Silicon City
SILICON CITY · Rangareddy · RERA P02400010045
SILICON CITY is an open plotted layout in MOGALAGIDA, Farooqnagar Mandal, Ranga Reddy District, developed by registered promoter SILICON CITY. The project covers a total site area of 60193.10 sq.mt and has 207 plots; plot sizes range from 111.48 sq.m to 439.74 sq.m. Its TG-RERA registration number is P02400010045, and the promoter’s declared completion date is 10-06-2028.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered project name | SILICON CITY RERA record |
| Project type | Plotted development / open plotted layout RERA record |
| Phase or registered portion | No separate phase designation is disclosed; the registration identifies the project land at Survey Nos. 211/PART and 224/PART |
| TG-RERA registration | P02400010045 |
| Registration validity | 10/06/2025–10/06/2028, unless extended by the Authority |
| Registered promoter | SILICON CITY; the Form B declaration identifies the promoter as M/S SILICON CITY REB |
| RERA status | Registered; certificate states a three-year registration period. Registration validity is not a completion certificate or an occupancy certificate. |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality | MOGALAGIDA RERA record |
| Revenue village | Mogiligidda; the layout approval also spells the village MOGALIGIDDA |
| Mandal | Farooqnagar |
| District | Ranga Reddy |
| PIN | 509216 in the project identity and registration certificate RERA record |
| Project survey numbers and subdivisions | 211/PART and 224/PART |
| Total site area | 60193.10 sq.mt |
| Road-affected area | 682.52 sq.mt |
| Net layout/site area | 59510.58 sq.mt |
| Boundaries | Not disclosed in the supplied project record. Land records |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | Hyderabad Metropolitan Development Authority (HMDA) |
| Principal layout approval | Draft Layout Permit / approval no. 003422/LO/HMDA/1017/SMD/2025, dated 10 June, 2025 |
| Approved built-up area | 0.00 proposed built-up area, both excluding and including parking, in the layout approval parameters |
| Plots | 207 individual sub-plots in the layout record |
| Buildings, floors and parking levels | Not disclosed; the submitted approval is for a plotted layout, not a building or apartment scheme. |
| RERA-declared unit count | A separate unit-inventory table is not supplied in the evidence. The approved layout drawing records 207 plots. |
Offering and status
| Field | Project record |
|---|---|
| Offering | Plots within an open plotted layout |
| Plot count and sizes | The layout drawing’s plot schedule records 207 plots; software-measured sizes range from 111.48 sq.m to 439.74 sq.m, with a median of 167.27 sq.m. These are drawing-derived measurements, not RERA-filed saleable-area figures. Layout record |
| Booked / available counts | Not disclosed in the supplied evidence. |
| Construction stage | No independently verified site-progress record is supplied. The promoter’s Form B declares completion by 10-06-2028. |
| Completion deadline | Promoter-declared date: 10-06-2028 |
| Occupancy / completion certificate | No project occupancy or completion certificate is supplied. The layout approval directs development works to be completed within three years and refers to release of final layout plans; it is not an occupancy certificate. |
2. The project story
- Project identity and location: SILICON CITY is a plotted-layout project in Mogiligidda, Farooqnagar Mandal, Ranga Reddy District. The RERA registration identifies the land as Survey Nos. 211/PART and 224/PART; HMDA’s layout record describes an open layout with 207 plots.
- Land and layout uses: The approved layout record covers a total site area of 60193.10 sq.mt, including 682.52 sq.mt affected by road widening, and gives a net layout area of 59510.58 sq.mt. It records roads, park/open space, social-infrastructure land and utility land as distinct layout uses.
- Infrastructure and completion status: The record lists infrastructure and utility provisions, but the supplied materials do not establish their completion on site. The registration certificate is valid through 10/06/2028, while the promoter’s Form B separately declares a project completion date of 10-06-2028. Neither date establishes that the layout works are complete. No verified progress update, final layout release or occupancy/completion certificate is included in the materials reviewed here.
