Avc Homes Sita Garden
AVC HOMES PRIVATE LIMITED · Rangareddy · RERA P02400005271
AVC HOMES SITA GARDEN is a plotted development in Gudur / Gudoor Village, Kandukur Mandal, Ranga Reddy District, developed by registered promoter AVC HOMES PRIVATE LIMITED. The HMDA draft layout letter states a total site area of 53720.23 sq.m and a net site area of 53049.24 sq.m; the supplied records do not state a tower or block count, floor configuration, complete plot count or plot-size schedule. The registered offering is plots. The project is registered with TG-RERA under P02400005271, issued 28 October 2022, and the promoter’s Form-B declaration states completion by 13 June 2025.
More from Avc Homes Pvt Ltd · 2 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
8 items to check before you pay, 6 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Record |
|---|---|
| Registered project name | AVC HOMES SITA GARDEN RERA record |
| Project type | Plotted development / open-plot layout RERA record |
| Phase or registered portion | Phase not separately identified in the supplied record; registration is for the named plotted project |
| TG-RERA registration | P02400005271, issued 28 October 2022; certificate says valid through 13 June 2025, unless extended by the Authority. The supplied certificate records no extension. Approvals record |
| RERA status | Project header classifies it as “New Project”; the certificate establishes registration, but current registration validity is not established by the supplied record. RERA record |
| Registered promoter | AVC HOMES PRIVATE LIMITED, a private limited company Corporate record |
Land and geographic identity
| Field | Record |
|---|---|
| Locality / revenue village | Gudur / Gudoor Village (the supplied records use both spellings) RERA record RERA filing |
| Mandal | Kandukur RERA record |
| District | Ranga Reddy RERA record |
| PIN | 501359 RERA record |
| Project survey numbers | 383P, 384P, 385P and 402P; the RERA certificate and HMDA draft layout letter use these project-level survey references. RERA record Approvals record |
| Site area figures in the HMDA draft layout letter | Total site area 53720.23 sq.m; master-plan-road-affected area 670.99 sq.m; net site area 53049.24 sq.m. |
| RERA land-detail figures | Total area 53049.24 sq.m; area affected by road widening/FTL/Nala widening 670.99 sq.m; net area 52378.25 sq.m. RERA filing |
| Boundaries in RERA filing | East: others’ land; west: others’ land; north: others’ land; south: existing 33-feet-wide road. RERA filing |
Development identity
| Field | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal layout approval | 000106/LO/Plg/HMDA/2022, dated 13 June 2022; the document is a draft layout letter. Approvals record |
| Approved built-up area in RERA filing | 32286.72 sq.m RERA filing |
| Building / tower count and floor configuration | Not disclosed in the supplied records; this is a plotted layout, not a supplied apartment-building schedule. |
| Parking | Open-plot layout; no project-wide parking count, level, or allocation schedule is supplied. RERA amenities |
| RERA-declared versus approved plot count | The supplied RERA registration extract does not give a plot inventory count. HMDA’s draft letter identifies mortgaged plots 37–47; the complete approved plot schedule is not supplied here. |
Offering and status
| Field | Record |
|---|---|
| Unit type | Plots; no unit-by-unit RERA inventory or plot-size schedule is supplied in this evidence. RERA record |
| Plot size / saleable area | Not established from the supplied RERA unit data. |
| Booked / available counts | Not supplied. |
| Construction stage | The RERA filing’s project-completion percentage is reported as 80%, but no as-of date or independent site verification accompanies that figure. RERA record |
| Original completion date | Promoter’s Form-B declaration states completion by 13 June 2025. |
| Registration validity | Separately, the certificate states registration from 28 October 2022 to 13 June 2025, unless extended. The supplied certificate records no extension. |
| Completion / occupancy certificate | No completion certificate or occupancy certificate is included in the supplied evidence; for this plotted layout, no phase- or plot-specific OC status is established. Document index |
2. The project story
- AVC HOMES SITA GARDEN is registered as a plotted-development project in the Gudur/Gudoor area of Kandukur Mandal, Ranga Reddy District, covering project survey references 383P, 384P, 385P and 402P. HMDA’s supplied document is a draft layout permission for an open-plot layout, rather than a building or apartment-floor approval. RERA record
- The HMDA letter’s area statement identifies a net site area of 53049.24 sq.m and records plotted land, layout roads, open space, park and social-infrastructure areas. It also records a 90-metre-wide master-plan road effect and requires specified roads, organised open space and social-infrastructure land to be handed over by registered gift deed before final layout release. The letter identifies plots 37–47 as mortgaged to HMDA and says those plots may not be sold while mortgaged.
