Bhagyaprastha Veera Lake View
BHAGYAPRASTHA ENGINEERS CONSTRUCTIONS PRIVATE LIMITED · Sangareddy · RERA P01100003495
BHAGYAPRASTHA VEERA LAKE VIEW is a plotted development at Kalvakunta Village, Sangareddy Mandal, Sangareddy District. The registered promoter is BHAGYAPRASTHA ENGINEERS CONSTRUCTIONS PRIVATE LIMITED. The project has a net site area of 54,711.54 sq. m and offers residential plots; the supplied overview does not state a verified plot count or plot configurations, or disclose towers, blocks, or floors. It is registered with TG-RERA under P01100003495, with proposed completion recorded as 25/02/2024.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Evidence-backed record |
|---|---|
| Registered project name | BHAGYAPRASTHA VEERA LAKE VIEW RERA record |
| Project type | Plotted development / residential open-plot layout RERA record |
| Phase or registered portion | No phase number is stated. TG-RERA registration identifies the project; the filed layout covers the described site and survey numbers below. RERA record |
| TG-RERA registration | P01100003495; certificate issued 24/09/2021; validity stated through 25/02/2024. No extension is recorded in the supplied certificate. Registration validity is separate from the completion undertaking and any layout approval. RERA record |
| Registered promoter | BHAGYAPRASTHA ENGINEERS CONSTRUCTIONS PRIVATE LIMITED RERA record |
| RERA project status | The filing identifies the project as “New Project.” Registration validity has expired according to the supplied certificate; this is not, by itself, an occupancy or completion certificate. RERA filing |
Land and geographic identity
| Item | Evidence-backed record |
|---|---|
| Locality / revenue village | The registration and layout documents identify Kalvakunta Village; RERA header fields also give locality KALWAKUNTA VILLAGE. The RERA certificate lists locality as SANGAREDDY. RERA record RERA filing |
| Mandal / district / PIN | SANGAREDDY mandal; Sangareddy district; PIN 502001. RERA record |
| Project survey numbers | As stated in the registration certificate and layout records: 93P, 101P, 102P, 103 and 104P. The layout approval writes these as 93(p), 101(p), 102(p), 103 and 104(p). |
| Registered site area | Total site area 56,149.72 sq. m; master-plan road-affected area 1,438.18 sq. m; net site area 54,711.54 sq. m in the draft-layout record. RERA filing |
| Layout-area breakdown | The draft-layout record gives plotted area 33,867.54 sq. m, layout road area 14,872.11 sq. m, open space 1,370.63 sq. m, and park 4,601.24 sq. m. The final-layout plan separately shows plotted area 33,867.54 sq. m, road area 14,872.11 sq. m, organized open-space/park/utility area 4,601.24 sq. m, and social-infrastructure area 1,370.63 sq. m. |
| Boundaries recorded in RERA filing | East: ROAD; west: ROAD; north and south: NEIGHBOURS LAND. RERA filing |
Development identity
| Item | Evidence-backed record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA). |
| Principal layout permit | 000123/LO/Plg/HMDA/2021, dated 25 February 2021. The final-layout letter records the same permit number. |
| Final-layout record | HMDA final-layout letter dated 06 December 2025, file no. 062411/LT/SKP/FLT/U6/HMDA/23022024. |
| Approved built-up area | 33,867.54 sq. m is recorded in the RERA filing as “Approved Built up Area”; the layout drawing also labels this figure “Plotted area.” It is not described here as building floor area. RERA filing |
| Buildings / floors | Not disclosed for this plotted layout. Individual residential building permissions are not listed in the supplied evidence. |
| Parking | No project-wide parking count or parking allocation is supplied. RERA amenities |
Offering and status
| Item | Evidence-backed record |
|---|---|
| Offering | Residential plots. The supplied RERA data does not provide a verified plot count by configuration or a saleable-area schedule. RERA record |
| Drawing-derived plot count | Software reads plot numbers 1 to 99 from the layout drawing; the source says the plot count and sizes require verification against the drawing. Layout record |
| RERA-filed booked / available counts | Not supplied in the evidence provided for this Overview. RERA record |
