLT/U6/HMDA/05022022. |
| Approved built-up area | 24,906.94 sq.m. is recorded as approved built-up area in the RERA filing; the layout drawing separately identifies 24,906.94 sq.m. as plotted area. These are different labels in the supplied record. RERA filing Layout record |
| Buildings / floors | Not disclosed for this plotted layout; individual dwelling-house permissions are to be considered separately. |
| Parking provision | Parking count and parking arrangement are not disclosed in the supplied project records. |
| Plots / RERA-declared count | The layout drawing software-read count is 13 printed plot numbers (1–13), but the drawing-derived record says plot sizes are not extracted and the plot count is incomplete. A RERA-declared total plot count is not supplied. Layout record |
Offering and status
| Field | Record |
|---|---|
| Unit type | Residential plots RERA record |
| RERA-filed saleable size range | Not available in the supplied RERA unit records. |
| Booked / available plots | Not available in the supplied RERA unit records. |
| Original completion undertaking | Promoter’s Form B declares completion within three years, by 12/08/2023. |
| Completion / occupancy record | A filed architect’s certificate states that HMDA issued an occupancy certificate on 20-06-2022, but the supplied extract does not establish the precise plot or phase scope of that certificate. |
| Construction stage | The RERA file includes an architect’s certificate dated 19-04-2024 listing project infrastructure and completion-related categories; no independently verified current site progress is supplied. |
2. The project story
LUCKIE TOWNSHIP THIMMAPUR is registered as a plotted residential development in Kothur, Kothur Mandal, Ranga Reddy District, over Survey Nos. 220 part and 221 part. The approved layout covers 47,186.11 sq.m. and organizes the land into residential plots, roads, park/open space and social-infrastructure land. It is not an apartment or tower project: the final HMDA layout permits residential dwelling houses, with individual building permissions to be considered separately. RERA record
HMDA’s file records draft layout approval in August 2020 and final layout release on 20 June 2022. The final-layout letter records that roads and open spaces were taken over by the local authority through registered gift deeds and that a relinquishment deed concerning mortgaged plots was executed.
The promoter’s RERA Form B undertook completion by 12/08/2023. Separately, a filed architect’s certificate records an HMDA occupancy certificate dated 20-06-2022 and states that the project was completed in all aspects. The supplied extract does not specify the exact scope covered by that certificate, and it is not an independent site inspection.
3. Master plan, architecture & building design
The HMDA-approved layout is a plotted plan over a total and net site area of 47,186.11 sq.m. The drawing-derived land-use schedule reports:
| Layout use | Area | Share of net layout area | Evidence |
|---|---|---|---|
| Plotted area | 24,906.94 sq.m. | 52.8% | Layout record |
| Roads | 17,026.20 sq.m. | 36.1% | Layout record |
| Parks / open space | 4,065.45 sq.m. | 8.6% | Layout record |
| Social infrastructure | 1,186.53 sq.m. | 2.5% | Layout record |
| Amenities area | 0.00 sq.m. in the drawing-derived schedule | 0.0% | Layout record |
- The layout record reads 13 printed plot numbers (1–13), but marks the count as incomplete; plot sizes were not extracted. The approved layout also identifies roads of 18 metres and above and 60 feet and above. Layout record
- The draft approval identified 25 plots—Nos. 1–6, 20–27, 42–47 and 62–66—totalling 5,098.88 sq.m., as mortgaged to HMDA. The final-layout letter records a later relinquishment deed concerning the mortgaged plots.
- This is a layout approval, not an approval of individual house designs. The supplied material does not describe house footprints, heights, floor configurations, or a common building arrangement.
4. Homes, configurations & floor plans
- This is a plotted project. The supplied RERA-filed unit schedule does not provide plot-wise configurations, saleable area, booking status or availability. The layout drawing record indicates 13 printed plot numbers (1–13), but does not provide a complete plot-size schedule. Layout record
- A third-party listing gives plot sizes of 1,259–4,413 sq.ft.; this is not a RERA-filed plot-size schedule and is not used here as the project’s registered offering. Promoter website
- The three supplied drawing sheets are layout sheets; none is recorded as an individual home floor plan. No software-measured carpet areas or room dimensions are available. Floor plans
5. Parking & vehicle circulation
No project parking-space count, visitor or accessible parking provision, plot-specific parking allocation, or parking-level arrangement is disclosed in the supplied records. The approved layout includes internal roads; the draft HMDA conditions also refer to road accessibility and pedestrian footpaths, but do not establish individual plot parking rights.
