Sign in

Signature Park

Kinetic Estates · Yadadri Bhuvanagiri · RERA P02000003451

SIGNATURE PARK is a plotted development / open-plot layout in BIBINAGAR, Bibinagar mandal, Yadadri Bhuvanagiri district, developed by registered promoter Kinetic Estates. The registered site extent is 61950.13 sq.m, and the HMDA draft-layout letter records 37083.85 sq.m of plotted area; the supplied record does not specify a tower or block count, floors, or total number of plots. The offering is plots, with no plot-size range stated in the RERA data. Its TG-RERA registration is P02000003451, and the original completion undertaking is 22/03/2023.

01What we found

Period endedTG-RERA registration ran to 22 Mar 2023 - check its extension on TG-RERA
15documents on file - each fact links to its page
0court cases on this project's land in the court records searched
11items to check - 5 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

11 items to check before you pay, 5 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Bibinagar, Bibinagar, Yadadri Bhuvanagiri · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameSIGNATURE PARK
Project typePlotted development / open-plot layout RERA record
Registered phase or portionNot separately identified in the supplied record RERA record
TG-RERA registrationP02000003451
Registration validity24/09/2021 to 22/03/2023; certificate states it is subject to extension by the Authority
Registered promoterKinetic Estates; entity type recorded as Partnership Corporate record RERA filing
RERA status in supplied recordNew Project; registration certificate records the validity dates above. No extension is recorded in the supplied certificate RERA record

Land and geographic identity

ItemRecord
Locality / revenue villageBIBINAGAR / Bibinagar RERA record
MandalBibinagar RERA record
DistrictYadadri Bhuvanagiri RERA record
PIN508126 RERA record
Project survey numbers and subdivisions260/P, 261/P, 262/P, 263, 264, 265, 266/P, 267, 268, 269, 305, 306
Registered site extent61950.13 sq.m; the HMDA draft-layout letter records total site area and net site area as 61950.13 sq.m RERA filing
Boundaries in RERA filingNorth: ROAD WIDTH 30; South, East and West: CTS NO RERA filing
Cadastral detail available in this reviewA Bhu Bharati cadastral entry is supplied for survey 260/P, extent 7001.79 sq.m; it is a survey-level record, not a complete parcel-by-parcel reconciliation of the whole layout Cadastral map

Development identity

ItemRecord
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA)
Principal layout approvalDraft Layout Permit 000165/LO/Plg/HMDA/2021, dated 22 March, 2021
Approved built-up areaRERA filing records 37083.85 sq.m RERA filing
Development arrangementOpen-plot layout; buildings, floor configuration, tower count and parking levels are not specified in the supplied project record
Layout area schedulePlotted area 37083.85 sq.m; layout road area 18164.62 sq.m; park 5138.19 sq.m; social infrastructure area 1563.52 sq.m; amenities area 0
Authority-mortgaged plotsDraft-layout letter records plots 174–203 (30 plots; 5687.07 sq.m) and plots 104–111 and 171–173 (11 plots; 1955.41 sq.m) as mortgage security in favour of HMDA

Offering and status

ItemRecord
Unit typePlots; plot-size range and plot-by-plot areas are not established by the supplied RERA data RERA record Layout record
Layout drawing count12 plot numbers (1 to 12) identified by software from the drawing; the drawing-derived plot list is marked incomplete and has no plot sizes Layout record
Booked / available countsNot supplied in the reviewed records RERA filing
Construction or site progressNo independently verified site-progress evidence supplied. The RERA amenities record contains status percentages of 0; this is not an independent site inspection RERA amenities
Original completion undertaking22/03/2023
Revised completion dateNone supplied
Occupancy / completion certificateNot supplied; the project is a plotted layout, and the available HMDA document is a draft-layout letter

2. The project story

SIGNATURE PARK is registered as a plotted-development project at Bibinagar in Bibinagar mandal, Yadadri Bhuvanagiri district. The registered land description covers twelve survey numbers/subdivisions and records a site area of 61950.13 sq.m. The HMDA document describes a proposed open-plot layout, with plotted land, internal roads, park/open space and a social-infrastructure area. RERA record

The available HMDA instrument is explicitly a draft layout letter. It identifies the applicant as Kinetic Estates, issues Draft Layout Permit 000165/LO/Plg/HMDA/2021, and makes final layout release subject to stated conditions, including local-body action and transfer of designated roads, open space and social-infrastructure areas. The supplied record does not establish that final layout release occurred.

