TRIPURAS GREEN ALPHA is a residential apartment project in TELLAPUR, RC PURAM, Sangareddy. It is being developed by registered promoter Tripura Constructions on a site extent of 21,749.98 Sq. Mt., with six residential blocks of 3Stilt + 10 floors and a commercial clubhouse building of 1Ground + 4 floors. The RERA unit schedule lists 515 apartments: 140 2BHK and 375 3BHK. The project is registered under TG-RERA number P01100002169, and the project header lists proposed completion as 30/11/2026.

📘 Project brochure from the promoter’s website ↗

More from Tripura Constructions · 5 projects →

01What we found

Period endedTG-RERA registration ran to 31 Jul 2024 - check its extension on TG-RERA
24documents on file - each fact links to its page
0court cases on this project's land in the court records searched
9items to check - 3 high

Read from TG-RERA filings, approvals, land and registration records and court records. A court case is counted only when the court record states this project's survey number with its village, or names the project.

02Check before you pay

9 items to check before you pay, 3 high - from the title chain, court records and approvals, each with what to ask the builder or your advocate. An item may not be a problem with the project: records can be incomplete.

Sign in to see each item and what to do

1. Project at a glance

Project identity

ItemProject record
Registered project nameTRIPURAS GREEN ALPHA RERA record
Project typeResidential apartment project RERA record
Phase / registered portionThe available certificate and approval identify the registered project; a separate phase name or phase boundary is not disclosed.
TG-RERA registrationP01100002169
Registration validityValid from 16/09/2020 through 31/07/2024; the certificate records three years’ validity and the registration record says no extension. Registration validity is separate from the stated project completion date.
Registered promoterTripura Constructions
RERA statusThe registration certificate’s stated validity ended on 31/07/2024; the supplied record does not show an extension.

Land and geographic identity

ItemProject record
LocalityTELLAPUR RERA record
Revenue villageTELAPUR in the project identity and RERA certificate; the HMDA technical-approval extraction describes the site as Tellapur Village. RERA record
MandalRC PURAM RERA record
DistrictSangareddy RERA record
PIN502032 RERA record
Project survey numbers and subdivisions368/AA2, 368/EE1/2, 368/EE2, 368/U, 368/U3 and 368/U4 RERA record
Registered site extent21,749.98 Sq. Mt.
RERA-filed total / net land areaTotal area 21,749.98 sq. m; net area 21,749.98 sq. m. RERA filing Land records
Boundaries (RERA-filed)East: VACANT LAND; West: VACANT LAND; North: VACANT LAND; South: ROAD WIDTH 18 MTR. RERA filing

Development identity

ItemProject record
Sanctioning authorityHyderabad Metropolitan Development Authority (HMDA); the technical approval states that building plans are subject to sanction and release by the local Executive Authority.
Principal technical approval020648/SKP/R1/U6/HMDA/20022019, dated 26/06/2020. The RERA filing displays plan approval number 020648/SKP/R1/U6/HMD. RERA filing
Proposed built-up area86,582.72 sq. m RERA filing
Total built-up area figure in approval extraction115,014.82 sq. m; the extraction separately identifies 86,582.72 sq. m as proposed built-up area.
BuildingsSix residential blocks—A, B, C, D, E and F—and one commercial clubhouse building are listed in the technical approval.
Sanctioned floor configurationResidential Blocks A–F: 3Stilt + 10 each. Club House: 1Ground + 4.
Parking levels / provisionThe approval extraction states that the silts/cellar are to be used exclusively for vehicle parking, without partition walls and rolling shutters. It does not provide a parking-space count or unit allocation.
Approved and RERA-filed home countThe project information records 6 total building units and 6 proposed building units. The RERA unit schedule records 515 apartments: 140 2BHK and 375 3BHK. RERA filing RERA unit details
Occupancy / completion certificateThe supplied technical-approval extraction does not certify completion or occupancy; it states that occupancy requires a “Fit for Occupancy” certificate from the Executive Authority. No project OC is supplied.