| Completion dates | Form B contains a promoter undertaking to complete by 25/08/2023. The RERA project header records proposed completion as 25/02/2024. These are stated as separate filed records, not as verified completion dates. RERA record |
| Completion / occupancy evidence | A final HMDA layout release is on record, dated 06 December 2025. No building-specific occupancy certificate is supplied; for a plotted development, the supplied record does not establish completion or occupancy certification for individual homes. |
2. The project story
BHAGYAPRASTHA VEERA LAKE VIEW is registered with TG-RERA as a plotted residential development at Kalvakunta Village, Sangareddy Mandal, Sangareddy District. Its filed layout concerns 93P, 101P, 102P, 103 and 104P and a net site area of 54,711.54 sq. m. The layout is organized into residential plots, internal roads, open space/park and social-infrastructure land; it is not an apartment or tower project. RERA record
The registration certificate states validity through 25/02/2024, while the supplied promoter declaration and RERA header give different completion commitments. The evidence also includes an HMDA final-layout letter dated 06 December 2025. These records describe registration, a promoter undertaking and layout permission respectively; none establishes the construction or occupancy status of homes subsequently built on the plots. The RERA amenities schedule reports selected infrastructure progress percentages, which are promoter-filed progress entries rather than an independent site inspection. RERA record RERA amenities
3. Master plan, architecture & building design
The HMDA draft-layout record gives a 56,149.72 sq. m total site, including 1,438.18 sq. m affected by a master-plan road, and a 54,711.54 sq. m net site area. Its stated land-use components include 33,867.54 sq. m of plotted area, 14,872.11 sq. m of layout roads, 4,601.24 sq. m of park, and 1,370.63 sq. m of open space/social infrastructure. The final-layout plan records corresponding plotted, road, organized open-space/park/utility and social-infrastructure areas. These are layout-area categories, not apartment floor areas.
The layout drawing is reported to contain plots numbered 1–99, but the software-derived plot count and sizes are explicitly subject to verification against the drawing; no plot-size schedule is supplied here. No building count, building footprints, floors, apartment distribution, or building-level plans are established in the supplied evidence. The final-layout letter states that building permissions for individual residential dwellings are to be considered under the applicable building rules. Layout record
The final-layout plan describes an open residential layout and lists road-width labels, including 30.00, 12, 30, 12.20 M, 100'-0", 12.20m, 12.20mm, 12.19m, 9.14m and 30.0M; the extracted record does not map each width to a specific road segment.
4. Homes, configurations & floor plans
This is a plotted project. The supplied RERA evidence does not include a plot-by-plot schedule of RERA-filed saleable areas, booking status or availability. The layout software identifies plots numbered 1 to 99, but reports no plot sizes and cautions that the count should be checked against the drawing. RERA record Layout record
| Units | Not established by supplied RERA unit schedule; layout drawing software reads plots numbered 1–99, subject to drawing verification. Layout record |
|---|---|
| Booked | Not supplied |
| Available | Not supplied |
| RERA saleable area | Not supplied |
| Measured carpet area | Not applicable / not supplied |
| Loading (if supplied) | Not supplied |
No floor plans for individual homes are available in the supplied records: the two drawing files identified in the floor-plan data are layout sheets, with no flats and no measured units. Floor plans
5. Parking & vehicle circulation
No project-wide parking-space count, visitor or accessible parking provision, parking allocation to particular plots, or vehicle-parking plan is supplied. The draft-layout conditions require roads to remain open for access to neighbouring sites and prohibit a compound wall/fencing around the site; the final-layout letter also states that roads are to remain open for public access. These are layout conditions and do not establish a specific parking arrangement.
