Sign in

Sindoor Township

UDUTHA VENKANNA AND ONE OTHER · Nalgonda · RERA P01800010070

SINDOOR TOWNSHIP is a plotted development at Ward No. 1, Block No. 5, under Nalgonda Municipality, Nalgonda Mandal, Nalgonda District. The registered promoter is UDUTHA VENKANNA AND ONE OTHER. The open-plot layout records 4532.58 sq.m, 18 plots and plot sizes of 104.05–173.78 sq.m; buildings and floors are not disclosed. It is registered under TG-RERA P01800010070, with proposed completion on or before 06/08/2027.

01What we found

RegisteredTG-RERA - valid till 6 Aug 2027
23documents on file - each fact links to its page
0court cases on this project's land in the court records searched
8items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

8 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

FieldRecord
Registered project nameSINDOOR TOWNSHIP RERA record
Project typePlotted development / open-plot layout RERA record
Phase or registered portionNot separately identified; the registration concerns the plotted project
TG-RERA registrationP01800010070 RERA record
Registration validity06/08/2025 to 06/08/2027, unless extended by the Authority RERA record
Registered promoterUDUTHA VENKANNA AND ONE OTHER; the second promoter’s full legal identity is not stated in the registration certificate RERA record
RERA statusRegistered; the certificate records a two-year validity period

Land and geographic identity

FieldRecord
Locality / addressWard No. 1, Block No. 5, under Nalgonda Municipality, Nalgonda, Telangana 508001 RERA record RERA filing
Revenue villageNalgonda Village (the project fields also identify Ward No. 1)
MandalNalgonda RERA record
DistrictNalgonda RERA record
PIN508001 RERA record
Project survey numbers and subdivisions766/E/1 and 782/E/1/1/1/1/1/1 RERA record
Registered site extent4532.54 sq.m in the project land details Land records; the layout drawing records a total and net layout area of 4532.58 sq.m Layout record
BoundariesEast, west and north: land of owners; south: 60 feet wide main road RERA filing

Development identity

FieldRecord
Sanctioning authorityDTCP is named in the project approval record; the tentative layout approval document is titled as Nalgonda Municipality’s approval Approvals record
Principal layout approvalTentative layout plan 0010/NALG/SWDL/2025, approved 06/08/2025; application/file number 001919/NALG/00004/SWDL/2025 Approvals record
Approved built-up area2226.61 sq.m, recorded as approved built-up area in the project fields RERA filing
Mortgage area434.47 sq.m recorded in project fields; the layout drawing describes it as 19.51% RERA filing
Plots18 plots recorded in the layout approval and drawing
Buildings / floorsNot disclosed as a building development; this is an open-plot layout RERA record
ParkingThe layout drawing records 0.00 sq.m common parking area; a vendor specification lists open parking, without a space count or allocation Promoter website

Offering and status

FieldRecord
Offered productOpen plots; the layout drawing schedules 18 plots
Plot-size range104.05–173.78 sq.m, read from the approved layout drawing Layout record
Booked / available countsNot disclosed in the supplied project record Document index
Construction / development stageA third-party vendor description calls the project “under construction”; the supplied evidence does not provide independently verified on-site progress Promoter website
Completion deadlinePromoter’s Form B undertaking: on or before 06/08/2027
Registration validity06/08/2025–06/08/2027, unless extended
Occupancy / completion certificateNo occupancy or completion certificate is supplied. The approval document concerns a tentative layout and states that an Occupancy Certificate is required before occupying any building; that building condition does not establish an OC for this plotted layout

2. The project story

SINDOOR TOWNSHIP is registered as a plotted development on land identified in the RERA record as Survey Nos. 766/E/1 and 782/E/1/1/1/1/1/1, at Ward No. 1, Block No. 5, under Nalgonda Municipality, Nalgonda. The tentative layout plan records 18 open plots and a total layout area of 4532.58 sq.m. RERA record

The layout provides for plots, internal roads, open space, social infrastructure and utility land. The drawing schedules plots from 104.05 sq.m to 173.78 sq.m. The supplied record does not establish independently verified construction progress, plot sales or an occupancy/completion certificate. Layout record

3. Master plan, architecture & building design

The approved layout drawing records a total and net layout area of 4532.58 sq.m. Its land-use statement allocates 2226.61 sq.m (49.12%) to plots, 1700.09 sq.m (37.51%) to roads, 445.38 sq.m (9.83%) to open space, 113.52 sq.m (2.50%) to social infrastructure and 46.99 sq.m (1.04%) to utilities. It records no common parking area. These are layout land-use figures, not building floor areas. Layout record

The layout approval records road widths of 30.0 m, 18.29 m and 9.14 m; the drawing’s plot schedule also gives individual plot road widths, including 9.27 m, 9.78 m and 8.70 m for certain plots. The drawing records an existing and proposed road width of 30.0 m.