- The project header reports 80% completeness, but the supplied evidence does not state when that percentage was measured or independently verify the physical work. No final layout release, completion certificate or occupancy certificate is supplied. The promoter’s declared completion date was 13 June 2025; that is a declared deadline, not evidence that the layout was completed or certified. RERA record Document index
3. Master plan, architecture & building design
This is a plotted layout, so the available design evidence concerns land-use arrangement and layout infrastructure rather than towers, floor plans or apartment configurations. The HMDA draft layout letter records the following area components:
| Layout component | Area / figure | Evidence |
|---|---|---|
| Total site area | 53720.23 sq.m | |
| Master-plan-road-affected area | 670.99 sq.m | |
| Net site area | 53049.24 sq.m | |
| Plotted area | 32286.72 sq.m | |
| Layout road area | 14751.94 sq.m; 27.81% as stated in the letter | |
| Organised open-space area / park | 4669.85 sq.m; 8.80% as stated in the letter | |
| Social-infrastructure area | 1340.72 sq.m; 2.53% as stated in the letter | |
| Amenities area | 0 in the area statement |
- The letter describes roads of 18 metres and above and a 90-metre-wide master-plan road. It specifies road formation with blacktop and requires roads to remain accessible to neighbouring sites. These are approval-document statements; the supplied material does not establish completion of the works.
- The RERA filing separately reports approved built-up area of 32286.72 sq.m. No building count, floors, building footprint, or building-level arrangement is provided. The layout drawing is identified as document 249143, but its extracted text was not available for a complete plot-by-plot review; software-derived plot counts or dimensions are therefore not presented. RERA filing Document index Layout record
4. Homes, configurations & floor plans
- The registered offering is plots. The supplied project record does not provide a RERA plot-count schedule, plot-size bands, booked/available inventory, or unit-specific saleable areas. The only vendor configuration provided is a marketed “Plot” at “saleable 2077 Sq. Ft.”; it is a vendor/marketing claim, not an established RERA-filed plot-size schedule. RERA record Promoter website
- No apartment floor plans are supplied: the available drawings are identified as layout sheets, with no flats measured. Accordingly, no carpet-area, room-dimension or loading figures can be reported. Floor plans Layout record
5. Parking & vehicle circulation
- No project-wide parking-space count, visitor or accessible parking provision, mechanical or structured parking, parking levels, or plot-specific parking allocation is established in the supplied records. The vendor lists open parking as a specification, but this is a vendor statement and does not establish a sanctioned count or an exclusive parking entitlement for a purchaser. Promoter website RERA amenities
- HMDA’s draft letter requires roads to be opened for access to neighbouring sites and lists road widths of 18 metres and above; it does not provide a complete internal circulation or driveway schedule in the available extracts.