6. Amenities, recreation & open spaces
The HMDA draft-layout record lists layout infrastructure and development works. Separately, the TG-RERA filing contains an amenities progress schedule; the percentages below are filed progress figures, not independently verified completion. The layout record gives 4,601.24 sq. m for park and 1,370.63 sq. m for open space/social infrastructure. RERA amenities
| Description / size | Layout record identifies park area 4,601.24 sq. m; RERA schedule names “Green Strip/TOT LOT/Park.” |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA schedule: 0%; completion not independently verified. RERA amenities |
| Description / size | Draft-layout record gives open space 1,370.63 sq. m and social infrastructure 1,370.63 sq. m; final-layout plan lists social-infrastructure area 1,370.63 sq. m. |
|---|---|
| Declared progress / verified status | RERA schedule lists aggregate recreational open space at 0%; no independent completion verification. RERA amenities |
| Description / size | No size or facility specification supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA schedule: 0%. RERA amenities |
| Description / size | Layout roads area 14,872.11 sq. m. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA schedule: 20%. RERA amenities |
| Description / size | No quantity or specification supplied. |
|---|---|
| Evidence source | RERA amenities |
| Declared progress / verified status | RERA schedule: 0%. RERA amenities |
7. Utilities, building services & safety
The draft HMDA layout record lists proposed layout services including black-top road formation, storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, electrical supply lines, street lights, a transformer, avenue planting, rainwater-harvesting pits, protected water supply with OHT and sumps, and underground ducting for utilities. These are listed as development works; the supplied material does not establish their present completion or operating capacity.
| Evidence in the supplied record | Internal water-supply pipelines, overhead tank, sumps and protected water supply are listed in the draft-layout record. |
|---|---|
| Declared progress / verified status | RERA schedule: 25% for Water Supply; no independent verification or capacity supplied. RERA amenities |
| Evidence in the supplied record | Underground drainage, common septic tank/STP, independent sewerage disposal and treatment/disposal of sewage and sullage are listed. |
|---|---|
| Declared progress / verified status | RERA schedule: Sewerage 60%, storm-water drains 30%, treatment/disposal of sewage and sullage 0%; no independent verification or capacity supplied. RERA amenities |
| Evidence in the supplied record | Rainwater-harvesting pits are listed in the draft-layout record. |
|---|---|
| Declared progress / verified status | RERA schedule: Water Conservation/Rainwater Harvesting 0%; completion not independently verified. RERA amenities |
| Evidence in the supplied record | Electrical supply lines and a transformer are listed in the draft-layout record. |
|---|---|
| Declared progress / verified status | RERA schedule: Electrical Meter Room/Sub-Station/Receiving Station 0%; no capacity or commissioning evidence supplied. RERA amenities |
| Evidence in the supplied record | No detailed waste-management system or capacity is supplied. |
|---|---|
| Declared progress / verified status | RERA schedule: Solid Waste Management and Disposal 0%. RERA amenities |
| Evidence in the supplied record | No project-specific fire-system details or clearance are supplied. |
|---|---|
| Declared progress / verified status | RERA schedule: Fire Protection and Fire Safety Requirements 0%. RERA amenities |
| Evidence in the supplied record | No project-specific evidence supplied. |
|---|---|
| Declared progress / verified status | Not disclosed. |
8. Location, access & connectivity
The registered project location is Kalvakunta Village, Sangareddy Mandal, Sangareddy District, Telangana, PIN 502001; the RERA header uses “KALWAKUNTA VILLAGE.” The RERA-filed site boundaries are road on the east and west, and neighbouring land on the north and south. RERA record RERA filing RERA filing
The location data records the nearest sampled Outer Ring Road interchange at approximately 59.7 km. No public-transport service, named approach-road route, or other measured landmark distance is supplied. Location record
9. Developer & development status
