Sign in

Gms Classic Avenue

BHUVI CONSTRUCTIONS · Rangareddy · RERA P02400009627

GMS CLASSIC AVENUE is a residential apartment project in Chanda Nagar, Serilingampally Mandal, Ranga Reddy District. It is being developed by the registered promoter BHUVI CONSTRUCTIONS on a site of 434.61 sq.m., with one building comprising 1 Stilt + 5 upper floors and 10 3BHK units. The project is registered with TG-RERA as P02400009627, with proposed completion by 29/06/2027.

More from Bhuvi Constructions · 3 projects →

01What we found

RegisteredTG-RERA
17documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 4 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldProject record
Registered project nameGMS CLASSIC AVENUE RERA record
Project type / registered portionResidential apartment project; the registration record describes one project/building, with no separate phase identified in the supplied material. RERA record RERA filing
TG-RERA registration numberP02400009627 Approvals record
Registration validity30/06/2024 to 29/06/2027, as stated in the certificate; this is registration validity, not confirmation of completion or occupancy. Approvals record
Registered promoterBHUVI CONSTRUCTIONS; RERA filing identifies the entity type as Partnership. RERA record Corporate record
RERA statusRecorded as a New Project; registration certificate is supplied. RERA record Approvals record

Land and geographic identity

FieldProject record
Locality / revenue villageSerilingampally locality; revenue village Chanda Nagar (also rendered “CHANDANAGAR” in the building-permit extract). RERA record RERA filing
Mandal / district / PINSerilingampally Mandal, Ranga Reddy District, 500050. RERA record
Project survey numbers276, 277, 278, 282, 283, 284, 285 and 286; the filed range is also written “282 TO 286.” RERA record RERA filing
Plot identificationPlot Nos. 268 and 278 Part, as described in the plan instrument.
Registered site extent / land area434.61 sq.m.; the permit extract states plot area and net plot area as 434.61 sq.m., with road-affected and nala-affected areas each recorded as 0.0 sq.m. RERA filing
Boundaries in RERA filingNorth: 30 wide road; South: Plot No. 278 Part; East: Plot No. 269 and 277; West: Plot No. 267 and 279. RERA filing

Development identity

FieldProject record
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal filed plan / file number000673/GHMC/0297/SLP2/2024-BP, approved 30 June 2024, as recorded in the supplied approval extract. The building permit order also identifies Permit No. 1969/GHMC/SLP/2024-BP. Approvals record
BuildingOne proposed residential building, identified as “PROP (BUILDING).”
Sanctioned floor arrangement1 Stilt + 5 upper floors. The permit extract lists building height as 14.99 and also states “Total Ht. 20.99mt.”; these are reproduced as recorded, without interpreting their differing labels.
Approved built-up area1,141.00 sq.m. excluding parking; 1,369.20 sq.m. including parking. Parking area is recorded as 228.20 sq.m.
Units10 units recorded in both the building-plan extract and TG-RERA unit data. RERA unit table
Parking provisionThe permit extract records total parking area of 228.2 sq.m. and “No of Stack: 10”; individual parking-space allocation and resident/visitor breakdown are not established by the supplied records.

Offering and status

FieldProject record
RERA-filed configuration3BHK; 10 units. RERA unit table RERA unit details
RERA-filed saleable area143.99 sq.m. per listed configuration. RERA unit table RERA unit details
Booking / availabilityPortal-derived unit record lists 0 booked and 10 available; the supplied unit record does not provide an as-of date, so counts are indicative. RERA unit table RERA unit details
Completion timelineThe RERA Form-B declaration states 29/06/2027; the permit extract states construction to be completed before 30 June, 2027.
Construction stageThe project is described as proposed in the registration declaration. The supplied approval records give sanctioned scope, but no independently verified site-progress assessment is provided.
Occupancy / completion certificateNo occupancy or completion certificate is supplied; the building-permit extract records completion certification as false and says an occupancy certificate is required before occupation.

2. The project story

  • GMS CLASSIC AVENUE is a single-building residential apartment project registered with TG-RERA as P02400009627. It is identified in the filing as being at Chanda Nagar, Serilingampally Mandal, Ranga Reddy District, on Plot Nos. 268 and 278 Part, comprising the recorded survey numbers 276, 277, 278 and 282 to 286. The site extent recorded in the building-permit extract is 434.61 sq.m. RERA record RERA filing
  • The sanctioned proposal is one building with a stilt level and five upper floors, with 10 residential units. The RERA filing lists the units as 3BHK apartments. The available record describes the project as proposed and supplies no independently verified construction-progress report or occupancy certificate; the plan’s existence therefore establishes the approved proposal, not that construction is complete or that the building is ready for occupation. RERA unit table

