Vasavi Homes

DRAKSHAPALLI · Mancherial · RERA P01200010100

VASAVI HOMES is a plotted development at Naspur, Naspur Mandal, Mancherial District. The registered promoter is DRAKSHAPALLI VENKATA LAXMI. The layout covers 17,802.24 sq. m and comprises 54 residential plots, with plot areas of 80.88–315.03 sq. m. It is registered with TG-RERA under P01200010100, with a proposed completion date of 06/09/2027.

01What we found

RegisteredTG-RERA - valid till 6 May 2027
13documents on file - each fact links to its page
3court cases on this project's land (survey 19, Naspur)
10items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

10 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Naspur, Naspur, Mancherial · geocoded — approximate.

1. Project at a glance

Project identity

ItemRecord
Registered project nameVASAVI HOMES RERA record
Project typePlotted development / residential layout RERA record RERA filing
Phase / registered portionNo phase designation is disclosed; the registration concerns the plotted layout identified in the filed records. RERA record
TG-RERA registrationP01200010100; registered 06/05/2025 to 06/05/2027, unless extended by the Authority. RERA record Approvals record
Registered promoterDRAKSHAPALLI VENKATA LAXMI (TG-RERA certificate); project header identifies the promoter as DRAKSHAPALLI. RERA record Corporate record
Registration statusNew Project; registration certificate supplied. RERA record

Land and geographic identity

ItemRecord
Locality / revenue villageNaspur; approval drawing describes the site as NASPUR SHIVAR and the certificate as Naspur Revenue Village. RERA record RERA filing
Mandal / district / PINNaspur Mandal; Mancherial District; 504302. RERA record RERA filing
Survey numbers as filed19/, 25/1 and 25/2; the layout drawing prints survey 19/^B, while the RERA certificate records 19/. RERA record RERA filing
Registered site extentRERA land details: 17,802.24 sq. m total and net area. The layout drawing records 17,801.91 sq. mt total/net layout area. RERA filing
Layout boundariesNorth: 9M wide road; South: others’ land; East: 9M wide road and others’ land; West: others’ land. RERA filing

Development identity

ItemRecord
Sanctioning authorityTentative layout approval issued by Naspur Municipality/Municipal Corporation; drawing identifies TS-DTCP and delegation to Naspur Municipality. Approvals record
Principal approvalTentative Layout Plan 0006/LO/3075/2025, dated 06 May, 2025; application 007945/LO/NASP/3075/0010/2024. Approvals record
Layout drawing file referenceG1/117/2019-2020; LTP 10/2019/WRO/W. Approvals record
Plots54 individual sub-plots, as stated in the approval records and plot schedule.
Approved built-up areaDrawing states total proposed built-up area 0.00 excluding parking and 0.00 including parking; this is a plotted layout, not an apartment-building schedule.
Buildings, floors and parking levelsNo tower/block count, floor configuration, building parking levels or sanctioned apartment count is disclosed in the supplied project records.

Offering and status

ItemRecord
OfferingResidential plots; no RERA-filed plot-by-plot booking or availability count is supplied here. RERA record
Plot-size range80.88–315.03 sq. m (software-read from the approved drawing’s plot schedule; drawing verification is advised). Layout record
Declared completion undertaking06/05/2027 in the Form B declaration and tentative-layout conditions.
Completion date in project header06/09/2027. This is the header’s proposed completion date; the Form B undertaking and tentative-layout infrastructure deadline are recorded separately above. RERA record
Registration validity06/05/2025–06/05/2027, unless extended. This is registration validity, not a statement that the development is complete by that date.
Construction / infrastructure stageThe records describe a tentative layout and prescribe infrastructure works; no independently verified on-site progress is supplied. RERA amenities
Occupancy / completion certificateNo occupancy or completion certificate is identified in the supplied records; the project is a plotted layout. Document index Approvals record

2. The project story

VASAVI HOMES is presented in the TG-RERA filing as a 54-plot residential layout at Naspur, Naspur Mandal, Mancherial District, on survey numbers 19/, 25/1 and 25/2. The layout drawing identifies a total/net layout area of 17,801.91 sq. mt and allocates land among plots, roads, park/open space, social infrastructure and utilities. RERA record