The registered promoter is BHAGYAPRASTHA ENGINEERS CONSTRUCTIONS PRIVATE LIMITED, a company. The TG-RERA certificate lists the promoter office as Village: GUDIMALKAUR 2, Mandal: ASIF NAGAR, District: Hyderabad, Pin: 500006. The project filing lists VAKA VENKATA KRISHNA REDDY as authorized signatory and GEETA VANI MANTENA and NARSI REDDY METTU as directors. No official website or contact details are supplied. Corporate record Parties record
The promoter’s Form B declaration, dated 16* day of AUGST 2021 as extracted, undertakes completion by 25/08/2023. The project header records proposed completion as 25/02/2024. The available evidence provides no independent site inspection or verified construction-completion statement. RERA record
10. Approvals, official records & documents
| Record | What the supplied document establishes |
|---|---|
| TG-RERA registration certificate | Form C for P01100003495, issued 24/09/2021, with stated validity through 25/02/2024. The certificate states no extension. |
| HMDA draft layout letter | Draft open-plot layout approval for 93(p), 101(p), 102(p), 103 and 104(p), permit 000123/LO/Plg/HMDA/2021, dated 25 February 2021; includes layout conditions and development-work requirements. |
| Sangareddy Municipality endorsement | Endorsement No.G1/LP/ 83/TPS/2021, dated 20-05-2021, referring to the HMDA draft layout and directing completion of development works as per the draft layout. |
| HMDA final-layout letter | Final-layout record dated 06 December 2025, file no. 062411/LT/SKP/FLT/U6/HMDA/23022024, for the same survey numbers and permit. |
| Final-layout plan | Plan identified as final layout in the same survey numbers, with land-use breakdown and layout conditions. |
| Promoter Form B declaration | Form B affidavit-cum-declaration naming the promoter, stating a completion undertaking, and listing encumbrance statement references and DAGPA numbers. |
| HMDA mortgage record cited in layout approval | Mortgage deed Document No. 1335/2021, covering 5,171.84 sq. m and specified plots in favour of the Metropolitan Commissioner, HMDA, as recorded in the draft-layout material. |
| Road-affected-area transfer cited in layout material | Road-affected area record Document No. 1334/2021 is cited in the draft-layout document; the final-layout material also cites registered relinquishment deed 8753/2025 for mortgaged plots. |
No building-specific commencement certificate, individual residential building permission, or occupancy certificate is established by the supplied Overview evidence. The final-layout records concern the plotted layout, not the occupancy certification of houses built on individual plots.
1. Project at a glance
Project identity
Registered project name: BHAGYAPRASTHA VEERA LAKE VIEW
Project type: Plotted development / residential open-plot layout
Phase or registered portion: No phase number is stated. TG-RERA registration identifies the project; the filed layout covers the described site and survey numbers below.
TG-RERA registration: P01100003495; certificate issued 24/09/2021; validity stated through 25/02/2024. No extension is recorded in the supplied certificate. Registration validity is separate from the completion undertaking and any layout approval.
Registered promoter: BHAGYAPRASTHA ENGINEERS CONSTRUCTIONS PRIVATE LIMITED
RERA project status: The filing identifies the project as “New Project.” Registration validity has expired according to the supplied certificate; this is not, by itself, an occupancy or completion certificate.
Land and geographic identity
Locality / revenue village: The registration and layout documents identify Kalvakunta Village; RERA header fields also give locality KALWAKUNTA VILLAGE. The RERA certificate lists locality as SANGAREDDY.
Mandal / district / PIN: SANGAREDDY mandal; Sangareddy district; PIN 502001.
Project survey numbers: As stated in the registration certificate and layout records: 93P, 101P, 102P, 103 and 104P. The layout approval writes these as 93(p), 101(p), 102(p), 103 and 104(p).
Registered site area: Total site area 56,149.72 sq. m; master-plan road-affected area 1,438.18 sq. m; net site area 54,711.54 sq. m in the draft-layout record.
Layout-area breakdown: The draft-layout record gives plotted area 33,867.54 sq. m, layout road area 14,872.11 sq. m, open space 1,370.63 sq. m, and park 4,601.24 sq. m. The final-layout plan separately shows plotted area 33,867.54 sq. m, road area 14,872.11 sq. m, organized open-space/park/utility area 4,601.24 sq. m, and social-infrastructure area 1,370.63 sq. m.
