KOUSTHUBHAM is a residential apartment project in Gajula Ramaram, Qutballapur mandal, Medchal-Malkajgiri district, developed by registered promoter SRI NANDANA PROJECTS. The project covers a total land area of 1,736.2 sq. m and comprises one residential building with 1 Cellar + 1 Stilt + 5 upper floors and 40 3BHK units. It is registered with TG-RERA under P02200009311, with proposed completion on 08/02/2028.

01What we found

RegisteredTG-RERA - valid till 8 Oct 2027
20documents on file - each fact links to its page
0court cases on this project's land in the court records searched
6items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

Project at a glance

Project identity

ItemRecord
Registered project nameKOUSTHUBHAM RERA record
Project typeResidential apartment project RERA record RERA filing
Phase / registered portionOne registered project; the RERA site is identified as Survey No. 116/Part. A separate phase name is not disclosed.
TG-RERA registrationP02200009311; registered 08/10/2024, valid through 08/10/2027, unless extended by the Authority. RERA record
Registered promoterSRI NANDANA PROJECTS, partnership. RERA record Corporate record
RERA statusRegistered project; the certificate states a three-year validity period. Registration validity is not the project completion deadline. RERA record

Land and geographic identity

ItemRecord
Locality / revenue villageGajula Ramaram; the filed plan and registration certificate also render the village as GAJULARAMARAM. RERA record RERA filing
Mandal / district / PINQutballapur; Medchal-Malkajgiri; 500055. RERA record
Project survey identifiersRERA registration: 116/Part. Filed plan: 116/PART and 116/P; the same plan also lists 115 in its survey-number field. RERA record
Filed site areaRERA land details state total area 1,736.2 sq. m, affected area 189.39 sq. m, and net area 1,546.81 sq. m. The building permit gives the same figures as 1,736.2, 189.39, and 1,546.81 sq. m. RERA filing
BoundariesEast: Sy No 116 Part; west: Proposed 30 Mts Wide Road; north: Sy No 115; south: Land of Sudheer Varma and Others. RERA filing
Roads identified in filed plan12.00 MT WIDE EXISTING ROAD and 30.00 MT WIDE PROPOSED ROAD; the building permit refers to an 18 mt. road.

Development identity

ItemRecord
Sanctioning authorityGreater Hyderabad Municipal Corporation (GHMC). Approvals record
Principal building permit3061/GHMC/KPL/2024-BP, dated 08 October, 2024; associated file number 007776/GHMC/3657/KPL1/2024-BP. Approvals record
Building configurationOne residential building, “A (BUILDING)”: 1 Cellar + 1 Stilt + 5 upper floors. The filed permit lists building height as 14.64.
Approved built-up areaThe permit extraction identifies 4,055.95 sq. m residential built-up area; it separately lists cellar area 912.19 sq. m, stilt area 882.67 sq. m, and total parking area 1816.9 sq. m.
Units40 units in the filed plan; the TG-RERA unit record also lists 40 units. RERA unit table
Parking provision shown in plan34 proposed cars; the plan also lists proposed visitor car parking of 152.73 and required visitor car parking of 121.68 (the supplied extraction does not state a unit for these latter figures). Cellar and stilt are designated for parking.

Offering and status

ItemRecord
TG-RERA unit offering3BHK, 40 units; filed saleable area 123.85 sq. m per unit. The portal-derived count shows 0 booked and 40 available, with no as-of date supplied; treat these counts as indicative. RERA unit table RERA unit table
Construction stageNo independently verified construction-progress record is supplied. The building permit required construction to commence before 08 April, 2025 and completion before 08 October, 2027.
Completion dateThe GHMC permit gives a completion-before date of 08 October, 2027; the RERA project header gives proposed completion 08/02/2028. These are recorded as separate fields here, not treated as evidence of completed work. RERA record
Occupancy certificate (OC)No OC is supplied in the evidence reviewed. The GHMC permit states that an OC is required before occupation.

The project story

KOUSTHUBHAM is registered with TG-RERA as a residential apartment project on land identified in the certificate as Survey No. 116/Part, in Gajula Ramaram village, Qutballapur mandal, Medchal-Malkajgiri district. The filed GHMC permit describes one building, “A (BUILDING),” with one cellar, one stilt level and five upper residential floors.

The TG-RERA unit record lists 40 three-bedroom apartments, all shown as available in the portal-derived count; the count has no stated retrieval date. The plan records 40 sanctioned units. The supplied documents do not establish the project’s actual construction progress, so the project cannot be described here as complete or at a verified construction stage. The permit’s completion-before date and the promoter’s RERA completion declaration are stated in the overview tables; neither establishes an OC or actual completion. RERA unit table

Master plan, architecture & building design

The filed building permit and plan describe one residential building, with 1 Cellar + 1 Stilt + 5 upper floors. The plan extraction gives total proposed built-up area excluding parking as 4,055.95 sq. m and including parking as 5,850.81 sq. m; it separately records a total parking area of 1816.9 sq. m. These are the figures as stated in the supplied plan and permit extraction, not carpet or saleable area. The permit also records cellar area 912.19 sq. m and stilt area 882.67 sq. m.