3. Master plan, architecture & building design
- Layout and area statement: This is a plotted layout, not a multi-storey building project in the supplied approval record. HMDA’s draft layout record lists 207 individual sub-plots and a net layout area of 59510.58 sq.mt. It records 36088.28 sq.mt as plotted area, 16910.01 sq.mt as road area, 4510.15 sq.mt as organized open space/park area, 1532.45 sq.mt as social-infrastructure area and 469.69 sq.mt as utility area; the layout table lists amenity area as 0.00.
- Roads and layout features: The drawing identifies roads of 9.14M, 18.0M, 30.00 MT and 45.00 MT widths, including an existing 30.00 MT road and proposed 45.00 MT road. The plan also names a cycle track and tot-lot among its amenity/utility items. No building footprint, floor configuration, apartment mix or building-height information is evidenced for this plotted project.
- Mortgage and release conditions: The layout and related HMDA record identify land subject to mortgage for layout-development obligations: 5707.79 sq.m covering specified plots. The approval conditions state that mortgaged plots are not to be sold until released, and that roads, open spaces, social-infrastructure and utility areas are to be handed over as specified before release of final layout plans.
4. Homes, configurations & floor plans
The offering evidenced in the approved layout is plots, rather than apartments. The plan’s schedule records 207 plots. The following plot-size summary is software-measured from the layout drawing; it is not a RERA-filed saleable-area schedule. Layout record
| Plot-size band (sq.yd, as supplied) | Area band (sq.m, as supplied) | Plots |
|---|---|---|
| 100–150 | 84–125 | 16 |
| 150–200 | 125–167 | 85 |
| 200–250 | 167–209 | 80 |
| 250–300 | 209–251 | 13 |
| 300–400 | 251–334 | 10 |
| 400–500 | 334–418 | 2 |
| 500–1000 | 418–836 | 1 |
Across the measured schedule, the smallest plot is 111.48 sq.m (133.3 sq.yd), the median is 167.27 sq.m (200.1 sq.yd) and the largest is 439.74 sq.m (525.9 sq.yd). These measurements are derived from drawing text and should be checked against the approved drawing. The evidence does not provide a booked/available inventory count or a RERA-filed plot saleable-area schedule. Layout record
The supplied drawing set contains 2 layout sheets and no floor plans with homes; measured floor-plan count is 0. Carpet-area and apartment-configuration measurements therefore do not apply to the evidence provided for this plotted layout. Floor plans
5. Parking & vehicle circulation
The layout approval records 0.00 common-parking area and does not establish a project-wide parking-space count, visitor or accessible parking provision, or individual plot parking allocations.
The drawing identifies internal roads with widths of 9.14M and 18.0M, as well as existing/proposed roads of 30.00 MT and 45.00 MT. It does not specify ramps, dedicated pedestrian segregation, EV charging, or legally documented parking rights for individual plots.
6. Amenities, recreation & open spaces
The layout records park/open space and lists several layout features and utilities. The “available” fields and progress values in the supplied amenity data do not establish that facilities have been constructed or independently verified as complete. RERA amenities
| Category | Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|---|
| Landscape / open space | Organized open space / park | 4510.15 sq.mt; 7.58% of net layout area | Included in the layout record; completion not independently verified. | |
| Sports / recreation | Tot-lot | Named in layout amenities/utilities | No completion evidence supplied. | |
| Sports / recreation | Cycle track | Named in layout amenities/utilities | No completion evidence supplied. | |
| Convenience / community | Social-infrastructure area | 1532.45 sq.mt; 2.58% | Included in the layout record; handover/development status not independently verified. | |
| Convenience / community | Utility area | 469.69 sq.mt | Included in the layout record; completion not independently verified. |
The plan’s area statement lists amenity area as 0.00; the evidence does not supply a separate clubhouse or community-building description, size or completion status.
