Rainbow City

RADIANT INFRA PROJECTS · Medak · RERA P01000005747

RAINBOW CITY is a plotted development in PILLIKOTYAL, MEDAK Mandal, Medak District. The registered promoter developing it is Radiant Infra Projects. The tentative layout approval records 509 residential plots on a stated extent of 41 Acer 5.44 Gts 199098 Sq. Yds; buildings, floors and plot configurations are not disclosed. Its TG-RERA registration is P01000005747, and the proposed completion date recorded in the RERA project information is 14/10/2024.

01What we found

Period endedTG-RERA registration ran to 14 Oct 2024 - check its extension on TG-RERA
34documents on file - each fact links to its page
0court cases on this project's land in the court records searched
12items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

12 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemRecord
Registered project nameRAINBOW CITY RERA record
Project typePlotted development / tentative residential layout RERA record
Phase / registered portionNo separate phase name is disclosed; the RERA certificate covers the listed survey numbers below.
TG-RERA registrationP01000005747; granted under section 5; certificate dated 13/03/2023.
Registration validity13/03/2023 to 14/10/2024. The certificate records no extension. This is registration validity, not a statement of completion or occupancy certification.
Registered promoterRadiant Infra Projects; the filed entity type is a partnership. RERA filing
RERA status in supplied recordThe project is labelled “New Project”; its recorded registration validity ended on 14/10/2024. No later extension certificate is supplied. RERA record

Land and geographic identity

ItemRecord
Locality / revenue villagePILLIKOTYAL is the RERA locality; the tentative layout approval describes the land as MEDAK Revenue Village.
Mandal / district / PINMEDAK Mandal, Medak District, PIN 502110. RERA record
Project survey numbers and subdivisions1325/P, 1326/P, 1327/P, 1328/, 1329/P, 1330/P, 1331/P, 1332/P, 1333/P, 1334/P, 1335/P, 1336/P, 1337/P, 1338/P, 1339/P, 1340/P, 1341/P, 1344/P, 1346/P, 1347/P, 1348/P, 1349/P, 1350/P, 1377/P.
Layout approval identifier0010/LO/3053/2022; application number 009121/LO/DTCP/3053/0024/2022.
Registered site extentThe RERA land details state total area 142172 sq m, affected area 54049 sq m and net area 88123.00 sq m. RERA filing
Layout-plan extent and boundariesThe tentative layout document states 41 Acer 5.44 Gts 199098 Sq. Yds. Boundaries in the RERA land details are recorded as “OTHERS LAND” on all four sides. RERA filing

Development identity

ItemRecord
Sanctioning authority / approvalThe filed tentative layout approval is No. 0010/LO/3053/2022, dated 14/10/2022, issued by MEDAK Municipality/Municipal Corporation. The RERA filing also identifies DTCP as the authority for the plan approval. Approvals record
Approved layout / plotsThe document describes a tentative layout plan for 509 plots.
Area figures in the RERA filingApproved built-up area is recorded as 88123 sq m; the land-details section separately records net area 88123.00 sq m. The supplied record does not explain an approved building programme or provide building-level plans. RERA filing RERA filing
Plot and reserved land-use figures in the tentative approvalPlotted area: 21 Acer 31.01 Gts 105395 Sq. Yds (52.93%); open space (park): 3 Acer 28.16 Gts 17928 Sq. Yds (9%); social infrastructure: 1 Acer 1.27 Gts 4994 Sq. Yds (2.51%); utilities: 0 Acer 16.79 Gts 2032 Sq. Yds (1.02%); roads: 13 Acer 14.22 Gts 64642 Sq. Yds (32.47%); mortgage area: 0 Acer 132.38 Gts 16019 Sq. Yds (15.13%).
Buildings, floors and parking levelsNot disclosed in the supplied project record. This is a plotted layout; no building count, floor configuration or parking-level plan is supplied. Document index

Offering and status

ItemRecord
What is offeredResidential plots; the tentative layout approval records 509 plots.
Plot-size rangeNot established in the supplied TG-RERA records. A third-party listing describes plots as 1,123–3,868 sq ft, but this is not a TG-RERA-filed measurement. Promoter website
Booked / available plotsNot disclosed in the supplied record. RERA filing
Construction / development stageThe project is labelled “New Project”; the supplied records do not establish current site progress independently. The RERA filing records 80% completeness, without a supplied verification date or explanation of the measure. RERA record RERA filing
Completion datesThe RERA project information records proposed completion 14/10/2024; the Form-B declaration undertakes completion on or before 31 10/2024. RERA record
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The available layout document is a tentative layout approval, not an occupancy certificate. Document index

2. The project story

RAINBOW CITY is recorded as a plotted residential layout in the Medak area, registered with TG-RERA under P01000005747. Its tentative layout approval identifies 509 plots and reserves land for plotted use, roads, parks, social infrastructure and utilities. The filed RERA land details identify a net area of 88123.00 sq m and an affected area of 54049 sq m. RERA filing

The layout approval places responsibility for carrying out infrastructure and amenities on the applicant. It also specifies that roads are to remain accessible to neighbouring sites and that open space, utility land and roads are to be handed over to the municipality by registered gift deed before final layout release. The supplied record does not establish whether those works or handovers have been completed.