The filed plan identifies 642.05 as “vacant plot area,” 87.10 sq.mtrs as tot-lot area, and a typical-floor area figure of 811.56 sq. m among its sanctioned parameters. It also lists 79.26 for “Tot Lot” in the permit extraction. These are drawing/extraction labels; the supplied evidence does not establish delivered open space or landscaping.

The building permit identifies one entry and one exit, each with a minimum width of 4.5mts. and height clearance of 5mts. It lists a lift and staircase among the building features. Detailed lift count/capacity, floor-by-floor apartment arrangement, building footprint and internal circulation drawings are not available in the supplied extracted information.

Homes, configurations & floor plans

The TG-RERA filing lists only 3BHK apartments: 40 units, with filed saleable area 123.85 sq. m per unit. The floor-plan drawing software measured eight 3BHK designs and produced a carpet-area range of 71.9–84.5 sq. m, with a median of 76.5 sq. m (824 sq. ft). These are software measurements from the drawing geometry, not RERA-filed carpet-area disclosures; the supplied floor-plan data cautions that the measurement needs review. Saleable area is a distinct filed measure that includes the home’s share of common areas. RERA unit table RERA unit table Floor plans

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
3BHK40040123.85 sq. mSoftware-measured: 71.9–84.5 sq. m; median 76.5 sq. m38% (supplied drawing-derived figure)

The 3BHK drawing sample includes bedrooms, kitchen, living/dining, toilets and balconies. For one depicted flat, the extracted dimensions include living/dining 6.15 × 5.6 m, kitchen 2.65 × 2.5 m, and bedrooms 3.0 × 3.6 m, 3.0 × 3.2 m and 3.95 × 3.2 m. The drawing labels balconies separately; balcony areas are excluded from the software-measured carpet area. These details describe the measured drawing sample, not a guarantee of a particular buyer’s unit. RERA unit details

Parking & vehicle circulation

The filed GHMC plan designates the cellar and stilt exclusively for vehicle parking. It lists 34 proposed cars, total parking area 1816.9 sq. m, proposed parking area 1794.86, and required parking area 1338.47. The supplied extraction does not identify units for the latter two figures. Visitor car parking is shown as 121.68 required and 152.73 proposed, also without a stated unit in the extraction.

The permit conditions state that the cellar and stilt approved for parking are to be used exclusively for parking and not converted or misused. The plan identifies one entry and one exit with a minimum width of 4.5mts. and height clearance of 5mts. The documents supplied do not establish individual parking-space allocations to apartments, two-wheeler counts, accessible parking, EV charging installation status, or completed parking works.

Amenities, recreation & open spaces

The RERA amenity record lists 14 facilities, but every listed item has a reported progress value of 0%. That is a portal record, not an independent site verification. The GHMC plan and permit also identify selected site features and permit conditions. RERA amenities

Tot-lot / recreational open space
Description / sizePlan lists tot-lot area 87.10 sq.mtrs; permit extraction lists 79.26.
Evidence sourceFiled plan and permit
Declared progress / verified statusRERA amenity record: 0%; completion not independently verified. RERA amenities
Green strip / greenery
Description / sizeGreen strip, greenery and peripheral planting are referenced in the filed plan/permit.
Evidence sourceFiled plan and permit
Declared progress / verified statusRERA amenity record: 0%; not independently verified. RERA amenities
Water supply
Description / sizeListed as a RERA amenity and addressed in the permit’s conditions. RERA amenities
Evidence sourceRERA amenity record and permit
Declared progress / verified statusRERA amenity progress: 0%; operational status not verified. RERA amenities
Sewerage and sewage/sullage treatment and disposal
Description / sizeListed in the RERA amenity record; system type and capacity are not specified in the supplied evidence. RERA amenities
Evidence sourceTG-RERA amenity record
Declared progress / verified status0%; not independently verified. RERA amenities
Storm-water drains
Description / sizeListed in the RERA amenity record. RERA amenities
Evidence sourceTG-RERA amenity record
Declared progress / verified status0%; not independently verified. RERA amenities
Rainwater harvesting
Description / sizePermit lists 6 rainwater-harvesting pits; the plan also requires a rainwater-harvesting structure/percolation pit.
Evidence sourceFiled plan and permit
Declared progress / verified statusInstallation/completion not independently verified.
Community buildings
Description / sizeListed in the RERA amenity record; no description or area supplied. RERA amenities
Evidence sourceTG-RERA amenity record
Declared progress / verified status0%; not independently verified. RERA amenities
Solid-waste management and disposal
Description / sizeListed in the RERA amenity record; permit calls for a garbage house within the premises. RERA amenities
Evidence sourceTG-RERA amenity record and permit
Declared progress / verified statusRERA amenity progress: 0%; not independently verified.
Internal roads and footpaths
Description / sizeListed in the RERA amenity record. RERA amenities
Evidence sourceTG-RERA amenity record
Declared progress / verified status0%; not independently verified. RERA amenities

