Sign in

Rk Golden City

CHEERLA RADHA AND OTHERS · Wanaparthy · RERA P01500009445

RK GOLDEN CITY is a plotted development / layout with open plots in Wanaparthy Municipal Corporation, Wanaparthy Mandal, Wanaparthy District. The registered promoter is CHEERLA RADHA AND OTHERS. The project covers 13960.82 sq. m in Survey Nos. 864 and 866 and comprises 58 residential plots; the plot sizes are 104.52–194.87 sq. m. It is registered under TG-RERA registration P01500009445, and the promoter’s declared completion date is 25 May 2026.

01What we found

Period endedTG-RERA registration ran to 25 May 2026 - check its extension on TG-RERA
28documents on file - each fact links to its page
0court cases on this project's land in the court records searched
7items to check - 2 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

7 items to check before you pay, 2 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemProject record
Registered nameRK GOLDEN CITY RERA record
Project typePlotted development / layout with open plots RERA record RERA filing
Phase or registered portionPhase not disclosed; the RERA-filed project is identified as the layout in Survey Nos. 864 and 866 RERA record
TG-RERA registrationP01500009445 Approvals record
Registration validity25 May 2024 to 25 May 2026, for two years, unless extended by the Authority. A later extension is not evidenced in the supplied records. Approvals record
Registered promoterCHEERLA RADHA AND OTHERS RERA record RERA filing

Land and geographic identity

ItemProject record
LocalityRERA record: Wanaparthy Municipal Corporation; the approval drawing describes “GOLDEN CITY NEAR SAI BABA TEMPLE PANGAL ROAD.” RERA filing
Revenue villageWanaparthy is stated in the RERA certificate; approval records variously identify Wanapartrhy Revenue Village and Metpally village. The revenue village applicable to each project parcel is not resolved in the supplied record.
Mandal / district / PINWanaparthy / Wanaparthy / 509103 RERA record
Project survey numbersSurvey Nos. 864 and 866; no project subdivision numbers are disclosed in the RERA project identity. RERA record Land records
Registered site extentRERA land record: 13960.82 sq. m. Land records
Layout area in filed drawing13960.31 sq. m; the drawing’s area statement labels the net layout area as 13960.31 sq. m.
BoundariesNorth: EXISTING 33 FEET ROAD; South, East and West: OTHERS LAND. Land records

Development identity

ItemProject record
Sanctioning / approving authoritiesRERA-filed approval records identify TS-DTCP and Wanaparthy Municipality/Municipal Corporation. Approvals record
Principal layout approvalTentative layout approval 0003/LO/3067/2024, dated 25 May 2024. Approvals record
Final layout recordFinal LP 0009/WANA/SWFL/2026, dated 07/03/2026, for a layout with open plots. Approvals record
Approved built-up areaThe RERA filing reports 7798.56 sq. m. The tentative layout drawing separately states proposed built-up area, excluding and including parking, as 0.00 for the layout. RERA filing
Plot count58 plots, as stated in the layout drawing and final layout record. Layout record
Buildings / floors / parking levelsNot applicable to the plotted-layout approval as supplied. Individual dwelling-house building permissions are not included.

Offering and status

ItemProject record
Unit typeResidential plots; the final layout record specifies detached, single-family dwelling use for each site.
Plot sizesSoftware-read from the approved layout drawing: 104.52–194.87 sq. m (approximately 125.0–233.1 sq. yd); verify against the drawing. Layout record
Booked / available plotsNot disclosed in the supplied records. RERA record
Construction / completionThe project is a plotted layout. An architect’s certificate dated 20/03/2026 certifies overall project completion; the supplied final layout record is dated 07/03/2026. These records do not establish the construction status of any future individual dwelling.
Promoter’s declared completion date25 May 2026 in the Form B declaration. This is distinct from RERA registration validity.
Occupancy certificateThe architect’s certificate identifies OC 0009/WANA/SWFL/2 026, dated 07/03/2026, issued by DTCP, and certifies completion of the registered project. The supplied final-layout proceeding is for the layout, not an individual dwelling.