The promoter’s RERA Form B declares a completion period ending 22/03/2023. No extension order, completed-works evidence, or occupancy/completion certificate is present in the materials reviewed; actual site progress is therefore not established here. Document index

3. Master plan, architecture & building design

This is a plotted layout, not a multi-storey building scheme in the supplied drawings. The HMDA draft-layout letter records total and net site area of 61950.13 sq.m, with 37083.85 sq.m of plotted area, 18164.62 sq.m of layout roads, 5138.19 sq.m of park area, and 1563.52 sq.m of social-infrastructure area. It records 0 sq.m for amenities area. The letter separately states that the road, open-space and social-infrastructure areas are to be handed over to the local body before final layout-plan release.

The RERA filing records approved built-up area of 37083.85 sq.m; this is reported as filed and is not presented as carpet area or saleable area. No building count, floors, parking levels, building footprint, or building plans are established in the supplied documents. RERA filing

The software-derived drawing review identifies 12 printed plot numbers (1–12), but states that the plot list is incomplete and that no plot sizes were measured. The layout drawing provides a land-use schedule; the plot-by-plot arrangement and dimensions should therefore be checked against the complete, legible approved plan. Layout record

4. Homes, configurations & floor plans

The offering identified in the RERA record is plots; no apartment configurations or RERA-filed plot-size range is supplied. The drawing review identifies 12 printed plot numbers but does not provide plot sizes, and marks the plot extraction incomplete. RERA record Layout record

Plots
UnitsNot established; drawing software identifies 12 printed plot numbers (1–12), with incomplete extraction
BookedNot supplied
AvailableNot supplied
RERA saleable areaNot supplied
Measured carpet areaNot applicable / not supplied
LoadingNot supplied

The two supplied drawing sheets are layout sheets with no flats; no software-measured carpet areas are available. Floor plans

5. Parking & vehicle circulation

No sanctioned parking count, visitor or accessible parking provision, parking levels, or plot-specific parking allocation is established in the supplied records. The layout drawing review does not provide plot dimensions or a verified parking schedule. HMDA’s draft-layout conditions require roads to be opened for access to neighbouring sites and state that a compound wall/fencing must not block that access. Layout record

The draft-layout letter records mortgage security over plots 174–203 and plots 104–111 and 171–173 in favour of HMDA. These are approval-related security plots, not evidence of parking allocation.

6. Amenities, recreation & open spaces

The RERA amenities record lists several layout infrastructure categories, but the supplied status percentages are 0; it does not establish that facilities have been completed or independently verified. The HMDA draft-layout letter separately specifies proposed layout infrastructure and land areas. RERA amenities

Park / open space
Description / size5138.19 sq.m; HMDA letter states 8.29%
Evidence sourceHMDA draft-layout letter; RERA amenities list includes Green Strip/TOT LOT/Park
Declared progress / verified statusListed; completion not independently verified; amenities status percentage 0 RERA amenities
Social infrastructure
Description / size1563.52 sq.m; HMDA letter states 2.52%
Evidence sourceHMDA draft-layout letter
Declared progress / verified statusArea provided in the layout schedule; facility type and completion not established
Internal roads and footpaths
Description / sizeLayout road area 18164.62 sq.m; letter states 29.32%
Evidence sourceHMDA draft-layout letter; RERA amenities list
Declared progress / verified statusListed; completion not independently verified; status percentage 0 RERA amenities
Community buildings
Description / sizeNo size or facility detail supplied
Evidence sourceRERA amenities list
Declared progress / verified statusCategory listed; no completed facility established RERA amenities
Sports, clubhouse and indoor recreation
Description / sizeNo RERA-filed facility or size established in the supplied project documents
Evidence sourceVendor claims include sports and recreation items Promoter website
Declared progress / verified statusMarketing/vendor claims only; not established as approved or delivered

7. Utilities, building services & safety

The HMDA draft-layout letter lists proposed common septic tank / STP, internal water-supply pipelines and an overhead tank, electrical supply lines with streetlights and a transformer, park development, rainwater-harvesting pits and social infrastructure. It also refers to drainage and channelisation of NALAs for stormwater runoff. These are described in the draft-layout record; no completion or capacity figures are supplied.

