Gayathri Enclave Phase - II
CHAKALI · Mahabubnagar · RERA P01400009665
GAYATHRI ENCLAVE PHASE - II is a plotted development in Addakal, Addakal Mandal, Mahabubnagar District, developed by registered promoter CHAKALI YADAGIRI. The site area is 9906.29 sq. m, and the DTCP draft layout lists 39 residential plots; tower, block and floor counts are not stated. TG-RERA registration number P01400009665 is valid from 09/01/2025 to 09/01/2027, and the promoter’s Form B declaration undertakes completion before 9th January, 2027.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
7 items to check before you pay, 4 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Field | Project record |
|---|---|
| Registered name | GAYATHRI ENCLAVE PHASE - II RERA record |
| Project type | Plotted development; the TG-RERA registration certificate’s extracted project-type field is recorded as “other,” while the DTCP filing describes residential plots. RERA record |
| Phase / registered portion | Phase II; registration covers Survey Nos. 28/P, 29/P, 30/P and 31/P at Addakal. RERA record |
| TG-RERA registration | P01400009665; registered 09/01/2025 to 09/01/2027. RERA record |
| Registered promoter | CHAKALI YADAGIRI (the RERA certificate names him as promoter); the project identity header gives the promoter as CHAKALI. RERA record |
| RERA status | The supplied record identifies the project as a registered “New Project.” Registration validity is separate from the promoter’s declared completion date; no extension is supplied. RERA record |
Land and geographic identity
| Field | Project record |
|---|---|
| Locality / revenue village | Addakal / Addakal RERA record |
| Mandal | Addakal RERA record |
| District | Mahabubnagar RERA record |
| PIN | 509382 RERA record |
| Project survey numbers / subdivisions | 28/P, 29/P, 30/P & 31/P. RERA record |
| Site area in RERA project fields | Total area 9906.29 sq. m; net area 9906.29 sq. m. RERA filing |
| DTCP draft-layout area | Net layout area Ac. 2.4479 Cents; 11847.83 Sq. Yds.; total area Ac.2.475 Cents; 11979.00 Sq. Yds., including a buffer zone of Ac.0.0271 Cents; 131.43 Sq. Yds. |
| Boundaries stated in RERA fields | North: BUFFER ZONE and CANAL; South: OTHERS LAND; East: 33-0 WIDE ROAD; West: OTHERS LAND. RERA filing |
Development identity
| Field | Project record |
|---|---|
| Sanctioning authority | District Town and Country Planning Officer, Mahabubnagar District (DTCP); the draft layout document delegates specified follow-up/release functions to Addakal Gram Panchayat. |
| Principal layout approval | TLP.NO.03/2025/DTCPO/MBNR, dated 09.01.2025; described in the document as a Draft Technical Layout Pattern for Residential Plots. |
| Other approval references shown | File No. Lr.Roc.No.01/2025/DTCPO/MBNR; application No. 10262/785/2025. The drawing also shows DTLP No.01/2024 DCPO/MBAR and C.No. 01/2025/DTCPO/MBNR. |
| Approved built-up area / buildings / floors | Not disclosed in the supplied plotted-layout record; building-floor configuration is not applicable to the layout information provided. RERA filing |
| Plots | 39 plots in the DTCP draft layout. |
| Layout land-use figures in draft approval | Open space: Ac. 0.2477 cents (10.12%), 1198.87 Sq. Yds.; roads: Ac:0.6583 cents (26.89%), 3186.17 Sq. Yds.; plotted area: Ac. 1.5419 Cents (62.99%), 7462.79 Sq. Yds.; mortgage area: Ac.0.2315 Cents (15.01%), 1120.46 Sq. Yds. |
| Parking | No parking-space count or parking arrangement is stated in the supplied project data. |
Offering and status
| Field | Project record |
|---|---|
| Offering | Residential plots; the DTCP draft layout lists 39 plots. Plot-by-plot dimensions, price range and current inventory are not supplied here. |
| Booked / available | Not disclosed in the supplied project records. |
| Construction / development stage | The RERA record labels the project “New Project.” The DTCP document is a draft layout approval subject to conditions; no independently verified site-progress record is supplied. RERA record |
| Completion date | The Form B declaration undertakes completion before 9th January, 2027. |
| Registration validity | 09/01/2025–09/01/2027; this is the registration period, not itself a completion or occupancy certificate. |
| Occupancy / completion certificate | No occupancy or completion certificate is included in the supplied evidence; the project is a plotted layout. Document index |
2. The project story
Gayathri Enclave Phase II is presented in the TG-RERA filing as a residential plotted development in Addakal village, Addakal Mandal, Mahabubnagar District, covering Survey Nos. 28/P, 29/P, 30/P and 31/P. The DTCP document describes a 39-plot layout, with internal road and open-space allocations, and identifies a portion of the plotted land for mortgage to the Gram Panchayat. RERA record
The DTCP record is specifically a draft technical layout pattern, with conditions to be met before final layout release. The supplied documents do not establish the current on-site development stage or independently verify that roads, open spaces, utilities or other works have been completed. The promoter’s Form B declaration states a completion undertaking before 9 January 2027; this is a promoter declaration, not a verified completion status.