The project story

RK GOLDEN CITY is registered as a plotted residential development in Wanaparthy, comprising a layout of 58 plots in Survey Nos. 864 and 866. The filed drawing identifies the locality as near Sai Baba Temple, Pangal Road, and provides for internal roads, open space, social-infrastructure land and utility land. The final layout record specifies detached, single-family dwelling use; it does not approve or describe completed houses on the plots. RERA record

The layout’s tentative approval is dated 25 May 2024, and a final-layout proceeding is dated 07/03/2026. An architect’s certificate dated 20/03/2026 certifies overall completion of the registered project and identifies an occupancy certificate. These are project/layout records; they do not establish that an individual plot purchaser’s future house has been built or received an occupancy certificate.

The RERA registration certificate states a validity period from 25 May 2024 to 25 May 2026. The promoter’s Form B separately declares 25 May 2026 as the completion date. The supplied records do not include an extension order.

Master plan, architecture & building design

The filed layout drawing describes a net layout area of 13960.31 sq. m and 58 individual sub-plots. Its land-use schedule allocates 7797.99 sq. m (55.86%) to plots, 4358.95 sq. m (31.22%) to roads, 1264.18 sq. m (9.06%) to organized open space/park, 353.76 sq. m (2.53%) to social infrastructure, and 185.42 sq. m (1.33%) to utilities. The drawing reports 0.00 sq. m for amenity area. These are layout allocations, not building floor areas.

The drawing lists internal road widths including 9.14 M, 10.06 M, 18.06 M, 18.29 M and 30.0 M, and also identifies existing and proposed roads. The final-layout record identifies the project as a layout with open plots and includes a site plan at scale 1:325.

No apartment buildings, floor configurations, building footprints, tower heights, or dwelling floor plans are evidenced in the supplied records. The three drawing sheets classified as layout sheets are not measured dwelling floor plans. Floor plans

Homes, configurations & floor plans

This is a plotted development, not a filed apartment-unit schedule. The layout drawing states 58 plots. Software reading of the approved drawing identifies plot areas from 104.52 sq. m to 194.87 sq. m, with a median of 125.42 sq. m; these measurements should be checked against the drawing. Layout record

Plot-size bandPlot countMeasurement basis
100–150 sq. yd (84–125 sq. m)11Software-measured from the drawing Layout record
150–200 sq. yd (125–167 sq. m)42Software-measured from the drawing Layout record
200–250 sq. yd (167–209 sq. m)5Software-measured from the drawing Layout record

The supplied records do not provide booked or available plot counts. No dwelling configurations, carpet areas, saleable areas, or floor-plan room measurements are available. RERA record Floor plans

Parking & vehicle circulation

The layout drawing allocates 0.00 sq. m to common parking area. The supplied records do not establish a project-wide parking-space count, visitor or accessible parking, or plot-specific parking allocations.

The drawing identifies internal roads of several widths, including 9.14 M, 10.06 M, 18.06 M, 18.29 M and 30.0 M. The tentative layout conditions state that roads are to remain open for neighbouring-site access. No separate vehicle-entry, pedestrian-separation, ramp or EV-charging plan is supplied.

Amenities, recreation & open spaces

Landscape/open space — Park / open space
Description / size1264.18 sq. m (9.06%) in the tentative layout drawing. The final-layout record also identifies an open-space area.
Evidence sourceApproved-layout records
Declared progress / verified statusThe records require handover of designated open space by registered gift deed before release of the tentative layout; the supplied material does not independently verify park delivery.
Sports/recreation — Tot-lot
Description / sizeIdentified as “Tot-lot”; no size or equipment details supplied.
Evidence sourceTentative layout drawing
Declared progress / verified statusListed in the drawing; completion is not independently established.
Convenience/community — Social infrastructure
Description / size353.76 sq. m (2.53%).
Evidence sourceApproved-layout records
Declared progress / verified statusLand allocation is recorded; a specific completed community facility is not established.

The RERA amenities schedule marks internal roads and footpaths, water supply, sewerage, storm-water drains, green strip/tot-lot/park, water conservation/rainwater harvesting, and electrical meter room/sub-station/receiving station as available at 100%. It marks street lighting, community buildings, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection, and aggregate recreational open space at 0%. These are RERA-filed schedule entries; independent on-site verification is not supplied. RERA amenities

Utilities, building services & safety

The tentative-layout conditions specify layout-development works including road formation with black top, storm-water drains, underground drainage lines and a common septic tank/STP, internal water-supply pipelines and overhead tank, an assured water-supply source, electrical supply lines, street lights, transformer, avenue plantation, park development and rainwater-harvesting pits. These are approval conditions and requirements; the supplied records do not establish their capacities or independently verify completion.