6. Amenities, recreation & open spaces
The following facilities appear in the supplied project records. Approval conditions describe required development works; a filed architect’s certificate lists infrastructure categories and reports progress, but the extracts do not independently verify present-day delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organised open space | 4,065.45 sq.m. | Layout record | Included in layout area schedule; final-layout letter records open spaces taken over by the local authority. Current condition not independently verified. |
| Social infrastructure land | 1,186.53 sq.m. | Layout record | Shown in the layout schedule; present use or facilities on the land are not specified. |
| Green strip / tot lot / park | No separate size supplied | RERA amenities | RERA amenities record marks “YES” and 100%; this is a filed declaration, not independent verification. |
| Internal roads and footpaths | Road area: 17,026.20 sq.m. | RERA amenities | RERA amenities record marks “YES” and 100%; current physical condition not independently verified. |
| Cycling tracks | No size supplied | Included among draft approval development conditions; completion not independently verified. | |
| Community buildings | No size or facility description supplied | RERA amenities | No completion percentage supplied in the RERA amenities record. |
| Kids’ play areas / tennis court | No size or capacity supplied | Promoter website | Third-party listing only; not established as sanctioned or delivered by the supplied project records. |
The draft HMDA conditions also refer to avenue plantation and park development. The final layout records that the roads and open spaces were handed over to the local authority through registered gift deeds.
7. Utilities, building services & safety
- The draft HMDA layout conditions specify development works including internal water-supply pipelines, an overhead tank and an assured water-supply source; underground drainage lines and a common septic tank / STP; storm-water drains; electrical lines, streetlights and a transformer; and rainwater-harvesting pits. They also call for underground ducting of utilities, a transformer yard, LED street lighting, solid-waste disposal space, a bio-compost unit and source segregation. These are approval conditions, not confirmation of current installation or capacity.
- The final-layout record describes water supply, sewerage and drainage-disposal systems, street lighting, rainwater-harvesting structure and other civic amenities, with maintenance assigned to the local body. The architect’s filed certificate lists internal roads and footpaths, water supply, sewerage, storm-water drains, landscaping, street lighting, sewage treatment and disposal, solid-waste management, water conservation, energy management, fire-safety requirements and electrical infrastructure. The extract does not provide capacities or independently verified completion details for those services.
- The supplied records do not specify fire-system equipment or clearances for the layout as a whole, security systems, accessible routes, or EV charging. The final layout does specify a minimum 3-metre safety distance between buildings and high-tension electricity lines when individual residential building permissions are considered.
8. Location, access & connectivity
- The registered project location is Kothur, Kothur Mandal, Ranga Reddy District, PIN 509228, on Survey Nos. 220 part and 221 part. The layout record identifies Kothur (Kothur) Village. RERA record
- The HMDA draft approval requires roads to remain open for accessibility to neighbouring sites and describes layout roads of 18 metres and above and 60 feet and above. No verified project-specific approach-road distance, public-transport service, or measured distance to landmarks is supplied.
9. Developer & development status
- The registered legal promoter is SWATHI PROMOTERS PRIVATE LIMITED, a private limited company. Its supplied GSTIN is 36AAJCS9335A1ZC. The project record gives the promoter address as SVSS Nivas, Flat No. 402, Czech Colony, near Gokul Theatre, Kothur, Ranga Reddy District, Telangana 509228. RERA record Corporate record Parties record
- The registration certificate separately lists a promoter-office address in Ameerpet, Hyderabad, PIN 500018. An official contact number, email address or company website is not supplied.
- The promoter’s Form B declares a completion deadline of 12/08/2023. The supplied RERA file also contains an architect’s certificate dated 19-04-2024 and a separate certificate extract reporting an HMDA occupancy certificate dated 20-06-2022. The supplied extracts do not establish a phase-by-phase scope or a current independent site assessment.