Boundaries recorded in RERA filing: East: ROAD; west: ROAD; north and south: NEIGHBOURS LAND.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA).
Principal layout permit: 000123/LO/Plg/HMDA/2021, dated 25 February 2021. The final-layout letter records the same permit number.
Final-layout record: HMDA final-layout letter dated 06 December 2025, file no. 062411/LT/SKP/FLT/U6/HMDA/23022024.
Approved built-up area: 33,867.54 sq. m is recorded in the RERA filing as “Approved Built up Area”; the layout drawing also labels this figure “Plotted area.” It is not described here as building floor area.
Buildings / floors: Not disclosed for this plotted layout. Individual residential building permissions are not listed in the supplied evidence.
Parking: No project-wide parking count or parking allocation is supplied.
Offering and status
Offering: Residential plots. The supplied RERA data does not provide a verified plot count by configuration or a saleable-area schedule.
Drawing-derived plot count: Software reads plot numbers 1 to 99 from the layout drawing; the source says the plot count and sizes require verification against the drawing.
RERA-filed booked / available counts: Not supplied in the evidence provided for this Overview.
Completion dates: Form B contains a promoter undertaking to complete by 25/08/2023. The RERA project header records proposed completion as 25/02/2024. These are stated as separate filed records, not as verified completion dates.
Completion / occupancy evidence: A final HMDA layout release is on record, dated 06 December 2025. No building-specific occupancy certificate is supplied; for a plotted development, the supplied record does not establish completion or occupancy certification for individual homes.
2. The project story
BHAGYAPRASTHA VEERA LAKE VIEW is registered with TG-RERA as a plotted residential development at Kalvakunta Village, Sangareddy Mandal, Sangareddy District. Its filed layout concerns 93P, 101P, 102P, 103 and 104P and a net site area of 54,711.54 sq. m. The layout is organized into residential plots, internal roads, open space/park and social-infrastructure land; it is not an apartment or tower project.
The registration certificate states validity through 25/02/2024, while the supplied promoter declaration and RERA header give different completion commitments. The evidence also includes an HMDA final-layout letter dated 06 December 2025. These records describe registration, a promoter undertaking and layout permission respectively; none establishes the construction or occupancy status of homes subsequently built on the plots. The RERA amenities schedule reports selected infrastructure progress percentages, which are promoter-filed progress entries rather than an independent site inspection.
3. Master plan, architecture & building design
The HMDA draft-layout record gives a 56,149.72 sq. m total site, including 1,438.18 sq. m affected by a master-plan road, and a 54,711.54 sq. m net site area. Its stated land-use components include 33,867.54 sq. m of plotted area, 14,872.11 sq. m of layout roads, 4,601.24 sq. m of park, and 1,370.63 sq. m of open space/social infrastructure. The final-layout plan records corresponding plotted, road, organized open-space/park/utility and social-infrastructure areas. These are layout-area categories, not apartment floor areas.
The layout drawing is reported to contain plots numbered 1–99, but the software-derived plot count and sizes are explicitly subject to verification against the drawing; no plot-size schedule is supplied here. No building count, building footprints, floors, apartment distribution, or building-level plans are established in the supplied evidence. The final-layout letter states that building permissions for individual residential dwellings are to be considered under the applicable building rules.
The final-layout plan describes an open residential layout and lists road-width labels, including 30.00, 12, 30, 12.20 M, 100'-0", 12.20m, 12.20mm, 12.19m, 9.14m and 30.0M; the extracted record does not map each width to a specific road segment.
