Perams Adithya Adhyata-2
GGR INFRA DEVELOPERS PRIVATE LIMITED · Medchal-Malkajgiri · RERA P02200000869
PERAMS ADITHYA ADHYATA-2 is a plotted development in Upperpally, Shamirpet mandal, Medchal-Malkajgiri district. The registered promoter is GGR INFRA DEVELOPERS PRIVATE LIMITED. The project covers 40,467.91 sq m and offers plots; the supplied record does not disclose the plot count or individual plot-size configurations, and no towers or floors are established. It is registered under TG-RERA number P02200000869, with a proposed completion date of 15-05-2024.
More from Ggr Infra Developers Pvt Ltd · 8 projects →
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | PERAMS ADITHYA ADHYATA-2 RERA record |
| Project type | Plotted development / open-plot layout RERA record RERA filing |
| Phase or registered portion | No phase designation disclosed; the registered project is identified by the project name and survey numbers below. RERA record |
| TG-RERA registration | P02200000869 RERA record |
| Registration validity | 12/06/2019 to 15/05/2024; the certificate states a four-year term, unless extended by the Authority. The supplied record says no extension is recorded. Validity is distinct from the completion deadline. Approvals record |
| RERA status in supplied record | New Project; registration certificate supplied. Current registration status after 15/05/2024 is not established by the supplied material. RERA record Approvals record |
| Registered promoter | GGR INFRA DEVELOPERS PRIVATE LIMITED RERA record Corporate record |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / village as filed | Upperpally; the project record identifies Upperpally village. RERA record RERA filing |
| Mandal | Shamirpet RERA record |
| District | Medchal-Malkajgiri RERA record |
| PIN | 500078 RERA record |
| Project survey numbers and subdivisions | 775/P, 777/P, 931/P RERA record Land records |
| Registered site extent | 40,467.91 sq m (total and net area in the RERA land fields). RERA filing Land records |
| HMDA draft layout areas | Total site area 40,467.91 sq m; net site area 38,698.52 sq m. |
| Boundaries | East: 774; West: 930; North: 778; South: 932 RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) Approvals record |
| Principal layout approval | Layout Permit 000118/LO/Plg/HMDA/2019, dated 16 May 2019; filed approval reference also appears as 000118/LO/PLG/HMDA/2. Approvals record |
| Approved built-up area | Not disclosed in the supplied layout-approval material; this is a plotted layout, not a building scheme. RERA filing |
| Buildings / floor configuration | No buildings, tower count, floor schedule or parking levels are established by the supplied project records. The HMDA letter states that buildings are not to be constructed on plots under that permission. |
| Layout land-use schedule | Plotted area 25,048.24 sq m; roads 9,652.82 sq m; parks/open space 3,026.99 sq m; social infrastructure 970.49 sq m. Layout record |
| HMDA-mortgaged plots | Plot Nos. 1 to 21, measuring 3,856.43 sq m, recorded as mortgaged to HMDA. Layout record |
Offering and status
| Item | Record |
|---|---|
| Offered product | Plots; plot count and plot-size schedule cannot be established from the supplied extracted records. RERA record RERA filing Layout record |
| RERA saleable area, booked/available counts | Not disclosed in the supplied evidence. Document index |
| Completion deadline | Promoter’s Form B declaration states 15-05-2024. |
| Construction/development stage | A RERA filing field reports 70% completeness; this is a filed progress figure, not independently verified site progress. RERA record |
| Occupancy/completion certificate | No occupancy or completion certificate is supplied. The project is a plotted layout; final layout release is not evidenced in the supplied material. Document index |
2. The project story
PERAMS ADITHYA ADHYATA-2 is registered as a plotted development in Upperpally, Shamirpet mandal, Medchal-Malkajgiri district, covering survey subdivisions 775/P, 777/P and 931/P. The RERA record identifies a 40,467.91 sq m site, while the HMDA draft layout letter gives a net site area of 38,698.52 sq m and sets out plots, roads, open space and social-infrastructure land. The product evidenced is plots rather than apartments or villas. The supplied material does not provide an independently verified site inspection or a plot-by-plot inventory. The promoter declared a completion date of 15-05-2024. No occupancy/completion certificate or final layout release is supplied. RERA record Land records
3. Master plan, architecture & building design
The supplied HMDA document is a draft layout letter, not a building design package. It records the following land-use schedule:
| Layout component | Area |
|---|---|
| Total site area | 40,467.91 sq m |
| Net site area | 38,698.52 sq m |
| Plotted area | 25,048.24 sq m |
| Layout roads | 9,652.82 sq m |
| Open space / park | 3,026.99 sq m |
| Social infrastructure | 970.49 sq m |
The layout drawing-derived record identifies 21 mortgaged plots, Nos. 1–21, with a total area of 3,856.43 sq m. The drawing-derived plot schedule is incomplete: plot count and individual plot sizes are not available for buyer review in the supplied extraction. No tower, building footprint, floor count, apartment arrangement, or approved built-up area is established. Layout record
4. Homes, configurations & floor plans
This is a plotted project; the supplied RERA data does not establish a plot-count inventory by size, or booked and available plot counts. The two supplied drawing sheets were not measured for unit floor plans and are recorded as having no flats. RERA record Layout record Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
The extracted HMDA layout schedule identifies 25,048.24 sq m as plotted area; it does not provide individual plot dimensions.
