Sumangali Mohana Mall
SANKALP KAKATIYA ASSOCIATES · Hanamkonda · RERA P00300011415
SUMANGALI MOHANA MALL is a commercial project in Waddepally, Hanamkonda mandal, Warangal Urban district, developed by registered promoter SANKALP KAKATIYA ASSOCIATES. It has a net plot area of 3289.94 sq. m and one building with 2 Cellars + Ground Floor + 4 Upper Floors. The RERA filing lists 63 SHOP units, each with a saleable area of 104.37 sq. m. Its TG-RERA registration number is P00300011415, and its proposed completion date is 15/05/2031.
01What we found
Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.
02Check before you pay
6 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.
1. Project at a glance
Project identity
| Item | Record |
|---|---|
| Registered project name | SUMANGALI MOHANA MALL RERA record |
| Project type / status | Commercial; recorded as a new project RERA record RERA filing |
| Registered portion / phase | One commercial building is identified in the filed building-permit order; no separate phase name is disclosed. |
| TG-RERA registration | P00300011415 |
| Registration validity | 15/05/2026 to 15/05/2031; the certificate says five years, unless extended by the Authority. This is registration validity, not evidence of completion or occupancy. |
| Registered promoter | SANKALP KAKATIYA ASSOCIATES, recorded as a partnership RERA record Corporate record |
| RERA status | Registration certificate issued under section 5; certificate issue date 06/11/2026. |
Land and geographic identity
| Item | Record |
|---|---|
| Locality / revenue village | Waddepally; the filing also identifies the locality as Hanamkonda. RERA filing |
| Mandal / district / PIN | Hanamkonda / Warangal Urban / 506001 RERA record |
| Plot / door numbers | 2-6-1511, 2-6-1512, 2-6-1513, 2-6-1514 |
| Survey numbers and subdivisions | Not disclosed in the project land record. The building-permit order labels the land ABADI; this is not a survey-number identification. Land records |
| Site area | Total plot area 3508.97 sq. m; road-affected area 219.03 sq. m; net plot area 3289.94 sq. m. |
| Boundaries | North: ROAD; South: OTHER BUILDING; East: OTHER BUILDING; West: ROAD. RERA filing |
Development identity
| Item | Record |
|---|---|
| Sanctioning authority | Greater Warangal Municipal Corporation (GWMC) |
| Principal building approval | 0182/GWMC/SWBP/2026, approved 15/05/2026; file number 017462/GWMC/00400/SWBP/2026. |
| Approved built-up area | 9160.42 sq. m as recorded in the RERA project information. The permit extraction separately records commercial ground-floor area 1825.2 sq. m and commercial upper-floors area 7335.22 sq. m. RERA filing |
| Building count and configuration | One building; 2 Cellars + Ground Floor + 4 Upper Floors. RERA filing |
| Height | 17.95 m, as recorded in the permit data. |
| Parking | Cellars are approved for parking; the permit records Total Parking Area 3688.19 sq. m. A number of parking spaces is not disclosed in the supplied record. |
| Unit count | The RERA filing records 1 total/proposed building unit; the commercial shop schedule records 63 shops. The permit extraction states 0 dwelling units. RERA filing RERA unit table |
Offering and status
| Item | Record |
|---|---|
| RERA-filed configuration | SHOP — 63 units, each with filed saleable area 104.37 sq. m. RERA unit table |
| Booked / available | 0 booked; 63 available in the portal data as retrieved. The record has no as-of date, so these counts are indicative. RERA unit table |
| Completion date | The project information and Form B declaration state 15/05/2031 as the proposed/undertaken completion date. RERA filing |
| Construction stage | The supplied records establish approval and registration, but do not establish on-site construction progress. |
| Occupancy / completion certificate | No occupancy or completion certificate is supplied. The permit requires an occupancy certificate before occupation and directs the applicant to obtain one after completion; this does not establish that one has been issued. |
2. The project story
SUMANGALI MOHANA MALL is a registered commercial development in Waddepally, Hanamkonda, comprising one building sanctioned as two cellar levels, a ground floor and four upper floors. The RERA filing lists 63 shop units, each with a saleable area of 104.37 sq. m; the retrieved portal schedule shows all 63 as available, but provides no as-of date. RERA record RERA unit table
The project has a GWMC building permit dated 15/05/2026 and a TG-RERA registration valid from 15/05/2026 to 15/05/2031. The promoter’s Form B undertaking also states completion by 15/05/2031. The available evidence does not report construction progress or confirm completion or occupancy certification, so the project’s physical stage cannot be established from this record.