4. Homes, configurations & floor plans
This is a plotted project. The supplied RERA evidence does not include a plot-by-plot schedule of RERA-filed saleable areas, booking status or availability. The layout software identifies plots numbered 1 to 99, but reports no plot sizes and cautions that the count should be checked against the drawing.
| Units | Not established by supplied RERA unit schedule; layout drawing software reads plots numbered 1–99, subject to drawing verification. |
|---|---|
| Booked | Not supplied |
| Available | Not supplied |
| RERA saleable area | Not supplied |
| Measured carpet area | Not applicable / not supplied |
| Loading (if supplied) | Not supplied |
No floor plans for individual homes are available in the supplied records: the two drawing files identified in the floor-plan data are layout sheets, with no flats and no measured units.
5. Parking & vehicle circulation
No project-wide parking-space count, visitor or accessible parking provision, parking allocation to particular plots, or vehicle-parking plan is supplied. The draft-layout conditions require roads to remain open for access to neighbouring sites and prohibit a compound wall/fencing around the site; the final-layout letter also states that roads are to remain open for public access. These are layout conditions and do not establish a specific parking arrangement.
6. Amenities, recreation & open spaces
The HMDA draft-layout record lists layout infrastructure and development works. Separately, the TG-RERA filing contains an amenities progress schedule; the percentages below are filed progress figures, not independently verified completion. The layout record gives 4,601.24 sq. m for park and 1,370.63 sq. m for open space/social infrastructure.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Park / green strip / tot lot | Layout record identifies park area 4,601.24 sq. m; RERA schedule names “Green Strip/TOT LOT/Park.” | RERA schedule: 0%; completion not independently verified. | |
| Open space / social infrastructure | Draft-layout record gives open space 1,370.63 sq. m and social infrastructure 1,370.63 sq. m; final-layout plan lists social-infrastructure area 1,370.63 sq. m. | RERA schedule lists aggregate recreational open space at 0%; no independent completion verification. | |
| Community buildings | No size or facility specification supplied. | RERA schedule: 0%. | |
| Internal roads and footpaths | Layout roads area 14,872.11 sq. m. | RERA schedule: 20%. | |
| Street lighting | No quantity or specification supplied. | RERA schedule: 0%. |
7. Utilities, building services & safety
The draft HMDA layout record lists proposed layout services including black-top road formation, storm-water drains, underground drainage lines, a common septic tank/STP, internal water-supply pipelines, an overhead tank, electrical supply lines, street lights, a transformer, avenue planting, rainwater-harvesting pits, protected water supply with OHT and sumps, and underground ducting for utilities. These are listed as development works; the supplied material does not establish their present completion or operating capacity.
| Evidence in the supplied record | Internal water-supply pipelines, overhead tank, sumps and protected water supply are listed in the draft-layout record. |
|---|---|
| Declared progress / verified status | RERA schedule: 25% for Water Supply; no independent verification or capacity supplied. |
| Evidence in the supplied record | Underground drainage, common septic tank/STP, independent sewerage disposal and treatment/disposal of sewage and sullage are listed. |
|---|---|
| Declared progress / verified status | RERA schedule: Sewerage 60%, storm-water drains 30%, treatment/disposal of sewage and sullage 0%; no independent verification or capacity supplied. |
| Evidence in the supplied record | Rainwater-harvesting pits are listed in the draft-layout record. |
|---|---|
| Declared progress / verified status | RERA schedule: Water Conservation/Rainwater Harvesting 0%; completion not independently verified. |
| Evidence in the supplied record | Electrical supply lines and a transformer are listed in the draft-layout record. |
|---|---|
| Declared progress / verified status | RERA schedule: Electrical Meter Room/Sub-Station/Receiving Station 0%; no capacity or commissioning evidence supplied. |
| Evidence in the supplied record | No detailed waste-management system or capacity is supplied. |
|---|---|
| Declared progress / verified status | RERA schedule: Solid Waste Management and Disposal 0%. |
| Evidence in the supplied record | No project-specific fire-system details or clearance are supplied. |
|---|---|
| Declared progress / verified status | RERA schedule: Fire Protection and Fire Safety Requirements 0%. |
| Evidence in the supplied record | No project-specific evidence supplied. |
|---|---|
| Declared progress / verified status | Not disclosed. |
8. Location, access & connectivity
The registered project location is Kalvakunta Village, Sangareddy Mandal, Sangareddy District, Telangana, PIN 502001; the RERA header uses “KALWAKUNTA VILLAGE.” The RERA-filed site boundaries are road on the east and west, and neighbouring land on the north and south.