5. Parking & vehicle circulation
No resident, visitor, accessible, or other parking-space counts, parking allocation terms, or vehicle-entry/exit details are established in the supplied evidence. The HMDA letter identifies internal layout roads, including road widths of 18 mts and above and 60 feet and above, and requires roads to be opened for access to neighbouring sites. The 21 plots mortgaged to HMDA are a layout approval condition, not a disclosed parking provision. Layout record
6. Amenities, recreation & open spaces
The RERA amenity record reports progress percentages for layout facilities. These figures are filed progress entries, not independent verification of completion. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | Layout roads and footpaths | RERA amenities | 95% declared; not independently verified |
| Green strip / tot lot / park | Park/open-space area: 3,026.99 sq m | RERA amenities Layout record | 95% declared; not independently verified |
| Community buildings | No size or further description supplied | RERA amenities | 0% recorded |
| Aggregate recreational open space | No separate size supplied in this amenity entry | RERA amenities | 0% recorded |
| Social infrastructure | 970.49 sq m in the layout schedule | Layout record | No completion status supplied |
| Cycling tracks | Included among HMDA draft-layout conditions | No completion status supplied |
7. Utilities, building services & safety
The HMDA draft layout letter includes requirements for protected water supply with an overhead tank and sumps, internal water-supply lines, independent sewerage disposal, a common septic tank/STP, storm-water drainage, rainwater-harvesting pits, transformers and street lighting. It also lists a bio-compost unit and a solid-waste segregation mechanism. These are approval-letter conditions or listed layout provisions; the supplied evidence does not independently verify their installation or operation.
| Evidence in the supplied record | Water supply recorded at 100%; HMDA letter specifies protected supply, OHT/sumps and internal pipelines. |
|---|---|
| Status shown | RERA-filed progress; no independent verification RERA amenities |
| Evidence in the supplied record | Sewerage recorded at 100%; HMDA letter specifies independent disposal and common septic tank/STP. |
|---|---|
| Status shown | RERA-filed progress; no independent verification RERA amenities |
| Evidence in the supplied record | Recorded at 100%; HMDA letter requires storm-water drains and channelisation of nalas. |
|---|---|
| Status shown | RERA-filed progress; no independent verification RERA amenities |
| Evidence in the supplied record | Recorded at 95%; HMDA letter requires rainwater-harvesting pits. |
|---|---|
| Status shown | RERA-filed progress; no independent verification RERA amenities |
| Evidence in the supplied record | Street lighting recorded at 100%; HMDA letter lists transformers and electricity facilities. |
|---|---|
| Status shown | RERA-filed progress for street lighting; no independent verification RERA amenities |
| Evidence in the supplied record | RERA amenity entry records 0%; HMDA letter lists solid-waste disposal, segregation and bio-compost provisions. |
|---|---|
| Status shown | No completion verification RERA amenities |
| Evidence in the supplied record | RERA amenity entries record 0%. |
|---|---|
| Status shown | No completion verification RERA amenities |
8. Location, access & connectivity
The registered project location is Upperpally, Shamirpet mandal, Medchal-Malkajgiri district, PIN 500078, on survey numbers 775/P, 777/P and 931/P. The supplied geocode is 17.5942672, 78.5743878. RERA record Location record
Supplied location distances are: Location record
| Nearby reference | Distance |
|---|---|
| Primary Health Centre Shamirpet | 0.5 km |
| NALSAR University of Law | 3.1 km |
| Outer Ring Road (nearest sampled interchange, approx) | 6.2 km |
The HMDA draft layout letter refers to internal layout roads and access to neighbouring sites. No public-transport details or further approach-road information is supplied.