3. Master plan, architecture & building design
The filed permit describes a single commercial building with 2 Cellars + Ground Floor + 4 Upper Floors, height 17.95 m, on a plot with total area 3508.97 sq. m and net area 3289.94 sq. m after a recorded 219.03 sq. m road-affected portion. The permit records 9160.42 sq. m as approved built-up area in the RERA project information. It also lists ground-floor commercial area of 1825.2 sq. m and upper-floor commercial area of 7335.22 sq. m. These are the figures as stated in the respective records; no FSI-counted area, carpet-area schedule, building footprint or floor-by-floor unit arrangement is supplied. RERA filing
The permit identifies 18M road width and requires front, rear and side setbacks of 5.08 m, 6.0 m, 5.03 m and 3.01 m, respectively. A unit-level or detailed floor-plan drawing could not be measured from the supplied records: the drawing index reports one drawing, no measured drawings, and no flats detected. Floor plans
4. Homes, configurations & floor plans
This is a commercial project; the RERA filing labels its sale units SHOP. The filing provides saleable area, not carpet area. No software-measured carpet areas or room dimensions are available in the supplied drawing data. RERA unit table Floor plans
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Shop | 63 | 0 | 63 | 104.37 sq. m each | Not available | Not supplied |
The portal schedule has no as-of date, so booking and availability figures should be treated as indicative. RERA unit table
5. Parking & vehicle circulation
The building permit identifies the two cellar levels for parking and records a total parking area of 3688.19 sq. m. It requires the approved cellar and stilt areas designated for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied records do not establish the number or allocation of bays, visitor or accessible spaces, two-wheeler provision, ramps, EV charging, or any legally documented exclusive parking allocation to a shop.
6. Amenities, recreation & open spaces
The RERA amenity schedule lists the following facilities. Its progress entries are shown as 0% where supplied; no independent completion verification is provided. The building-permit order separately specifies four rainwater-harvesting pits, 50 trees, transformer space and a garbage house. RERA amenities
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Size not supplied | RERA amenity schedule RERA amenities | Listed as available: YES; 0%; not independently verified |
| Water supply | Source and capacity not supplied | RERA amenity schedule RERA amenities | Listed as available: YES; 0%; not independently verified |
| Sewerage | Schedule names chambers, lines, septic tank and STP; no capacity or configuration supplied | RERA amenity schedule RERA amenities | Listed as available: YES; 0%; not independently verified |
| Storm-water drains | Size not supplied | RERA amenity schedule RERA amenities | Listed as available: YES; 0%; not independently verified |
| Green strip / tot lot / park | Area not supplied; permit records Tot Lot 0 sq. m | RERA amenity schedule RERA amenities; building permit | Listed as available: YES; 0%; not independently verified |
| Street lighting | Details not supplied | RERA amenity schedule RERA amenities | Listed as available: YES; 0%; not independently verified |
| Community buildings | No description or size supplied | RERA amenity schedule RERA amenities | Progress recorded as 0%; availability not stated |
| Sewage and sullage treatment/disposal | Details not supplied | RERA amenity schedule RERA amenities | Progress recorded as 0%; availability not stated |
| Solid-waste management and disposal | Details not supplied | RERA amenity schedule RERA amenities | Progress recorded as 0%; availability not stated |
| Water conservation / rainwater harvesting | Permit specifies 4 rainwater-harvesting pits | RERA amenity schedule RERA amenities; building permit | Listed as available: YES; schedule records 0%; not independently verified |
| Energy management | Details not supplied | RERA amenity schedule RERA amenities | Progress recorded as 0%; availability not stated |
| Fire protection and fire safety | Systems and capacities not supplied | RERA amenity schedule RERA amenities | Listed as available: YES; 0%; not independently verified |