3. Master plan, architecture & building design
The available design evidence concerns a plotted layout rather than buildings. The DTCP draft layout identifies 39 plots across a stated net layout area of Ac. 2.4479 Cents; 11847.83 Sq. Yds. It assigns Ac. 0.2477 cents (10.12%), 1198.87 Sq. Yds. to open space, Ac:0.6583 cents (26.89%), 3186.17 Sq. Yds. to roads, and Ac. 1.5419 Cents (62.99%), 7462.79 Sq. Yds. to plotted area. The document separately identifies Ac.0.2315 Cents (1120.46 Sq. Yds.) as the mortgage area, comprising Plot Nos. 18, 19, 34, 35, 36 and 37.
Road widths shown in the approval record include 31-0" wide, 33-0" wide, 33'-0" wide and 31 WIDE. The approval requires roads to be opened for access to neighbouring sites. No building footprints, building heights, floor levels, plot-size schedule, landscaping design or final released layout drawing is available in the supplied material.
4. Homes, configurations & floor plans
This is a plotted development; apartment configurations and apartment carpet-area measurements are not available. The DTCP draft layout specifies 39 plots, but the supplied extract does not provide individual plot numbers beyond identifying the six mortgage-reserved plots, or plot-by-plot dimensions.
The available floor-plan record contains one drawing, but it is pending scan and has 0 measured plans. Accordingly, no software-measured plot or building dimensions can be reported. Floor plans
5. Parking & vehicle circulation
The supplied records do not state a parking-space count, visitor or accessible parking provision, parking allocation to individual plots, EV charging, or parking layout. The DTCP draft approval does identify internal roads and requires that they remain open for access to neighbouring sites; detailed driveway dimensions and pedestrian/vehicle separation are not disclosed in the supplied extract.
6. Amenities, recreation & open spaces
The TG-RERA amenity record lists the following facilities. The filed progress percentages are 0 where shown; these figures do not establish independent site verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | No size or specification supplied | RERA amenities | Listed “YES”; progress 0; completion not independently verified |
| Water Supply | No source, capacity or storage details supplied | RERA amenities | Listed “YES”; progress 0; completion not independently verified |
| Sewerage (Chamber, Lines, Septic Tank, STP) | No system type or capacity details supplied | RERA amenities | Listed “YES”; progress 0; completion not independently verified |
| Storm Water Drains | No size or network details supplied | RERA amenities | Listed; progress 0; completion not independently verified |
| Green Strip/TOT LOT/Park | No additional dimensions stated in the amenity entry; draft-layout open space is Ac. 0.2477 cents (10.12%), 1198.87 Sq. Yds. | RERA amenities | Listed “YES”; progress 0; completion not independently verified |
| Street Lighting | No specification supplied | RERA amenities | Listed “YES”; progress 0; completion not independently verified |
| Community Buildings | No type, size or capacity supplied | RERA amenities | Listed; progress 0; completion not independently verified |
| Treatment and Disposal of Sewage and Sullage Water | No system or capacity details supplied | RERA amenities | Listed; progress 0; completion not independently verified |
| Solid Waste Management and Disposal | No method or capacity supplied | RERA amenities | Listed; progress 0; completion not independently verified |
| Water Conservation, Rain Water Harvesting | No system or capacity supplied | RERA amenities | Listed “YES”; progress 0; completion not independently verified |
| Energy management | No system or capacity supplied | RERA amenities | Listed; progress 0; completion not independently verified |
| Fire Protection and Fire Safety Requirements | No system details supplied | RERA amenities | Listed; progress 0; completion not independently verified |
| Electrical Meter Room, Sub-Station, Receiving Station | No capacity or location supplied | RERA amenities | Listed; progress 0; completion not independently verified |
| Aggregate area of recreational Open Space | No separate amenity-entry figure; draft layout states Ac. 0.2477 cents (10.12%), 1198.87 Sq. Yds. as open space | RERA amenities | Listed; progress 0; completion not independently verified |
7. Utilities, building services & safety