9. Developer & development status
The registered promoter is GGR INFRA DEVELOPERS PRIVATE LIMITED, a private limited company. The project record names Bathala Greesma as an authorised signatory; Form B is attributed to Bathala Greesma on behalf of G.G.R. Infra Developers. A promoter office address is recorded as Manjeera Majestic Commercials, near JNTU, Upperpalliroad, Upperpally, Shamirpet, Medchal-Malkajgiri, 500078. The supplied material does not provide official contact details or a company website. Corporate record Parties record
The RERA filing reports 70% completeness, and the promoter’s Form B declares a completion date of 15-05-2024. Neither figure establishes current independently inspected progress. No phase-wise construction schedule or completion/occupancy certificate is supplied. RERA record Document index
10. Approvals, official records & documents
| Record | Supplied evidence |
|---|---|
| TG-RERA registration | Form C for PERAMS ADITHYA ADHYATA-2, registration P02200000869, dated 12/06/2019; stated validity through 15/05/2024. |
| Principal layout approval | HMDA draft layout letter dated 16 May 2019, Layout Permit 000118/LO/Plg/HMDA/2019, application 021880/ZOB/LO/U6/HMDA/22032019. |
| Survey/location scope in approval | Survey Nos. 775/p, 777/p and 931/p, Upperpalli-ORRGC, Shamirpet-ORRGC, Medchal-Malkajgiri. |
| Mortgage record in approval | Registered mortgage deed 4434/2019, dated 9/5/2019, for Plot Nos. 1–21 measuring 3,856.43 sq m in favour of the Metropolitan Commissioner, HMDA. |
| Promoter declaration | Form B attributed to Bathala Greesma for G.G.R. Infra Developers; it declares a completion date of 15-05-2024. The declaration’s day and month are illegible, and its OCR text does not state the project registration number. |
| Final layout release / OC or completion certificate | Not supplied. The HMDA letter describes draft layout approval and states that final layout release follows conditions. |
The HMDA DPMS approved-layout lookup is recorded as unavailable through the public internet in the supplied project data; that portal-access limitation is not evidence that approval was refused. HMDA
1. Project at a glance
Project identity
Registered project name: PERAMS ADITHYA ADHYATA-2
Project type: Plotted development / open-plot layout
Phase or registered portion: No phase designation disclosed; the registered project is identified by the project name and survey numbers below.
TG-RERA registration: P02200000869
Registration validity: 12/06/2019 to 15/05/2024; the certificate states a four-year term, unless extended by the Authority. The supplied record says no extension is recorded. Validity is distinct from the completion deadline.
RERA status in supplied record: New Project; registration certificate supplied. Current registration status after 15/05/2024 is not established by the supplied material.
Registered promoter: GGR INFRA DEVELOPERS PRIVATE LIMITED
Land and geographic identity
Locality / village as filed: Upperpally; the project record identifies Upperpally village.
Mandal: Shamirpet
District: Medchal-Malkajgiri
PIN: 500078
Project survey numbers and subdivisions: 775/P, 777/P, 931/P
Registered site extent: 40,467.91 sq m (total and net area in the RERA land fields).
HMDA draft layout areas: Total site area 40,467.91 sq m; net site area 38,698.52 sq m.
Boundaries: East: 774; West: 930; North: 778; South: 932
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval: Layout Permit 000118/LO/Plg/HMDA/2019, dated 16 May 2019; filed approval reference also appears as 000118/LO/PLG/HMDA/2.
Approved built-up area: Not disclosed in the supplied layout-approval material; this is a plotted layout, not a building scheme.
Buildings / floor configuration: No buildings, tower count, floor schedule or parking levels are established by the supplied project records. The HMDA letter states that buildings are not to be constructed on plots under that permission.
Layout land-use schedule: Plotted area 25,048.24 sq m; roads 9,652.82 sq m; parks/open space 3,026.99 sq m; social infrastructure 970.49 sq m.