| Electrical meter room / sub-station / receiving station | Permit requires space for a transformer; other details not supplied | RERA amenity schedule RERA amenities; building permit | Listed as available: YES; 0%; not independently verified |
| Recreational open space | Aggregate area not supplied | RERA amenity schedule RERA amenities | Listed as available: YES; 0%; not independently verified |
| Trees | 50 trees specified | Building permit | Permit requirement; planting/completion not verified |
| Garbage house | Required within the premises | Building permit | Permit condition; completion not verified |
7. Utilities, building services & safety
The RERA amenity schedule lists water supply, sewerage, storm-water drains, fire protection and an electrical meter room/sub-station/receiving station, but the supplied data does not state capacities, designs or completion status. The permit calls for 4 rainwater-harvesting pits, transformer space and a garbage house. It also makes public water and electricity connections conditional on production of an occupancy certificate. These records describe filed or permit requirements, not verified installed services. RERA amenities
The permit states that structural and fire-safety requirements are the responsibility of the owner, builder/developer, architect and structural engineer. No fire-system specifications, lift details, backup-power capacity, CCTV, security arrangements, accessibility features or independent completion verification are supplied.
8. Location, access & connectivity
The registered location is Waddepally, Hanamkonda mandal, Warangal Urban district, PIN 506001; the project plot/door numbers are 2-6-1511, 2-6-1512, 2-6-1513 and 2-6-1514. The permit describes the locality as SRINIVASA COLONY, NGO S COLONY ROAD, HANAMKONDA and records an 18M road width. The parcel boundaries identify roads to the north and west. RERA filing
The supplied location data gives the nearest sampled Outer Ring Road interchange as approximately 155.4 km. No other measured distances, public-transport details or useful landmark distances are supplied. Location record
9. Developer & development status
The registered promoter is SANKALP KAKATIYA ASSOCIATES, recorded as a partnership. The supplied promoter address is KRISHNA SAI ENCLAVE, SAHAKAR NAGAR, NGOS COLONY ROAD, HANAMKONDA, Hanamkonda, Warangal Urban, 506001. A registered office contact number, email address or website is not supplied. Corporate record Parties record
The Form B declaration states a completion undertaking of 15/05/2031. The registration certificate is valid through that date, but registration validity and the declared completion date are distinct records; neither establishes that construction is complete. No construction-progress percentage or site-verified stage is available.
10. Approvals, official records & documents
| Supplied evidence | P00300011415, Form C; issued 06/11/2026; valid 15/05/2026–15/05/2031 |
|---|---|
| Scope / note | SUMANGALI MOHANA MALL |
| Supplied evidence | GWMC approval 0182/GWMC/SWBP/2026, dated 15/05/2026; file 017462/GWMC/00400/SWBP/2026 |
|---|---|
| Scope / note | Commercial building at Waddepally |
| Supplied evidence | Promoter undertaking, including completion date 15/05/2031 |
|---|---|
| Scope / note | Promoter declaration; not a completion certificate |
| Supplied evidence | Advocate’s title search report dated 08-08-2026 |
|---|---|
| Scope / note | Filed document; detailed title-chain issues are addressed in the Land & Title section |
| Supplied evidence | Registered instrument 6428/2026, referenced in the title-report materials |
|---|---|
| Scope / note | Development-rights document |
| Supplied evidence | Registered mortgage deed 8232/2026, dated 13/05/2026 |
|---|---|
| Scope / note | Permit records a mortgage over 962.53 sq. m on the third and fourth floors |
| Supplied evidence | Not supplied |
|---|---|
| Scope / note | The permit requires an occupancy certificate before occupation; the supplied record does not establish issuance. |
1. Project at a glance
Project identity
Registered project name: SUMANGALI MOHANA MALL
Project type / status: Commercial; recorded as a new project
Registered portion / phase: One commercial building is identified in the filed building-permit order; no separate phase name is disclosed.