10. Approvals, official records & documents
| Identifier / date | P02400002523; 01/02/2021–12/08/2023 |
|---|---|
| What it establishes | Registration of LUCKIE TOWNSHIP THIMMAPUR; certificate states validity and conditions. |
| Identifier / date | 000084/LO/Plg/HMDA/2020; 13 August 2020 |
|---|---|
| What it establishes | Draft technical approval for the open-plot layout in Survey Nos. 220 part and 221 part. |
| Identifier / date | File 052205/LT/SMD/FLT/U6/HMDA/05022022; 20 June 2022 |
|---|---|
| What it establishes | Final residential open-plot layout release for the recorded 47,186.11 sq.m. site. |
| Identifier / date | 9044/2021, dated 29/11/2021; 2364/2022, dated 26/03/2022 |
|---|---|
| What it establishes | Final-layout letter records handover of roads and open spaces to the local authority. |
| Identifier / date | 4092/2022, dated 25.05.2022 |
|---|---|
| What it establishes | Final-layout letter records relinquishment concerning mortgaged plots. |
| Identifier / date | 19-04-2024; RERA no. P02400002523 |
|---|---|
| What it establishes | Filed certificate relating to project progress and listed infrastructure categories. |
| Identifier / date | 052205/LT/SMD/FLT/U6/HMDA/05022022, dated 20-06-2022 |
|---|---|
| What it establishes | Filed extract reports an HMDA occupancy certificate; precise scope is not established by the supplied extract. |
| Identifier / date | Completion undertaking to 12/08/2023 |
|---|---|
| What it establishes | Promoter declaration covering title basis, encumbrance disclosure, separate-account commitments and completion timeline. |
1. Project at a glance
Project identity
Registered project name: LUCKIE TOWNSHIP THIMMAPUR
Project type: Plotted development / residential open-plot layout
Phase / registered portion: Phase not separately identified; the registration and layout records refer to the project in Survey Nos. 220 part and 221 part
TG-RERA registration: P02400002523
Registration validity: 01/02/2021 to 12/08/2023; the certificate states two years. This is registration validity, not the occupancy-certificate date.
Registered promoter: SWATHI PROMOTERS PRIVATE LIMITED
RERA status in supplied record: Registration certificate supplied; it states validity through 12/08/2023 and that it was not extended. Current registration status is not independently verified here.
Land and geographic identity
Locality / revenue village: Kothur; the layout records refer to Kothur (Kothur) Village.
Mandal / district: Kothur Mandal, Ranga Reddy District
PIN: 509228
Project survey numbers: Survey No. 220 part and Survey No. 221 part; the RERA certificate records these as 220part and 221part.
Registered site extent: 47,186.11 sq.m.
Net / total area: Total site area 47,186.11 sq.m.; net site area 47,186.11 sq.m.
Boundaries as filed: East: vacant land; West: vacant land; North: existing layout; South: vacant land.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval: 000084/LO/Plg/HMDA/2020, dated 13 August 2020 (draft layout approval); final layout release recorded on 20 June 2022 under file no. 052205/LT/SMD/FLT/U6/HMDA/05022022.
Approved built-up area: 24,906.94 sq.m. is recorded as approved built-up area in the RERA filing; the layout drawing separately identifies 24,906.94 sq.m. as plotted area. These are different labels in the supplied record.
Buildings / floors: Not disclosed for this plotted layout; individual dwelling-house permissions are to be considered separately.
Parking provision: Parking count and parking arrangement are not disclosed in the supplied project records.
Plots / RERA-declared count: The layout drawing software-read count is 13 printed plot numbers (1–13), but the drawing-derived record says plot sizes are not extracted and the plot count is incomplete. A RERA-declared total plot count is not supplied.
Offering and status
Unit type: Residential plots
RERA-filed saleable size range: Not available in the supplied RERA unit records.
Booked / available plots: Not available in the supplied RERA unit records.
Original completion undertaking: Promoter’s Form B declares completion within three years, by 12/08/2023.
Completion / occupancy record: A filed architect’s certificate states that HMDA issued an occupancy certificate on 20-06-2022, but the supplied extract does not establish the precise plot or phase scope of that certificate.
Construction stage: The RERA file includes an architect’s certificate dated 19-04-2024 listing project infrastructure and completion-related categories; no independently verified current site progress is supplied.
2. The project story
LUCKIE TOWNSHIP THIMMAPUR is registered as a plotted residential development in Kothur, Kothur Mandal, Ranga Reddy District, over Survey Nos. 220 part and 221 part. The approved layout covers 47,186.11 sq.m. and organizes the land into residential plots, roads, park/open space and social-infrastructure land. It is not an apartment or tower project: the final HMDA layout permits residential dwelling houses, with individual building permissions to be considered separately.