The RERA amenity list includes water supply, sewerage-related works, storm-water drains, rain-water harvesting, street lighting, electrical meter room/sub-station/receiving station, fire-protection requirements, sewage and sullage treatment, and solid-waste management. It does not provide system capacities, technical specifications, design details or evidence of completed installation. These are recorded as listed project provisions, not verified operational services. RERA amenities
The DTCP draft conditions also refer to leaving the required width of land along any Mission Bhagiratha water pipeline passing through the site, and to shifting or realigning electrical lines along existing and proposed roads before the final-layout proposal. The supplied record does not establish whether either condition applies on site or has been completed.
8. Location, access & connectivity
The registered site is in Addakal village, Addakal Mandal, Mahabubnagar District, Telangana, PIN 509382. The supplied cadastral parcel centroid is 16.50618, 77.93279; this is a parcel-centroid location, not a surveyed entrance point. RERA record Cadastral map
The RERA land-boundary description identifies a 33-0 WIDE ROAD on the east, other land on the west and south, and a buffer zone and canal on the north. The DTCP draft layout shows internal roads including widths of 31-0", 33-0", 33'-0" and 31 WIDE, and requires access to neighbouring sites. The location data lists the nearest sampled Outer Ring Road interchange at approximately 96.3 km. No public-transport details, travel times or additional verified landmark distances are supplied. RERA filing Location record
9. Developer & development status
The TG-RERA certificate names CHAKALI YADAGIRI as the registered promoter and identifies his address as House No. 14-63/A-208, Medipally, Medipally Mandal, Medchal-Malkajgiri District, Telangana, PIN 500098. The project identity record gives the promoter name as CHAKALI; the legal entity type and further corporate identifiers are not established in the supplied evidence. Corporate record
The Form B filing is a promoter declaration by four deponents—Chakali Yadagiri, Chinthala Venkateshwarlu, Badugula Praveen Kumar and Haritha Gunda. It declares ownership of the layout land, states that the land is free from encumbrances, and undertakes completion before 9 January 2027. These are the deponents’ statements in the filing.
The RERA record describes a new project; no independently verified construction progress is provided. The registration certificate is valid through 09/01/2027, while the Form B completion undertaking is before 9 January 2027; these are distinct recorded dates. RERA record
10. Approvals, official records & documents
| Record | What it identifies |
|---|---|
| TG-RERA Form C certificate, P01400009665 | Project name, promoter CHAKALI YADAGIRI, site surveys 28/P, 29/P, 30/P and 31/P, and registration validity 09/01/2025–09/01/2027. |
| DTCP draft layout approval, TLP.NO.03/2025/DTCPO/MBNR, 09.01.2025 | Draft Technical Layout Pattern for 39 residential plots in Survey Nos. 28/P, 29/P, 30/P & 31/P, Addakal; subject to stated conditions and later Gram Panchayat release/final-layout requirements. |
| DTCP application and file references | Application No. 10262/785/2025 and File No. Lr.Roc.No.01/2025/DTCPO/MBNR. |
| Form B affidavit-cum-declaration | Promoter-side declarations concerning ownership, encumbrances, project accounts, approvals and completion before 9 January 2027. |
| Document No. 3250/2025, dated 21-03-2025 | Supplied OCR identifies a registered gift deed involving portions of Survey Nos. 28, 29, 30 and 31 at Addakal; the extraction does not provide readable approval terms or a complete instrument schedule. |
| Document No. 3251/2025, dated 21-03-2025 | Supplied OCR identifies a registered mortgage deed involving portions of Survey Nos. 28, 29, 30 and 31 at Addakal; the extraction does not provide readable approval terms or a complete instrument schedule. |
| Commencement / occupancy certificates | No separate building commencement certificate or occupancy/completion certificate is established by the supplied documents. The document labelled as commencement certificates includes the DTCP draft layout approval and deed-related material. Document index |
1. Project at a glance
Project identity
Registered name: GAYATHRI ENCLAVE PHASE - II
Project type: Plotted development; the TG-RERA registration certificate’s extracted project-type field is recorded as “other,” while the DTCP filing describes residential plots.