3. Master plan, architecture & building design

  • The supplied GHMC plan extract describes a residential apartment building on a 434.61 sq.m. plot, with 1,141.00 sq.m. proposed built-up area excluding parking and 1,369.20 sq.m. including parking. It records 228.20 sq.m. as parking area. These are approval-extract figures; they are not unit carpet or saleable areas.
  • The sanctioned building arrangement is one stilt plus five upper floors, with the building permit extract recording 14.99 as building height and also “Total Ht. 20.99mt.” The supplied material does not establish a separate basement or podium, the number of flats per floor, lift or stair count, detailed circulation, or a building footprint.
  • The plan extract lists a 3.6M wide driveway and 9.00 MT wide existing/proposed roads among its road-width details. It also records a vacant plot area of 206.41, periphery greenery, tree planting and a tot-lot/greenery condition. The plan extract refers to a 1.00 M W green belt and restricts construction or parking in setback areas. The supplied evidence does not provide a measured landscaped/open-space schedule or a drawing-based site-area breakdown beyond the figures cited above.

4. Homes, configurations & floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK10010143.99 sq.m.Software-measured: 74.4–90.0 sq.m.; median 82.2 sq.m.43%
  • The 3BHK configuration and unit count are recorded in the TG-RERA data. The saleable area is the RERA-filed figure. Carpet figures are software measurements from the supplied plan drawings, not a RERA disclosure; they are marked as needing drawing review. The floor-plan measurement record reports four measured flat designs. RERA unit table RERA unit details Floor plans
  • Carpet area refers to the measured internal floor-plan geometry in the supplied analysis. The RERA saleable area is a separate filed measure that can include the home’s share of common areas; it should not be read as carpet area. The supplied drawing extract includes a sample flat layout with hall, dining, kitchen, bedrooms, toilets, puja and utility spaces, but does not establish that every unit has identical room dimensions. RERA unit details Floor plans

5. Parking & vehicle circulation

  • The GHMC plan extract records 228.20 sq.m. of parking area and “No of Stack: 10,” while the building-permit extract states that the stilt approved for parking is to be used exclusively for vehicle parking and not converted or misused. The RERA unit record also marks the listed 3BHK units as mortgaged. The supplied records do not set out individual bay allocations, visitor or accessible parking counts, or a confirmed number of car or two-wheeler spaces. RERA unit table
  • The plan extract lists a 3.6M wide driveway and one entry and one exit to the premises, each with a minimum width of 4.5mts. and height clearance of 5mts. These are recorded plan provisions; the supplied material does not establish completed vehicle circulation or pedestrian separation on site.

6. Amenities, recreation & open spaces

  • The TG-RERA amenity record marks water supply, sewerage, storm-water drains, rainwater harvesting and electrical meter room/sub-station/receiving station as available; each listed amenity has 0% progress recorded. The building-plan extract separately lists proposed site features and conditions. No independent completion verification is supplied. RERA amenities
Clubhouse / indoor — no facility established in the project approval or RERA amenity data supplied.
Description / sizeNot disclosed in the project-specific approval or RERA amenity record.
Evidence sourceRERA amenities
Declared progress / verified statusNo project-specific approval/progress evidence supplied.
Sports / recreation — tot-lot / green area
Description / sizePlan condition says the tot-lot is to be fenced and maintained as greenery before issue of the occupancy certificate; the approval extract also records “Tot Lot NA.”
Declared progress / verified statusCondition recorded; completion not verified. RERA amenity record shows Green Strip/TOT LOT/Park at 0%. RERA amenities
Landscape / open space — periphery greenery and tree planting
Description / sizePeriphery greenery and tree planting are specified in the plan conditions; no area or quantity is stated.
Declared progress / verified statusRequired by the approval conditions; completion not verified. RERA amenity record shows aggregate recreational open space at 0%. RERA amenities
Convenience / community — garbage house
Description / sizeRequired within the premises by the approval conditions.
Declared progress / verified statusRequired; completion not verified.
Convenience / community — street lighting, community buildings, energy management, solid-waste management and disposal
Description / sizeListed in the RERA amenity schedule; no project-specific size or capacity is supplied.
Evidence sourceRERA amenities
Declared progress / verified statusEach listed item records 0% progress.
Convenience / community — internal roads and footpaths
Description / sizeListed in the RERA amenity schedule; no project-specific area or completion evidence supplied.
Evidence sourceRERA amenities
Declared progress / verified status0% progress recorded.