HMDA-mortgaged plots: Plot Nos. 1 to 21, measuring 3,856.43 sq m, recorded as mortgaged to HMDA.
Offering and status
Offered product: Plots; plot count and plot-size schedule cannot be established from the supplied extracted records.
RERA saleable area, booked/available counts: Not disclosed in the supplied evidence.
Completion deadline: Promoter’s Form B declaration states 15-05-2024.
Construction/development stage: A RERA filing field reports 70% completeness; this is a filed progress figure, not independently verified site progress.
Occupancy/completion certificate: No occupancy or completion certificate is supplied. The project is a plotted layout; final layout release is not evidenced in the supplied material.
2. The project story
PERAMS ADITHYA ADHYATA-2 is registered as a plotted development in Upperpally, Shamirpet mandal, Medchal-Malkajgiri district, covering survey subdivisions 775/P, 777/P and 931/P. The RERA record identifies a 40,467.91 sq m site, while the HMDA draft layout letter gives a net site area of 38,698.52 sq m and sets out plots, roads, open space and social-infrastructure land. The product evidenced is plots rather than apartments or villas. The supplied material does not provide an independently verified site inspection or a plot-by-plot inventory. The promoter declared a completion date of 15-05-2024. No occupancy/completion certificate or final layout release is supplied.
3. Master plan, architecture & building design
The supplied HMDA document is a draft layout letter, not a building design package. It records the following land-use schedule:
Total site area: 40,467.91 sq m
Net site area: 38,698.52 sq m
Plotted area: 25,048.24 sq m
Layout roads: 9,652.82 sq m
Open space / park: 3,026.99 sq m
Social infrastructure: 970.49 sq m
The layout drawing-derived record identifies 21 mortgaged plots, Nos. 1–21, with a total area of 3,856.43 sq m. The drawing-derived plot schedule is incomplete: plot count and individual plot sizes are not available for buyer review in the supplied extraction. No tower, building footprint, floor count, apartment arrangement, or approved built-up area is established.
4. Homes, configurations & floor plans
This is a plotted project; the supplied RERA data does not establish a plot-count inventory by size, or booked and available plot counts. The two supplied drawing sheets were not measured for unit floor plans and are recorded as having no flats.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Plots | Not disclosed | Not disclosed | Not disclosed | Not disclosed | Not applicable | Not supplied |
The extracted HMDA layout schedule identifies 25,048.24 sq m as plotted area; it does not provide individual plot dimensions.
5. Parking & vehicle circulation
No resident, visitor, accessible, or other parking-space counts, parking allocation terms, or vehicle-entry/exit details are established in the supplied evidence. The HMDA letter identifies internal layout roads, including road widths of 18 mts and above and 60 feet and above, and requires roads to be opened for access to neighbouring sites. The 21 plots mortgaged to HMDA are a layout approval condition, not a disclosed parking provision.
6. Amenities, recreation & open spaces
The RERA amenity record reports progress percentages for layout facilities. These figures are filed progress entries, not independent verification of completion.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads and footpaths | Layout roads and footpaths | 95% declared; not independently verified | |
| Green strip / tot lot / park | Park/open-space area: 3,026.99 sq m | 95% declared; not independently verified | |
| Community buildings | No size or further description supplied | 0% recorded | |
| Aggregate recreational open space | No separate size supplied in this amenity entry | 0% recorded | |
| Social infrastructure | 970.49 sq m in the layout schedule | No completion status supplied | |
| Cycling tracks | Included among HMDA draft-layout conditions | No completion status supplied |
7. Utilities, building services & safety
The HMDA draft layout letter includes requirements for protected water supply with an overhead tank and sumps, internal water-supply lines, independent sewerage disposal, a common septic tank/STP, storm-water drainage, rainwater-harvesting pits, transformers and street lighting. It also lists a bio-compost unit and a solid-waste segregation mechanism. These are approval-letter conditions or listed layout provisions; the supplied evidence does not independently verify their installation or operation.