7. Utilities, building services & safety
The layout and approval records identify infrastructure provisions but do not provide capacity data or independent commissioning evidence.
| What the supplied record identifies | Internal water-supply pipelines, overhead tank and an “assured water supply source” are listed in the HMDA mortgage-letter extraction. The source, storage capacity and completion status are not stated. |
|---|
| What the supplied record identifies | Common septic tank / STP and storm-water drainage/channelization of NALAs are identified in the approval materials. Capacity and completion status are not supplied. |
|---|
| What the supplied record identifies | Rainwater-harvesting pits are listed; quantity and completion status are not supplied. |
|---|
| What the supplied record identifies | Electrical supply lines, street lights, a transformer and transformer yard are listed. Capacity and completion status are not supplied. |
|---|
| What the supplied record identifies | Bio-compost unit is listed in the layout record. Operating status is not supplied. |
|---|
| What the supplied record identifies | No project-specific fire-system details or clearance are supplied for this plotted layout. RERA amenities |
|---|
| What the supplied record identifies | No project-specific accessibility, CCTV or access-control design details are established in the supplied layout approval. RERA amenities |
|---|
8. Location, access & connectivity
The registered project location is MOGALAGIDA, revenue village Mogiligidda, Farooqnagar Mandal, Ranga Reddy District, Telangana, PIN 509216. The supplied location record geocodes the site at 17.0861197, 78.1240904, with the geocoder label “Mogiligidda III, Pargi Road, Ayyawaripalle, Ramachandrapoor, Farooqnagar mandal, Ranga Reddy, Telangana, 509207, India.” RERA record Location record
- The closest sampled Outer Ring Road interchange is listed at approximately 36.2 km. Location record
- The layout drawing records internal road widths of 9.14M and 18.0M, along with existing/proposed 30.00 MT and 45.00 MT roads. No public-transport service details, landmark distances or verified travel times are supplied.
9. Developer & development status
- Promoter: The TG-RERA registration identifies SILICON CITY as the registered promoter. The project filing describes the organization as a partnership; the supplied evidence does not establish a separate corporate registration identifier or a complete registered-office/contact profile. RERA record RERA filing
- Representatives and partners: The layout approval names M/S SILICON CITY, represented by SHAIK SULTHAN and GOPIREDDY SUDEER REDDY; the project record identifies SHAIk SULTHAN as authorized signatory and lists VALA SRINIVAS RAO and GOPIREDDY SUDHEER REDDY as partners. Parties record
- Declared completion and status: The promoter’s Form B declares that it will complete the project by 10-06-2028. No quarterly progress evidence or independently verified construction-stage assessment is included here, and no occupancy/completion certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P02400010045; valid 10/06/2025–10/06/2028 |
|---|---|
| What it establishes | Registration of SILICON CITY and identification of the project land at Survey Nos. 211/PART and 224/PART in Mogiligidda, Farooqnagar, Ranga Reddy. |
| Identifier / date | 003422/LO/HMDA/1017/SMD/2025; 10 June, 2025 |
|---|---|
| What it establishes | Draft open plotted layout for 207 plots, with stated land uses and approval conditions. |
| Identifier / date | Permit reference 003422/LO/HMDA/1017/SMD/2025 |
|---|---|
| What it establishes | Plot schedule, road widths and layout-area breakdown; software-measured plot dimensions are drawing-derived. Layout record |
| Identifier / date | Mortgage deed 6230/2025, dated 07 May, 2025 |
|---|---|
| What it establishes | Records the mortgage of specified layout plots in favour of the Metropolitan Commissioner, HMDA, and related conditions. |
| Identifier / date | Filed by MR SULTHAN SHAIK for M/S SILICON CITY REB |
|---|---|
| What it establishes | Promoter declaration including stated completion date 10-06-2028 and project obligations. |
| Identifier / date | Not supplied |
|---|---|
| What it establishes | No project completion or occupancy certificate is evidenced in the reviewed documents. Document index |
1. Project at a glance
Project identity
Registered project name: SILICON CITY
Project type: Plotted development / open plotted layout
Phase or registered portion: No separate phase designation is disclosed; the registration identifies the project land at Survey Nos. 211/PART and 224/PART
TG-RERA registration: P02400010045
Registration validity: 10/06/2025–10/06/2028, unless extended by the Authority
Registered promoter: SILICON CITY; the Form B declaration identifies the promoter as M/S SILICON CITY REB
RERA status: Registered; certificate states a three-year registration period. Registration validity is not a completion certificate or an occupancy certificate.