6. Amenities, recreation & open spaces
The HMDA draft layout letter includes approval-document provisions for layout infrastructure and land handover. The RERA amenity records mark certain facilities as available (“YES”), while their reported progress percentage is 0; those entries do not establish that facilities have been delivered. Vendor-listed features are identified separately below.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Organised open space / park | 4669.85 sq.m; the HMDA letter states 8.80% | Area shown in draft layout letter; completion and handover not verified. | |
| Social-infrastructure area | 1340.72 sq.m; the letter states 2.53% | Required by the letter to be handed over by registered gift deed before final layout release; handover not verified. | |
| Layout roads | 14751.94 sq.m; 27.81% as stated in the letter | Draft-layout requirement; construction and handover not verified. | |
| Internal roads and footpaths | No size supplied | RERA amenities | RERA amenity record says “YES”; progress shown as 0; completion not independently verified. |
| Green strip / tot lot / park | No size supplied beyond the park area above | RERA amenities Promoter website | RERA record says “YES”; progress shown as 0; vendor also lists the feature; delivery not verified. |
| Water conservation / rainwater harvesting | No quantity or capacity supplied | RERA amenities | RERA record says “YES”; progress shown as 0. HMDA letter lists rainwater-harvesting pits; installation not verified. |
| Kids’ play areas / sand pits | No size or capacity supplied | Promoter website | Vendor-listed; not established as delivered by the supplied records. |
| Community buildings | No size supplied | RERA amenities | Listed in RERA amenity record; no “YES” value or progress above 0 is shown. |
| Cycling tracks | No size supplied | Listed among HMDA layout infrastructure requirements; completion not verified. |
7. Utilities, building services & safety
- The HMDA draft layout letter lists proposed layout infrastructure including storm-water drains, underground drainage lines, a common septic tank / STP, internal water-supply pipelines, an overhead tank, electrical supply lines, street lights, a transformer, avenue plantation, park development, rainwater-harvesting pits, solid-waste disposal and dumping space, a bio-compost unit, and cycling tracks. The available document does not give capacities or establish that these services have been installed or commissioned.
- The RERA amenity record marks water supply, sewerage (chamber, lines, septic tank, STP), water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as “YES”; the corresponding reported progress is 0. It also lists storm-water drains, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection and fire-safety requirements, and aggregate recreational open space. These entries are disclosures, not independent verification of completed facilities or statutory compliance. RERA amenities
- The vendor describes 24×7 water supply and security, but no source, storage capacity, treatment details, backup arrangements, CCTV/access-control design, fire-system specifications, accessibility provisions, or emergency-service capacity are supplied. Promoter website RERA amenities
8. Location, access & connectivity
- The registered project location is Gudur/Gudoor Village, Kandukur Mandal, Ranga Reddy District, Telangana, PIN 501359. The RERA filing records the southern boundary as an existing 33-feet-wide road; HMDA’s draft layout letter also refers to a 90-metre-wide master-plan road affecting the site. RERA record RERA filing
- A supplied location record gives an approximate distance of 16.6 km to the nearest sampled Outer Ring Road interchange. This is a location-data estimate, not a travel time or an official project access measurement. Location record
- The vendor describes the site as en route to Pharma City; that is a vendor connectivity claim. Promoter website
9. Developer & development status
- The registered promoter is AVC HOMES PRIVATE LIMITED, a private limited company, with GSTIN 36AAFCA7696A1ZM. The project evidence lists Aluri Ramachandra Rao as authorized signatory and Aparna Chirumamilla as a director. Corporate record Parties record
- The RERA registration certificate gives the promoter office as “Village: Mandal: Nampally, District: Hyderabad, Pin: 500001.” The supplied promoter information also contains an address at Ahuja Estates, Abids, Gudur, Kandukur, Ranga Reddy, 501359; the evidence does not identify an official contact number or email address. Parties record
- The promoter website listed in the evidence is avchomes.com; website content is not used here to establish sanctioned or delivered features. Parties record
- The RERA project header reports 80% completeness without an as-of date or independent verification. Form-B declares a completion date of 13 June 2025. The certificate states registration validity through that date unless extended, and the supplied certificate records no extension. No final layout release or completion/occupancy certificate is included. RERA record Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form “C” certificate for AVC HOMES SITA GARDEN, P02400005271, under section 5; dated 28 October 2022 and stated valid through 13 June 2025 unless extended. |
| HMDA layout approval | Draft layout letter 000106/LO/Plg/HMDA/2022, dated 13 June 2022, for survey references 383/P, 384/P, 385/P and 402/P at Gudoor Village, Kandukur Mandal. |
| HMDA application reference | 051658/SMD/LT/U6/HMDA/12012022; the letter gives the application date as 12 January 2022. |
| Layout drawing | Document 249143 is identified as the layout plan; complete plot-by-plot measurements are not available in the supplied extraction. Document index Layout record |
| Authority mortgage | HMDA draft letter records mortgage deed 8895-2022 / 8895/2022 for plots 37–47, in favour of HMDA. |
| Master-plan-road gift deed | The HMDA letter references registered gift deed 10544/2022, dated 18 May 2022, for the affected master-plan-road area. |
| Promoter declaration | Form-B affidavit dated 18 July 2022, including the promoter’s declared completion date and project-fund undertakings. |
| Completion / occupancy record | No completion certificate, occupancy certificate or final layout-release document is supplied. Document index |
1. Project at a glance
Project identity
Registered project name: AVC HOMES SITA GARDEN
Project type: Plotted development / open-plot layout
Phase or registered portion: Phase not separately identified in the supplied record; registration is for the named plotted project
TG-RERA registration: P02400005271, issued 28 October 2022; certificate says valid through 13 June 2025, unless extended by the Authority. The supplied certificate records no extension.