| Evidence in the supplied record | Water supply recorded at 100%; HMDA letter specifies protected supply, OHT/sumps and internal pipelines. |
|---|---|
| Status shown | RERA-filed progress; no independent verification |
| Evidence in the supplied record | Sewerage recorded at 100%; HMDA letter specifies independent disposal and common septic tank/STP. |
|---|---|
| Status shown | RERA-filed progress; no independent verification |
| Evidence in the supplied record | Recorded at 100%; HMDA letter requires storm-water drains and channelisation of nalas. |
|---|---|
| Status shown | RERA-filed progress; no independent verification |
| Evidence in the supplied record | Recorded at 95%; HMDA letter requires rainwater-harvesting pits. |
|---|---|
| Status shown | RERA-filed progress; no independent verification |
| Evidence in the supplied record | Street lighting recorded at 100%; HMDA letter lists transformers and electricity facilities. |
|---|---|
| Status shown | RERA-filed progress for street lighting; no independent verification |
| Evidence in the supplied record | RERA amenity entry records 0%; HMDA letter lists solid-waste disposal, segregation and bio-compost provisions. |
|---|---|
| Status shown | No completion verification |
| Evidence in the supplied record | RERA amenity entries record 0%. |
|---|---|
| Status shown | No completion verification |
8. Location, access & connectivity
The registered project location is Upperpally, Shamirpet mandal, Medchal-Malkajgiri district, PIN 500078, on survey numbers 775/P, 777/P and 931/P. The supplied geocode is 17.5942672, 78.5743878.
Supplied location distances are:
Primary Health Centre Shamirpet: 0.5 km
NALSAR University of Law: 3.1 km
Outer Ring Road (nearest sampled interchange, approx): 6.2 km
The HMDA draft layout letter refers to internal layout roads and access to neighbouring sites. No public-transport details or further approach-road information is supplied.
9. Developer & development status
The registered promoter is GGR INFRA DEVELOPERS PRIVATE LIMITED, a private limited company. The project record names Bathala Greesma as an authorised signatory; Form B is attributed to Bathala Greesma on behalf of G.G.R. Infra Developers. A promoter office address is recorded as Manjeera Majestic Commercials, near JNTU, Upperpalliroad, Upperpally, Shamirpet, Medchal-Malkajgiri, 500078. The supplied material does not provide official contact details or a company website.
The RERA filing reports 70% completeness, and the promoter’s Form B declares a completion date of 15-05-2024. Neither figure establishes current independently inspected progress. No phase-wise construction schedule or completion/occupancy certificate is supplied.
10. Approvals, official records & documents
TG-RERA registration: Form C for PERAMS ADITHYA ADHYATA-2, registration P02200000869, dated 12/06/2019; stated validity through 15/05/2024.
Principal layout approval: HMDA draft layout letter dated 16 May 2019, Layout Permit 000118/LO/Plg/HMDA/2019, application 021880/ZOB/LO/U6/HMDA/22032019.
Survey/location scope in approval: Survey Nos. 775/p, 777/p and 931/p, Upperpalli-ORRGC, Shamirpet-ORRGC, Medchal-Malkajgiri.
Mortgage record in approval: Registered mortgage deed 4434/2019, dated 9/5/2019, for Plot Nos. 1–21 measuring 3,856.43 sq m in favour of the Metropolitan Commissioner, HMDA.
Promoter declaration: Form B attributed to Bathala Greesma for G.G.R. Infra Developers; it declares a completion date of 15-05-2024. The declaration’s day and month are illegible, and its OCR text does not state the project registration number.
Final layout release / OC or completion certificate: Not supplied. The HMDA letter describes draft layout approval and states that final layout release follows conditions.
The HMDA DPMS approved-layout lookup is recorded as unavailable through the public internet in the supplied project data; that portal-access limitation is not evidence that approval was refused.
Frequently asked questions
Is PERAMS ADITHYA ADHYATA-2 registered with Telangana RERA?
Yes. PERAMS ADITHYA ADHYATA-2 is registered with the Telangana Real Estate Regulatory Authority as P02200000869; the registration status is New Project.
Who is the developer of PERAMS ADITHYA ADHYATA-2?
The promoter named in the RERA registration is GGR INFRA DEVELOPERS PRIVATE LIMITED.
Where is PERAMS ADITHYA ADHYATA-2 located?
PERAMS ADITHYA ADHYATA-2 is in UPPERPALLY, Shamirpet, Medchal-Malkajgiri, Telangana (500078).
When will PERAMS ADITHYA ADHYATA-2 be completed?
The promoter's proposed date of completion filed with RERA is 15/05/2024. This is the promoter's declaration, not a guarantee.