Land and geographic identity
Locality: MOGALAGIDA
Revenue village: Mogiligidda; the layout approval also spells the village MOGALIGIDDA
Mandal: Farooqnagar
District: Ranga Reddy
PIN: 509216 in the project identity and registration certificate
Project survey numbers and subdivisions: 211/PART and 224/PART
Total site area: 60193.10 sq.mt
Road-affected area: 682.52 sq.mt
Net layout/site area: 59510.58 sq.mt
Boundaries: Not disclosed in the supplied project record.
Development identity
Sanctioning authority: Hyderabad Metropolitan Development Authority (HMDA)
Principal layout approval: Draft Layout Permit / approval no. 003422/LO/HMDA/1017/SMD/2025, dated 10 June, 2025
Approved built-up area: 0.00 proposed built-up area, both excluding and including parking, in the layout approval parameters
Plots: 207 individual sub-plots in the layout record
Buildings, floors and parking levels: Not disclosed; the submitted approval is for a plotted layout, not a building or apartment scheme.
RERA-declared unit count: A separate unit-inventory table is not supplied in the evidence. The approved layout drawing records 207 plots.
Offering and status
Offering: Plots within an open plotted layout
Plot count and sizes: The layout drawing’s plot schedule records 207 plots; software-measured sizes range from 111.48 sq.m to 439.74 sq.m, with a median of 167.27 sq.m. These are drawing-derived measurements, not RERA-filed saleable-area figures.
Booked / available counts: Not disclosed in the supplied evidence.
Construction stage: No independently verified site-progress record is supplied. The promoter’s Form B declares completion by 10-06-2028.
Completion deadline: Promoter-declared date: 10-06-2028
Occupancy / completion certificate: No project occupancy or completion certificate is supplied. The layout approval directs development works to be completed within three years and refers to release of final layout plans; it is not an occupancy certificate.
2. The project story
- Project identity and location: SILICON CITY is a plotted-layout project in Mogiligidda, Farooqnagar Mandal, Ranga Reddy District. The RERA registration identifies the land as Survey Nos. 211/PART and 224/PART; HMDA’s layout record describes an open layout with 207 plots.
- Land and layout uses: The approved layout record covers a total site area of 60193.10 sq.mt, including 682.52 sq.mt affected by road widening, and gives a net layout area of 59510.58 sq.mt. It records roads, park/open space, social-infrastructure land and utility land as distinct layout uses.
- Infrastructure and completion status: The record lists infrastructure and utility provisions, but the supplied materials do not establish their completion on site. The registration certificate is valid through 10/06/2028, while the promoter’s Form B separately declares a project completion date of 10-06-2028. Neither date establishes that the layout works are complete. No verified progress update, final layout release or occupancy/completion certificate is included in the materials reviewed here.
3. Master plan, architecture & building design
- Layout and area statement: This is a plotted layout, not a multi-storey building project in the supplied approval record. HMDA’s draft layout record lists 207 individual sub-plots and a net layout area of 59510.58 sq.mt. It records 36088.28 sq.mt as plotted area, 16910.01 sq.mt as road area, 4510.15 sq.mt as organized open space/park area, 1532.45 sq.mt as social-infrastructure area and 469.69 sq.mt as utility area; the layout table lists amenity area as 0.00.