Utilities, building services & safety

The filed plan lists a water sump, water-supply facilities, a transformer, rainwater harvesting/percolation pit, garbage house, lift and staircase. The building permit specifies 6 rainwater-harvesting pits and requires a fire NOC before issue of an OC; it also calls for an automatic sprinkler system in cellar floors. These are documented plan/permit provisions, not confirmation that the systems have been installed, tested or approved as complete.

The RERA amenity record lists sewerage, storm-water drains, sewage/sullage treatment and disposal, solid-waste management, energy management, fire protection and safety, and an electrical meter room/sub-station/receiving station; each is recorded at 0% progress. The supplied information does not provide water-storage capacity, STP capacity, electrical backup capacity, lift capacity, CCTV/security specifications, accessibility details or verified commissioning status. RERA amenities

Location, access & connectivity

The registered location is Gajula Ramaram, Qutballapur mandal, Medchal-Malkajgiri district, PIN 500055. The filed site plan identifies an existing 12.00 MT road and a proposed 30.00 MT road; the building permit also refers to an 18 mt. road and specifies one entry and one exit. RERA record

A supplied location record gives the Financial District (Nanakramguda) as 1.2 km from the project’s cadastral parcel centroid. The supplied data provides no independently verified public-transport distances or other verified landmark distances. Location record

Developer & development status

The TG-RERA-registered promoter is SRI NANDANA PROJECTS, identified as a partnership. The supplied promoter record names Vaka Venkateshwara Reddy as partner and Devarapalli Madhava Reddy as authorized signatory. Its GSTIN is 36AFPFS0783N1Z5. The registration certificate gives the promoter’s address as Kukatpally, Kukatpally mandal, Medchal-Malkajgiri district, PIN 500072; the project record separately lists an address at S. V. Heights, KRCR Colony, Gajula Ramaram. Corporate record Parties record

The Form B filed by Sri Nandana Projects declares completion by 08.10.2027 and includes declarations about project funds, annual audit and pending approvals. These are promoter declarations, not independent confirmation of progress or completion. The evidence gives no independently verified construction-stage report or OC.

Approvals, official records & documents

TG-RERA registration certificate
Identifier / dateP02200009311; 08/10/2024–08/10/2027
What it establishes in this reviewRegistration of KOUSTHUBHAM under Sri Nandana Projects; identifies the project site as Survey No. 116/Part.
GHMC building permit order
Identifier / datePermit 3061/GHMC/KPL/2024-BP, dated 08 October, 2024; file 007776/GHMC/3657/KPL1/2024-BP
What it establishes in this reviewConditional building permission for one residential building, 1 Cellar + 1 Stilt + 5 upper floors, with conditions including OC before occupation.
Filed layout/building plan
Identifier / dateDocument 512046
What it establishes in this reviewPlan record for the proposed residential building; includes land-use, floor, parking and tot-lot figures and conditions. The supplied evidence does not include a separate, independently verified approved-layout certificate.
Promoter Form B declaration
Identifier / dateDocument 629988, dated 21st June day of 2025 as extracted
What it establishes in this reviewPromoter declaration of title basis, encumbrance position, fund management and completion by 08.10.2027.
Title/search and encumbrance documents
Identifier / dateDocuments 512041, 512045, 530951, 629993
What it establishes in this reviewFiled title-search and encumbrance materials; detailed title and encumbrance review belongs in the Land & Title section. Document index
Occupancy/completion certificate
Identifier / dateNot supplied in the reviewed evidence
What it establishes in this reviewOC status cannot be confirmed from the available documents. The GHMC permit states an OC is required before occupation.

Frequently asked questions

Is KOUSTHUBHAM registered with Telangana RERA?

Yes. KOUSTHUBHAM is registered with the Telangana Real Estate Regulatory Authority as P02200009311; the registration status is New Project.

Who is the developer of KOUSTHUBHAM?

The promoter named in the RERA registration is SRI NANDANA PROJECTS.

Where is KOUSTHUBHAM located?

KOUSTHUBHAM is in Gajula Ramaram, Qutballapur, Medchal-Malkajgiri, Telangana (500055).

When will KOUSTHUBHAM be completed?

The promoter's proposed date of completion filed with RERA is 08/02/2028. This is the promoter's declaration, not a guarantee.