Phase / registered portion: Phase II; registration covers Survey Nos. 28/P, 29/P, 30/P and 31/P at Addakal.
TG-RERA registration: P01400009665; registered 09/01/2025 to 09/01/2027.
Registered promoter: CHAKALI YADAGIRI (the RERA certificate names him as promoter); the project identity header gives the promoter as CHAKALI.
RERA status: The supplied record identifies the project as a registered “New Project.” Registration validity is separate from the promoter’s declared completion date; no extension is supplied.
Land and geographic identity
Locality / revenue village: Addakal / Addakal
Mandal: Addakal
District: Mahabubnagar
PIN: 509382
Project survey numbers / subdivisions: 28/P, 29/P, 30/P & 31/P.
Site area in RERA project fields: Total area 9906.29 sq. m; net area 9906.29 sq. m.
DTCP draft-layout area: Net layout area Ac. 2.4479 Cents; 11847.83 Sq. Yds.; total area Ac.2.475 Cents; 11979.00 Sq. Yds., including a buffer zone of Ac.0.0271 Cents; 131.43 Sq. Yds.
Boundaries stated in RERA fields: North: BUFFER ZONE and CANAL; South: OTHERS LAND; East: 33-0 WIDE ROAD; West: OTHERS LAND.
Development identity
Sanctioning authority: District Town and Country Planning Officer, Mahabubnagar District (DTCP); the draft layout document delegates specified follow-up/release functions to Addakal Gram Panchayat.
Principal layout approval: TLP.NO.03/2025/DTCPO/MBNR, dated 09.01.2025; described in the document as a Draft Technical Layout Pattern for Residential Plots.
Other approval references shown: File No. Lr.Roc.No.01/2025/DTCPO/MBNR; application No. 10262/785/2025. The drawing also shows DTLP No.01/2024 DCPO/MBAR and C.No. 01/2025/DTCPO/MBNR.
Approved built-up area / buildings / floors: Not disclosed in the supplied plotted-layout record; building-floor configuration is not applicable to the layout information provided.
Plots: 39 plots in the DTCP draft layout.
Layout land-use figures in draft approval: Open space: Ac. 0.2477 cents (10.12%), 1198.87 Sq. Yds.; roads: Ac:0.6583 cents (26.89%), 3186.17 Sq. Yds.; plotted area: Ac. 1.5419 Cents (62.99%), 7462.79 Sq. Yds.; mortgage area: Ac.0.2315 Cents (15.01%), 1120.46 Sq. Yds.
Parking: No parking-space count or parking arrangement is stated in the supplied project data.
Offering and status
Offering: Residential plots; the DTCP draft layout lists 39 plots. Plot-by-plot dimensions, price range and current inventory are not supplied here.
Booked / available: Not disclosed in the supplied project records.
Construction / development stage: The RERA record labels the project “New Project.” The DTCP document is a draft layout approval subject to conditions; no independently verified site-progress record is supplied.
Completion date: The Form B declaration undertakes completion before 9th January, 2027.
Registration validity: 09/01/2025–09/01/2027; this is the registration period, not itself a completion or occupancy certificate.
Occupancy / completion certificate: No occupancy or completion certificate is included in the supplied evidence; the project is a plotted layout.
2. The project story
Gayathri Enclave Phase II is presented in the TG-RERA filing as a residential plotted development in Addakal village, Addakal Mandal, Mahabubnagar District, covering Survey Nos. 28/P, 29/P, 30/P and 31/P. The DTCP document describes a 39-plot layout, with internal road and open-space allocations, and identifies a portion of the plotted land for mortgage to the Gram Panchayat.