TG-RERA registration: P00300011415
Registration validity: 15/05/2026 to 15/05/2031; the certificate says five years, unless extended by the Authority. This is registration validity, not evidence of completion or occupancy.
Registered promoter: SANKALP KAKATIYA ASSOCIATES, recorded as a partnership
RERA status: Registration certificate issued under section 5; certificate issue date 06/11/2026.
Land and geographic identity
Locality / revenue village: Waddepally; the filing also identifies the locality as Hanamkonda.
Mandal / district / PIN: Hanamkonda / Warangal Urban / 506001
Plot / door numbers: 2-6-1511, 2-6-1512, 2-6-1513, 2-6-1514
Survey numbers and subdivisions: Not disclosed in the project land record. The building-permit order labels the land ABADI; this is not a survey-number identification.
Site area: Total plot area 3508.97 sq. m; road-affected area 219.03 sq. m; net plot area 3289.94 sq. m.
Boundaries: North: ROAD; South: OTHER BUILDING; East: OTHER BUILDING; West: ROAD.
Development identity
Sanctioning authority: Greater Warangal Municipal Corporation (GWMC)
Principal building approval: 0182/GWMC/SWBP/2026, approved 15/05/2026; file number 017462/GWMC/00400/SWBP/2026.
Approved built-up area: 9160.42 sq. m as recorded in the RERA project information. The permit extraction separately records commercial ground-floor area 1825.2 sq. m and commercial upper-floors area 7335.22 sq. m.
Building count and configuration: One building; 2 Cellars + Ground Floor + 4 Upper Floors.
Height: 17.95 m, as recorded in the permit data.
Parking: Cellars are approved for parking; the permit records Total Parking Area 3688.19 sq. m. A number of parking spaces is not disclosed in the supplied record.
Unit count: The RERA filing records 1 total/proposed building unit; the commercial shop schedule records 63 shops. The permit extraction states 0 dwelling units.
Offering and status
RERA-filed configuration: SHOP — 63 units, each with filed saleable area 104.37 sq. m.
Booked / available: 0 booked; 63 available in the portal data as retrieved. The record has no as-of date, so these counts are indicative.
Completion date: The project information and Form B declaration state 15/05/2031 as the proposed/undertaken completion date.
Construction stage: The supplied records establish approval and registration, but do not establish on-site construction progress.
Occupancy / completion certificate: No occupancy or completion certificate is supplied. The permit requires an occupancy certificate before occupation and directs the applicant to obtain one after completion; this does not establish that one has been issued.
2. The project story
SUMANGALI MOHANA MALL is a registered commercial development in Waddepally, Hanamkonda, comprising one building sanctioned as two cellar levels, a ground floor and four upper floors. The RERA filing lists 63 shop units, each with a saleable area of 104.37 sq. m; the retrieved portal schedule shows all 63 as available, but provides no as-of date.
The project has a GWMC building permit dated 15/05/2026 and a TG-RERA registration valid from 15/05/2026 to 15/05/2031. The promoter’s Form B undertaking also states completion by 15/05/2031. The available evidence does not report construction progress or confirm completion or occupancy certification, so the project’s physical stage cannot be established from this record.