HMDA’s file records draft layout approval in August 2020 and final layout release on 20 June 2022. The final-layout letter records that roads and open spaces were taken over by the local authority through registered gift deeds and that a relinquishment deed concerning mortgaged plots was executed.
The promoter’s RERA Form B undertook completion by 12/08/2023. Separately, a filed architect’s certificate records an HMDA occupancy certificate dated 20-06-2022 and states that the project was completed in all aspects. The supplied extract does not specify the exact scope covered by that certificate, and it is not an independent site inspection.
3. Master plan, architecture & building design
The HMDA-approved layout is a plotted plan over a total and net site area of 47,186.11 sq.m. The drawing-derived land-use schedule reports:
| Layout use | Area | Share of net layout area | Evidence |
|---|---|---|---|
| Plotted area | 24,906.94 sq.m. | 52.8% | |
| Roads | 17,026.20 sq.m. | 36.1% | |
| Parks / open space | 4,065.45 sq.m. | 8.6% | |
| Social infrastructure | 1,186.53 sq.m. | 2.5% | |
| Amenities area | 0.00 sq.m. in the drawing-derived schedule | 0.0% |
- The layout record reads 13 printed plot numbers (1–13), but marks the count as incomplete; plot sizes were not extracted. The approved layout also identifies roads of 18 metres and above and 60 feet and above.
- The draft approval identified 25 plots—Nos. 1–6, 20–27, 42–47 and 62–66—totalling 5,098.88 sq.m., as mortgaged to HMDA. The final-layout letter records a later relinquishment deed concerning the mortgaged plots.
- This is a layout approval, not an approval of individual house designs. The supplied material does not describe house footprints, heights, floor configurations, or a common building arrangement.
4. Homes, configurations & floor plans
- This is a plotted project. The supplied RERA-filed unit schedule does not provide plot-wise configurations, saleable area, booking status or availability. The layout drawing record indicates 13 printed plot numbers (1–13), but does not provide a complete plot-size schedule.
- A third-party listing gives plot sizes of 1,259–4,413 sq.ft.; this is not a RERA-filed plot-size schedule and is not used here as the project’s registered offering.
- The three supplied drawing sheets are layout sheets; none is recorded as an individual home floor plan. No software-measured carpet areas or room dimensions are available.
5. Parking & vehicle circulation
No project parking-space count, visitor or accessible parking provision, plot-specific parking allocation, or parking-level arrangement is disclosed in the supplied records. The approved layout includes internal roads; the draft HMDA conditions also refer to road accessibility and pedestrian footpaths, but do not establish individual plot parking rights.
6. Amenities, recreation & open spaces
The following facilities appear in the supplied project records. Approval conditions describe required development works; a filed architect’s certificate lists infrastructure categories and reports progress, but the extracts do not independently verify present-day delivery.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / organised open space | 4,065.45 sq.m. | Included in layout area schedule; final-layout letter records open spaces taken over by the local authority. Current condition not independently verified. | |
| Social infrastructure land | 1,186.53 sq.m. | Shown in the layout schedule; present use or facilities on the land are not specified. | |
| Green strip / tot lot / park | No separate size supplied | RERA amenities record marks “YES” and 100%; this is a filed declaration, not independent verification. | |
| Internal roads and footpaths | Road area: 17,026.20 sq.m. | RERA amenities record marks “YES” and 100%; current physical condition not independently verified. | |
| Cycling tracks | No size supplied | Included among draft approval development conditions; completion not independently verified. | |
| Community buildings | No size or facility description supplied | No completion percentage supplied in the RERA amenities record. | |
| Kids’ play areas / tennis court | No size or capacity supplied | Third-party listing only; not established as sanctioned or delivered by the supplied project records. |
The draft HMDA conditions also refer to avenue plantation and park development. The final layout records that the roads and open spaces were handed over to the local authority through registered gift deeds.
7. Utilities, building services & safety
- The draft HMDA layout conditions specify development works including internal water-supply pipelines, an overhead tank and an assured water-supply source; underground drainage lines and a common septic tank / STP; storm-water drains; electrical lines, streetlights and a transformer; and rainwater-harvesting pits. They also call for underground ducting of utilities, a transformer yard, LED street lighting, solid-waste disposal space, a bio-compost unit and source segregation. These are approval conditions, not confirmation of current installation or capacity.