The DTCP record is specifically a draft technical layout pattern, with conditions to be met before final layout release. The supplied documents do not establish the current on-site development stage or independently verify that roads, open spaces, utilities or other works have been completed. The promoter’s Form B declaration states a completion undertaking before 9 January 2027; this is a promoter declaration, not a verified completion status.
3. Master plan, architecture & building design
The available design evidence concerns a plotted layout rather than buildings. The DTCP draft layout identifies 39 plots across a stated net layout area of Ac. 2.4479 Cents; 11847.83 Sq. Yds. It assigns Ac. 0.2477 cents (10.12%), 1198.87 Sq. Yds. to open space, Ac:0.6583 cents (26.89%), 3186.17 Sq. Yds. to roads, and Ac. 1.5419 Cents (62.99%), 7462.79 Sq. Yds. to plotted area. The document separately identifies Ac.0.2315 Cents (1120.46 Sq. Yds.) as the mortgage area, comprising Plot Nos. 18, 19, 34, 35, 36 and 37.
Road widths shown in the approval record include 31-0" wide, 33-0" wide, 33'-0" wide and 31 WIDE. The approval requires roads to be opened for access to neighbouring sites. No building footprints, building heights, floor levels, plot-size schedule, landscaping design or final released layout drawing is available in the supplied material.
4. Homes, configurations & floor plans
This is a plotted development; apartment configurations and apartment carpet-area measurements are not available. The DTCP draft layout specifies 39 plots, but the supplied extract does not provide individual plot numbers beyond identifying the six mortgage-reserved plots, or plot-by-plot dimensions.
The available floor-plan record contains one drawing, but it is pending scan and has 0 measured plans. Accordingly, no software-measured plot or building dimensions can be reported.
5. Parking & vehicle circulation
The supplied records do not state a parking-space count, visitor or accessible parking provision, parking allocation to individual plots, EV charging, or parking layout. The DTCP draft approval does identify internal roads and requires that they remain open for access to neighbouring sites; detailed driveway dimensions and pedestrian/vehicle separation are not disclosed in the supplied extract.
6. Amenities, recreation & open spaces
The TG-RERA amenity record lists the following facilities. The filed progress percentages are 0 where shown; these figures do not establish independent site verification.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal Roads & Footpaths | No size or specification supplied | Listed “YES”; progress 0; completion not independently verified | |
| Water Supply | No source, capacity or storage details supplied | Listed “YES”; progress 0; completion not independently verified | |
| Sewerage (Chamber, Lines, Septic Tank, STP) | No system type or capacity details supplied | Listed “YES”; progress 0; completion not independently verified | |
| Storm Water Drains | No size or network details supplied | Listed; progress 0; completion not independently verified | |
| Green Strip/TOT LOT/Park | No additional dimensions stated in the amenity entry; draft-layout open space is Ac. 0.2477 cents (10.12%), 1198.87 Sq. Yds. | Listed “YES”; progress 0; completion not independently verified | |
| Street Lighting | No specification supplied | Listed “YES”; progress 0; completion not independently verified | |
| Community Buildings | No type, size or capacity supplied | Listed; progress 0; completion not independently verified | |
| Treatment and Disposal of Sewage and Sullage Water | No system or capacity details supplied | Listed; progress 0; completion not independently verified | |
| Solid Waste Management and Disposal | No method or capacity supplied | Listed; progress 0; completion not independently verified | |
| Water Conservation, Rain Water Harvesting | No system or capacity supplied | Listed “YES”; progress 0; completion not independently verified | |
| Energy management | No system or capacity supplied | Listed; progress 0; completion not independently verified | |
| Fire Protection and Fire Safety Requirements | No system details supplied | Listed; progress 0; completion not independently verified | |
| Electrical Meter Room, Sub-Station, Receiving Station | No capacity or location supplied | Listed; progress 0; completion not independently verified | |
| Aggregate area of recreational Open Space | No separate amenity-entry figure; draft layout states Ac. 0.2477 cents (10.12%), 1198.87 Sq. Yds. as open space | Listed; progress 0; completion not independently verified |
7. Utilities, building services & safety
The RERA amenity list includes water supply, sewerage-related works, storm-water drains, rain-water harvesting, street lighting, electrical meter room/sub-station/receiving station, fire-protection requirements, sewage and sullage treatment, and solid-waste management. It does not provide system capacities, technical specifications, design details or evidence of completed installation. These are recorded as listed project provisions, not verified operational services.