3. Master plan, architecture & building design
The filed permit describes a single commercial building with 2 Cellars + Ground Floor + 4 Upper Floors, height 17.95 m, on a plot with total area 3508.97 sq. m and net area 3289.94 sq. m after a recorded 219.03 sq. m road-affected portion. The permit records 9160.42 sq. m as approved built-up area in the RERA project information. It also lists ground-floor commercial area of 1825.2 sq. m and upper-floor commercial area of 7335.22 sq. m. These are the figures as stated in the respective records; no FSI-counted area, carpet-area schedule, building footprint or floor-by-floor unit arrangement is supplied.
The permit identifies 18M road width and requires front, rear and side setbacks of 5.08 m, 6.0 m, 5.03 m and 3.01 m, respectively. A unit-level or detailed floor-plan drawing could not be measured from the supplied records: the drawing index reports one drawing, no measured drawings, and no flats detected.
4. Homes, configurations & floor plans
This is a commercial project; the RERA filing labels its sale units SHOP. The filing provides saleable area, not carpet area. No software-measured carpet areas or room dimensions are available in the supplied drawing data.
| Configuration | Units | Booked | Available | RERA saleable area | Measured carpet area | Loading (if supplied) |
|---|---|---|---|---|---|---|
| Shop | 63 | 0 | 63 | 104.37 sq. m each | Not available | Not supplied |
The portal schedule has no as-of date, so booking and availability figures should be treated as indicative.
5. Parking & vehicle circulation
The building permit identifies the two cellar levels for parking and records a total parking area of 3688.19 sq. m. It requires the approved cellar and stilt areas designated for parking to be used exclusively for vehicle parking, without partition walls or rolling shutters. The supplied records do not establish the number or allocation of bays, visitor or accessible spaces, two-wheeler provision, ramps, EV charging, or any legally documented exclusive parking allocation to a shop.
6. Amenities, recreation & open spaces
The RERA amenity schedule lists the following facilities. Its progress entries are shown as 0% where supplied; no independent completion verification is provided. The building-permit order separately specifies four rainwater-harvesting pits, 50 trees, transformer space and a garbage house.
| Facility | Description / size | Evidence source | Declared progress / verified status |
|---|---|---|---|
| Internal roads & footpaths | Size not supplied | RERA amenity schedule | Listed as available: YES; 0%; not independently verified |
| Water supply | Source and capacity not supplied | RERA amenity schedule | Listed as available: YES; 0%; not independently verified |
| Sewerage | Schedule names chambers, lines, septic tank and STP; no capacity or configuration supplied | RERA amenity schedule | Listed as available: YES; 0%; not independently verified |
| Storm-water drains | Size not supplied | RERA amenity schedule | Listed as available: YES; 0%; not independently verified |
| Green strip / tot lot / park | Area not supplied; permit records Tot Lot 0 sq. m | RERA amenity schedule; building permit | Listed as available: YES; 0%; not independently verified |
| Street lighting | Details not supplied | RERA amenity schedule | Listed as available: YES; 0%; not independently verified |
| Community buildings | No description or size supplied | RERA amenity schedule | Progress recorded as 0%; availability not stated |
| Sewage and sullage treatment/disposal | Details not supplied | RERA amenity schedule | Progress recorded as 0%; availability not stated |
| Solid-waste management and disposal | Details not supplied | RERA amenity schedule | Progress recorded as 0%; availability not stated |
| Water conservation / rainwater harvesting | Permit specifies 4 rainwater-harvesting pits | RERA amenity schedule; building permit | Listed as available: YES; schedule records 0%; not independently verified |
| Energy management | Details not supplied | RERA amenity schedule | Progress recorded as 0%; availability not stated |
| Fire protection and fire safety | Systems and capacities not supplied | RERA amenity schedule | Listed as available: YES; 0%; not independently verified |
| Electrical meter room / sub-station / receiving station | Permit requires space for a transformer; other details not supplied | RERA amenity schedule; building permit | Listed as available: YES; 0%; not independently verified |
| Recreational open space | Aggregate area not supplied | RERA amenity schedule | Listed as available: YES; 0%; not independently verified |
| Trees | 50 trees specified | Building permit | Permit requirement; planting/completion not verified |
| Garbage house | Required within the premises | Building permit | Permit condition; completion not verified |
7. Utilities, building services & safety
The RERA amenity schedule lists water supply, sewerage, storm-water drains, fire protection and an electrical meter room/sub-station/receiving station, but the supplied data does not state capacities, designs or completion status. The permit calls for 4 rainwater-harvesting pits, transformer space and a garbage house. It also makes public water and electricity connections conditional on production of an occupancy certificate. These records describe filed or permit requirements, not verified installed services.