Offering and status

ItemProject record
RERA-filed configurations2BHK and 3BHK RERA unit details
RERA-filed saleable areas2BHK: 117.52 sq. m; 3BHK: 170.11 sq. m RERA unit details
Booked / available (portal record; no as-of date supplied)2BHK: 47 booked / 93 available; 3BHK: 115 booked / 260 available. Treat counts as indicative because the portal extract has no as-of date. RERA unit table RERA unit details
Completion datesThe promoter’s Form B undertaking states 31/07/2024; the project header lists proposed completion 30/11/2026. The evidence does not establish a RERA-approved extension or revised deadline. RERA record
Construction stageThe RERA amenity record provides percentages for selected infrastructure items, but no overall construction-completion percentage or independently verified site-progress report is supplied. RERA amenities
OC status and scopeNo occupancy certificate is supplied for the project or for any individual block. Document index

2. The project story

TRIPURAS GREEN ALPHA is a residential apartment development registered under TG-RERA number P01100002169 at Tellapur, in Sangareddy district. The RERA-filed land schedule identifies survey subdivisions 368/AA2, 368/EE1/2, 368/EE2, 368/U, 368/U3 and 368/U4, with a site extent of 21,749.98 sq. m. RERA record

The HMDA technical-approval extraction describes six residential blocks, each with 3Stilt + 10 floors, and a clubhouse building with 1Ground + 4 floors. The RERA unit schedule lists 515 homes in 2BHK and 3BHK configurations. These are approval and filing records; they do not establish that construction is complete or that any block has received an occupancy certificate. RERA unit details

The RERA amenity schedule reports varying progress percentages for listed infrastructure and services. No overall construction-progress figure, independent site inspection, block-wise completion status, or OC is included in the supplied evidence. RERA amenities Document index

3. Master plan, architecture & building design

The HMDA technical approval covers a site extent of 21,749.98 Sq. Mt. and lists a proposed built-up area of 86,582.72 sq. m; it also gives a separate total built-up-area figure of 115,014.82 sq. m. These figures are reported as stated in the approval extraction, not as carpet area or saleable area.

The approval identifies six residential buildings—Blocks A through F—and a commercial clubhouse. Each residential block is recorded as 3Stilt + 10; the clubhouse is 1Ground + 4. The extraction lists residential block heights of 29.9 and clubhouse height of 14.95, without a unit stated in the supplied field.

The approval extraction names a transformer, garbage house, rainwater-harvesting structure (percolation pit) and sewage treatment plant, and specifies separate underground and residential terrace water tanks of 25,000 lts. capacity each. It also states that silts/cellar are for vehicle parking.

The available material does not provide readable, drawing-derived information on building footprints, flats per floor, lift and stair numbers, internal road geometry, tower orientation, open-space dimensions, or the distribution of residential and common-area floor space. The supplied floor-plan set has 16 drawings, none yet software-measured; all are listed as scans pending. Floor plans

4. Homes, configurations & floor plans

The RERA unit schedule lists 140 2BHK and 375 3BHK apartments. Booked and available counts below are from the TG-RERA portal record, which has no as-of date and should be treated as indicative. RERA unit details RERA unit table

ConfigurationUnitsBookedAvailableRERA saleable areaMeasured carpet areaLoading (if supplied)
2BHK1404793117.52 sq. mNot available: no floor plans have been software-measured.Not supplied
3BHK375115260170.11 sq. mNot available: no floor plans have been software-measured.Not supplied

The 16 supplied floor-plan drawings are scans pending review; therefore, no drawing-based carpet area, room dimensions, balcony or utility measurements, orientation, or typical-floor layout can be reported as software-measured. RERA saleable area is the filed area measure; a carpet-area measurement is not available in the reviewed drawings. Floor plans RERA unit details

5. Parking & vehicle circulation

The HMDA technical-approval extraction states that the silts/cellar are to be used exclusively for vehicle parking, without partition walls and rolling shutters. The RERA filing reports mortgage area of 13,308.62 sq. m, but that figure is not a parking-space count. RERA filing

The supplied evidence does not establish the sanctioned number of car or two-wheeler spaces, visitor or accessible parking, parking allocation to particular apartments, ramp and driveway arrangements, pedestrian separation, or EV-charging provision. The approval’s parking-use condition does not itself establish exclusive ownership or allocation of any bay. RERA filing

6. Amenities, recreation & open spaces

The TG-RERA amenity schedule lists infrastructure and community facilities with reported progress percentages. These figures are RERA-recorded progress entries, not an independent verification of completion. RERA amenities

FacilityDescription / sizeEvidence sourceDeclared progress / verified status
Community buildingsNo size or facility breakdown supplied.RERA amenity schedule50% reported; not independently verified. RERA amenities
Green strip / tot lot / parkNo area or capacity supplied.RERA amenity schedule0% reported; not independently verified. RERA amenities
Aggregate recreational open spaceNo area supplied.RERA amenity schedule0% reported; not independently verified. RERA amenities

The HMDA technical-approval extraction also identifies a clubhouse building and requires the earmarked open space to be developed and maintained as open space with greenery. The approval extraction does not provide a clubhouse size or facility inventory.