The DTCP draft conditions also refer to leaving the required width of land along any Mission Bhagiratha water pipeline passing through the site, and to shifting or realigning electrical lines along existing and proposed roads before the final-layout proposal. The supplied record does not establish whether either condition applies on site or has been completed.
8. Location, access & connectivity
The registered site is in Addakal village, Addakal Mandal, Mahabubnagar District, Telangana, PIN 509382. The supplied cadastral parcel centroid is 16.50618, 77.93279; this is a parcel-centroid location, not a surveyed entrance point.
The RERA land-boundary description identifies a 33-0 WIDE ROAD on the east, other land on the west and south, and a buffer zone and canal on the north. The DTCP draft layout shows internal roads including widths of 31-0", 33-0", 33'-0" and 31 WIDE, and requires access to neighbouring sites. The location data lists the nearest sampled Outer Ring Road interchange at approximately 96.3 km. No public-transport details, travel times or additional verified landmark distances are supplied.
9. Developer & development status
The TG-RERA certificate names CHAKALI YADAGIRI as the registered promoter and identifies his address as House No. 14-63/A-208, Medipally, Medipally Mandal, Medchal-Malkajgiri District, Telangana, PIN 500098. The project identity record gives the promoter name as CHAKALI; the legal entity type and further corporate identifiers are not established in the supplied evidence.
The Form B filing is a promoter declaration by four deponents—Chakali Yadagiri, Chinthala Venkateshwarlu, Badugula Praveen Kumar and Haritha Gunda. It declares ownership of the layout land, states that the land is free from encumbrances, and undertakes completion before 9 January 2027. These are the deponents’ statements in the filing.
The RERA record describes a new project; no independently verified construction progress is provided. The registration certificate is valid through 09/01/2027, while the Form B completion undertaking is before 9 January 2027; these are distinct recorded dates.
10. Approvals, official records & documents
TG-RERA Form C certificate, P01400009665: Project name, promoter CHAKALI YADAGIRI, site surveys 28/P, 29/P, 30/P and 31/P, and registration validity 09/01/2025–09/01/2027.
DTCP draft layout approval, TLP.NO.03/2025/DTCPO/MBNR, 09.01.2025: Draft Technical Layout Pattern for 39 residential plots in Survey Nos. 28/P, 29/P, 30/P & 31/P, Addakal; subject to stated conditions and later Gram Panchayat release/final-layout requirements.
DTCP application and file references: Application No. 10262/785/2025 and File No. Lr.Roc.No.01/2025/DTCPO/MBNR.
Form B affidavit-cum-declaration: Promoter-side declarations concerning ownership, encumbrances, project accounts, approvals and completion before 9 January 2027.
Document No. 3250/2025, dated 21-03-2025: Supplied OCR identifies a registered gift deed involving portions of Survey Nos. 28, 29, 30 and 31 at Addakal; the extraction does not provide readable approval terms or a complete instrument schedule.
Document No. 3251/2025, dated 21-03-2025: Supplied OCR identifies a registered mortgage deed involving portions of Survey Nos. 28, 29, 30 and 31 at Addakal; the extraction does not provide readable approval terms or a complete instrument schedule.
Commencement / occupancy certificates: No separate building commencement certificate or occupancy/completion certificate is established by the supplied documents. The document labelled as commencement certificates includes the DTCP draft layout approval and deed-related material.
Frequently asked questions
Is GAYATHRI ENCLAVE PHASE - II registered with Telangana RERA?
Yes. GAYATHRI ENCLAVE PHASE - II is registered with the Telangana Real Estate Regulatory Authority as P01400009665; the registration status is New Project.
Who is the developer of GAYATHRI ENCLAVE PHASE - II?
The promoter named in the RERA registration is CHAKALI.
Where is GAYATHRI ENCLAVE PHASE - II located?
GAYATHRI ENCLAVE PHASE - II is in Addakal, Mahabubnagar, Telangana (509382).
When will GAYATHRI ENCLAVE PHASE - II be completed?
The promoter's proposed date of completion filed with RERA is 09/05/2027. This is the promoter's declaration, not a guarantee.