The permit states that structural and fire-safety requirements are the responsibility of the owner, builder/developer, architect and structural engineer. No fire-system specifications, lift details, backup-power capacity, CCTV, security arrangements, accessibility features or independent completion verification are supplied.
8. Location, access & connectivity
The registered location is Waddepally, Hanamkonda mandal, Warangal Urban district, PIN 506001; the project plot/door numbers are 2-6-1511, 2-6-1512, 2-6-1513 and 2-6-1514. The permit describes the locality as SRINIVASA COLONY, NGO S COLONY ROAD, HANAMKONDA and records an 18M road width. The parcel boundaries identify roads to the north and west.
The supplied location data gives the nearest sampled Outer Ring Road interchange as approximately 155.4 km. No other measured distances, public-transport details or useful landmark distances are supplied.
9. Developer & development status
The registered promoter is SANKALP KAKATIYA ASSOCIATES, recorded as a partnership. The supplied promoter address is KRISHNA SAI ENCLAVE, SAHAKAR NAGAR, NGOS COLONY ROAD, HANAMKONDA, Hanamkonda, Warangal Urban, 506001. A registered office contact number, email address or website is not supplied.
The Form B declaration states a completion undertaking of 15/05/2031. The registration certificate is valid through that date, but registration validity and the declared completion date are distinct records; neither establishes that construction is complete. No construction-progress percentage or site-verified stage is available.
10. Approvals, official records & documents
| Supplied evidence | P00300011415, Form C; issued 06/11/2026; valid 15/05/2026–15/05/2031 |
|---|---|
| Scope / note | SUMANGALI MOHANA MALL |
| Supplied evidence | GWMC approval 0182/GWMC/SWBP/2026, dated 15/05/2026; file 017462/GWMC/00400/SWBP/2026 |
|---|---|
| Scope / note | Commercial building at Waddepally |
| Supplied evidence | Promoter undertaking, including completion date 15/05/2031 |
|---|---|
| Scope / note | Promoter declaration; not a completion certificate |
| Supplied evidence | Advocate’s title search report dated 08-08-2026 |
|---|---|
| Scope / note | Filed document; detailed title-chain issues are addressed in the Land & Title section |
| Supplied evidence | Registered instrument 6428/2026, referenced in the title-report materials |
|---|---|
| Scope / note | Development-rights document |
| Supplied evidence | Registered mortgage deed 8232/2026, dated 13/05/2026 |
|---|---|
| Scope / note | Permit records a mortgage over 962.53 sq. m on the third and fourth floors |
| Supplied evidence | Not supplied |
|---|---|
| Scope / note | The permit requires an occupancy certificate before occupation; the supplied record does not establish issuance. |
Frequently asked questions
Is SUMANGALI MOHANA MALL registered with Telangana RERA?
Yes. SUMANGALI MOHANA MALL is registered with the Telangana Real Estate Regulatory Authority as P00300011415; the registration status is New Project.
Who is the developer of SUMANGALI MOHANA MALL?
The promoter named in the RERA registration is SANKALP KAKATIYA ASSOCIATES.
Where is SUMANGALI MOHANA MALL located?
SUMANGALI MOHANA MALL is in HANAMKONDA, Waddepally, Telangana (506001).
When will SUMANGALI MOHANA MALL be completed?
The promoter's proposed date of completion filed with RERA is 15/05/2031. This is the promoter's declaration, not a guarantee.