The RERA filing reports 80% completeness, but no independently verified site inspection or dated progress record is supplied here. Neither the proposed completion date of 14/10/2024 nor the Form-B declaration of completion on or before 31 10/2024 establishes current completion. No occupancy/completion certificate is in the supplied documents. RERA record Document index

3. Master plan, architecture & building design

The available plan evidence concerns a tentative plotted layout, not apartment or building architecture. It records 509 plots over a stated extent of 41 Acer 5.44 Gts 199098 Sq. Yds and the following land-use allocations:

Layout componentArea and share recorded in tentative approval
Plotted area21 Acer 31.01 Gts 105395 Sq. Yds (52.93%)
Road area13 Acer 14.22 Gts 64642 Sq. Yds (32.47%)
Open space (park)3 Acer 28.16 Gts 17928 Sq. Yds (9%)
Social infrastructure1 Acer 1.27 Gts 4994 Sq. Yds (2.51%)
Utilities0 Acer 16.79 Gts 2032 Sq. Yds (1.02%)
Mortgage area0 Acer 132.38 Gts 16019 Sq. Yds (15.13%)

The layout conditions identify infrastructure works including internal roads, storm-water drains, underground drainage lines, internal water-supply pipelines, street lights and avenue plantation, as well as water and sewerage facilities. These are listed as required or specified works; the supplied record does not verify their completion.

No plot-by-plot arrangement drawing, plot-size schedule, building footprint, building elevations, floor plans or building-level circulation details are supplied. The RERA filing’s 88123 sq m approved built-up-area field is recorded, but the available material does not provide a building programme explaining that figure. RERA filing Document index

4. Homes, configurations & floor plans

This is a plotted development, not an apartment configuration schedule. The tentative layout approval records 509 plots, but the supplied RERA material does not disclose plot-wise areas, booked or available counts, or a plot-size band. RERA filing

The third-party vendor listing gives a plot size range of 1,123–3,868 sq ft; this is a vendor claim, not a TG-RERA-filed plot schedule. Promoter website

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
Residential plots509 (tentative layout approval)Not disclosedNot disclosedNot disclosedNot applicable / not suppliedNot supplied

The supplied drawing review reports two drawings, both classified as having no flats; no software-measured carpet areas are available. Floor plans

5. Parking & vehicle circulation

The supplied layout approval identifies a road area of 13 Acer 14.22 Gts 64642 Sq. Yds (32.47%) and requires roads to be opened for accessibility to neighbouring sites. It does not provide a parking count, parking allocation schedule, visitor or accessible parking provision, or a parking-level plan.

The approval conditions also state that only a detached dwelling house designed for one family is to be built on a site, and that no site is to be altered, subdivided or used for more than one family. These conditions do not establish plot-specific parking rights or an exclusive parking allocation.

6. Amenities, recreation & open spaces

The tentative layout approval identifies reserved areas for a park, social infrastructure and utilities. Its conditions list several infrastructure and amenity works, but the supplied record does not establish that they have been completed. RERA amenity fields show several items with 0% progress; those entries are not independent site verification. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Park / open space3 Acer 28.16 Gts 17928 Sq. Yds (9%) reserved as open space.Reserved in tentative approval; completion or handover not verified.
Social infrastructure1 Acer 1.27 Gts 4994 Sq. Yds (2.51%) reserved.Reserved in tentative approval; facility type and delivery status not specified.
Utilities land0 Acer 16.79 Gts 2032 Sq. Yds (1.02%) reserved.Reserved in tentative approval; construction status not verified.
Internal roads and footpathsListed as layout infrastructure.RERA amenitiesRERA amenity field marked “YES”; progress shown as 0%. Completion not independently verified.
Green strip / tot lot / parkRERA amenity entry; the approval separately reserves park/open-space land.RERA amenitiesRERA entry marked “YES”; progress shown as 0%.
Community buildingsListed in RERA amenity fields; no size or facility description supplied.RERA amenitiesProgress shown as 0%; no completion verification.

7. Utilities, building services & safety

The tentative approval lists proposed layout services and conditions, including a water reservoir, overhead tank, sump, septic tank and/or sewage treatment plant, electric transformer, solid-waste management, rainwater-harvesting pits, storm-water drains, underground drainage lines, internal water-supply pipelines, street lights and avenue plantation. The document does not provide capacities or establish that these facilities are operational.