RERA status: Project header classifies it as “New Project”; the certificate establishes registration, but current registration validity is not established by the supplied record.
Registered promoter: AVC HOMES PRIVATE LIMITED, a private limited company
Land and geographic identity
Locality / revenue village: Gudur / Gudoor Village (the supplied records use both spellings)
Mandal: Kandukur
District: Ranga Reddy
PIN: 501359
Project survey numbers: 383P, 384P, 385P and 402P; the RERA certificate and HMDA draft layout letter use these project-level survey references.
Site area figures in the HMDA draft layout letter: Total site area 53720.23 sq.m; master-plan-road-affected area 670.99 sq.m; net site area 53049.24 sq.m.
RERA land-detail figures: Total area 53049.24 sq.m; area affected by road widening/FTL/Nala widening 670.99 sq.m; net area 52378.25 sq.m.
Boundaries in RERA filing: East: others’ land; west: others’ land; north: others’ land; south: existing 33-feet-wide road.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval: 000106/LO/Plg/HMDA/2022, dated 13 June 2022; the document is a draft layout letter.
Approved built-up area in RERA filing: 32286.72 sq.m
Building / tower count and floor configuration: Not disclosed in the supplied records; this is a plotted layout, not a supplied apartment-building schedule.
Parking: Open-plot layout; no project-wide parking count, level, or allocation schedule is supplied.
RERA-declared versus approved plot count: The supplied RERA registration extract does not give a plot inventory count. HMDA’s draft letter identifies mortgaged plots 37–47; the complete approved plot schedule is not supplied here.
Offering and status
Unit type: Plots; no unit-by-unit RERA inventory or plot-size schedule is supplied in this evidence.
Plot size / saleable area: Not established from the supplied RERA unit data.
Booked / available counts: Not supplied.
Construction stage: The RERA filing’s project-completion percentage is reported as 80%, but no as-of date or independent site verification accompanies that figure.
Original completion date: Promoter’s Form-B declaration states completion by 13 June 2025.
Registration validity: Separately, the certificate states registration from 28 October 2022 to 13 June 2025, unless extended. The supplied certificate records no extension.
Completion / occupancy certificate: No completion certificate or occupancy certificate is included in the supplied evidence; for this plotted layout, no phase- or plot-specific OC status is established.
2. The project story
- AVC HOMES SITA GARDEN is registered as a plotted-development project in the Gudur/Gudoor area of Kandukur Mandal, Ranga Reddy District, covering project survey references 383P, 384P, 385P and 402P. HMDA’s supplied document is a draft layout permission for an open-plot layout, rather than a building or apartment-floor approval.
- The HMDA letter’s area statement identifies a net site area of 53049.24 sq.m and records plotted land, layout roads, open space, park and social-infrastructure areas. It also records a 90-metre-wide master-plan road effect and requires specified roads, organised open space and social-infrastructure land to be handed over by registered gift deed before final layout release. The letter identifies plots 37–47 as mortgaged to HMDA and says those plots may not be sold while mortgaged.
- The project header reports 80% completeness, but the supplied evidence does not state when that percentage was measured or independently verify the physical work. No final layout release, completion certificate or occupancy certificate is supplied. The promoter’s declared completion date was 13 June 2025; that is a declared deadline, not evidence that the layout was completed or certified.