7. Utilities, building services & safety

ServiceEvidence in the project record
Water supply and storageThe RERA amenity schedule reports water supply at 80%. The HMDA technical-approval extraction specifies a separate underground static water-storage tank of 25,000 lts. and a separate residential terrace tank of 25,000 lts. capacity. The water source and treatment capacity are not established in the supplied records. RERA amenities
Sewerage and drainageThe RERA amenity schedule reports sewerage at 100%, treatment and disposal of sewage and sullage water at 50%, and storm-water drains at 80%. The approval extraction lists an STP but supplies no capacity or independent commissioning evidence. RERA amenities
Rainwater harvestingThe RERA amenity schedule reports water conservation/rainwater harvesting at 70%. The approval extraction identifies a rainwater-harvesting structure (percolation pit); completion is not independently verified. RERA amenities
Electrical servicesThe RERA amenity schedule reports the electrical meter room/sub-station/receiving station at 70%. The approval extraction requires provision for a transformer; installed capacity and permanent service status are not supplied. RERA amenities
Fire and life safetyThe RERA amenity schedule reports fire protection and fire-safety requirements at 80%. The approval extraction refers to compliance with Fire Service NOCs, but the supplied material does not establish the status or terms of a project-specific fire NOC. RERA amenities
Waste managementThe RERA amenity schedule reports solid-waste management and disposal at 60%. The approval extraction identifies a garbage house and requires a refuse chute and garbage-disposal system; delivery is not independently verified. RERA amenities
Street lighting and energy managementStreet lighting is reported at 70%; energy management is listed at 0%. RERA amenities
Lifts, accessibility and securityLift numbers/capacities, accessible circulation, ramps, CCTV, access control and other security provisions are not established by the supplied RERA and approval extracts. Document index

8. Location, access & connectivity

The supplied location record gives the Outer Ring Road (nearest sampled interchange, approx) as 7.4 km. No other measured access-road or public-transport distances are supplied. Location record

9. Developer & development status

The TG-RERA registration names Tripura Constructions as the promoter, and the project records identify its organization type as Partnership. The RERA filing names Sudhakar Pasupulati as authorized signatory and Suguna Pasupulati as partner. The supplied registered-office information is incomplete or inconsistent across records, so a verified registered-office address is not stated here. Parties record Corporate record

The project’s TG-RERA registration certificate records validity through 31/07/2024 and no extension in the supplied certificate extraction. The promoter’s Form B declaration, dated 27 July 2020, undertakes completion by 31/07/2024; the project header separately lists a proposed completion date of 30/11/2026. No RERA extension order, overall construction percentage, or occupancy certificate is supplied to establish a revised registered deadline or completed occupancy scope. RERA record Document index

10. Approvals, official records & documents

RecordWhat the supplied evidence establishes
TG-RERA registration certificateP01100002169, Form C, for TRIPURAS GREEN ALPHA; states validity from 16/09/2020 to 31/07/2024.
HMDA technical approvalTechnical approval 020648/SKP/R1/U6/HMDA/20022019, dated 26/06/2020, for the listed residential blocks and clubhouse. The extraction states that building plans are subject to sanction and release by the local Executive Authority.
Building and layout-plan recordsThe RERA document register includes layout-plan/building-plan entries, but the supplied entries are not extracted into readable plan content. No independently accessible approved-layout drawing is provided here. Document index
Commencement / completion / occupancyThe approval document is titled “Commencement Certificates for each building in each phase,” but its extracted contents describe HMDA technical approval subject to local sanction and release. No project completion certificate or occupancy certificate is supplied. Document index
Promoter’s Form BForm B declaration by partner Pasupulati Sudhakar, dated 27 July 2020, including the promoter’s title and encumbrance declarations and a completion undertaking of 31/07/2024. These are promoter declarations.
HMDA mortgage records cited in approvalThe approval extraction cites registered mortgage deed 13994/2020 and additional built-up-area mortgage document 13993/2020 in favour of HMDA.

Frequently asked questions

Is TRIPURAS GREEN ALPHA registered with Telangana RERA?

Yes. TRIPURAS GREEN ALPHA is registered with the Telangana Real Estate Regulatory Authority as P01100002169; the registration status is New Project.

Who is the developer of TRIPURAS GREEN ALPHA?

The promoter named in the RERA registration is Tripura Constructions.

Where is TRIPURAS GREEN ALPHA located?

TRIPURAS GREEN ALPHA is in TELLAPUR, TELAPUR, RC PURAM, Sangareddy, Telangana (502032).

When will TRIPURAS GREEN ALPHA be completed?

The promoter's proposed date of completion filed with RERA is 30/11/2026. This is the promoter's declaration, not a guarantee.

More projects in Telapur