The supplied approval is for a tentative layout, not evidence that the listed infrastructure is already delivered. Its conditions require the layout applicant to complete infrastructure and amenities within two years of approval—by 06 May, 2027—and set out a process for a possible further extension. The records supplied do not establish the current physical completion of roads, drainage, water supply, lighting or other works through an independent site inspection. RERA amenities

3. Master plan, architecture & building design

The filed drawing describes a plotted residential layout, rather than a multi-storey building scheme. It records 54 plots and a total/net layout area of 17,801.91 sq. mt; the land-details filing records 17,802.24 sq. m. The drawing’s land-use schedule is: RERA filing

Layout useAreaShare
Plotted area10,683.83 sq. m60.02%
Roads4,889.76 sq. m27.47%
Organized open space / park1,603.90 sq. m9.01%
Social infrastructure445.56 sq. m2.50%
Utility area178.85 sq. m1.00%
Total net layout17,801.90 sq. m100.00%

The approval records list internal road widths of 9.14 mt and 18.28 mt, and identify existing/wide-road annotations including 9.14 M W ROAD and 18 M W ROAD. The drawing also lists a “Tot-lot,” social infrastructure and utility area.

The drawing states proposed built-up area of 0.00 both excluding and including parking. No building footprints, building heights, floor plans, apartments-per-floor, lifts or stairs are evidenced in the supplied records. The approval calls for infrastructure and amenities to be completed before release of the final layout; the listed tentative approval should not be read as confirmation that those works are complete.

4. Homes, configurations & floor plans

This is a plotted layout. The drawing’s plot schedule states 54 plots. Plot counts and size bands below are software-read from the drawing; the supplied record notes that plot-count and size readings should be verified against the drawing. Layout record

Plot size bandNumber of plots
0–100 sq yd (0–84 sq. m)1
100–150 sq yd (84–125 sq. m)3
150–200 sq yd (125–167 sq. m)8
200–250 sq yd (167–209 sq. m)29
250–300 sq yd (209–251 sq. m)1
300–400 sq yd (251–334 sq. m)12

The software-read smallest, median and largest plot areas are 80.88 sq. m, 179.11 sq. m and 315.03 sq. m, respectively. These are plot areas read from the drawing, not apartment saleable or carpet areas. Layout record

No RERA unit-type table, plot-wise booked/available inventory, or apartment floor plans are supplied. The two drawing sheets are classified as layout sheets, with no apartment floor plans measured. Floor plans

5. Parking & vehicle circulation

The layout approval drawing records 0.00 common parking area. The supplied records do not establish resident or visitor parking counts, individual plot parking allocations, accessible parking, EV charging, or a separate parking facility. RERA amenities

The layout drawing identifies internal road widths of 9.14 mt and 18.28 mt and states that roads must remain accessible to neighbouring sites. It does not provide a vehicle-circulation plan or establish exclusive ownership of any parking space.

6. Amenities, recreation & open spaces

The layout drawing allocates land for a park/open space, social infrastructure and utilities. The tentative approval also lists infrastructure and amenity works to be carried out by the layout applicant; no independent evidence of completion is supplied. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / organized open space1,603.90 sq. m; 9.01% of the layoutApproved layout drawing; tentative approvalReserved in the layout; completion not independently verified
Tot-lotListed as a layout amenity; no size statedLayout drawingListed; progress not supplied
Social infrastructure445.56 sq. m; 2.50%Layout drawingReserved; delivery status not supplied
Utility area178.85 sq. m; 1.00%Layout drawingReserved; delivery status not supplied
Internal roadsRoad area 4,889.76 sq. m; drawing lists widths of 9.14 mt and 18.28 mtLayout drawingApproval condition requires road formation; completed status not independently verified
Avenue plantation / park developmentSpecified as layout development works; no quantities or dimensions statedTentative approvalRequired work; completion not independently verified

7. Utilities, building services & safety

The tentative approval lists layout-level services and works, including internal water pipelines, an overhead tank, an assured water source, underground drainage, a common septic tank or STP, storm-water drains, street lighting, an electrical transformer, solid-waste management and rainwater-harvesting pits. It also requires an overhead tank or sump and sufficient harvesting pits. These are approval conditions and listed works, not confirmation that the facilities have been installed or commissioned.