The final-layout record also lists rainwater-harvesting structures and refers to utility land. The RERA amenities schedule marks water supply, sewerage, storm-water drains and rainwater harvesting as available at 100%, while its entries for street lighting and solid-waste management are 0%. RERA amenities

The records do not provide water-storage capacities, an identified water source, treatment capacity, electrical-load details, backup-power provision, CCTV/security arrangements, accessibility design or project-specific fire-system details. The layout record concerns plots; individual building services and safety provisions will depend on separate dwelling approvals.

Location, access & connectivity

The registered location is Wanaparthy, Wanaparthy Mandal, Wanaparthy District, PIN 509103. The RERA address identifies Wanaparthy Municipal Corporation; the filed drawing describes “GOLDEN CITY NEAR SAI BABA TEMPLE PANGAL ROAD.” The stated northern boundary is an existing 33-foot road. RERA record RERA filing Land records

The layout drawing identifies internal roads at widths including 9.14 M, 10.06 M, 18.06 M, 18.29 M and 30.0 M, and states that roads are to remain open for access to neighbouring sites. No verified distances to public transport, services or other landmarks are supplied.

Developer & development status

The TG-RERA registered promoter is CHEERLA RADHA AND OTHERS. The RERA filing describes the organization type as “Others” and its description as “Individual Partners”; a more specific legal entity type is not established in the supplied record. RERA record RERA filing

The Form B declaration is made by Mr. Cheerla Ravi and is dated 20 January 2025. It declares 25 May 2026 as the project completion date and records the promoter’s undertakings concerning project funds, audits and pending approvals. These are promoter declarations, not independent verification.

An architect’s certificate dated 20/03/2026 certifies overall completion of the registered project. The final-layout proceeding is dated 07/03/2026. No phase-wise or plot-wise construction progress, sales inventory, or dwelling completion information is supplied.

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP01500009445; valid 25/05/2024–25/05/2026
Scope and evidenceForm C certificate for RK GOLDEN CITY, identifying Cheerla Radha and others as promoter and Survey Nos. 864 and 866.
Tentative layout approval
Identifier / date0003/LO/3067/2024; 25 May 2024
Scope and evidenceTentative layout plan for 58 plots in Survey Nos. 864 and 866; records layout-development conditions and municipal mortgage plots.
Layout plan drawing
Identifier / dateFile No. TS/004539/2024
Scope and evidenceFiled drawing for a 58-plot layout, with land-use schedule and road widths.
Final-layout proceeding
Identifier / date0009/WANA/SWFL/2026; 07/03/2026
Scope and evidenceFinal layout proceeding for 58 open plots in Survey Nos. 864 and 866.
Architect’s completion certificate
Identifier / date20/03/2026
Scope and evidenceCertifies completion of the registered project and identifies OC 0009/WANA/SWFL/2 026, dated 07/03/2026.
Form B promoter declaration
Identifier / date20 January 2025
Scope and evidenceIncludes the promoter’s declared completion date of 25 May 2026 and other registration undertakings.
RERA-filed layout record
Identifier / date0003/LO/3067/2024
Scope and evidenceFiled as a plan/layout document; the record describes the plan as a layout with open plots.

Frequently asked questions

Is RK GOLDEN CITY registered with Telangana RERA?

Yes. RK GOLDEN CITY is registered with the Telangana Real Estate Regulatory Authority as P01500009445; the registration status is New Project.

Who is the developer of RK GOLDEN CITY?

The promoter named in the RERA registration is CHEERLA RADHA AND OTHERS.

Where is RK GOLDEN CITY located?

RK GOLDEN CITY is in Wanaparthy Municipal Corporation, Wanaparthy, Telangana (509103).

When will RK GOLDEN CITY be completed?

The promoter's proposed date of completion filed with RERA is 25/05/2026. This is the promoter's declaration, not a guarantee.

More projects in Wanaparthy