3. Master plan, architecture & building design
This is a plotted layout, so the available design evidence concerns land-use arrangement and layout infrastructure rather than towers, floor plans or apartment configurations. The HMDA draft layout letter records the following area components:
| Layout component | Area / figure | Evidence |
|---|---|---|
| Total site area | 53720.23 sq.m | |
| Master-plan-road-affected area | 670.99 sq.m | |
| Net site area | 53049.24 sq.m | |
| Plotted area | 32286.72 sq.m | |
| Layout road area | 14751.94 sq.m; 27.81% as stated in the letter | |
| Organised open-space area / park | 4669.85 sq.m; 8.80% as stated in the letter | |
| Social-infrastructure area | 1340.72 sq.m; 2.53% as stated in the letter | |
| Amenities area | 0 in the area statement |
- The letter describes roads of 18 metres and above and a 90-metre-wide master-plan road. It specifies road formation with blacktop and requires roads to remain accessible to neighbouring sites. These are approval-document statements; the supplied material does not establish completion of the works.
- The RERA filing separately reports approved built-up area of 32286.72 sq.m. No building count, floors, building footprint, or building-level arrangement is provided. The layout drawing is identified as document 249143, but its extracted text was not available for a complete plot-by-plot review; software-derived plot counts or dimensions are therefore not presented.
4. Homes, configurations & floor plans
- The registered offering is plots. The supplied project record does not provide a RERA plot-count schedule, plot-size bands, booked/available inventory, or unit-specific saleable areas. The only vendor configuration provided is a marketed “Plot” at “saleable 2077 Sq. Ft.”; it is a vendor/marketing claim, not an established RERA-filed plot-size schedule.
- No apartment floor plans are supplied: the available drawings are identified as layout sheets, with no flats measured. Accordingly, no carpet-area, room-dimension or loading figures can be reported.
5. Parking & vehicle circulation
- No project-wide parking-space count, visitor or accessible parking provision, mechanical or structured parking, parking levels, or plot-specific parking allocation is established in the supplied records. The vendor lists open parking as a specification, but this is a vendor statement and does not establish a sanctioned count or an exclusive parking entitlement for a purchaser.
- HMDA’s draft letter requires roads to be opened for access to neighbouring sites and lists road widths of 18 metres and above; it does not provide a complete internal circulation or driveway schedule in the available extracts.
6. Amenities, recreation & open spaces
The HMDA draft layout letter includes approval-document provisions for layout infrastructure and land handover. The RERA amenity records mark certain facilities as available (“YES”), while their reported progress percentage is 0; those entries do not establish that facilities have been delivered. Vendor-listed features are identified separately below.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Organised open space / park | 4669.85 sq.m; the HMDA letter states 8.80% | Area shown in draft layout letter; completion and handover not verified. | |
| Social-infrastructure area | 1340.72 sq.m; the letter states 2.53% | Required by the letter to be handed over by registered gift deed before final layout release; handover not verified. | |
| Layout roads | 14751.94 sq.m; 27.81% as stated in the letter | Draft-layout requirement; construction and handover not verified. | |
| Internal roads and footpaths | No size supplied | RERA amenity record says “YES”; progress shown as 0; completion not independently verified. | |
| Green strip / tot lot / park | No size supplied beyond the park area above | RERA record says “YES”; progress shown as 0; vendor also lists the feature; delivery not verified. | |
| Water conservation / rainwater harvesting | No quantity or capacity supplied | RERA record says “YES”; progress shown as 0. HMDA letter lists rainwater-harvesting pits; installation not verified. | |
| Kids’ play areas / sand pits | No size or capacity supplied | Vendor-listed; not established as delivered by the supplied records. | |
| Community buildings | No size supplied | Listed in RERA amenity record; no “YES” value or progress above 0 is shown. | |
| Cycling tracks | No size supplied | Listed among HMDA layout infrastructure requirements; completion not verified. |
7. Utilities, building services & safety
- The HMDA draft layout letter lists proposed layout infrastructure including storm-water drains, underground drainage lines, a common septic tank / STP, internal water-supply pipelines, an overhead tank, electrical supply lines, street lights, a transformer, avenue plantation, park development, rainwater-harvesting pits, solid-waste disposal and dumping space, a bio-compost unit, and cycling tracks. The available document does not give capacities or establish that these services have been installed or commissioned.