Water
Evidence in the project recordInternal water-supply pipelines, overhead tank and assured water-supply source are specified.
Status evidencedRequired/proposed in approval conditions; source capacity and completion not supplied.
Sewerage and drainage
Evidence in the project recordUnderground drainage lines and a common septic tank/STP are specified.
Status evidencedRequired/proposed; capacity and completion not supplied.
Storm-water and rainwater
Evidence in the project recordStorm-water drains and rainwater-harvesting pits are specified.
Status evidencedRequired/proposed; completion not independently verified.
Electrical and lighting
Evidence in the project recordElectrical supply lines, transformer and street lights are specified.
Status evidencedRequired/proposed; capacity and completion not supplied.
Solid waste
Evidence in the project recordSolid-waste management is listed among the works.
Status evidencedRequired/proposed; operating arrangements not supplied.
Fire and safety
Evidence in the project recordFire-protection and fire-safety requirements appear in the RERA amenities record.
Status evidencedNo system design, clearance or completed installation is evidenced. RERA amenities
Security / CCTV / backup
Evidence in the project recordVendor data lists CCTV, security and power backup.
Status evidencedNo project-specific approval or completion evidence supplied; not treated as verified delivery. Promoter website

8. Location, access & connectivity

The project’s filed location is Naspur Revenue Village, Naspur Mandal, Mancherial District, Telangana, PIN 504302. The layout drawing describes the site as Naspur Shivar and identifies roads along the north and part of the east boundary, with “others’ land” along the south, west and part of the east. RERA record RERA filing

The supplied location record gives an approximate 171.2 km distance to the nearest sampled Outer Ring Road interchange. This is a recorded approximate location measurement; no local public-transport routes or additional nearby landmarks are established in the project data. Location record

9. Developer & development status

The TG-RERA certificate names DRAKSHAPALLI VENKATA LAXMI as the registered promoter. The project header uses DRAKSHAPALLI as the promoter name. The legal entity type, corporate identifier, registered office and official project contact details are not established in the supplied records. RERA record Corporate record

The promoter’s Form B declaration undertakes completion by 06/05/2027 and includes declarations concerning project funds, accounts, audits and pending approvals. Those are promoter declarations, not independent confirmations of funding or physical progress. The approval conditions separately require infrastructure and amenities by 06 May, 2027. No independently verified construction-stage assessment is supplied.

10. Approvals, official records & documents

TG-RERA registration certificate
Supplied evidenceForm C certificate; P01200010100, valid 06/05/2025–06/05/2027 unless extended.
Scope / noteProject registration; not a conveyance of title
Tentative layout approval
Supplied evidence0006/LO/3075/2025, dated 06 May, 2025; issued by Naspur Municipality/Municipal Corporation.
Scope / noteResidential layout on survey numbers 19/, 25/1 and 25/2
Layout plan / area schedule
Supplied evidenceDrawing references file G1/117/2019-2020 and LTP 10/2019/WRO/W; records 54 plots and land-use allocations.
Scope / noteLayout drawing and schedule
Form B declaration
Supplied evidencePromoter declaration includes completion undertaking of 06/05,2027.
Scope / notePromoter-declared information
Commencement / building approvals
Supplied evidenceNo separate building commencement certificate or building-permission schedule is identified in the supplied records. Document index Approvals record
Scope / noteThe supplied approval is for a tentative plotted layout
Occupancy / completion certificate
Supplied evidenceNone identified in the supplied records. Document index Approvals record
Scope / noteNo OC status beyond absence of a supplied certificate is established

Frequently asked questions

Is VASAVI HOMES registered with Telangana RERA?

Yes. VASAVI HOMES is registered with the Telangana Real Estate Regulatory Authority as P01200010100; the registration status is New Project.

Who is the developer of VASAVI HOMES?

The promoter named in the RERA registration is DRAKSHAPALLI.

Where is VASAVI HOMES located?

VASAVI HOMES is in NASPUR, Mancherial, Telangana (504302).

When will VASAVI HOMES be completed?

The promoter's proposed date of completion filed with RERA is 06/09/2027. This is the promoter's declaration, not a guarantee.