The location data records the nearest sampled Outer Ring Road interchange at approximately 59.7 km. No public-transport service, named approach-road route, or other measured landmark distance is supplied.
9. Developer & development status
The registered promoter is BHAGYAPRASTHA ENGINEERS CONSTRUCTIONS PRIVATE LIMITED, a company. The TG-RERA certificate lists the promoter office as Village: GUDIMALKAUR 2, Mandal: ASIF NAGAR, District: Hyderabad, Pin: 500006. The project filing lists VAKA VENKATA KRISHNA REDDY as authorized signatory and GEETA VANI MANTENA and NARSI REDDY METTU as directors. No official website or contact details are supplied.
The promoter’s Form B declaration, dated 16* day of AUGST 2021 as extracted, undertakes completion by 25/08/2023. The project header records proposed completion as 25/02/2024. The available evidence provides no independent site inspection or verified construction-completion statement.
10. Approvals, official records & documents
TG-RERA registration certificate: Form C for P01100003495, issued 24/09/2021, with stated validity through 25/02/2024. The certificate states no extension.
HMDA draft layout letter: Draft open-plot layout approval for 93(p), 101(p), 102(p), 103 and 104(p), permit 000123/LO/Plg/HMDA/2021, dated 25 February 2021; includes layout conditions and development-work requirements.
Sangareddy Municipality endorsement: Endorsement No.G1/LP/ 83/TPS/2021, dated 20-05-2021, referring to the HMDA draft layout and directing completion of development works as per the draft layout.
HMDA final-layout letter: Final-layout record dated 06 December 2025, file no. 062411/LT/SKP/FLT/U6/HMDA/23022024, for the same survey numbers and permit.
Final-layout plan: Plan identified as final layout in the same survey numbers, with land-use breakdown and layout conditions.
Promoter Form B declaration: Form B affidavit-cum-declaration naming the promoter, stating a completion undertaking, and listing encumbrance statement references and DAGPA numbers.
HMDA mortgage record cited in layout approval: Mortgage deed Document No. 1335/2021, covering 5,171.84 sq. m and specified plots in favour of the Metropolitan Commissioner, HMDA, as recorded in the draft-layout material.
Road-affected-area transfer cited in layout material: Road-affected area record Document No. 1334/2021 is cited in the draft-layout document; the final-layout material also cites registered relinquishment deed 8753/2025 for mortgaged plots.
No building-specific commencement certificate, individual residential building permission, or occupancy certificate is established by the supplied Overview evidence. The final-layout records concern the plotted layout, not the occupancy certification of houses built on individual plots.
Frequently asked questions
Is BHAGYAPRASTHA VEERA LAKE VIEW registered with Telangana RERA?
Yes. BHAGYAPRASTHA VEERA LAKE VIEW is registered with the Telangana Real Estate Regulatory Authority as P01100003495; the registration status is New Project.
Who is the developer of BHAGYAPRASTHA VEERA LAKE VIEW?
The promoter named in the RERA registration is BHAGYAPRASTHA ENGINEERS CONSTRUCTIONS PRIVATE LIMITED.
Where is BHAGYAPRASTHA VEERA LAKE VIEW located?
BHAGYAPRASTHA VEERA LAKE VIEW is in KALWAKUNTA VILLAGE, SANGAREDDY, Telangana (502001).
When will BHAGYAPRASTHA VEERA LAKE VIEW be completed?
The promoter's proposed date of completion filed with RERA is 25/02/2024. This is the promoter's declaration, not a guarantee.
More projects in Sangareddy