- The RERA amenity record marks water supply, sewerage (chamber, lines, septic tank, STP), water conservation/rainwater harvesting, and an electrical meter room/sub-station/receiving station as “YES”; the corresponding reported progress is 0. It also lists storm-water drains, sewage and sullage treatment/disposal, solid-waste management, energy management, fire protection and fire-safety requirements, and aggregate recreational open space. These entries are disclosures, not independent verification of completed facilities or statutory compliance.
- The vendor describes 24×7 water supply and security, but no source, storage capacity, treatment details, backup arrangements, CCTV/access-control design, fire-system specifications, accessibility provisions, or emergency-service capacity are supplied.
8. Location, access & connectivity
- The registered project location is Gudur/Gudoor Village, Kandukur Mandal, Ranga Reddy District, Telangana, PIN 501359. The RERA filing records the southern boundary as an existing 33-feet-wide road; HMDA’s draft layout letter also refers to a 90-metre-wide master-plan road affecting the site.
- A supplied location record gives an approximate distance of 16.6 km to the nearest sampled Outer Ring Road interchange. This is a location-data estimate, not a travel time or an official project access measurement.
- The vendor describes the site as en route to Pharma City; that is a vendor connectivity claim.
9. Developer & development status
- The registered promoter is AVC HOMES PRIVATE LIMITED, a private limited company, with GSTIN 36AAFCA7696A1ZM. The project evidence lists Aluri Ramachandra Rao as authorized signatory and Aparna Chirumamilla as a director.
- The RERA registration certificate gives the promoter office as “Village: Mandal: Nampally, District: Hyderabad, Pin: 500001.” The supplied promoter information also contains an address at Ahuja Estates, Abids, Gudur, Kandukur, Ranga Reddy, 501359; the evidence does not identify an official contact number or email address.
- The promoter website listed in the evidence is avchomes.com; website content is not used here to establish sanctioned or delivered features.
- The RERA project header reports 80% completeness without an as-of date or independent verification. Form-B declares a completion date of 13 June 2025. The certificate states registration validity through that date unless extended, and the supplied certificate records no extension. No final layout release or completion/occupancy certificate is included.
10. Approvals, official records & documents
TG-RERA registration: Form “C” certificate for AVC HOMES SITA GARDEN, P02400005271, under section 5; dated 28 October 2022 and stated valid through 13 June 2025 unless extended.
HMDA layout approval: Draft layout letter 000106/LO/Plg/HMDA/2022, dated 13 June 2022, for survey references 383/P, 384/P, 385/P and 402/P at Gudoor Village, Kandukur Mandal.
HMDA application reference: 051658/SMD/LT/U6/HMDA/12012022; the letter gives the application date as 12 January 2022.
Layout drawing: Document 249143 is identified as the layout plan; complete plot-by-plot measurements are not available in the supplied extraction.
Authority mortgage: HMDA draft letter records mortgage deed 8895-2022 / 8895/2022 for plots 37–47, in favour of HMDA.
Master-plan-road gift deed: The HMDA letter references registered gift deed 10544/2022, dated 18 May 2022, for the affected master-plan-road area.
Promoter declaration: Form-B affidavit dated 18 July 2022, including the promoter’s declared completion date and project-fund undertakings.
Completion / occupancy record: No completion certificate, occupancy certificate or final layout-release document is supplied.
Frequently asked questions
Is AVC HOMES SITA GARDEN registered with Telangana RERA?
Yes. AVC HOMES SITA GARDEN is registered with the Telangana Real Estate Regulatory Authority as P02400005271; the registration status is New Project.
Who is the developer of AVC HOMES SITA GARDEN?
The promoter named in the RERA registration is AVC HOMES PRIVATE LIMITED.
Where is AVC HOMES SITA GARDEN located?
AVC HOMES SITA GARDEN is in Gudur, Kandukur, Rangareddy, Telangana (501359).
When will AVC HOMES SITA GARDEN be completed?
The promoter's proposed date of completion filed with RERA is 13/06/2025. This is the promoter's declaration, not a guarantee.