Water
Evidence in the supplied recordWater reservoir, overhead tank, sump and internal water-supply pipelines are listed in the layout approval.
Status limitationSource, storage capacity and completion status are not supplied.
Sewerage / drainage
Evidence in the supplied recordSeptic tank and/or STP, underground drainage lines and storm-water drains are listed.
Status limitationCapacity, treatment/reuse arrangements and completed status are not supplied. RERA amenities
Electrical
Evidence in the supplied recordElectric transformer, electrical meter room/substation/receiving station and street lighting appear in the records.
Status limitationCapacity, supply arrangements and completion status are not supplied. RERA amenities
Rainwater / water conservation
Evidence in the supplied recordSufficient harvesting pits are required by the layout conditions; water conservation/rainwater harvesting also appears in RERA amenity fields.
Status limitationQuantity, capacity and completed status are not established. RERA amenities
Solid waste
Evidence in the supplied recordSolid-waste management and disposal are listed in RERA amenity fields and the layout’s utility description.
Status limitationSystem details and completion status are not supplied. RERA amenities
Fire and life safety
Evidence in the supplied recordFire-protection and fire-safety requirements appear in RERA amenity fields.
Status limitationNo specific system, clearance or completion evidence is supplied. RERA amenities
Lifts, accessibility and security
Evidence in the supplied recordNo project-specific evidence supplied.
Status limitationNot disclosed. Document index

8. Location, access & connectivity

The RERA certificate identifies the project locality as PILLIKOTYAL, PIN 502110, in Medak District. The tentative layout approval describes the land as being in MEDAK Revenue Village, MEDAK Mandal, Medak District.

The location dataset gives coordinates 17.9375095, 78.211745 and lists the nearest sampled Outer Ring Road interchange at approximately 44.5 km. No other measured road distances, public-transport details or landmark distances are supplied. Location record

The tentative layout conditions require that roads be opened for accessibility to neighbouring sites. No specific approach road name or internal-road dimensions are provided.

9. Developer & development status

The registered promoter is RADIANT INFRA PROJECTS, identified in the RERA filing as a partnership. The filed GSTIN is 36ABBFR2843Q1ZP. The RERA records list DUVVURI JYOTHI, NARASIMHA REDDY BOMMA, GIDIPALLY MEENA, SADDI SRIDHAR REDDY and VIJAYA BHASKAR REDDY as partners, and KETHIREDDY SUMAN KUMAR as authorized signatory. RERA filing Corporate record Parties record

The registration certificate lists the promoter office as Village: Medchal 1, Mandal: Medchal, District: Medchal-Malkajgiri, Pin: 500100. The project records separately give the project location as PILLIKOTYAL / Medak. RERA record

See completion dates and progress above.

10. Approvals, official records & documents

TG-RERA registration certificate
Evidence suppliedP01000005747, Form C; issued 13/03/2023, valid to 14/10/2024; certificate records no extension.
Scope / noteRAINBOW CITY; covers the listed survey numbers.
Tentative layout approval
Evidence suppliedApproval 0010/LO/3053/2022, dated 14/10/2022; application 009121/LO/DTCP/3053/0024/2022.
Scope / noteIssued by MEDAK Municipality/Municipal Corporation; document identifies a tentative layout and 509 plots.
Layout mortgage entry
Evidence suppliedMortgage Deed No. 2670/2022, dated 03 October, 2022; stated mortgage area 0 Acer 132.38 Gts 16019 Sq. Yds, in favour of the Municipality/Municipal Corporation.
Scope / noteThe approval lists the reserved mortgage plots and states that release of final layout is subject to the prescribed development and mortgage-release conditions.
Other approval receipts cited in layout document
Evidence suppliedTS/25214/2022 and TS/25215/2022, dated 29 August, 2022; TS/25289/2022, dated 29 September, 2022.
Scope / noteReceipt references in the layout approval.
Promoter declaration
Evidence suppliedForm-B affidavit by Radiant Infra Projects’ representatives, including a title-basis declaration, encumbrance declaration and completion undertaking.
Scope / notePromoter declaration; not independent verification of title, completion or facilities.
Other project documents
Evidence suppliedEncumbrance statement 118163262; partnership-deed record and a partially filled agreement-for-sale form are listed in the supplied project documents.
Scope / noteThe supplied evidence does not include an occupancy/completion certificate or a final layout-release certificate.

Frequently asked questions

Is RAINBOW CITY registered with Telangana RERA?

Yes. RAINBOW CITY is registered with the Telangana Real Estate Regulatory Authority as P01000005747; the registration status is New Project.

Who is the developer of RAINBOW CITY?

The promoter named in the RERA registration is RADIANT INFRA PROJECTS.

Where is RAINBOW CITY located?

RAINBOW CITY is in MEDAK, PILLIKOTYAL, Telangana (502110).

When will RAINBOW CITY be completed?

The promoter's proposed date of completion filed with RERA is 14/10/2024. This is the promoter's declaration, not a guarantee.

More projects in Medak