7. Utilities, building services & safety

  • The RERA amenity schedule marks water supply, sewerage (including chamber, lines, septic tank and STP), storm-water drains, rainwater harvesting and the electrical meter room/sub-station/receiving station as available, but records 0% progress for each. The plan extract lists a septic tank, sump, percolation pit, rainwater harvesting, transformer space, generator and emergency lighting. It records an underground static water-storage tank capacity of 25,000 lits. and a separate terrace tank of 25,000lits capacity for residential buildings. These are filed or plan-specified provisions, not evidence of completed operation. RERA amenities
  • The plan extract also lists hose reel, down corner and automatic sprinkler system, and requires fire-safety installations under qualified technical supervision. The building-permit conditions state that an Occupancy FIRE NOC shall be obtained from the Director (EV&DM) before issue of the occupancy certificate. No Fire NOC or occupancy certificate is included in the supplied material.
  • Other recorded conditions include provision of transformer space, a garbage house, rainwater-harvesting structure, construction of four rainwater-harvesting pits in the approval extract, CCTV installation and a dust-mitigation/control plan during construction. The extracts mention EV charging infrastructure requirements for parking places, but do not identify a project-specific installed charger or charging count. Lift count/capacity, backup-power capacity, water source and treatment capacity, STP capacity, accessibility features and completed security systems are not established by the supplied project-specific records.

8. Location, access & connectivity

  • The registered location is Chanda Nagar, Serilingampally Mandal, Ranga Reddy District, Telangana, PIN 500050. The location record includes a mapped point at 17.4856259, 78.333707. The building-permit extract identifies the same village and district and records an 18 mt. road. RERA record Location record
  • The location data lists HITEC City at 6.6 km. A separate vendor record lists nearby places and road-distance claims, but those are third-party details rather than project-filed connectivity information: Vidya Vani High School 1.0 km; Deepthisri Nagar Park 0.5 km; Pradham Dental Care 0.8 km; Old Mumbai Highway ~ 3 Kms; NH 65 ~ 0.5 Kms. Location record Promoter website

9. Developer & development status

  • The registered promoter is BHUVI CONSTRUCTIONS, identified in the RERA filing as a partnership. The supplied corporate identifier is GSTIN 36AAQFB7280H1Z2. The RERA filing names MANNE GIDIGINGALA MANJULA as a partner and MANNE GIDIGINGALA SRINIVAS as authorized signatory. The registration certificate gives the promoter address as Madina Guda, Serilingampally, Ranga Reddy, PIN 500049; the project filing separately records a Chanda Nagar, Serilingampally address, PIN 500050. Corporate record Parties record
  • The project registration certificate is valid through 29/06/2027 unless extended by the Authority. The promoter’s Form-B declaration undertakes completion by 29/06/2027. The supplied building-permit extract states construction is to be completed before 30 June, 2027. These are registration/declaration and permit timelines; no independent construction-progress report or occupancy certificate is provided.

10. Approvals, official records & documents

TG-RERA registration
Supplied evidenceCertificate, P02400009627.
What it establishesRegistration of GMS CLASSIC AVENUE by BHUVI CONSTRUCTIONS; validity stated from 30/06/2024 to 29/06/2027.
GHMC building permit
Supplied evidencePermit No. 1969/GHMC/SLP/2024-BP, dated 30 June, 2024; file No. 000673/GHMC/0297/SLP2/2024-BP.
What it establishesResidential building proposal with 1 stilt and 5 upper floors; approval conditions include occupancy certification before occupation.
Plan / approval extract
Supplied evidenceRERA-filed plan extract, document 531230.
What it establishesRecords the project site, 10 units, proposed floor arrangement, area and listed building/site provisions.
Layout / LRS references
Supplied evidenceLRS/3238/CR12/WZ/GHMC/08 and LRS/3624/CR12/WZ/GHMC08, appearing in the permit extract.
What it establishesReferences recorded in the supplied permit document; separate layout approval documents are not supplied here.
Promoter declaration
Supplied evidenceForm-B affidavit-cum-declaration, document 557637.
What it establishesPromoter declaration of title/encumbrance status and completion and project-account undertakings.
Occupancy / completion record
Supplied evidenceNone supplied; permit extract records completion_certified: false.
What it establishesNo completion or occupancy certification is established by the material reviewed.

Frequently asked questions

Is GMS CLASSIC AVENUE registered with Telangana RERA?

Yes. GMS CLASSIC AVENUE is registered with the Telangana Real Estate Regulatory Authority as P02400009627; the registration status is New Project.

Who is the developer of GMS CLASSIC AVENUE?

The promoter named in the RERA registration is BHUVI CONSTRUCTIONS.

Where is GMS CLASSIC AVENUE located?

GMS CLASSIC AVENUE is in SERILINGAMPALLY, Chanda Nagar, Rangareddy, Telangana (500050).

When will GMS CLASSIC AVENUE be completed?

The promoter's proposed date of completion filed with RERA is 29/10/2027. This is the promoter's declaration, not a guarantee.

More projects in Chanda Nagar