The project fields separately record 2226.61 sq.m as approved built-up area and 434.47 sq.m as mortgage area. No building count, floor configuration, building footprint or residential-building arrangement is disclosed for this plotted layout. RERA filing

4. Homes, configurations & floor plans

This project offers plots rather than apartments. The approved drawing schedules 18 plots; the size measurements below are read from that drawing and are not apartment saleable or carpet areas. Layout record

Plot-size band (sq.m)Plots
104.05–1258
125–1679
167–2091

The drawing records the smallest plot as 104.05 sq.m, the median as 125.42 sq.m and the largest as 173.78 sq.m. Seven plots are shown at 125.42 sq.m each. It also schedules Plot 1 at 173.78 sq.m; Plots 2–8 at 125.42 sq.m each; and Plots 9–18 at 122.00, 109.75, 104.05, 108.24, 112.43, 116.62, 120.82, 125.01, 129.20 and 126.78 sq.m, respectively. These drawing-derived plot measurements should be checked against the approved drawing. Layout record

No booked or available plot inventory is supplied. The floor-plan record contains two layout sheets and no measured home floor plans; no apartment configuration, room schedule, carpet area or loading figure is provided. Floor plans Document index

5. Parking & vehicle circulation

The layout drawing allocates 0.00 sq.m to common parking. The vendor specification lists “Open Parking,” but the supplied record does not state a parking-space count, plot-wise parking arrangement, visitor or accessible provision, or an exclusive parking allocation. Promoter website

Internal roads are included in the layout, with road widths recorded as 30.0 m, 18.29 m and 9.14 m; the plot schedule also includes stated plot-specific road widths. The evidence does not describe vehicle entry/exit points, ramps, pedestrian separation or EV charging provision for the layout.

6. Amenities, recreation & open spaces

The layout approval and RERA-filed amenity list identify the following facilities. Amenity percentages in the project record are 0%; no independently verified completion status is supplied. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Open space / park445.38 sq.m; drawing records 9.83% of layout areaLayout recordIncluded in layout; completion not independently verified
Tot-lotListed as a layout amenity; no separate size suppliedApproval condition says it is to be fenced and maintained as greenery; completion not verified
Social infrastructure113.52 sq.mLayout recordReserved in layout; specific facility and completion status not supplied
Internal roads and footpathsRoad area 1700.09 sq.m; road widths include 30.0 m, 18.29 m and 9.14 mRERA amenitiesIncluded in layout; completion not independently verified
Green strip / plantingPeriphery greenery and tree planting are specified in approval conditionsRequired by conditions; completion not verified

7. Utilities, building services & safety

The tentative layout approval identifies utility land of 46.99 sq.m and lists a water reservoir, septic tank, sewage treatment plant, electric transformer and solid-waste management among the layout infrastructure. It also requires sufficient harvesting pits and describes water, sewerage and other infrastructure as development works. These are approval-recorded provisions or conditions; the supplied material does not verify that they have been completed or provide capacities. Layout record

The RERA-filed amenity list also includes water supply, sewerage, storm-water drains, rainwater harvesting, street lighting and an electrical meter room/sub-station/receiving station, without a disclosed progress percentage above 0%. No project-specific storage or treatment capacities, electrical supply or backup details, security arrangements, accessibility facilities, or completed life-safety systems are supplied. The approval document includes conditions concerning a transformer space, garbage house and rainwater-harvesting structure; these are not evidence of installation. RERA amenities

8. Location, access & connectivity

The registered project location is Ward No. 1, Block No. 5, under Nalgonda Municipality, Nalgonda, Telangana 508001; the approval records Nalgonda Village, Nalgonda Mandal and Nalgonda District. The southern boundary is described as a 60 feet wide main road. RERA record RERA filing RERA filing

A location record gives an approximate sampled distance of 75.0 km to the nearest sampled Outer Ring Road interchange. No public-transport details or other verified landmark distances are supplied. Location record

9. Developer & development status

The registered promoter is UDUTHA VENKANNA AND ONE OTHER. The RERA registration certificate identifies Udutha Venkanna and refers to the second promoter only as “ONE OTHER”; the supplied record does not disclose the second promoter’s full legal name, legal entity type, corporate registration identifier, official website or project contact details. RERA record Corporate record

The promoter’s Form B, signed by Sri Udutha Venkanna as authorized signatory, gives a completion undertaking of on or before 06/08/2027. The registration certificate separately records validity to 06/08/2027, unless extended by the Authority. These dates do not establish construction progress or completion certification.

10. Approvals, official records & documents

RecordAvailable evidence
TG-RERA registrationForm C registration certificate for SINDOOR TOWNSHIP, registration P01800010070, valid 06/08/2025–06/08/2027 unless extended
Layout approvalTentative layout plan 0010/NALG/SWDL/2025, approved 06/08/2025; application/file number 001919/NALG/00004/SWDL/2025
Layout drawingPlan for an open-plot residential layout in Survey Nos. 766/E/1 and 782/E/1/1/1/1/1/1, at Nalgonda Village; records 18 plots and land-use allocation
Promoter declarationForm B affidavit by Sri Udutha Venkanna as authorized signatory, dated 23/08/2025; includes project-location, title, encumbrance and completion declarations
Occupancy / completion certificateNot supplied in the reviewed project documents Document index

Frequently asked questions

Is SINDOOR TOWNSHIP registered with Telangana RERA?

Yes. SINDOOR TOWNSHIP is registered with the Telangana Real Estate Regulatory Authority as P01800010070; the registration status is New Project.

Who is the developer of SINDOOR TOWNSHIP?

The promoter named in the RERA registration is UDUTHA VENKANNA AND ONE OTHER.

Where is SINDOOR TOWNSHIP located?

SINDOOR TOWNSHIP is in NALGONDA, Ward No. 1, Telangana (508001).

When will SINDOOR TOWNSHIP be completed?

The promoter's proposed date of completion filed with RERA is 06/12/2027. This is the promoter's declaration, not a guarantee.

More projects in Nalgonda