Water
Evidence in the supplied recordInternal water-supply pipelines and overhead tank listed in the draft-layout letter
Status establishedProposed/listed; capacity, source and completion not supplied
Sewerage and drainage
Evidence in the supplied recordCommon septic tank / STP and stormwater drains listed; drainage/channelisation of NALAs noted
Status establishedProposed/listed; treatment capacity and completion not supplied
Rainwater harvesting
Evidence in the supplied recordRainwater-harvesting pits listed
Status establishedProposed/listed; completion not verified
Electrical
Evidence in the supplied recordSupply lines, streetlights and transformer listed
Status establishedProposed/listed; capacity and completion not supplied
Waste management
Evidence in the supplied recordSolid-waste management and disposal appears in the RERA amenities list RERA amenities
Status establishedListed; implementation not independently verified
Fire/life safety, lifts and accessibility
Evidence in the supplied recordNo project-specific system, lift or accessibility detail established in the supplied records RERA amenities Document index
Status establishedNot established

8. Location, access & connectivity

The registered location is BIBINAGAR, Bibinagar mandal, Yadadri Bhuvanagiri district, Telangana, PIN 508126. The HMDA draft-layout letter identifies the site as being in Bibinagar village and states that internal roads are to be opened for access to neighbouring sites. RERA record

A location record gives the nearest sampled Outer Ring Road interchange as approximately 12.6 km. Location record The vendor materials make additional proximity and travel-time claims, but these are not relied on here as independently verified project-access measurements. Promoter website

9. Developer & development status

The registered promoter is Kinetic Estates, recorded as a partnership. The RERA filing identifies Vamsi Krishna Bommareddy as authorized signatory and lists Gurava Reddy Nerla, Charan Teja Bommareddy, Vijaya Lakshmi Nerla, Venkata Subba Reddy Alla and Sindhura Alla as partners. Corporate record Parties record

The RERA registration certificate gives the promoter office as “Village: Mandal: Serilingampally, District: Ranga Reddy, Pin: 500049”; the supplied record does not provide a complete street address or official contact details for that office.

The promoter’s Form B declares a completion date of 22/03/2023. No revised completion date, extension order, or independently verified progress information is supplied.

10. Approvals, official records & documents

RecordSupplied evidence
TG-RERA registrationForm C for SIGNATURE PARK, registration P02000003451, valid 24/09/2021–22/03/2023; certificate includes the separate-account condition
HMDA layout approvalDraft Layout Permit 000165/LO/Plg/HMDA/2021, dated 22 March, 2021, for the listed Bibinagar survey numbers; draft-layout conditions include requirements before final-plan release
Local-body referenceGPBBN/51/2021, dated 03/07/2021, appears in the supplied commencement-certificate filing text; further terms are not legible in the extraction
Layout planRERA-filed layout-plan document is present, but the supplied extraction is not text-readable; drawing-derived layout schedule and limitations are summarised above Layout record
Promoter declarationForm B by Bommareddy Vamsi Krishna includes the promoter’s title, encumbrance and completion declarations
Registration-period statusThe supplied certificate records the original validity period; no extension or occupancy/completion certificate is supplied in this evidence set

Frequently asked questions

Is SIGNATURE PARK registered with Telangana RERA?

Yes. SIGNATURE PARK is registered with the Telangana Real Estate Regulatory Authority as P02000003451; the registration status is New Project.

Who is the developer of SIGNATURE PARK?

The promoter named in the RERA registration is Kinetic Estates.

Where is SIGNATURE PARK located?

SIGNATURE PARK is in BIBINAGAR, Yadadri Bhuvanagiri, Telangana (508126).

When will SIGNATURE PARK be completed?

The promoter's proposed date of completion filed with RERA is 22/03/2023. This is the promoter's declaration, not a guarantee.

More projects in Bibinagar