- Roads and layout features: The drawing identifies roads of 9.14M, 18.0M, 30.00 MT and 45.00 MT widths, including an existing 30.00 MT road and proposed 45.00 MT road. The plan also names a cycle track and tot-lot among its amenity/utility items. No building footprint, floor configuration, apartment mix or building-height information is evidenced for this plotted project.
- Mortgage and release conditions: The layout and related HMDA record identify land subject to mortgage for layout-development obligations: 5707.79 sq.m covering specified plots. The approval conditions state that mortgaged plots are not to be sold until released, and that roads, open spaces, social-infrastructure and utility areas are to be handed over as specified before release of final layout plans.
4. Homes, configurations & floor plans
The offering evidenced in the approved layout is plots, rather than apartments. The plan’s schedule records 207 plots. The following plot-size summary is software-measured from the layout drawing; it is not a RERA-filed saleable-area schedule.
| Plot-size band (sq.yd, as supplied) | Area band (sq.m, as supplied) | Plots |
|---|---|---|
| 100–150 | 84–125 | 16 |
| 150–200 | 125–167 | 85 |
| 200–250 | 167–209 | 80 |
| 250–300 | 209–251 | 13 |
| 300–400 | 251–334 | 10 |
| 400–500 | 334–418 | 2 |
| 500–1000 | 418–836 | 1 |
Across the measured schedule, the smallest plot is 111.48 sq.m (133.3 sq.yd), the median is 167.27 sq.m (200.1 sq.yd) and the largest is 439.74 sq.m (525.9 sq.yd). These measurements are derived from drawing text and should be checked against the approved drawing. The evidence does not provide a booked/available inventory count or a RERA-filed plot saleable-area schedule.
The supplied drawing set contains 2 layout sheets and no floor plans with homes; measured floor-plan count is 0. Carpet-area and apartment-configuration measurements therefore do not apply to the evidence provided for this plotted layout.
5. Parking & vehicle circulation
The layout approval records 0.00 common-parking area and does not establish a project-wide parking-space count, visitor or accessible parking provision, or individual plot parking allocations.
The drawing identifies internal roads with widths of 9.14M and 18.0M, as well as existing/proposed roads of 30.00 MT and 45.00 MT. It does not specify ramps, dedicated pedestrian segregation, EV charging, or legally documented parking rights for individual plots.
6. Amenities, recreation & open spaces
The layout records park/open space and lists several layout features and utilities. The “available” fields and progress values in the supplied amenity data do not establish that facilities have been constructed or independently verified as complete.
| Category | Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|---|
| Landscape / open space | Organized open space / park | 4510.15 sq.mt; 7.58% of net layout area | Included in the layout record; completion not independently verified. | |
| Sports / recreation | Tot-lot | Named in layout amenities/utilities | No completion evidence supplied. | |
| Sports / recreation | Cycle track | Named in layout amenities/utilities | No completion evidence supplied. | |
| Convenience / community | Social-infrastructure area | 1532.45 sq.mt; 2.58% | Included in the layout record; handover/development status not independently verified. | |
| Convenience / community | Utility area | 469.69 sq.mt | Included in the layout record; completion not independently verified. |
The plan’s area statement lists amenity area as 0.00; the evidence does not supply a separate clubhouse or community-building description, size or completion status.
7. Utilities, building services & safety
The layout and approval records identify infrastructure provisions but do not provide capacity data or independent commissioning evidence.