- The final-layout record describes water supply, sewerage and drainage-disposal systems, street lighting, rainwater-harvesting structure and other civic amenities, with maintenance assigned to the local body. The architect’s filed certificate lists internal roads and footpaths, water supply, sewerage, storm-water drains, landscaping, street lighting, sewage treatment and disposal, solid-waste management, water conservation, energy management, fire-safety requirements and electrical infrastructure. The extract does not provide capacities or independently verified completion details for those services.
- The supplied records do not specify fire-system equipment or clearances for the layout as a whole, security systems, accessible routes, or EV charging. The final layout does specify a minimum 3-metre safety distance between buildings and high-tension electricity lines when individual residential building permissions are considered.
8. Location, access & connectivity
- The registered project location is Kothur, Kothur Mandal, Ranga Reddy District, PIN 509228, on Survey Nos. 220 part and 221 part. The layout record identifies Kothur (Kothur) Village.
- The HMDA draft approval requires roads to remain open for accessibility to neighbouring sites and describes layout roads of 18 metres and above and 60 feet and above. No verified project-specific approach-road distance, public-transport service, or measured distance to landmarks is supplied.
9. Developer & development status
- The registered legal promoter is SWATHI PROMOTERS PRIVATE LIMITED, a private limited company. Its supplied GSTIN is 36AAJCS9335A1ZC. The project record gives the promoter address as SVSS Nivas, Flat No. 402, Czech Colony, near Gokul Theatre, Kothur, Ranga Reddy District, Telangana 509228.
- The registration certificate separately lists a promoter-office address in Ameerpet, Hyderabad, PIN 500018. An official contact number, email address or company website is not supplied.
- The promoter’s Form B declares a completion deadline of 12/08/2023. The supplied RERA file also contains an architect’s certificate dated 19-04-2024 and a separate certificate extract reporting an HMDA occupancy certificate dated 20-06-2022. The supplied extracts do not establish a phase-by-phase scope or a current independent site assessment.
10. Approvals, official records & documents
| Identifier / date | P02400002523; 01/02/2021–12/08/2023 |
|---|---|
| What it establishes | Registration of LUCKIE TOWNSHIP THIMMAPUR; certificate states validity and conditions. |
| Identifier / date | 000084/LO/Plg/HMDA/2020; 13 August 2020 |
|---|---|
| What it establishes | Draft technical approval for the open-plot layout in Survey Nos. 220 part and 221 part. |
| Identifier / date | File 052205/LT/SMD/FLT/U6/HMDA/05022022; 20 June 2022 |
|---|---|
| What it establishes | Final residential open-plot layout release for the recorded 47,186.11 sq.m. site. |
| Identifier / date | 9044/2021, dated 29/11/2021; 2364/2022, dated 26/03/2022 |
|---|---|
| What it establishes | Final-layout letter records handover of roads and open spaces to the local authority. |
| Identifier / date | 4092/2022, dated 25.05.2022 |
|---|---|
| What it establishes | Final-layout letter records relinquishment concerning mortgaged plots. |
| Identifier / date | 19-04-2024; RERA no. P02400002523 |
|---|---|
| What it establishes | Filed certificate relating to project progress and listed infrastructure categories. |
| Identifier / date | 052205/LT/SMD/FLT/U6/HMDA/05022022, dated 20-06-2022 |
|---|---|
| What it establishes | Filed extract reports an HMDA occupancy certificate; precise scope is not established by the supplied extract. |
| Identifier / date | Completion undertaking to 12/08/2023 |
|---|---|
| What it establishes | Promoter declaration covering title basis, encumbrance disclosure, separate-account commitments and completion timeline. |
Frequently asked questions
Is LUCKIE TOWNSHIP THIMMAPUR registered with Telangana RERA?
Yes. LUCKIE TOWNSHIP THIMMAPUR is registered with the Telangana Real Estate Regulatory Authority as P02400002523; the registration status is New Project.
Who is the developer of LUCKIE TOWNSHIP THIMMAPUR?
The promoter named in the RERA registration is SWATHI PROMOTERS PRIVATE LIMITED.
Where is LUCKIE TOWNSHIP THIMMAPUR located?
LUCKIE TOWNSHIP THIMMAPUR is in KOTHUR, Rangareddy, Telangana (509228).
When will LUCKIE TOWNSHIP THIMMAPUR be completed?
The promoter's proposed date of completion filed with RERA is 12/08/2023. This is the promoter's declaration, not a guarantee.