| What the supplied record identifies | Internal water-supply pipelines, overhead tank and an “assured water supply source” are listed in the HMDA mortgage-letter extraction. The source, storage capacity and completion status are not stated. |
|---|
| What the supplied record identifies | Common septic tank / STP and storm-water drainage/channelization of NALAs are identified in the approval materials. Capacity and completion status are not supplied. |
|---|
| What the supplied record identifies | Rainwater-harvesting pits are listed; quantity and completion status are not supplied. |
|---|
| What the supplied record identifies | Electrical supply lines, street lights, a transformer and transformer yard are listed. Capacity and completion status are not supplied. |
|---|
| What the supplied record identifies | Bio-compost unit is listed in the layout record. Operating status is not supplied. |
|---|
| What the supplied record identifies | No project-specific fire-system details or clearance are supplied for this plotted layout. |
|---|
| What the supplied record identifies | No project-specific accessibility, CCTV or access-control design details are established in the supplied layout approval. |
|---|
8. Location, access & connectivity
The registered project location is MOGALAGIDA, revenue village Mogiligidda, Farooqnagar Mandal, Ranga Reddy District, Telangana, PIN 509216. The supplied location record geocodes the site at 17.0861197, 78.1240904, with the geocoder label “Mogiligidda III, Pargi Road, Ayyawaripalle, Ramachandrapoor, Farooqnagar mandal, Ranga Reddy, Telangana, 509207, India.”
- The closest sampled Outer Ring Road interchange is listed at approximately 36.2 km.
- The layout drawing records internal road widths of 9.14M and 18.0M, along with existing/proposed 30.00 MT and 45.00 MT roads. No public-transport service details, landmark distances or verified travel times are supplied.
9. Developer & development status
- Promoter: The TG-RERA registration identifies SILICON CITY as the registered promoter. The project filing describes the organization as a partnership; the supplied evidence does not establish a separate corporate registration identifier or a complete registered-office/contact profile.
- Representatives and partners: The layout approval names M/S SILICON CITY, represented by SHAIK SULTHAN and GOPIREDDY SUDEER REDDY; the project record identifies SHAIk SULTHAN as authorized signatory and lists VALA SRINIVAS RAO and GOPIREDDY SUDHEER REDDY as partners.
- Declared completion and status: The promoter’s Form B declares that it will complete the project by 10-06-2028. No quarterly progress evidence or independently verified construction-stage assessment is included here, and no occupancy/completion certificate is supplied.
10. Approvals, official records & documents
| Identifier / date | P02400010045; valid 10/06/2025–10/06/2028 |
|---|---|
| What it establishes | Registration of SILICON CITY and identification of the project land at Survey Nos. 211/PART and 224/PART in Mogiligidda, Farooqnagar, Ranga Reddy. |
| Identifier / date | 003422/LO/HMDA/1017/SMD/2025; 10 June, 2025 |
|---|---|
| What it establishes | Draft open plotted layout for 207 plots, with stated land uses and approval conditions. |
| Identifier / date | Permit reference 003422/LO/HMDA/1017/SMD/2025 |
|---|---|
| What it establishes | Plot schedule, road widths and layout-area breakdown; software-measured plot dimensions are drawing-derived. |
| Identifier / date | Mortgage deed 6230/2025, dated 07 May, 2025 |
|---|---|
| What it establishes | Records the mortgage of specified layout plots in favour of the Metropolitan Commissioner, HMDA, and related conditions. |
| Identifier / date | Filed by MR SULTHAN SHAIK for M/S SILICON CITY REB |
|---|---|
| What it establishes | Promoter declaration including stated completion date 10-06-2028 and project obligations. |
| Identifier / date | Not supplied |
|---|---|
| What it establishes | No project completion or occupancy certificate is evidenced in the reviewed documents. |
Frequently asked questions
Is SILICON CITY registered with Telangana RERA?
Yes. SILICON CITY is registered with the Telangana Real Estate Regulatory Authority as P02400010045; the registration status is New Project.
Who is the developer of SILICON CITY?
The promoter named in the RERA registration is SILICON CITY.
Where is SILICON CITY located?
SILICON CITY is in MOGALAGIDA, Mogiligidda, Farooqnagar, Rangareddy, Telangana (509216).
When will SILICON CITY be completed?
The promoter's proposed date of completion filed with RERA is 10/10/2028. This is the promoter's declaration, not a guarantee.
More projects in Mogiligidda